This is a Record Drawing Index documenting the original shop drawings, design drawings, operating machinery drawings, erection plans, and machinery house drawings from the 1934-1936 construction of the Cape Cod Canal Railroad Bridge. The index lists over 150 detailed shop drawings from 1935 covering all major components of the vertical lift bridge including grillages, tower spans, counterweights, lift span elements, machinery houses, platforms, railings, and operating equipment. It also includes the original 15 Corps of Engineers design drawings from 1934, 14 operating machinery shop drawings from 1934, 15 erection plan sheets from 1935, and 3 machinery house drawings from 1936.

The drawing index provides a comprehensive catalog of the bridge's original construction documents, which will be relevant for the current solicitation's painting and steel repair work. The detailed nature of these drawings, covering structural, mechanical and architectural elements, offers bidders important reference documentation about the bridge's design and construction. This is particularly important given the requirement to maintain proper bridge balance during repairs and coordinate with ongoing rail operations.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0008.pdf PDF
Amendment 0008 Attachment.pdf PDF
Specifications - Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Specifications - Amendment 0006.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
USCG Bridge Lighting Regulations.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
1935-ERECTION-PLAN.pdf PDF
SHOP_DRAWINGS-1_TO_50.pdf PDF
2022 Routine Inspection Report.pdf PDF
SHOP_DRAWINGS-51_TO_100.pdf PDF
1934-ORIGINAL-COE-DESIGN-DRAWINGS.pdf PDF
1934-OPERATING-MACHINERY-SHOP-DRAWINGS.pdf PDF
SHOP_DRAWINGS-102_TO_154.pdf PDF
2022 Routine Inspection ME Final Report.pdf PDF
1936-OPER-HOUSE.pdf PDF
Drawing Index.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shop Drawings 1935 Sheet Number & Sheet Name

