Record Drawing Index.docx
DOCX document 18 KB Posted
- Attached to
- Cape Cod Canal, Buzzards Bay, MA ? Painting and Steel Repairs, Vertical Lift Railroad Bridge
- Solicitation number
- W912WJ25B0001
About this file
This is a Record Drawing Index documenting the original shop drawings, design drawings, operating machinery drawings, erection plans, and machinery house drawings from the 1934-1936 construction of the Cape Cod Canal Railroad Bridge. The index lists over 150 detailed shop drawings from 1935 covering all major components of the vertical lift bridge including grillages, tower spans, counterweights, lift span elements, machinery houses, platforms, railings, and operating equipment. It also includes the original 15 Corps of Engineers design drawings from 1934, 14 operating machinery shop drawings from 1934, 15 erection plan sheets from 1935, and 3 machinery house drawings from 1936.
The drawing index provides a comprehensive catalog of the bridge's original construction documents, which will be relevant for the current solicitation's painting and steel repair work. The detailed nature of these drawings, covering structural, mechanical and architectural elements, offers bidders important reference documentation about the bridge's design and construction. This is particularly important given the requirement to maintain proper bridge balance during repairs and coordinate with ongoing rail operations.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shop Drawings 1935 Sheet Number & Sheet Name
| 1 | GRILLAGES |
| 1-A | GRILLAGES |
| 2 | GRILLAGES |
| 3 | BEARING TOWER SPANS |
| 4 | BEARING – LIFT SPAN |
| 5 | FLOORBEAMS- TOWER SPANS (LIFT SPAN LOC. DIAG.) |
| 6 | GRILLAGE-SLABS-ANC.BOLTS-MAN HOLE FRAMS |
| 7 | STRINGERS AND BRACING-TOWER SPANS (LIFT LOC. DIAG.) |
| 8 | BOTTOM CHORD SECTIONS-TOWER SPANS |
| 9 | LOWER TIER COLUMNS – U0-L0 FOR PIER “B” |
| 9-A | LOWER TIER COLUMNS – U0-L0 FOR PIER “B” |
| 10 | 2nd TIER TOWER COLUMNS A0-U0 FOR PIER B (TOWER PLAN) |
| 10-A | 2nd TIER TOWER COLUMNS A0-U0 FOR PIER B |
| 11 | MAIN AND AUXILIARY COUNTERWEIGHT ROPES |
| 12 | STRINGERS AND BRACING – TOWER SPANS |
| 13 | BOTTOM LATERALS & BOTTOM LATERAL PLS. (EL. DIAGRAM) |
| 14 | BOTTOM CHORDS B2 TOWERS |
| 15 | FLOORBEAMS – TOWER SPANS (LIFT SPAN DIAGRAM) |
| 16 | DIAGONALS – TOWER SPANS |
| 17 | VERTICAL TOWER SPANS (LOCATION DIAGRAMS) |
| 18 | TOP CHORDS T2R-T2B-T2AL & T2CL |
| 19 | TOP CHORDS T1L&R T1XL&R |
| 20 | BOTTOM LAT & BOTTOM LATERALS PLS TOWER SPAN |
| 21 | SWAY FRAM U2 SOUTH TOWER SF2 & 3, STRUT U3 PORTAL AT U4 NORTH AND SOUTH TOWER, PS1 & 2 |
| 22 | 3rd. TIER COLUMNS, TOWER SPAN B0 TO A0 FOR PIER B |
| 22-A | 3rd. TIER COLUMNS, TOWER SPAN B0 TO A0 FOR PIER B |
| 23 | 4th. TIER COLUMNS, TOWER SPAN C0 TO B0 FOR PIERS B & C |
| 23-A | 4th. TIER COLUMNS, TOWER SPAN C0 TO B0 FOR PIERS B & |
| 24 | 2-ND-TIER REAT TOWER POSTS-P6 R1, L2, R3, L4 |
| 25 | PORTALS FRONT OF TOWER |
