RFI_Answers-July_7,_2018.pdf

PDF 193 KB Posted

Attached to
Renovate Hangar 885 Federal contract opportunity
Solicitation number
W9136418B5000
Issued by
Department of the Army Ohio Army National Guard

About this file

RFI Answers July 7, 2018

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Hangar 885, newest first.
File Type Posted
Bid_Opening_Sign_In_W91364-18-B-5000.pdf PDF
Final_Bid_Opening_DOC_Abstract_of_offers_18B5000.pdf PDF
Amendment_6_Drawings.pdf PDF
Amendment_6_RFI_Questions-Answers-July_20_2018.pdf PDF
26_2500_-_ENCLOSED_BUS_ASSEMBLIES.PDF PDF
W91364-18-B-5000-0006.pdf PDF
W91364-18-B-5000-0005.pdf PDF
Amendment_4_RFI_Questions-Answers-July_17_2018.pdf PDF
Amendment_4_Civil_-_C300_Site_Plan.pdf PDF
Amendment_4_ARCH_-_7.17.2018.pdf PDF
Amendment_4_HVAC_-_7.17.2018.pdf PDF
Amendment_4_ELEC_-_7.17.2018.pdf PDF
ANGETL_15-01-03,_Fire_Prot_Design_Policy.pdf PDF
Amendment_4_drawing_narrative.pdf PDF
W91364-18-B-5000-0004.pdf PDF
321216_-_ASPHALT_PAVING.pdf PDF
323113_-_CHAIN_LINK_FENCES_AND_GATES.pdf PDF
W9136418B5000-Amendment_0003.pdf PDF
OH1180099_7-06-2018_Franklin_County.pdf PDF
RFI_Questions-Answers-July_13,_2018.pdf PDF
Pre-Bid_Conference_Renovate_Hangar_-6_Jul_18-_18B5000.pdf PDF
885F_1981Reno.pdf PDF
885S_1981Reno.pdf PDF
W9136418B5000-Amendment_0002.pdf PDF
885A_1981Reno.pdf PDF
RFI__Answer-July_10,_2018.pdf PDF
6JUL18_885_Site_Visit_Sign_In_Sheet.pdf PDF
885H_1981Reno.pdf PDF
885S_1953.pdf PDF
885E__1981Reno.pdf PDF
OH118_6-15-2018-Franklin.pdf PDF
W9136418B5000_Hangar_885_Survey_Reports_and_Sampling_Data.pdf PDF
W91364-18-B-5000_Amendment_0001_RENOVATE_BLDG_885.pdf PDF
27JUN18_Site_Visit_Docs.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_3_of_3.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_01-IFB.pdf PDF
SECTION_013100_Govt_Specific_Addendum.pdf PDF
W91364-18-B-5000_RENOVATE_BLDG_885.pdf PDF
18B5000_-_JA_Manaco_Fire_Alarm_System.pdf PDF
18B5000_JA_Project_Mates.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_1_of_3_.pdf PDF
W9136418B5000-_RFI_template.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_02-IFB.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_2_of_3.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_01-IFB.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91364-18-B-5000 Renovate Hangar 885

Rickenbacker ANGB, Columbus OH

RFI 0001- Not answered yet

RFI 0002: Specification Section 028220 paragraph 1.03D states, “This specification is based on an

Asbestos Survey of the site conducted by AECOM in October 2015. Laboratory test results are on file and may be obtained for review and are attached to this specification.”

The referenced Asbestos Survey conducted by AECOM does not appear to be included with any of the

RFP documents. Please provide this survey.

Answer: The Asbestos and Lead survey is attached: Titled: W91364185000 Hangar 885 Survey Reports and Sampling Data.

RFI 0003: Section 010000 paragraph 17.11 describes the requirement to have all employees complete the AT Level I Awareness Training. The website link in paragraph 17.12.1 does not work. How long does this training take and are there any costs associated with the training?

Answer: The correct URL for AT Level I Training is: http://jko.jten.mil/courses/atl1/launch.html it is an on-line course. There is no cost associated with taking the course.

RFI 0004: Specification Section 028220 paragraph 1.05 says, “The total quantity of ACM and/or contaminated materials shall be field verified by the Asbestos Removal Contractor during the Pre-bid walkthrough. If the Asbestos Removal Contractor finds any perceived conflict, error, omission, or discrepancy in the Contract Documents, the Asbestos Removal Contractor shall submit a written request for an interpretation or clarification prior to the Bid Opening as specified in Division One of the Contract

Documents. The Asbestos Removal Contractor shall not, at any time after the Bid Opening, be compensated for a claim alleging insufficient data, incomplete Contract Documents, or incorrectly-assumed conditions regarding the amount or nature of Work, if no request for interpretation was made by the Asbestos Removal Contractor prior to the Bid Opening. “

It is an impossibility of performance to expect us to catch any errors in the government provided design

/ scope of the hazardous material abatement work by making a short visual inspection during the site visit to the facility. In addition we cannot tell by a visual inspection if a building material is hazardous or not. That determination can only be made after destructive field sampling and laboratory testing. Even if we could make a determination of whether a building material was hazardous by looking at it, there may still be hazardous materials hidden above ceilings, behind walls, underground, etc.

Please remove the paragraph noted above from the contract documents and confirm that bidding contractors should assume the only hazardous material that we are to include in our bid is the hazardous material specifically noted to be removed and that any additional hazardous material that may be discovered after award will be treated as a differing site condition.

http://jko.jten.mil/courses/atl1/launch.html

Answer: The Hazardous Material and Environmental Survey was issued as a response to RFI-0002

Revise Specification Section 028220 paragraph 1.05 to read as follows: "The Hazardous Material and

Environmental Survey indicates all areas in the building where suspected asbestos containing materials

(ACM) were tested. Therefore, all impacted ACM within the renovation or demolition area should be removed and disposed of in accordance with Federal, State, and local regulations, prior to disturbance.

ACM not impacted within the renovation or demolition do not require removal as a part of this project.

ACM that are discovered during construction and required removal but are not indicated in the construction documents, specifications or noted in the Hazardous Material and Environmental Survey that was issued as a response to RFI-0002, will be treated as a differing site condition."

File details come from the government source that posted it.