1GRILLAGES
1-AGRILLAGES
2GRILLAGES
3BEARING TOWER SPANS
4BEARING – LIFT SPAN
5FLOORBEAMS- TOWER SPANS (LIFT SPAN LOC. DIAG.)
6GRILLAGE-SLABS-ANC.BOLTS-MAN HOLE FRAMS
7STRINGERS AND BRACING-TOWER SPANS (LIFT LOC. DIAG.)
8BOTTOM CHORD SECTIONS-TOWER SPANS
9LOWER TIER COLUMNS – U0-L0 FOR PIER “B”
9-ALOWER TIER COLUMNS – U0-L0 FOR PIER “B”
102nd TIER TOWER COLUMNS A0-U0 FOR PIER B (TOWER PLAN)
10-A2nd TIER TOWER COLUMNS A0-U0 FOR PIER B
11MAIN AND AUXILIARY COUNTERWEIGHT ROPES
12STRINGERS AND BRACING – TOWER SPANS
13BOTTOM LATERALS & BOTTOM LATERAL PLS. (EL. DIAGRAM)
14BOTTOM CHORDS B2 TOWERS
15FLOORBEAMS – TOWER SPANS (LIFT SPAN DIAGRAM)
16DIAGONALS – TOWER SPANS
17VERTICAL TOWER SPANS (LOCATION DIAGRAMS)
18TOP CHORDS T2R-T2B-T2AL & T2CL
19TOP CHORDS T1L&R T1XL&R
20BOTTOM LAT & BOTTOM LATERALS PLS TOWER SPAN
21SWAY FRAM U2 SOUTH TOWER SF2 & 3, STRUT U3 PORTAL AT U4 NORTH AND SOUTH TOWER, PS1 & 2
223rd. TIER COLUMNS, TOWER SPAN B0 TO A0 FOR PIER B
22-A3rd. TIER COLUMNS, TOWER SPAN B0 TO A0 FOR PIER B
234th. TIER COLUMNS, TOWER SPAN C0 TO B0 FOR PIERS B & C
23-A4th. TIER COLUMNS, TOWER SPAN C0 TO B0 FOR PIERS B &
242-ND-TIER REAT TOWER POSTS-P6 R1, L2, R3, L4
25PORTALS FRONT OF TOWER
26DIAGONALS – TOWER SPANS
27TOP LATERALS AND TOP LATERAL PLATES – TOWER SPAN
28REAR TOWER POSTS P5 U1 TO L1
29SWAY FRAME AT U1 SOUTH TOWER
30TRANSVERSE BRACING FRONT TOWER LEG
31TRANSVERSE BRACING REAR TOWER LEG
32TOP LATERALS & TOP LATERAL BRACKETS – TOWER SPAN
33STRUTS, FOOTWALK SUPPORTS ETC.
34LOWER TIER COLUMNS, U0-L0 FOR PIER “C”
34-ALOWER TIER COLUMNS, U0-L0 FOR PIER “C”
352nd TIER TOWER COLUMNS A0-U0 FOR PIER “C”
363rd TIER COLUMNS, TOWER SPAN B0 TO A0 FOR PIER C
37FOOTWALK MATERIAL
38FRONT GIRDERS G5r/l NORTH & SOUTH TOWERS
39LADDERS – FRONT OF TOWER
40MAIN DIAGONALS – TOWER MAIN STRUTS TOWER
413rd TIER REAR TOWER POSTS B1 TO A1
42TRANVERSE BRACING REAR TOWER LEG ELEVATOR GUIDE BRACKETS
43VERTICALS TOWER SPAN
44SWAY FRAME NORTH TOWER
45REAR TOWER POSTS P8 R1 & L2, P8 R3 & L4, B1 TO C1
46ELEVATOR GUIDE POSTS
47DIAGONALS – TOWER SPAN
48PORTAL PLATFORM FOR LADDER & PLATFORM AT OPERATORS HOUSE
49ELEVATOR SCREEN ENCLOSURES
50ELEVATOR SCREEN ENCLOSURE AT OPERTOR HOUSE PLATFORM
51RAILING – TOWER SPONS $ STAIR WAYS TO PIERS
52GIRDER G6 r/l & STRUTS ST4 r/l & ST6 r/l & BRACK
53MAIN STRUT TOWER COUNTERWEIGHT GUIDES
54PLATFORMS AND STAIRWAYS TO OPERATOR HOUSE NORTH
55PIPE RAILING
56MAIN COUNTERWEIGHT BOX - (BOTTOM)
57MAIN COUNTERWEIGHT BOX SIDES AND ENDS
58MAIN COUNTERWEIGHT – GIRDERS AND BRACING
59MAIN COUNTERWEIGHT BOX – LONG & GRIDERS AND BRAC
60AUXILIARY COUNTERWEIGHT BOXES
61SWAY FRAME AT U2 NORTH TOWER
62GRIDERS G1 r/l TOP OF TOWERS
63GRATING FOR MAIN WALKWAY TOWER SPANS
64MAIN GEAR HOUSING
65SHEAVE GRIDERS G3 & G3A EAST GRIDERS NORTH & SOU
66STRUTS & REAILING – FRONT LEG
67GRATING FOR PLATFORMS TOWER SPANS
68MAIN GEAR SUPPORTS SMALL GEAR SUPPORTS
69LADDERS – REAR OF TOWERS AT ELEVATOR SHORT LADDE
70SHEAVE GIRDERS G3B & G3C WEST GIRS NORTH & SOUTH
71GRATING FOR PLATFORMS & STAIR TREADS FOR STAIRS
72FRONT & REAR FASCIA GRIDERDS
73SHEAVE GRIDERS G4 & G4A NORTH & SOUTH TOWERS
74WALKWAY PLATES AT TOP OF TOWER NORTH & SOUTH TOW