| 26 | DIAGONALS – TOWER SPANS |
| 27 | TOP LATERALS AND TOP LATERAL PLATES – TOWER SPAN |
| 28 | REAR TOWER POSTS P5 U1 TO L1 |
| 29 | SWAY FRAME AT U1 SOUTH TOWER |
| 30 | TRANSVERSE BRACING FRONT TOWER LEG |
| 31 | TRANSVERSE BRACING REAR TOWER LEG |
| 32 | TOP LATERALS & TOP LATERAL BRACKETS – TOWER SPAN |
| 33 | STRUTS, FOOTWALK SUPPORTS ETC. |
| 34 | LOWER TIER COLUMNS, U0-L0 FOR PIER “C” |
| 34-A | LOWER TIER COLUMNS, U0-L0 FOR PIER “C” |
| 35 | 2nd TIER TOWER COLUMNS A0-U0 FOR PIER “C” |
| 36 | 3rd TIER COLUMNS, TOWER SPAN B0 TO A0 FOR PIER C |
| 37 | FOOTWALK MATERIAL |
| 38 | FRONT GIRDERS G5r/l NORTH & SOUTH TOWERS |
| 39 | LADDERS – FRONT OF TOWER |
| 40 | MAIN DIAGONALS – TOWER MAIN STRUTS TOWER |
| 41 | 3rd TIER REAR TOWER POSTS B1 TO A1 |
| 42 | TRANVERSE BRACING REAR TOWER LEG ELEVATOR GUIDE BRACKETS |
| 43 | VERTICALS TOWER SPAN |
| 44 | SWAY FRAME NORTH TOWER |
| 45 | REAR TOWER POSTS P8 R1 & L2, P8 R3 & L4, B1 TO C1 |
| 46 | ELEVATOR GUIDE POSTS |
| 47 | DIAGONALS – TOWER SPAN |
| 48 | PORTAL PLATFORM FOR LADDER & PLATFORM AT OPERATORS HOUSE |
| 49 | ELEVATOR SCREEN ENCLOSURES |
| 50 | ELEVATOR SCREEN ENCLOSURE AT OPERTOR HOUSE PLATFORM |
| 51 | RAILING – TOWER SPONS $ STAIR WAYS TO PIERS |
| 52 | GIRDER G6 r/l & STRUTS ST4 r/l & ST6 r/l & BRACK |
| 53 | MAIN STRUT TOWER COUNTERWEIGHT GUIDES |
| 54 | PLATFORMS AND STAIRWAYS TO OPERATOR HOUSE NORTH |
| 55 | PIPE RAILING |
| 56 | MAIN COUNTERWEIGHT BOX - (BOTTOM) |
| 57 | MAIN COUNTERWEIGHT BOX SIDES AND ENDS |
| 58 | MAIN COUNTERWEIGHT – GIRDERS AND BRACING |
| 59 | MAIN COUNTERWEIGHT BOX – LONG & GRIDERS AND BRAC |
| 60 | AUXILIARY COUNTERWEIGHT BOXES |
| 61 | SWAY FRAME AT U2 NORTH TOWER |
| 62 | GRIDERS G1 r/l TOP OF TOWERS |
| 63 | GRATING FOR MAIN WALKWAY TOWER SPANS |
| 64 | MAIN GEAR HOUSING |
| 65 | SHEAVE GRIDERS G3 & G3A EAST GRIDERS NORTH & SOU |
| 66 | STRUTS & REAILING – FRONT LEG |
| 67 | GRATING FOR PLATFORMS TOWER SPANS |
| 68 | MAIN GEAR SUPPORTS SMALL GEAR SUPPORTS |
| 69 | LADDERS – REAR OF TOWERS AT ELEVATOR SHORT LADDE |
| 70 | SHEAVE GIRDERS G3B & G3C WEST GIRS NORTH & SOUTH |
| 71 | GRATING FOR PLATFORMS & STAIR TREADS FOR STAIRS |
| 72 | FRONT & REAR FASCIA GRIDERDS |
| 73 | SHEAVE GRIDERS G4 & G4A NORTH & SOUTH TOWERS |
| 74 | WALKWAY PLATES AT TOP OF TOWER NORTH & SOUTH TOW |
| 75 | GALLERY UNDER TOP TOWER GIRDERS AND REST PLATFOR |
| 76 | TOP CORD LT1r (LOCATION DIAGRAM ELEVATION SECTIO |
| 77 | TOP CORD LT2r LIFT SPAN |
| 78 | TOP CORD LT3r LIFT SPAN |
| 79 | TOP CORD LT4r LIFT SPAN |
| 80 | TOP CORD LT5r LIFT SPAN |
| 81 | BOTTOM CORD LB1r LIFT SPAN (LOCATION DIAGRAM) |
| 82 | BOTTOM CORD LB2r LIFT SPAN (LOCATION DIAGRAM) |
| 83 | BOTTOM CORD LB3r LIFT SPAN (LOCATION DIAGRAM) |
| 84 | BOTTOM CORD LB4r & LB5r LIFT SPAN (LOCATION DIAG |
| 85 | END POST LEPr & LEPxr LIFT SPAN |
| 86 | VERTICALS LP6r, LP7r, LP8r, LIFT SPAN (LOCATION |
