About this file

This is Amendment 0003 to solicitation W912WJ25B0001, issued by the U.S. Army Corps of Engineers New England District, which makes three key changes to the railroad bridge painting contract. The amendment extends the bid due date from February 5, 2025 to February 19, 2025 at 1:00 PM Eastern and establishes February 10, 2025 as the deadline for submitting requests for information.

The amendment adds new technical requirements for blast media testing under Section 09 97 02, requiring blast abrasives to comply with SSPC AB 2 Abrasive Standard No. 2 and mandating oil content testing per ASTM D7393 once per containment. It also addresses three contractor questions, referring to Amendment 0002 for platform installation limitations, confirming the bid date extension request, and establishing the RFI submission deadline. All other terms and conditions remain unchanged.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0008.pdf PDF
Amendment 0008 Attachment.pdf PDF
Specifications - Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Specifications - Amendment 0006.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
USCG Bridge Lighting Regulations.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
1935-ERECTION-PLAN.pdf PDF
SHOP_DRAWINGS-1_TO_50.pdf PDF
2022 Routine Inspection Report.pdf PDF
SHOP_DRAWINGS-51_TO_100.pdf PDF
Record Drawing Index.docx DOCX document
1934-ORIGINAL-COE-DESIGN-DRAWINGS.pdf PDF
1934-OPERATING-MACHINERY-SHOP-DRAWINGS.pdf PDF
SHOP_DRAWINGS-102_TO_154.pdf PDF
2022 Routine Inspection ME Final Report.pdf PDF
1936-OPER-HOUSE.pdf PDF
Drawing Index.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the bid due date, change the specif ications, and answ ers requests for information. All other aspects remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jan-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ25B0001

X 9B. DATED (SEE ITEM 11)

10-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jan-2025

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ25B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

1. Amend Section 09 97 02 “PAINTING OF THE RAILROAD BRIDGE” as follows:

A. Under subparagraph 3.2 titled “CLEANING AND PREPARATION OF STEEL SURFACES TO

BE PAINTED”, insert the following:

“3.2.2.1 Blast Media Testing Blast abrasives shall comply with SSPC AB 2, Abrasive Standard No. 2. Specifically, a single random sample of the abrasive work mix shall be tested for oil content in accordance with ASTM D7393. The test shall be performed once per containment.”

Response to RFIs:

1. As we understand it there is a limit to containing the span to only three panels at one time. Is it acceptable to install platform along the entirety of the span at one time?

GOV Response: Please see Amendment 0002, Question 1.

2. We would request at minimum a two (2) week extension to the bid date. This would be to receive and process any additional questions that may be answer through addenda and to allow for appropriate amount of time to consult with our engineering team to design appropriate access and containment as well as a plan for adjusting the counterbalance weights throughout the project. Please advise if this is acceptable.

GOV Response: This amendment extends the bid due date.

3. Finally, we have not seen a final date for questions in the RFP. Can you advise if there is a due date for these questions?

GOV Response: Please submit all requests for information by 10 February 2025 at 1:00 p.m. Eastern.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 05-Feb-2025 01:00 PM to 19-Feb-2025 01:00 PM.

(End of Summary of Changes)

W912WJ25B0001

File details come from the government source that posted it. Updated .