USCG Bridge Lighting Regulations.pdf
PDF 1 MB Posted
- Attached to
- Cape Cod Canal, Buzzards Bay, MA ? Painting and Steel Repairs, Vertical Lift Railroad Bridge
- Solicitation number
- W912WJ25B0001
About this file
This document is a U.S. Coast Guard Bridge Administration manual detailing the lighting and signal requirements for various types of bridges over navigable waterways, as specified in 33 CFR 118. The manual contains detailed technical diagrams and specifications for bridge lighting configurations, including fixed bridges, swing bridges, bascule bridges, vertical lift bridges, and floating drawbridges.
The document outlines specific requirements for light colors, positioning, and visibility arcs, including: main channel lighting (180° white lights in vertical lines), pier lighting (180° red), channel margin lighting (180° red), and channel center lighting (360° green). It also covers requirements for retroreflective panels, radar reflectors, racons, traveler platforms, and clearance gauges. The manual includes precise specifications for clearance gauge numerals, including height requirements based on visibility distance and detailed diagrams showing proper spacing and dimensions. These specifications appear to be referenced in a contract opportunity for painting and repairs to the Cape Cod Canal Vertical Lift Railroad Bridge, providing mandatory compliance requirements for bridge lighting and signaling systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 0008 Attachment.pdf | ||
| Specifications - Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| Specifications - Amendment 0006.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| 1935-ERECTION-PLAN.pdf | ||
| SHOP_DRAWINGS-1_TO_50.pdf | ||
| 2022 Routine Inspection Report.pdf | ||
| SHOP_DRAWINGS-51_TO_100.pdf | ||
| Record Drawing Index.docx | DOCX document | |
| 1934-ORIGINAL-COE-DESIGN-DRAWINGS.pdf | ||
| 1934-OPERATING-MACHINERY-SHOP-DRAWINGS.pdf | ||
| SHOP_DRAWINGS-102_TO_154.pdf | ||
| 2022 Routine Inspection ME Final Report.pdf | ||
| 1936-OPER-HOUSE.pdf | ||
| Drawing Index.xlsx | XLSX spreadsheet |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES COAST GUARD
OFFICE OF BRIDGE ADMINISTRATION
BRIDGE LIGHTING
AND
OTHER SIGNALS
B R
ID
GE ADMINISTRATIO
N
U . S
. COAST GUAR
D
DEPARTMENT OF HOMELAND SECURITY
BRIDGE ADMINISTRATION DIVISION
MINIMUM LIGHTING FOR FIXED BRIDGES
33 CFR 118.65
MAIN CHANNEL-180˚ WHITE, 3 LIGHTS
IN VERTICAL LINE (60˚—180˚ ON
BRIDGES LIGHTED PRIOR TO JAN. 1,
1953, UNTIL LIGHTS ARE REPAIRED OR
REPLACED).
PIER—180˚ RED
LIGHT COLORS AND HORIZONTAL ARCS OF VISIBILITY
CHANNEL MARGIN—180˚ RED
CHANNEL CENTER—360˚ GREEN (180˚
GREEN ON BRIDGES LIGHTED PRIOR TO
JAN 1, 1947, UNTIL LIGHTS ARE
REPAIRED OR REPLACED).
MULTIPLE-SPAN FIXED BRIDGE
SINGLE-SPAN FIXED BRIDGE
CHANNEL
B BA
B
B
B
B
A
A
CHANNEL
CC
A
C
C
A
A
C
C
CHANNEL MAIN CHANNELCHANNEL
B
C C C
AAA
D
AAA CCCB
AAA CCCB
ALSO 3 WHITE LIGHTS IN VERTICAL LINE (D)
A
B
C
D
MINIMUM LIGHTING FOR DOUBLE-OPENING SWING BRIDGES
33 CFR 118.70
AXIS—180˚ RED.
MAY BE OMITTED WHEN DRAW AND
PROTECTION PIERS ARE STRAIGHT ON
THEIR CHANNEL FACES.
PIER—180˚ RED
LIGHT COLORS AND HORIZONTAL ARCS OF VISIBILITY
SWING SPAN—ALTERNATE RED (1) AND
GREEN (2), EACH 60˚ AND AT 90˚
BETWEEN RED AND GREEN.
SWING SPAN—ALTERNATE RED (2) AND
GREEN (2), EACH 60˚ AND AT 90˚ TO
EACH OTHER.