| 87 | VERTICALS LP2, LP3, LP4, LP5 & LP5x LIFT SPAN (L |
| 88 | DIAGONALS LD1r & LD1xry, LD2, LD3, LD4 LIFT SPAN |
| 89 | DIAGONALS LD5, LD6, LD7, LD8, LD9 7 LD9x LIFT SP |
| 90 | PORTAL STRUTS LIFT SPAN (LOCATION DIAGRAM) |
| 91 | LIFTING GIRDERS |
| 92 | TOP LATERALS & STRUTS LIFT SPAN |
| 93 | STRINGERS – LIFT SPAN |
| 94 | FLOOR BEAMS – LIFT SPAN |
| 95 | BOTTOM LATERALS |
| 96 | BOTTOM LATERALS |
| 97 | BOTTOM LATERALS |
| 98 | PIPE RAILINGS AND STAIRS – LIFT SPAN |
| 99 | RAILING & WALK |
| 100 | LADDERS, PLATFORMS, RAILING ECT L9-U9 LIFT SPAN ( |
| 101 | MISSING |
| 102 | SWAY FRAMS (LOCATION DIAGRAM) |
| 103 | PLATFORMS OVER MAIN SHEAVE BEARINGS |
| 104 | MAIN SHEAVE COVERING AUXILIARY SHEAVE COVERING |
| 105 | SHEAVE GIRDERS G2 & G2A EAST GIRDERS NORTH & SOUTH |
| 106 | SHEAVE GIRDERS G2B & G2C WEST GIRDERS NORTH & SOUTH |
| 107 | BRACKETS SUPPORTING OPERATOR’S HOUSE AT U0-U1 & U2 |
| 108 | LADDERS TO CTWT, AND MACHINERY FLOOR |
| 109 | SIDE FASCIA GIRDER & CATENARY PLATFORM SUPPORTS |
| 110 | BRACING & BEAMS AT TOP OF TOWER |
| 111 | LOWER SPAN LOCK MACHINERY SUPPORTS AND MAN HOLE COV |
| 112 | ENDS, FOR ENGINE, TRANSFORMER & STORAGE ROOMS NORTH |
| 113 | SIDE OF OPERATORS HOUSE OH67 |
| 114 | ROOF PLATES & CHANNELS – TOP OF OPERATORS HOUSE |
| 115 | TRACK MATERIAL – TOWER SPANS |
| 116 | FLOOR BEAMS 7 SEALING PLATS OPERATOR’S HOUSE |
| 117 | CRANE HOUSING – RUNWAY AND BRACING |
| 118 | NORTH & SOUTH ENDS OF OPERATORS HOUSE |
| 119 | LOWER HOUSE PLATFORMS, GRATING AND RAILING NORTH TO |
| 120 | WEST SIDE OF OPERATOR’S HOUSE |
| 120-A | EST SIDE OF OPERATOR’S HOUSE (OFFSET) |
| 121 | ANCHORAGES FOR OVER HEAD CABLES |
| 122 | SIDE OF OPERATOR’S HOUSE OH 102 |
| 123 | CATENARY BRKTS |
| 124 | EAST SIDE OF ENGINE HOUSE OH-111 |
| 125 | ROOF ANGLES, OPERATORS, ENGINE & TRANSFORMER HOUSESAIR & WATER TANKS SUPPORTS |
| 126 | WEST SIDE OF ENGINE HOUSE NORTH TOWER |
| 127 | FLOOR BEAMS & SEALING PLATES. ENGINE ROOM & TRANSFO |
| 128 | EAST SIDE OF TRANSFORMER HOUSE OH138 |
| 129 | SIDE FOR TRANSFORMER HOUSE OH-140 |
| 130 | ROOF PLATES – ENGINE ROOM & TRANSFORMER HOUSE |
| 131 | MACHINERY SUPPORT TOWER SPANS |
| 132 | CATENARY PLATFORM |
| 133 | SIDE OF OPERATORS HOUSE 0H-101 |
| 134 | RAILING ON TOP OF TOWERS |
| 135 | PASSAGEWAY BETWEEN OPERATORS HOUSE & ENGINE HOUSE |
| 136 | MACHINERY SUPPORTS TOWER SPANS |
| 137 | ROOF TRUSS & TRUSSED COLS. IN MACHINERY HOUSE |
| 138 | SMALL GEAR HOUSINGS |
| 139 | MACHINERY HOUSE SECTIONS FOR REAR WALL |
| 140 | FRAMING AROUND ELEVATOR MACHINERY ROOM |
| 141 | RAFTERS ETC. MACHINERY HOUSE ROOF |
| 142 | SPIRE SECTIONS & LOWER PART OF RIBS |
| 143 | BRACING, REST PLATFORMS, LADDERS & GRATING FOR SPIR |
| 144 | MACHINERY HOUSE SECTIONS |
| 145 | MACHINERY HOUSE SECTIONS FOR EAST & WEST SIDES |
| 146 | FRONT OF SHEAVE ROOM |
| 147 | FRAMING AROUND ELEVATOR MACHINERY ROOM |
| 148 | MACHINERY HOUSE WALL SECTIONS AND COLUMNS |
