W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9aof16_C1a-0000.pdf

PDF 34 MB Posted

Attached to
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
Solicitation number
W912QR25R0016
Issued by

About this file

This appears to be an announcement of a solicitation for the Rough River Dam Safety Modification Phase II project, focusing on new outlet works and cutoff wall construction at Rough River Lake in Falls of Rough, KY. The project is being managed by the Department of the Army Corps of Engineers Engineering District Louisville and is being issued as a full and open competition with a HUBZone 10% price evaluation preference and subcontracting plan requirement for large businesses.

The solicitation requires contractor services for planning, programming, administration, management, supervision, communications, and inspection activities. Quotes are due March 20, 2025, at 10:00 AM EST, with submission required through PIEE. The contract will be awarded as a single firm-fixed-price contract, with payment via Electronic Funds Transfer. Pricing must be complete and realistic across all line items in the price breakout schedule. The work falls under NAICS code 237990, and contractors must be registered in SAM.gov prior to quote submission.

View the file

Other files

File Type Posted
W912QR25R0016_CERT_Final__Plans-0009.pdf PDF
W912QR25R0016_CERT_Final_Specs-0009.pdf PDF
W912QR25R0016_CERT_Final_V1A_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_V1B_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0008.pdf PDF
W912QR25R0016_CERT_Final__V3_CTWSTR_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0007.pdf PDF
W912QR25R0016-0006.pdf PDF
W912QR25R0016_CERT_Final_Plans-0005.pdf PDF
W912QR25R0016_CERT_Final_Specs-0005.pdf PDF
W912QR25R0016_CERT_Final_EnviroAssess-0005.pdf PDF
W912QR25R0016_CERT_Final_Plans-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0003.pdf PDF
W912QR25R0016_CERT_Final_Vol5_ MFR_ConcreteMatTest-0003.pdf PDF
W912QR25R0016_CERT_Final_Plans-0003.pdf PDF
Site Visit Sign In Sheet.docx DOCX document
W912QR25R0016_CERT_Final_Specs-0002.pdf PDF
Virtual Registration.pdf PDF
W912QR25R0016_CERT_Final_Specs-0001.pdf PDF
W912QR25R0016 0001.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_18of20_E2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_20of28_D1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_9of20_C2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_3of9_2B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_15of28_B1-0000.pdf PDF
W912QR25R0016_CERT_Final_V4c_Specs-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_13of16_F-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_14of16_G-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_7of16_B5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_1of20-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_10of20_C3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_16of16_I-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_1of16-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_3of28_A2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGBR_MainReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_10bof16_C2b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_19of20_E3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1941_GeoReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_8of9_4C-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_4of16_B2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_2of20_A-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1953_DesignMemo1-0000.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Rough River Dam Safety Modification Project Phase II - New Outlet Works and Cutoff Wall, Rough River Reservoir, Falls of Rough, KY

P2: 145870

Design-Bid-Build

Geotechnical Information Report (GIR) Vol. 6 (9a of 16) Appendix C1a

Certified Final

20 December 2024

W912QR25R0016

ARIMS: 1200

Disposition: Permanent

W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9aof16_C1a-0000

Rough River Dam Geotechnical Data Report for Tunnel Construction

Volume 6: Project GIR

Appendix C1a - Soil Laboratory Test Results (9a of 16)

ROUGH RIVER, FALLS OF ROUGH, KY

LOUISVILLE DISTRICT, LRD DIVISION

ROUGH RIVER, FALLS OF ROUGH, KY

LOUISVILLE DISTRICT, LRD DIVISION

Appendix A

SYNOPSIS OF CONSTRUCTION HISTORY AND PERFORMANCE

Appendix B

BORING LOCATION PLANS AND BORING LOGS

Appendix C

SOIL AND ROCK TESTING AND ANALYSES BY

INVESTIGATION

Appendix D

INSTRUMENTATION AND MONITORING

Appendix E

ANALYSES OF THE UPSTREAM FILTER AND DEWATERING

Appendix F

ANALYSES OF THE DOWNSTREAM COFFERDAM AND DEWATERING

Appendix G

ANALYSES OF DOWNSTREAM FILTER FOR STILLING BASIN ABANDONMENT

Appendix H

ANALYSES OF CUTOFF WALL WORK PLATFORM

Appendix I

ANALYSES OF UPLAND DISPOSAL AREA AND ARCHERY BERM

INTRODUCTION

This appendix is presented in two major sections; section C1 provides laboratory test results and some analyses of the soils at the project site while section C2 provides similar types of presentations for the rock.

The information is temporally organized by investigation or O&M activity, each of which has the first page bookmarked. To assist the reader in spatially locating the borings, the last two pages of this appendix provide a table in which the boring identifications have been correlated to the sub-areas as shown on the ‘Overall BLP’ in Appendix B.

C-1

Appendix C1a – Laboratory Test Results (Soil)

1996 Phase I Special Study

2002 Sinkhole Evaluation

2003 DSAP Evaluation

2007 DSAP Construction PZ Replacement Cutoff Wall

2007 Special Study 700 Series

2007 Aquatrack Geophysical Investigation

2012 Subsurface Characterization Report

2013 Report of Geotechnical Exploration

2015 Instrumentation Upgrade

2016‐17 Phase 1B Grouting and Geotechnical Exploration

2017 Instrumentation Upgrade

2019 Geotechnical Exploration

2021 Analysis of Native Valley Soils

C-2

Project: Prepared By: Date:

Subject: Checked By: Date:

Gradation Summary

Historical Borings

D values

F-205 (1.0'- 2.6')

F-205 (3.0'- 4.6')

F-205 (7.0'- 9.1')

F-205 (15.2'- 16.6')

F-205 (17.0'- 19.0')

F-205 (19.0'- 20.8')

F-205 (24.4'- 26.0')

F-205 (34.0'- 36.0')

F-205 (40.3'- 41.9')

F-205 (46.2'- 47.5')

F-40 (9.5'- 11.5')

F-40 (20.0'- 22.0')

B-50 (7.0'- 10.0')

B-52 (3.0'- 9.0')

B-55 (6.0'- 10.0')