75GALLERY UNDER TOP TOWER GIRDERS AND REST PLATFOR
76TOP CORD LT1r (LOCATION DIAGRAM ELEVATION SECTIO
77TOP CORD LT2r LIFT SPAN
78TOP CORD LT3r LIFT SPAN
79TOP CORD LT4r LIFT SPAN
80TOP CORD LT5r LIFT SPAN
81BOTTOM CORD LB1r LIFT SPAN (LOCATION DIAGRAM)
82BOTTOM CORD LB2r LIFT SPAN (LOCATION DIAGRAM)
83BOTTOM CORD LB3r LIFT SPAN (LOCATION DIAGRAM)
84BOTTOM CORD LB4r & LB5r LIFT SPAN (LOCATION DIAG
85END POST LEPr & LEPxr LIFT SPAN
86VERTICALS LP6r, LP7r, LP8r, LIFT SPAN (LOCATION
87VERTICALS LP2, LP3, LP4, LP5 & LP5x LIFT SPAN (L
88DIAGONALS LD1r & LD1xry, LD2, LD3, LD4 LIFT SPAN
89DIAGONALS LD5, LD6, LD7, LD8, LD9 7 LD9x LIFT SP
90PORTAL STRUTS LIFT SPAN (LOCATION DIAGRAM)
91LIFTING GIRDERS
92TOP LATERALS & STRUTS LIFT SPAN
93STRINGERS – LIFT SPAN
94FLOOR BEAMS – LIFT SPAN
95BOTTOM LATERALS
96BOTTOM LATERALS
97BOTTOM LATERALS
98PIPE RAILINGS AND STAIRS – LIFT SPAN
99RAILING & WALK
100LADDERS, PLATFORMS, RAILING ECT L9-U9 LIFT SPAN (
101MISSING
102SWAY FRAMS (LOCATION DIAGRAM)
103PLATFORMS OVER MAIN SHEAVE BEARINGS
104MAIN SHEAVE COVERING AUXILIARY SHEAVE COVERING
105SHEAVE GIRDERS G2 & G2A EAST GIRDERS NORTH & SOUTH
106SHEAVE GIRDERS G2B & G2C WEST GIRDERS NORTH & SOUTH
107BRACKETS SUPPORTING OPERATOR’S HOUSE AT U0-U1 & U2
108LADDERS TO CTWT, AND MACHINERY FLOOR
109SIDE FASCIA GIRDER & CATENARY PLATFORM SUPPORTS
110BRACING & BEAMS AT TOP OF TOWER
111LOWER SPAN LOCK MACHINERY SUPPORTS AND MAN HOLE COV
112ENDS, FOR ENGINE, TRANSFORMER & STORAGE ROOMS NORTH
113SIDE OF OPERATORS HOUSE OH67
114ROOF PLATES & CHANNELS – TOP OF OPERATORS HOUSE
115TRACK MATERIAL – TOWER SPANS
116FLOOR BEAMS 7 SEALING PLATS OPERATOR’S HOUSE
117CRANE HOUSING – RUNWAY AND BRACING
118NORTH & SOUTH ENDS OF OPERATORS HOUSE
119LOWER HOUSE PLATFORMS, GRATING AND RAILING NORTH TO
120WEST SIDE OF OPERATOR’S HOUSE
120-AEST SIDE OF OPERATOR’S HOUSE (OFFSET)
121ANCHORAGES FOR OVER HEAD CABLES
122SIDE OF OPERATOR’S HOUSE OH 102
123CATENARY BRKTS
124EAST SIDE OF ENGINE HOUSE OH-111
125ROOF ANGLES, OPERATORS, ENGINE & TRANSFORMER HOUSESAIR & WATER TANKS SUPPORTS
126WEST SIDE OF ENGINE HOUSE NORTH TOWER
127FLOOR BEAMS & SEALING PLATES. ENGINE ROOM & TRANSFO
128EAST SIDE OF TRANSFORMER HOUSE OH138
129SIDE FOR TRANSFORMER HOUSE OH-140
130ROOF PLATES – ENGINE ROOM & TRANSFORMER HOUSE
131MACHINERY SUPPORT TOWER SPANS
132CATENARY PLATFORM
133SIDE OF OPERATORS HOUSE 0H-101
134RAILING ON TOP OF TOWERS
135PASSAGEWAY BETWEEN OPERATORS HOUSE & ENGINE HOUSE
136MACHINERY SUPPORTS TOWER SPANS
137ROOF TRUSS & TRUSSED COLS. IN MACHINERY HOUSE
138SMALL GEAR HOUSINGS
139MACHINERY HOUSE SECTIONS FOR REAR WALL
140FRAMING AROUND ELEVATOR MACHINERY ROOM
141RAFTERS ETC. MACHINERY HOUSE ROOF
142SPIRE SECTIONS & LOWER PART OF RIBS
143BRACING, REST PLATFORMS, LADDERS & GRATING FOR SPIR
144MACHINERY HOUSE SECTIONS
145MACHINERY HOUSE SECTIONS FOR EAST & WEST SIDES
146FRONT OF SHEAVE ROOM
147FRAMING AROUND ELEVATOR MACHINERY ROOM
148MACHINERY HOUSE WALL SECTIONS AND COLUMNS
149MACHINERY HOUSE WALL SECTIONS CEILINGS CEILING CHAN
150MACHINERY HOUSE PARTITION & CRANE
151MACHINERY HOUSE SECTIONS
152ANGLE PURLINS – MACHINERY HOUSES
153MACHINERY HOUSE ROOF PLATES
154PLATFORMS OVER MAIN SHEAVE BEARINGS