| 149 | MACHINERY HOUSE WALL SECTIONS CEILINGS CEILING CHAN |
| 150 | MACHINERY HOUSE PARTITION & CRANE |
| 151 | MACHINERY HOUSE SECTIONS |
| 152 | ANGLE PURLINS – MACHINERY HOUSES |
| 153 | MACHINERY HOUSE ROOF PLATES |
| 154 | PLATFORMS OVER MAIN SHEAVE BEARINGS |
1934 Original COE Design Drawings Sheet Number & Sheet Name
| G-001 | COVER SHEET AND INDEX CCC-RRB-G001.DGN |
| 1 | ORIGINAL GENERAL PLAN AND ELEVATION |
| 1A | AS-BUILT GENERAL PLAN AND ELEVATION |
| SHEET 2 | TOPOGRAPHY AND BORINGS |
| SHEET 3 | MAIN PIERS B AND C |
| SHEET 3A | MAIN PIERS B AND C |
| SHEET 4 | PIERS A AND D |
| SHEET 4A | PILES UNDER ABUTMENTS A AND D |
| SHEET 5 | LIFT SPAN STRESS SHEET |
| SHEET 6 | TOWER STRESS SHEET |
| SHEET 7 | CROSS SECTION OF LIFT SPAN |
| SHEET 8 | LIFT SPAN DETAILS |
| SHEET 9 | COUNTERWEIGHTS |
| SHEET 10 | TOP OF IRON |
| SHEET 11 | HOUSES |
| SHEET 11A | REVISIONS TO HOUSES |
| SHEET 11B | REVISIONS TO HOUSES |
| SHEET 11C | HOUSES |
| SHEET 12 | SPAN LOCKS AND RAIL LOCKS |
| SHEET 13 | MACHINERY |
| SHEET 13A | MACHINERY (CHANGE ORDER No 1) |
| SHEET 14 | SHEAVES |
| SHEET 15 | TOWER BASE |
| 452 E-14-1 | PROPOSED MOD. FOR PILE FOUNDATION |
| 436 E-14-1 | STEEL SHEETING CUT-OFF LEFT IN PLACE |
1934 Operating Machinery Shop Drawings Sheet Number & Sheet Name
| M-1 | COVER SHEET AND INDEX |
| B1 | MAIN SHEAVES |
| M-2 | OPERATING MACHINERY |
| M-3 | OPERATING MACHINERY |
| M-4 | OPERATING MACHINERY |
| M-5 | OPERATING MACHINERY |
| M-6 | OPERATING MACHINERY |
| M-7 | OPERATING MACHINERY |
| M-7A | OPERATING MACHINERY |
| M-8 | OPERATING MACHINERY & TRACK MATERIAL |
| M-9 | TRACK MATERIAL |
| M-10 | OPERATING MACHINERY |
| M-11 | OPERATING MACHINERY |
| M-12 | TURN BOLT & KEY LISTS |
| M-13 | GENERAL PLAN - OPERATING MACHINERY |
| M-14 | TRACK PLAN AND SPAN LOCK |
1935 Erection Plan Sheet Number & Sheet Name
| P-1 | ERECTION PLAN MAIN COUNTERWEIGHT BOXES |
| P2 | ERECTION PLAN – SOUTH TOWER |
| P3 | ERECTION PLAN – NORTH TOWER SPAN |
| P4 | ERECTION PLAN OF NORTH & SOUTH TOWERS |
| P4-A | PLAN SHOWING SECTIONS THROUGH TOP OF TOWERS |
| P5 | ERECTION DIAGRAM |
| P5A | ERECTION DIAGRAM |
| P6 | ERECTION PLAN OF MACHINERY HOUSE |
| P6A | ERECTION PLAN OF MACHINERY HOUSE |
| P7 | ADJ. FOR TOWER AT U1-UPPER SPAN LOCK, ASM. GUIDE ROLLER ADJ. AT TOP OF TOWERS |
| P8 | TRACK PLAN – NORTH TOWER |
| P8A | TRACK PLAN – NORTH TOWER |
| P9 | TRACK PLAN –SOUTH TOWER |
| P9A | TRACK PLAN –SOUTH TOWER |
| P10 | TIE PLAN |
| P11 | GENERAL PLAN |
| P12 | ROPE PLAN |
| P13 | PLAN OF RE-INFORCING CONC. FLOORS, OPER. HOUSE, STORAGE ENGIN TRNS. RM. |
| P14 | ERECTION PLAN FOR SPIRES ON TOP OF MACHINE HOUSES NORTH & SOUTH TOWERS |
| P15 | PLAN OFRE0ENFORCING FLOOR MACHINERY HOUSE |
| 1 | ERECTION PLATFORM AT TOP OF TOWER (REVISED 5/10/35) |
1936 Machinery Houses Drawings 3 sheets with no names 3 sheets with no names 3 sheets with no names
File details come from the government source that posted it. Updated .