10 0.004 0.001 0.001 0.009 0.087 0.005 Embankment 20 0.024 0.009 0.011 0.033 0.110 0.027 0.005 0.003 0.005 0.002 0.004 30 0.047 0.024 0.029 0.080 0.120 0.058 0.013 0.007 0.009 0.008 0.005 0.005 0.009 0.003 Foundation Soils (CL) 40 0.070 0.040 0.053 0.100 0.140 0.089 0.026 0.013 0.014 0.011 0.008 0.009 0.016 0.008 50 0.090 0.059 0.076 0.120 0.150 0.110 0.045 0.020 0.022 0.015 0.011 0.014 0.003 0.022 0.017 Foundation Soils (ML) 60 0.110 0.080 0.099 0.140 0.160 0.130 0.070 0.031 0.040 0.021 0.015 0.017 0.008 0.031 0.033 70 0.120 0.099 0.110 0.150 0.170 0.150 0.099 0.046 0.067 0.031 0.021 0.021 0.030 0.044 0.063 Foundation Soils (SM) 80 0.140 0.130 0.130 0.160 0.190 0.160 0.120 0.068 0.099 0.050 0.034 0.028 0.089 0.067 0.130 90 0.180 0.150 0.160 0.180 0.220 0.190 0.160 0.098 0.140 0.090 0.100 0.047 0.160 0.140 0.260 Foundation Soils (SP)

100 0.280 0.280 0.280 0.300 0.330 0.450 0.300 0.270 0.280 0.280 2.000 0.500 5.000 5.000

REFERENCES:

F-205 DM No. 1, Plate 3-2, 3-3 F-40 DM No. 1, Plate 3-25 B-50 DM No. 1, Plate 3-29 B-52 DM No. 1, Plate 3-30 B-55 DM No. 1, Plate 3-31

Historical Borings

Dam Safety Modification Study Alsip, Stephanie 15 Oct 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 29 Oct 2008

0.0010.010.1110

Grain Size (mm)

Pe rc en t F in er b y

W ei gh t

F-205, 1.0-2.6 F-205, 3.0-4.6 F-205, 7.0-9.1 F-205, 15.2-16.6 F-205, 17.0-19.0 F-205, 19.0-20.8 F-205, 24.4-26.0 F-205, 34.0-36.0 F-205, 40.3-41.9 F-205, 46.2-47.5 F-40, 9.5-11.0 F-40, 20.0-22.0 B-50, 7.0-10.0 B-52, 3.0-9.0 B-55, 6.0-10.0

C-3

Permeability Summary

Minimum ft/sec Average ft/sec Standard Deviation ft/sec Maximum ft/sec Median ft/sec Variance

5.67E-11 9.06E-09 1.77E-08 5.75E-08 1.25E-09 3.13E-16

Source / Comments

DM No. 3, Page 3

DM No. 1, Plate 3-28Lean clay (CL)

Sandy clay (CL)

CL

Material Description

K (ft/min)

1.37E-10

K (ft/sec)

Original Investigation Embankment

Hogan, Chris 16 Jan 2004 Rough River Dam, Green River Basin, Kentucky O'Leary, Tim 22 Jan 2004 Dam Safety Assurance Program Evaluation Report

25.4-26.4

B-55

7.0-10.0

3.0-9.0

6.0-10.0

35.0-36.6

F-218

Depth (ft)

3.0-4.5 9.1-10.6

2.20E-08 3.45E-06

Pressure (tsf)

ML

Sandy clay (CH) 5.67E-11 4.95E-09

3.67E-10 5.75E-08 1.77E-09 1.31E-08

1.15E-08 5.17E-10

7.33E-10 6.89E-07 3.10E-08

2.97E-07 4.40E-08

0.51 4.06

1.06E-07 7.87E-07 8.20E-09 3.40E-09

0.50 4.03 0.51 4.05

Boring No.

Direction

B-50

B-52

Version 3/13/2009 Original Permeabilities: Embankment

C-4

Permeability Summary

F-206 Vertical, Lean Clay (CL) - 6 Samples Minimum ft/sec Average ft/sec Standard Deviation ft/sec Maximum ft/sec Median ft/sec Variance

F-206 Horizontal, Lean Clay (CL) - 4 Samples Minimum ft/sec Average ft/sec Standard Deviation ft/sec Maximum ft/sec Median ft/sec Variance

F-206 Vertical, Sandy Clay (CL) - 2 Samples Minimum ft/sec Average ft/sec Standard Deviation ft/sec Maximum ft/sec Median ft/sec Variance

F-206 Horizontal, Sandy Clay (CL) - 2 Samples Minimum ft/sec Average ft/sec Standard Deviation ft/sec Maximum ft/sec Median ft/sec Variance

1.02E-08 4.69E-09 2.21E-17

Source / Comments

DM No. 1, Plate 3-69

DM No. 3, Pages 13 and 14

3.23E-09 1.04E-17

8.43E-10 5.10E-09 4.71E-09

7.80E-09 2.98E-09 1.69E-09

Boring No.

Vertical

1.90E-10

F-206

N/A

15.0-16.4

17.0-18.5

Relief Well

25.1-26.5

Depth (ft)

N/A

Direction

Vertical

Horizontal

Vertical

Horizontal

Vertical

Horizontal

N/A 1.67E-09

Pressure (tsf) 0.25 2.02

0.25 2.03

0.25 2.03

2.41E-07 9.18E-08 1.72E-09 1.67E-09

1.02E-08 8.00E-09 1.10E-07 5.62E-08

1.03E-07 1.00E-07 1.00E-07

K (ft/sec)

2.73E-10 1.90E-10 1.37E-09 8.43E-10 7.80E-09 6.23E-09

K (ft/min)

1.64E-08 1.14E-08 8.23E-08 5.06E-08 4.68E-07 3.74E-07 6.12E-07

7.0-8.5

9.0-10.6

4.80E-07 6.59E-06 3.37E-06

21 Jan 2004 Dam Safety Assurance Program Evaluation Report

Original Investigation

Hogan, Chris 16 Jan 2004 Rough River Dam, Green River Basin, Kentucky O'Leary, Tim

Foundation

Material Description

Lean clay (CL)

Sandy clay (CL)

Lean clay (CL)

1.44E-05 5.51E-06

5.62E-08 8.30E-08 3.79E-08 1.10E-07 8.30E-08 1.44E-15

9.18E-08 1.66E-07 1.05E-07 2.41E-07 1.66E-07 1.11E-14

Version 3/13/2009 Original Permeabilities: Foundation

C-5

Statistical Analysis of Rock Permeabilities

Loc.