1934 Original COE Design Drawings Sheet Number & Sheet Name

G-001COVER SHEET AND INDEX CCC-RRB-G001.DGN
1ORIGINAL GENERAL PLAN AND ELEVATION
1AAS-BUILT GENERAL PLAN AND ELEVATION
SHEET 2TOPOGRAPHY AND BORINGS
SHEET 3MAIN PIERS B AND C
SHEET 3AMAIN PIERS B AND C
SHEET 4PIERS A AND D
SHEET 4APILES UNDER ABUTMENTS A AND D
SHEET 5LIFT SPAN STRESS SHEET
SHEET 6TOWER STRESS SHEET
SHEET 7CROSS SECTION OF LIFT SPAN
SHEET 8LIFT SPAN DETAILS
SHEET 9COUNTERWEIGHTS
SHEET 10TOP OF IRON
SHEET 11HOUSES
SHEET 11AREVISIONS TO HOUSES
SHEET 11BREVISIONS TO HOUSES
SHEET 11CHOUSES
SHEET 12SPAN LOCKS AND RAIL LOCKS
SHEET 13MACHINERY
SHEET 13AMACHINERY (CHANGE ORDER No 1)
SHEET 14SHEAVES
SHEET 15TOWER BASE
452 E-14-1PROPOSED MOD. FOR PILE FOUNDATION
436 E-14-1STEEL SHEETING CUT-OFF LEFT IN PLACE

1934 Operating Machinery Shop Drawings Sheet Number & Sheet Name

M-1COVER SHEET AND INDEX
B1MAIN SHEAVES
M-2OPERATING MACHINERY
M-3OPERATING MACHINERY
M-4OPERATING MACHINERY
M-5OPERATING MACHINERY
M-6OPERATING MACHINERY
M-7OPERATING MACHINERY
M-7AOPERATING MACHINERY
M-8OPERATING MACHINERY & TRACK MATERIAL
M-9TRACK MATERIAL
M-10OPERATING MACHINERY
M-11OPERATING MACHINERY
M-12TURN BOLT & KEY LISTS
M-13GENERAL PLAN - OPERATING MACHINERY
M-14TRACK PLAN AND SPAN LOCK

1935 Erection Plan Sheet Number & Sheet Name

P-1ERECTION PLAN MAIN COUNTERWEIGHT BOXES
P2ERECTION PLAN – SOUTH TOWER
P3ERECTION PLAN – NORTH TOWER SPAN
P4ERECTION PLAN OF NORTH & SOUTH TOWERS
P4-APLAN SHOWING SECTIONS THROUGH TOP OF TOWERS
P5ERECTION DIAGRAM
P5AERECTION DIAGRAM
P6ERECTION PLAN OF MACHINERY HOUSE
P6AERECTION PLAN OF MACHINERY HOUSE
P7ADJ. FOR TOWER AT U1-UPPER SPAN LOCK, ASM. GUIDE ROLLER ADJ. AT TOP OF TOWERS
P8TRACK PLAN – NORTH TOWER
P8ATRACK PLAN – NORTH TOWER
P9TRACK PLAN –SOUTH TOWER
P9ATRACK PLAN –SOUTH TOWER
P10TIE PLAN
P11GENERAL PLAN
P12ROPE PLAN
P13PLAN OF RE-INFORCING CONC. FLOORS, OPER. HOUSE, STORAGE ENGIN TRNS. RM.
P14ERECTION PLAN FOR SPIRES ON TOP OF MACHINE HOUSES NORTH & SOUTH TOWERS
P15PLAN OFRE0ENFORCING FLOOR MACHINERY HOUSE
1ERECTION PLATFORM AT TOP OF TOWER (REVISED 5/10/35)

1936 Machinery Houses Drawings 3 sheets with no names 3 sheets with no names 3 sheets with no names

File details come from the government source that posted it. Updated .