DECK BRIDGE
THROUGH BRIDGE
CLOSED
C C
CDDDD
A A
A
10'
OPEN
A
A
A
C
C
C
C
C
D D D D
C
PROTECTION
PIER
DRAW
PIER
PIVOT
PIER
AXIS
CLOSED
C CDDDD
A A
A
10'
C
C C CDDDD
BB
CLOSED
OPEN
A
A
A
C
C
C
C
C
D D D D
C
OPEN
A
C
C
C
C B
BB
B C
D D D D
C
PROTECTION
PIER
DRAW
PIER
PIVOT
PIER
AXIS
PROTECTION
PIER
DRAW
PIER
PIVOT
PIER
AXIS
A
B
C
D
DEPARTMENT OF HOMELAND SECURITY
BRIDGE ADMINISTRATION DIVISION
ELEVATION VIEW
CLOSED
PLAN VIEW
FLOATING SWINGSPAN DRAWBRIDGE
A
AA
A C
C
C BB
BB
ELEVATION VIEW
OPEN
PLAN VIEW
A
BB
A
A
C
BB
B
15' 15'
ELEVATION VIEW
CHANNEL
FLOATING
DRAWBRIDGE
CLOSED
PLAN VIEW
FLOATING RETRACTABLE DRAWBRIDGE
D
ED
C
C B
B
B
E
DB
C
CHANNEL
RETRACTABLE PONTOON
MORSE CODE B – ...
ELEVATION VIEW
CHANNEL
ABUTMENT
ABUTMENT
OPEN
PLAN VIEW
ED
B
B
B C
C
ED
B
C
CHANNEL
RETRACTABLE PONTOON
E
A
C D
E
B
RETRACTABLE PONTOON
—DRAWSPAN CLOSED—180˚ RED
—DRAWSPAN OPEN—180˚ GREEN
PIER OR ABUTMENT—180˚ RED
LIGHT COLORS AND HORIZONTAL ARCS OF VISIBILITY
AT CENTERLINE OF THE NAVIGATION
CHANNEL DRAWSPAN OF FLOATING
DRAWBRIDGES, DIAMOND IN SHAPE,
YELLOW IN COLOR WITH HIGH
INTENSITY RETROREFLECTIVE MATERIAL
BORDER AND MAY EXHIBIT A MORSE
CODE B YELLOW LIGHT. THE MARK
SHALL NOT BE VISIBLE WHEN THE
DRAWSPAN IS IN THE OPEN POSITION.
(33 CFR 118.110(c)).
DRAW SPAN—ALTERNATE RED (2) AND
GREEN (2), EACH 60˚ AND AT 90˚ TO
EACH OTHER.
MINIMUM LIGHTING FOR SINGLE-OPENING DRAWBRIDGES
33 CFR 118.75
RETRACTABLE PONTOON
—DRAWSPAN CLOSED—180˚ RED
—DRAWSPAN—LIGHT OFF
DEPARTMENT OF HOMELAND SECURITY
BRIDGE ADMINISTRATION DIVISION
LIGHT COLORS
AND
ARCS OF VISIBILITY
PIER—180˚ RED.B
LIFT SPAN—180˚ GREEN WHEN LIFT
SPAN IS FULLY OPEN FOR NAVIGATION,
180˚ RED FOR ALL OTHER POSITIONS OF
LIFT SPAN (60˚ OR LESS GREEN AND
RED PERMITTED ON BRIDGES LIGHTED
PRIOR TO JAN. 1, 1949, UNTIL LIGHTS
ARE REPAIRED OR REPLACED).
A
AXIS—180˚ RED
MAY BE OMMITTED WHEN DRAW AND
PROTECTION PIERS ARE STRAIGHT ON
THEIR CHANNEL FACES.
C
SINGLE-LIFT BRIDGE
LIFT SPAN
CLOSED
O
PE
N
A
A A
A
A
C
C
B
B
B
CLOSED
O
PEN
A
A
C BB C
DOUBLE-LIFT BRIDGE
LIFT SPANS
CLOSED
O
PEN
A
C B
A
A
C
B
B
A
A
CC
B
B
B
B
PROTECTION PIER
DRAW PIERS
CLOSEDCLOSED BRIDGE AXIS
PROTECTION PIER
DRAW PIERS
CLOSEDCLOSED BRIDGE AXIS
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
BRIDGE ADMINISTRATION DIVISION
MINIMUM LIGHTING FOR BASCULE BRIDGES
33 CFR 118.80
PROTECTION PIERS
LIFT SPAN CLOSED
LIFT PIERS
BRIDGE AXIS
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
BRIDGE ADMINISTRATION DIVISION
MINIMUM LIGHTING FOR VERTICAL L IFT BRIDGES
33 CFR 118.85
AXIS—180˚ RED.
MAY BE OMITTED WHEN LIFT AND
PROTECTION PIERS ARE STRAIGHT ON
THEIR CHANNEL FACES.
PIER—180˚ RED
LIGHT COLORS AND HORIZONTAL ARCS OF VISIBILITY
LIFT SPAN—360˚ GREEN WHEN LIFT
SPAN IS FULLY OPEN FOR NAVIGATION,
180˚ RED FOR ALL OTHER POSITIONS
OF LIFT SPAN (180˚ GREEN AND RED
PERMITTED ON BRIDGES LIGHTED
PRIOR TO JAN 1, 1949, UNTIL LIGHTS
ARE REPAIRED OR REPLACED).