Minimum ft/sec Average ft/sec Standard Deviation ft/sec Maximum ft/sec Median ft/sec Variance

5.56E-06 4.04E-06 1.15E-05 3.57E-06

19 Dec 2003 Rough River Dam, Green River Basin, Kentucky T. O'Leary 02 Feb 2004

A. Evans

P er m ea bi li ty ft /s ec

Dam Safety Assurance Program Evaluation Report

Original Investigation Borings

FC-243 DC-245 C-246 C-247 C-248

1.14E-06 5.54E-06 1.21E-06 4.95E-06 1.08E-06 9.77E-07 6.38E-07 8.90E-07 5.43E-06 1.74E-06 4.95E-06 4.58E-07

7.61E-07 3.22E-06 2.42E-06 1.62E-05 7.35E-07 7.51E-06 3.79E-05 7.11E-07 2.14E-06

2.72E-06 8.08E-06 1.98E-06 2.44E-06 3.79E-05 1.95E-05

9.52E-06 9.07E-11

4.58E-07 3.79E-05

6.38E-06 2.72E-06

Rock Permeability: Summary

C-6

Rock Permeability from Borehole Pressure Testing Ref: Erdmann, F.W. Borehole Pressure Test Procedures . 27 December 2001

Boring No. Angle (fom Vertical) deg Top of Ground Elevation feet Core Size (see table below) Core Diameter in Ground Water Elevation feet

RW RX EW EX AW AX BW BX NW NX HW HX PW PX SW SX UW UX ZW ZX

1.44 1.44 1.81 1.81 2.25 2.25 2.88 2.88 3.5 3.5 4.5 4.5 5.5 5.5 6.63 6.63 7.63 7.63 8.63 8.63

502.1 497.1 5.0

497.1 492.1 5.0

492.0 487.1 4.9

487.1 482.1 5.0

482.1 477.1 5.0

477.1 472.1 5.0

472.1 467.1 5.0

467.1 462.1 5.0

462.1 457.1 5.0

457.1 452.1 5.0

452.1 447.1 5.0

447.1 432.5 14.6 0.0 191.5 51.0 0.0

7,906 7,906

7,906 7,906 7,906 7,906

3,528 7,906

Cp

7,906 7,906 8,021

Core Size

Outside Diameter (in)

33.0 5.0

19.0 5.0

Tested Length (feet)

Elevation (feet)

Max. Water Pressure

(psi)

Test Duration

(min)

Permeability (ft/sec)

5.56E-06 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00

0.00E+00 0.00E+00

113.1

131.8 7.61E-07 136.4

145.6

7,906125.1

150.2 242.5

72.7 82.5 92.0

63.1

23.0 5.0 0.0

30.0 5.0 0.0

83.0 5.0

0.0

21.0 5.0 0.0

51.0 0.0

0.0

0.4 80.8 51.0

76.2 48.9 0.0

85.4

35.0 5.0

37.0 5.0

39.0 90.0 51.0 0.05.0 0.4

5.0

69.2 43.9 0.0

5.0 0.0 51.0 0.094.6

0.0

0.0

0.00E+0041.0

53.1 38.9 0.0

7.35E-07

141.0 7.11E-07

0.4

43.8 28.9 0.0

43.0 0.0 99.2 51.0 0.0

48.5 34.0

DC-245

3.5

526.0 475.0

0.0

NX

Original Investigation Borings Left Abutment

Dam Safety Assurance Program Evaluation Report A. Evans 19 Dec 2003 Rough River Dam, Green River Basin, Kentucky T. O'Leary 02 Feb 2004

39.2 23.9

Pressure (ft water)

Gage Column Friction

Loss Net

0.05.0 1.4

Water Loss

(gpm)

Length Tested (feet)

17.0

Version 01272004 Rock Permeability: DC-245

C-7

Rock Permeability from Borehole Pressure Testing Ref: Erdmann, F.W. Borehole Pressure Test Procedures . 27 December 2001

Boring No. Angle (fom Vertical) deg Top of Ground Elevation feet Core Size (see table below) Core Diameter in Ground Water Elevation feet

RW RX EW EX AW AX BW BX NW NX HW HX PW PX SW SX UW UX ZW ZX

1.44 1.44 1.81 1.81 2.25 2.25 2.88 2.88 3.5 3.5 4.5 4.5 5.5 5.5 6.63 6.63 7.63 7.63 8.63 8.63

531.4 526.4 5.0

526.4 521.4 5.0

521.4 516.4 5.0

516.4 511.4 5.0

511.4 506.4 5.0

506.4 501.4 5.0

501.4 496.4 5.0

496.4 491.4 5.0

491.4 486.4 5.0

486.4 481.4 5.0

481.4 472.6 8.8

5.0 0.0

Water Loss

(gpm)

Length Tested (feet)

12.0 27.7 14.0

Pressure (ft water)

Gage Column Friction

Loss Net

0.0

Dam Safety Assurance Program Evaluation Report A. Evans 19 Dec 2003 Rough River Dam, Green River Basin, Kentucky T. O'Leary 02 Feb 2004 Original Investigation Borings Right Abutment

FC-243

3.5

545.4 475.0

0.0

NX

32.3 19.0 0.0

40.0 0.0 92.3 64.0 0.0

36.9 24.0 0.0

0.00E+0033.0

43.8 29.0 0.0

0.00E+00

123.2 0.00E+00

0.0

5.0

48.5 34.0 0.0

5.0 0.0 59.0 0.076.2

0.0

30.0 69.2 54.0 0.05.0 0.0

25.0 5.0

27.0 5.0 49.0 0.0

0.0

0.0 57.7 44.0

53.1 39.0 0.0

62.3

0.0

16.0 5.0 0.0

19.0 5.0 0.0

21.0 5.0 0.0

51.3 60.9 72.8

41.7

82.5

101.7 0.00E+00 111.3

135.2

7,90692.1

156.3

0.00E+00 0.00E+00 0.00E+00

0.00E+00

Permeability (ft/sec)

0.00E+00 0.00E+00 0.00E+00

Core Size

Outside Diameter (in)

