1935-ERECTION-PLAN.pdf
PDF 4 MB Posted
- Attached to
- Cape Cod Canal, Buzzards Bay, MA ? Painting and Steel Repairs, Vertical Lift Railroad Bridge
- Solicitation number
- W912WJ25B0001
About this file
This is a set of detailed engineering drawings from 1935 showing the erection plans for the Cape Cod Railroad Bridge, a vertical lift railway bridge at Buzzards Bay, Massachusetts. The drawings consist of 22 detailed engineering sheets that provide comprehensive construction and assembly information for different components of the bridge structure.
The plans include specifications for the main counterweight boxes, north and south towers, tower spans, machinery houses, track layouts, tie arrangements, rope systems, and reinforced concrete floors. Key components detailed in the drawings include the tower structures rising 257 feet tall, a 544-foot main lift span, 128-foot approach spans, guide roller adjustments, spires for the machinery houses, and various structural sections showing assembly details. The drawings provide precise measurements, cross-sections, elevation views, and assembly instructions that were used to construct this bolted and riveted steel through-truss bridge designed to lift vertically to allow marine vessel passage while accommodating rail traffic across the Cape Cod Canal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 0008 Attachment.pdf | ||
| Specifications - Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| Specifications - Amendment 0006.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| USCG Bridge Lighting Regulations.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| SHOP_DRAWINGS-1_TO_50.pdf | ||
| 2022 Routine Inspection Report.pdf | ||
| SHOP_DRAWINGS-51_TO_100.pdf | ||
| Record Drawing Index.docx | DOCX document | |
| 1934-ORIGINAL-COE-DESIGN-DRAWINGS.pdf | ||
| 1934-OPERATING-MACHINERY-SHOP-DRAWINGS.pdf | ||
| SHOP_DRAWINGS-102_TO_154.pdf | ||
| 2022 Routine Inspection ME Final Report.pdf | ||
| 1936-OPER-HOUSE.pdf | ||
| Drawing Index.xlsx | XLSX spreadsheet |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1935 ERECTION PLAN OF CAPE CODE RAILROAD BRIDGE
DRAWING # DESCRIPTION
P-1 ERECTION PLAN MAIN COUNTERWEIGHT BOXES
P2 ERECTION PLAN – SOUTH TOWER
P3 ERECTION PLAN – NORTH TOWER SPAN
P4 ERECTION PLAN OF NORTH & SOUTH TOWERS
P4-A PLAN SHOWING SECTIONS THROUGH TOP OF TOWERS
P5 ERECTION DIAGRAM
P5A ERECTION DIAGRAM
P6 ERECTION PLAN OF MACHINERY HOUSE
P6A ERECTION PLAN OF MACHINERY HOUSE
P7 ADJ. FOR TOWER AT U1-UPPER SPAN LOCK, ASM. GUIDE ROLLER ADJ. AT TOP OF TOWERS
P8 TRACK PLAN – NORTH TOWER
P8A TRACK PLAN – NORTH TOWER
P9 TRACK PLAN –SOUTH TOWER
P9A TRACK PLAN –SOUTH TOWER
P10 TIE PLAN
P11 GENERAL PLAN
P12 ROPE PLAN
P13 PLAN OF RE-INFORCING CONC. FLOORS, OPER. HOUSE, STORAGE ENGIN TRNS. RM.
P14 ERECTION PLAN FOR SPIRES ON TOP OF MACHINE HOUSES NORTH & SOUTH TOWERS
P15 PLAN OFRE0ENFORCING FLOOR MACHINERY HOUSE
1 ERECTION PLATFORM AT TOP OF TOWER (REVISED 5/10/35)
LIST OF ABBREAVATIONS: ADJ. ADJUSTMENT
ASM. ASSEMBLY
CONC. CONCRETE
OPER. OPERATORS
TRANS. TRANSFORMER
RM. ROOM
File details come from the government source that posted it. Updated .