A
C
D
C
LIFT SPAN OPEN
A
B C B
C
C
B
A
A
B
B
B
C
AB C B
BRIDGE ADMINISTRATION DIVISION
RETROREFLECTIVE PANELS ON BRIDGE PIERS
33 CFR 118.100
PANEL SIZE AND COLORS
CHANNEL CHANNEL
BA
BA
B
B
B
A
A
A
BA
GREEN SQUARE RETROREFLECTIVE
PANELS SHALL BE USED. THE PANELS
SHALL BE AT LEAST 36 SQUARE INCHES
IN AREA TO PROVIDE A NOMINAL
NIGHTIME VISIBILITY DISTANCE OF AT
LEAST ONE-HALF MILE.
A
RED TRIANGULAR RETROREFLECTIVE
PANELS SHALL BE USED. THE PANELS
SHALL BE AT LEAST 36 SQUARE INCHES
IN AREA TO PROVIDE A NOMINAL
NIGHTIME VISIBILITY DISTANCE OF AT
LEAST ONE-HALF MILE.
B
RETROREFLECTIVE PANELS MAY ALSO
BE REQUIRED OR AUTHORIZED AS A
BACK UP FOR BRIDGE LIGHTING (SEE
33CFR 118.100(b)).
NOTE:
BRIDGE ADMINISTRATION DIVISION
DAYMARKS AND LATERAL L IGHTING ON BRIDGES
33 CFR 118.110
LIGHT AND PANEL COLORS AND HORIZONTAL ARCS OF VISIBILITY
CHANNEL MARGIN OR PIER—GREEN
SQUARE PANEL. MAY BE LIGHTED
SAFE WATER MARK—OCTAGONAL IN
SHAPE AT CENTERLINE OF CHANNEL
WITH RETROREFLECTIVE WHITE
BORDER. MAY BE LIGHTED
CHANNEL MARGIN OR PIER—RED
TRIANGULAR PANEL. MAY BE LIGHTED
CHANNEL MARGIN OR PIER—180˚
QUICK FLASHING, FLASHING, ISOPHASE
OR OCCULTING GREEN LIGHT
MAIN CHANNEL CENTERLINE—180˚
OCCULTING WHITE LIGHT ONLY
CHANNEL MARGIN OR PIER—180˚
QUICK FLASHING, FLASHING,ISOPHASE
OR OCCULTING RED LIGHT
ADJACENT PIER—180˚ FIXED YELLOW
LIGHT ONLY
MAIN CHANNEL MAIN CHANNEL
B CA
B
A
C
F
E
G
D
B
B
B
B CA
B CA
MAIN CHANNEL
CHANNEL AND ADJACENT PIER LIGHTING
CHANNEL DAYMARKS
F G
DD
E
F G
DD
E
F G
DD
E
A C
A C
A C
MAIN CHANNEL
F
ED DG
FED DG
FED DG
BRIDGE ADMINISTRATION DIVISION
RADAR REFLECTORS AND RACONS 33 CFR 118.120
TRAVELLER PLATFORMS 33 CFR 118.150
CLEARANCE GAUGES 33 CFR 118.160
A
B
B
DC
C D
D
C
C C
A
A A
CHANNEL
CHANNEL
LOW STEEL
TRAVELLERS
PLATFORM
CLEARANCE
GAUGE
RECOMMENDED MINIMUM
DISTANCE FROM PIER - 20 METERS
BRIDGE
RADAR REFLECTORS
RACON
CHANNEL
A
B
C
D
SIGNAL LOCATIONS, LIGHT COLORS AND HORIZONTAL ARCS OF VISIBILITY
RADAR REFLECTOR (ON STAKES, BUOYS)
LOCATED AT THE EDGES OF A NAVIGATION CHANNEL
RACON, LOCATED AT THE CENTERLINE OF A BRIDGE CHANNEL
QUICK FLASHING RED LIGHTS ON EACH LOWER CORNER
GAUGE SCALED IN FEET FROM LOW STEEL. MUST COMPLY WITH
33 CFR 118.160, VERTICAL CLEARANCE GAUGES
BRIDGE ADMINISTRATION DIVISION
STANDARD BRIDGE CLEARANCE GAUGE
33 CFR 118.160
3W
LEGEND
W W/2
A A/
W W/2
H /2
H
FOOT MARK
INTERMEDIATE
FOOT MARK
(IF USED)
3W X W1
X SPACING
A A/
W1 SPACING W
NOTE: SIZE, TYPE AND SPACING
OF NUMERALS SHALL
CONFORM TO THE
FEDERAL HIGHWAY
ADMINISTRATION
"STANDARD ALPHABET
FOR HIGHWAY SIGNS"
W WIDTH OF WIDEST SINGLE
NUMERAL EXCLUDING NUMERAL 4
H HEIGHT OF NUMERAL
PRESCRIBED FOR DISTANCE
VISIBILITY
A WIDTH OF STROKE
BRIDGE ADMINISTRATION DIVISION
HEIGHT AND VERTICAL SPACING
FOR CLEARANCE GAUGE NUMERALS
33 CFR 118.160
C
LE
A R
A N
C E
F R
O M
L O
W S
T E
E L
(F E
E T
363024
NUMERAL HEIGHT ( INCHES)
File details come from the government source that posted it. Updated .