23.0 5.0

14.0 5.0

Tested Length (feet)

Elevation (feet)

Max. Water Pressure

(psi)

Test Duration

(min) Cp

7,906 7,906 7,906 7,906 7,906

7,906 7,906 7,906 7,906 5,211

Version 01272004 Rock Permeability: FC-243

C-8

Rock Permeability from Borehole Pressure Testing Ref: Erdmann, F.W. Borehole Pressure Test Procedures . 27 December 2001

Boring No. Angle (fom Vertical) deg Top of Ground Elevation feet Core Size (see table below) Core Diameter in Ground Water Elevation feet

RW RX EW EX AW AX BW BX NW NX HW HX PW PX SW SX UW UX ZW ZX

1.44 1.44 1.81 1.81 2.25 2.25 2.88 2.88 3.5 3.5 4.5 4.5 5.5 5.5 6.63 6.63 7.63 7.63 8.63 8.63

485.3 436.2 64.1

485.3 481.4 5.1

481.4 477.4 5.2

477.4 473.8 4.7

473.8 469.9 5.1

469.9 466.1 5.0

466.1 462.3 5.0

462.3 458.5 5.0

458.5 454.6 5.1

454.6 450.8 5.0

450.8 447.0 5.0

447.0 443.1 5.1

443.1 440.1 3.9

440.1 436.2 5.1

5.0 6.0

Water Loss

(gpm)

Length Tested (feet)

20.0 46.2 3.8

Pressure (ft water)

Gage Column Friction

Loss Net

0.0

Dam Safety Assurance Program Evaluation Report A. Evans 19 Dec 2003 Rough River Dam, Green River Basin, Kentucky T. O'Leary 02 Feb 2004 Original Investigation Borings Right Abutment

C-246 3.5

489.1 475.0

40.0

NX

30.0 3.8 0.0

27.0 0.6 62.3 14.1 0.0

32.3 7.7 0.0

2.72E-0626.0

36.9 11.7 0.0

7.51E-06

69.5 2.14E-06

2.0

5.0

41.5 14.1 0.0

5.0 0.8 14.1 0.060.0

0.0

24.0 55.4 14.1 0.05.0 0.6

21.0 5.0

23.0 5.0 14.1 0.0

0.4

0.8 48.5 14.1

43.8 14.1 0.0

53.1

0.0

14.0 5.0 0.2

16.0 5.0 0.2

18.0 5.0 0.2

29.0 5.0

33.8 40.0 48.6

50.0

55.6

62.6 3.22E-06 67.2

74.1

7,95157.9

76.4 81.0

1.08E-06 8.90E-07 1.74E-06

1.98E-06 2.44E-06 3.79E-05 1.95E-05

Permeability (ft/sec)

4.04E-06 0.00E+00 1.21E-06

Core Size

Outside Diameter (in)

19.0 5.0

13.0 5.0

Tested Length (feet)

Elevation (feet)

Max. Water Pressure

(psi)

Test Duration

(min) Cp

1,062 7,804 7,663 8,264 7,804

7,951 7,951 7,804 7,951

7,804 7,951

0.8 66.9 14.1 0.0

28.0 5.0 10.0 64.6 14.1 0.0 78.7 9,396

49.0 5.0 10.0 113.1 14.1 0.0 127.2 7,804

Version 01272004 Rock Permeability: C-246

C-9

Rock Permeability from Borehole Pressure Testing Ref: Erdmann, F.W. Borehole Pressure Test Procedures . 27 December 2001

Boring No. Angle (fom Vertical) deg Top of Ground Elevation feet Core Size (see table below) Core Diameter in Ground Water Elevation feet

RW RX EW EX AW AX BW BX NW NX HW HX PW PX SW SX UW UX ZW ZX

1.44 1.44 1.81 1.81 2.25 2.25 2.88 2.88 3.5 3.5 4.5 4.5 5.5 5.5 6.63 6.63 7.63 7.63 8.63 8.63

478.3 473.8 5.9

473.8 469.8 5.2

469.8 465.9 5.1

465.9 461.9 5.2

461.9 458.0 5.1

458.0 454.0 5.2

454.0 450.1 5.1

450.1 446.1 5.2

446.1 442.2 5.1

442.2 433.6 11.2

7,663 7,804

7,804 7,663 7,804 4,327

Cp

7,036 7,663 7,804

Core Size

Outside Diameter (in)

22.0 5.0

15.0 5.0

Tested Length (feet)

Elevation (feet)

Max. Water Pressure

(psi)

Test Duration

(min)

Permeability (ft/sec)

1.15E-05 1.14E-06 0.00E+00 9.77E-07 0.00E+00 4.95E-06

54.4

61.3 2.42E-06 77.4

169.7

7,66359.0

42.8 47.4 49.7

34.9

18.0 5.0 0.2

20.0 5.0 0.0

0.2

17.0 5.0 0.0

8.2 0.0

1.2

0.6 53.1 8.2

50.8 8.2 0.0

69.2

23.0 5.0

30.0 5.0

47.0 108.5 8.2 0.05.0 0.0

46.2 8.2 0.0

15.0 10.0 8.2 0.0161.5

0.0

0.0

8.08E-0670.0

41.5 8.2 0.0

0.00E+00

116.7 0.00E+00

0.0

34.6 8.2 0.0

39.2 8.2

C-247 3.5

483.2 475.0

40.0

NX

Original Investigation Borings Right Abutment

Dam Safety Assurance Program Evaluation Report A. Evans 19 Dec 2003 Rough River Dam, Green River Basin, Kentucky T. O'Leary 02 Feb 2004

30.0 4.9

Pressure (ft water)

Gage Column Friction

Loss Net

0.05.0 1.8

Water Loss

(gpm)

Length Tested (feet)

13.0

Version 01272004 Rock Permeability: C-247

C-10

Rock Permeability from Borehole Pressure Testing Ref: Erdmann, F.W. Borehole Pressure Test Procedures . 27 December 2001

Boring No. Angle (fom Vertical) deg Top of Ground Elevation feet Core Size (see table below) Core Diameter in Ground Water Elevation feet

RW RX EW EX AW AX BW BX NW NX HW HX PW PX SW SX UW UX ZW ZX

1.44 1.44 1.81 1.81 2.25 2.25 2.88 2.88 3.5 3.5 4.5 4.5 5.5 5.5 6.63 6.63 7.63 7.63 8.63 8.63

467.9 464.0 5.1

464.0 460.0 5.2

460.0 456.1 5.1

456.1 452.1 5.2

452.1 448.2 5.1

448.2 444.2 5.2

444.2 440.3 5.1

440.3 436.3 5.2

5.0 0.6

Water Loss

(gpm)

Length Tested (feet)

18.0 41.5 0.0

Pressure (ft water)

Gage Column Friction

Loss Net

0.0

Dam Safety Assurance Program Evaluation Report A. Evans 19 Dec 2003 Rough River Dam, Green River Basin, Kentucky T. O'Leary 02 Feb 2004 Original Investigation Borings Right Abutment

C-248 3.5

471.9 471.9

40.0

NX

43.8 0.0 0.0

60.0 0.0 0.0

76.2 0.0 0.0

3.79E-0514.4

91.2 0.0 0.0

0.053.0 5.0

40.0 5.0 0.0 0.0

0.2

8.0 122.3 0.0

106.2 0.0 0.0

92.3

1.0

26.0 5.0 1.2

33.0 5.0 0.2

39.5 5.0 2.0

43.8 60.0 76.2

41.5

91.2

122.3 1.62E-05 92.3

7,663106.2

6.38E-07 5.43E-06 4.58E-07

Permeability (ft/sec)

3.57E-06 5.54E-06 4.95E-06

Core Size

Outside Diameter (in)

46.0 5.0

19.0 5.0

Tested Length (feet)

Elevation (feet)

Max. Water Pressure

(psi)

Test Duration

(min) Cp

7,804 7,663 7,804 7,663 7,804

7,804 7,663

Version 01272004 Rock Permeability: C-248

C-11

1996 Phase I Special Study

2002 Sinkhole Evaluation

2003 DSAP Evaluation

2007 DSAP Construction PZ Replacement Cutoff Wall

2007 Special Study 700 Series

2007 Aquatrack Geophysical Investigation

2012 Subsurface Characterization Report

2013 Report of Geotechnical Exploration

2015 Instrumentation Upgrade

2016‐17 Phase 1B Grouting and Geotechnical Exploration

2017 Instrumentation Upgrade

2019 Geotechnical Exploration

2021 Analysis of Native Valley Soils

C-12

Appendix C1a – Laboratory Test Results (Soil)

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Liquid Limits Ref: ASTM D4318 Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

32 42 36 37 32 33 34 38 34 33 39 32 32.0 42.0 3.0 10.0 35.0 Embankment Fill 46 34 43 29 35 32 28 34 38 32 28.0 46.0 5.0 33.0 35.0 Foundation Soils 31 32 26 22 20 31 34 26 20.0 34.0 5.0 25.0 27.0

31 23 21 25 28 27 21.0 31.0 3.0 12.0 25.0 33 31 31.0 33.0 1.0 2.0 32.0 41 30 30.0 41.0 7.0 60.0 35.0 38 38.0 38.0 - - 38.0

Summary 20 46 5 34 32

Embankment Fill Foundation Soils

28.0 43.0 3.8 14.5 34.6 20.0 46.0 6.6 44.1 29.8

Liquid Limit (percent)

Var. Avg.

Statistical Analysis

Min. Max.

Std.

Dev.

AD-

AD-

AD-

AD-

AD-

AD-

AD-

AD-

12 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 12 Nov 2008

Statistical Analysis of Liquid Limits

Elev.

(feet)

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

AD-

AD-

AD-

AD-

Min.Var. Avg.

(E le va ti on s no t a va il ab le

Min. Max.

Std.

Dev.

Max.

Std.

Dev.

Var. Avg.

Version 04012005 Phase I Special Study (1996) Atterberg: LL Values

C-13

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Plasticity Indices Ref: ASTM D4318 Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

16 24 18 18 17 19 18 21 13 14 21 15 13.0 24.0 3.0 9.0 17.0 Embankment Fill 28 17 22 10 17 12 11 17 18 14 10.0 28.0 5.0 29.0 16.0 Foundation Soils 14 12 8 4 5 11 11 7 4.0 14.0 3.0 12.0 9.0

13 6 5 10 10 7 5.0 13.0 3.0 9.0 8.0 12 11 11.0 12.0 0.0 0.0 11.0 21 11 11.0 21.0 7.0 50.0 16.0 21 21.0 21.0 - - 21.0

Summary 4 28 5 31 14

Embankment Fill Foundation Soils

10.0 24.0 3.6 13.1 16.8 4.0 28.0 6.0 36.3 11.4

Plasticity Index (percent)Elev.

(feet)

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

AD-

AD-

AD-

AD-

12 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 13 Nov 2008

Statistical Analysis of Plasticity Indices

AD-

AD-

AD-

AD-

AD-

AD-

AD-

AD-

Var. Avg.

Statistical Analysis

Min. Max.

Std.

Dev.

(E le va ti on s no t a va il ab le

Min. Max.

Std.

Dev.

Std.

Dev.

Var. Avg.Var. Avg. Min. Max.

Version 04012005 Phase I Special Study (1996) Atterberg: PI Values

C-14

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

555 - - - - - - - - - - - - - - - - - 554 - 14.0 - - - - - - - - - - 14.0 14.0 - - 14.0 Rock Fill 553 - - - - 18.0 - - - - - - - 18.0 18.0 - - 18.0 Foundation Soils 552 - - - - - - - 15.0 - - 15.0 - 15.0 15.0 0.0 0.0 15.0 Embankment Fill 551 - - - - - - - - - - - - - - - - - Sand Filter 550 - - - - - - - - - - - - - - - - - 549 - 16.0 - - 15.0 - - - - - - - 15.0 16.0 0.7 0.5 15.5 548 - - - - - - - 15.0 - - 17.0 - 15.0 17.0 1.4 2.0 16.0 547 - - - - - - - - - - - - - - - - - 546 - - - - - - - - - - - - - - - - - 545 - - - - - - - - - - - - - - - - - 544 - 18.0 - - 19.0 - - - - - - - 18.0 19.0 0.7 0.5 18.5 543 - - - - - - - 16.0 - - 17.0 - 16.0 17.0 0.7 0.5 16.5 542 - - - - - - - - - - - - - - - - - 541 - - - - - - - - - - - - - - - - - 540 - - - - - - - - - - - - - - - - - 539 - 14.0 - - 18.0 - - - - - - - 14.0 18.0 2.8 8.0 16.0 538 - - - - - - - 22.0 - - 17.0 - 17.0 22.0 3.5 12.5 19.5 537 - - - - - - - - - - - - - - - - - 536 - - - - - - - - - - - - - - - - - 535 - - - - - - - - - - - - - - - - - 534 - 11.0 - - 17.0 - - - - - - - 11.0 17.0 4.2 18.0 14.0 533 - - - - - - - 18.0 - - 18.0 - 18.0 18.0 0.0 0.0 18.0 532 - - - - - - - - - - - - - - - - - 531 - - - - - - - - - - - - - - - - - 530 - - - - - - - - - - - - - - - - - 529 - 16.0 - - 21.0 - - - - - - - 16.0 21.0 3.5 12.5 18.5 528 - - - - - - - 17.0 - - 18.0 - 17.0 18.0 0.7 0.5 17.5 527 - - - - - - - - - - - - - - - - - 526 - - - - - - - - - - - - - - - - - 525 - - - - - - - - - - - - - - - - - 524 - 18.0 - - 16.0 - - - - - - - 16.0 18.0 1.4 2.0 17.0

Moisture Content (percent)

Var. Avg.

Statistical Analysis

Min. Max.

Std.

Dev.

AD-

AD-

AD-

AD-

AD-

AD-

AD-

AD-

05 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 10 Nov 2008

Statistical Analysis of Moisture Contents

Elev.

(feet)

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

AD-

AD-

AD-

AD-

Version 04012005 Phase I Special Study (1996) Moisture Contents: MC Values

C-15

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

05 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 10 Nov 2008

Statistical Analysis of Moisture Contents

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

523 - - - - - - - 19.0 - - 19.0 - 19.0 19.0 0.0 0.0 19.0 522 - - - - - - - - - - - - - - - - - 521 - - - - - - - - - - - - - - - - - 520 - - - - - - - - - - - - - - - - - 519 - 16.0 - - 19.0 - - - - - - - 16.0 19.0 2.1 4.5 17.5 518 - - - - - - - 19.0 - - 19.0 - 19.0 19.0 0.0 0.0 19.0 517 - - - - - - - - - - - - - - - - - 516 4.0 - - - - - - - - - - - 4.0 4.0 - - 4.0 515 - - - - - - - - - - - - - - - - - 514 9.0 17.0 - - 16.0 4.0 - - - - - - 4.0 17.0 6.1 37.7 11.5 513 6.0 - - - - - - 16.0 - - 17.0 - 6.0 17.0 6.1 37.0 13.0 512 - - - - - - 0.0 - - - - - - - - - - 511 0.0 - 27.0 - - - - - - - - 4.0 0.0 27.0 14.6 212.3 10.3 510 21.0 - 14.0 32.0 - - - - 25.0 19.0 - - 14.0 32.0 6.8 45.7 22.2 509 - 18.0 11.0 - 16.0 17.0 - - 19.0 16.0 - - 11.0 19.0 2.8 7.8 16.2 508 20.0 - 15.0 - - - - 15.0 - - 21.0 - 15.0 21.0 3.2 10.3 17.8 507 17.0 - - - - - 21.0 - - - - - 17.0 21.0 2.8 8.0 19.0 506 - - 18.0 - - - - - - - - 21.0 18.0 21.0 2.1 4.5 19.5 505 18.0 - 16.0 18.0 - - - - 18.0 21.0 - - 16.0 21.0 1.8 3.2 18.2 504 17.0 15.0 - - 16.0 19.0 - - - - - - 15.0 19.0 1.7 2.9 16.8 503 - - 18.0 - - - - 19.0 - - 14.0 - 14.0 19.0 2.6 7.0 17.0 502 19.0 - 15.0 - - - 17.0 - - - - - 15.0 19.0 2.0 4.0 17.0 501 18.0 - - - - - - - - - - 19.0 18.0 19.0 0.7 0.5 18.5 500 - - 16.0 17.0 - - - - 19.0 18.0 - - 16.0 19.0 1.3 1.7 17.5 499 15.0 12.0 19.0 - 13.0 17.0 - - - - - - 12.0 19.0 2.9 8.2 15.2 498 18.0 - - - - - - 19.0 - - 18.0 - 18.0 19.0 0.6 0.3 18.3 497 - - 21.0 - - - 17.0 - - - - - 17.0 21.0 2.8 8.0 19.0 496 19.0 - 4.0 - - - - - - - - 19.0 4.0 19.0 8.7 75.0 14.0 495 27.0 - - 18.0 - - - - 19.0 19.0 - - 18.0 27.0 4.2 17.6 20.8 494 - 20.0 5.0 - 15.0 17.0 - - - - - - 5.0 20.0 6.5 42.3 14.3 493 33.0 - 19.0 - - - - 18.0 - - 18.0 - 18.0 33.0 7.3 54.0 22.0 492 28.0 - - - - - 16.0 - - - - - 16.0 28.0 8.5 72.0 22.0 491 - - 22.0 - - - - - - - - 18.0 18.0 22.0 2.8 8.0 20.0 490 17.0 25.0 32.0 17.0 - - - - 15.0 19.0 - - 15.0 32.0 6.5 41.8 20.8 489 17.0 17.0 - - 15.0 17.0 - - - - - - 15.0 17.0 1.0 1.0 16.5

Version 04012005 Phase I Special Study (1996) Moisture Contents: MC Values

C-16

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

05 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 10 Nov 2008

Statistical Analysis of Moisture Contents

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

488 - - 30.0 - - - - 19.0 - - 19.0 - 19.0 30.0 6.4 40.3 22.7 487 - 20.0 19.0 - - - 16.0 - - - - - 16.0 20.0 2.1 4.3 18.3 486 - 16.0 - - - - - - - - - 22.0 16.0 22.0 4.2 18.0 19.0 485 - - 18.0 19.0 - - - - 19.0 19.0 - - 18.0 19.0 0.5 0.3 18.8 484 - 17.0 9.0 - 20.0 20.0 - - - - - - 9.0 20.0 5.2 27.0 16.5 483 - 18.0 - - - - - 17.0 - - 20.0 - 17.0 20.0 1.5 2.3 18.3 482 - - - - - - 20.0 - - - - - 20.0 20.0 - - 20.0 481 - 15.0 - - - - - - - - - 16.0 15.0 16.0 0.7 0.5 15.5 480 - 13.0 - 15.0 - - - - 16.0 16.0 - - 13.0 16.0 1.4 2.0 15.0 479 - - - - 18.0 18.0 - - - - - - 18.0 18.0 0.0 0.0 18.0 478 - 12.0 - - - - - 17.0 - - 19.0 - 12.0 19.0 3.6 13.0 16.0 477 - - - - - - 21.0 - - - - - 21.0 21.0 - - 21.0 476 - - - - - - - - - - - 19.0 19.0 19.0 - - 19.0 475 - - - 19.0 - - - - 19.0 16.0 - - 16.0 19.0 1.7 3.0 18.0 474 - - - - 21.0 15.0 - - - - - - 15.0 21.0 4.2 18.0 18.0 473 - - - - - - - 18.0 - - 17.0 - 17.0 18.0 0.7 0.5 17.5 472 - - - - - - 18.0 - - - - - 18.0 18.0 - - 18.0 471 - - - 19.0 - 11.0 - - - - - 19.0 11.0 19.0 4.6 21.3 16.3 470 - - - 4.0 - - - - 15.0 17.0 - - 4.0 17.0 7.0 49.0 12.0 469 - - - 10.0 19.0 19.0 - - - - - - 10.0 19.0 5.2 27.0 16.0 468 - - - - - - - 21.0 - - 18.0 - 18.0 21.0 2.1 4.5 19.5 467 - - - - - - 16.0 - - - - - 16.0 16.0 - - 16.0 466 - - - - - - - - - - - 21.0 21.0 21.0 - - 21.0 465 - - - - - - - - 14.0 15.0 - - 14.0 15.0 0.7 0.5 14.5 464 - - - - 20.0 - - - - - - - 20.0 20.0 - - 20.0 463 - - - - - - - 20.0 - - 21.0 - 20.0 21.0 0.7 0.5 20.5 462 - - - - - - 19.0 - - - - - 19.0 19.0 - - 19.0 461 - - - - - - - - - - - 22.0 22.0 22.0 - - 22.0 460 - - - - - - - - 21.0 17.0 - - 17.0 21.0 2.8 8.0 19.0 459 - - - - 20.0 - - - - - - - 20.0 20.0 - - 20.0 458 - - - - - - - 18.0 - - 19.0 - 18.0 19.0 0.7 0.5 18.5 457 - - - - - - 16.0 - - - - - 16.0 16.0 - - 16.0 456 - - - - - - 20.0 - 15.0 - - 20.0 15.0 20.0 2.9 8.3 18.3 455 - - - - - - - 20.0 - 18.0 - - 18.0 20.0 1.4 2.0 19.0 454 - - - - 19.0 - 18.0 20.0 18.0 - - - 18.0 20.0 1.0 0.9 18.8

Version 04012005 Phase I Special Study (1996) Moisture Contents: MC Values

C-17

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

05 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 10 Nov 2008

Statistical Analysis of Moisture Contents

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

453 - - - - - - 22.0 - 15.0 - 18.0 - 15.0 22.0 3.5 12.3 18.3 452 - - - - - - - 17.0 - - - - 17.0 17.0 - - 17.0 451 - - - - 19.0 - 21.0 18.0 19.0 - - 19.0 18.0 21.0 1.1 1.2 19.2 450 - - - - - - 18.0 - 18.0 16.0 - - 16.0 18.0 1.2 1.3 17.3 449 - - - - 20.0 - - 19.0 - - - - 19.0 20.0 0.7 0.5 19.5 448 - - - - 21.0 - 17.0 19.0 22.0 - 16.0 - 16.0 22.0 2.5 6.5 19.0 447 - - - - - - 21.0 - 20.0 - - - 20.0 21.0 0.7 0.5 20.5 446 - - - - 24.0 - - 16.0 6.0 - - 22.0 6.0 24.0 8.1 65.3 17.0 445 - - - - 15.0 - 18.0 18.0 14.0 16.0 - - 14.0 18.0 1.8 3.2 16.2 444 - - - - - - 18.0 - 22.0 - - - 18.0 22.0 2.8 8.0 20.0 443 - - - - 15.0 - - 20.0 - - 21.0 - 15.0 21.0 3.2 10.3 18.7 442 - - - - 14.0 - 24.0 11.0 19.0 - - - 11.0 24.0 5.7 32.7 17.0 441 - - - - - - 18.0 - 23.0 - - 13.0 13.0 23.0 5.0 25.0 18.0 440 - - - - - - - 16.0 - 17.0 - - 16.0 17.0 0.7 0.5 16.5 439 - - - - - - 17.0 19.0 22.0 - - - 17.0 22.0 2.5 6.3 19.3 438 - - - - - - 19.0 - 21.0 - 21.0 - 19.0 21.0 1.2 1.3 20.3 437 - - - - - - - 20.0 - - - - 20.0 20.0 - - 20.0 436 - - - - - - 21.0 20.0 20.0 - - 28.0 20.0 28.0 3.9 14.9 22.3 435 - - - - - - 22.0 - 22.0 25.0 - - 22.0 25.0 1.7 3.0 23.0 434 - - - - - - - 21.0 - - - - 21.0 21.0 - - 21.0 433 - - - - - - 22.0 20.0 20.0 - 26.0 - 20.0 26.0 2.8 8.0 22.0 432 - - - - - - - - 22.0 - - - 22.0 22.0 - - 22.0 431 - - - - - - - 21.0 21.0 - 26.0 27.0 21.0 27.0 3.2 10.3 23.8 430 - - - - - - - 19.0 18.0 25.0 - 26.0 18.0 26.0 4.1 16.7 22.0 429 - - - - - - 18.0 - 18.0 25.0 28.0 - 18.0 28.0 5.1 25.6 22.3 428 - - - - - - - 20.0 - - 28.0 21.0 20.0 28.0 4.4 19.0 23.0 427 - - - - - - - 20.0 17.0 25.0 - 21.0 17.0 25.0 3.3 10.9 20.8 426 - - - - - - - - 20.0 28.0 24.0 - 20.0 28.0 4.0 16.0 24.0 425 - - - - - - - 26.0 - - 22.0 22.0 22.0 26.0 2.3 5.3 23.3 424 - - - - - - 23.0 24.0 17.0 28.0 - 22.0 17.0 28.0 4.0 15.7 22.8 423 - - - - - - 24.0 - 17.0 27.0 22.0 - 17.0 27.0 4.2 17.7 22.5 422 - - - - - - - 30.0 - - 24.0 22.0 22.0 30.0 4.2 17.3 25.3 421 - - - - - - 25.0 24.0 18.0 19.0 - 26.0 18.0 26.0 3.6 13.3 22.4 420 - - - - - - 21.0 - 17.0 16.0 25.0 - 16.0 25.0 4.1 16.9 19.8 419 - - - - - - - 26.0 - - 25.0 27.0 25.0 27.0 1.0 1.0 26.0

Version 04012005 Phase I Special Study (1996) Moisture Contents: MC Values

C-18

Reviewed By: Date:

Approved By: Date:

Statistical Analysis of Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

05 Nov 2008 Rough River Dam, Green River Basin, Kentucky Williams, Carmen 10 Nov 2008

Statistical Analysis of Moisture Contents

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996)

418 - - - - - - 28.0 18.0 18.0 17.0 - 25.0 17.0 28.0 5.0 24.7 21.2 417 - - - - - - 25.0 - 18.0 20.0 25.0 - 18.0 25.0 3.6 12.7 22.0 416 - - - - - - - 17.0 - - 26.0 24.0 17.0 26.0 4.7 22.3 22.3 415 - - - - - - 26.0 17.0 18.0 17.0 - 22.0 17.0 26.0 3.9 15.5 20.0 414 - - - - - - 15.0 - 18.0 16.0 25.0 - 15.0 25.0 4.5 20.3 18.5 413 - - - - - - - 19.0 - - 25.0 17.0 17.0 25.0 4.2 17.3 20.3 412 - - - - - - 14.0 20.0 18.0 16.0 - - 14.0 20.0 2.6 6.7 17.0 411 - - - - - - 14.0 - 21.0 16.0 21.0 - 14.0 21.0 3.6 12.7 18.0 410 - - - - - - - 17.0 - - 21.0 - 17.0 21.0 2.8 8.0 19.0 409 - - - - - - 15.0 18.0 20.0 10.0 - - 10.0 20.0 4.3 18.9 15.8 408 - - - - - - 15.0 - 19.0 16.0 25.0 - 15.0 25.0 4.5 20.3 18.8 407 - - - - - - - 18.0 - - 20.0 - 18.0 20.0 1.4 2.0 19.0 406 - - - - - - 17.0 18.0 19.0 11.0 - - 11.0 19.0 3.6 12.9 16.3 405 - - - - - - 17.0 - 20.0 - 19.0 - 17.0 20.0 1.5 2.3 18.7 404 - - - - - - - 17.0 - 17.0 - - 17.0 17.0 0.0 0.0 17.0 403 - - - - - - 14.0 20.0 18.0 12.0 - - 12.0 20.0 3.7 13.3 16.0 402 - - - - - - - - 14.0 - - - 14.0 14.0 - - 14.0 401 - - - - - - - 11.0 9.0 - - - 9.0 11.0 1.4 2.0 10.0 400 - - - - - - 10.0 14.0 14.0 - - - 10.0 14.0 2.3 5.3 12.7

Summary 4.0 30.0 4.1 16.6 19.1

Embankment Fill Sand Filter Foundation Soils Rock Fill

4.0 32.0 3.2 10.0 18.2 5.0 6.0 0.7 0.5 5.5 4.0 33.0 4.6 21.1 19.5 0.0 9.0 3.2 10.1 3.9

Min. Max.

Std.

Dev.

Var. Avg. Min. Max.

Std.

Dev.

Var. Avg. Min. Max.

Std.

Dev.

Var. Avg. Min. Max.

Std.

Dev.

Var. Avg.

Version 04012005 Phase I Special Study (1996) Moisture Contents: MC Values

C-19

Reviewed By: Date:

Approved By: Date:

Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

0.0 516 4 0.5 554 14 0.0 511 27 0.0 510 32 0.5 553 18 0.0 514 4 0.0 512 0

1.5 514 9 5.0 549 16 0.5 510 14 0.5 510 17 5.0 549 15 5.0 509 17 5.0 507 21

3.0 513 6 10.0 544 18 1.5 509 11 5.0 505 18 10.0 544 19 10.0 504 19 10.0 502 17

4.5 511 0 15.0 539 14 3.0 508 15 10.0 500 17 15.0 539 18 15.0 499 17 15.0 497 17

6.0 510 21 20.0 534 11 4.5 506 18 15.0 495 18 20.0 534 17 20.0 494 17 20.0 492 16

7.5 508 20 25.0 529 16 6.0 505 16 20.0 490 17 25.0 529 21 25.0 489 17 25.0 487 16

9.0 507 17 30.0 524 18 7.5 503 18 25.0 485 19 30.0 524 16 30.0 484 20 30.0 482 20

10.5 505 18 35.0 519 16 9.0 502 15 30.0 480 15 35.0 519 19 35.0 479 18 35.0 477 21

12.0 504 17 40.0 514 17 10.5 500 16 35.0 475 19 40.0 514 16 40.0 474 15 40.0 472 18

13.5 502 19 45.0 509 18 12.0 499 19 39.0 471 19 45.0 509 16 43.0 471 11 45.0 467 16

15.0 501 18 50.0 504 15 13.5 497 21 40.0 470 4 50.0 504 16 44.5 469 19 50.0 462 19

16.5 499 15 55.0 499 12 15.0 496 4 41.0 469 10 55.0 499 13 55.0 457 16

18.0 498 18 60.0 494 20 16.5 494 5 60.0 494 15 56.5 456 20

19.5 496 19 64.0 490 25 18.0 493 19 65.0 489 15 58.0 454 18

21.0 495 27 65.5 489 17 19.5 491 22 70.0 484 20 59.5 453 22

22.5 493 33 67.0 487 20 21.0 490 32 75.0 479 18 61.0 451 21

24.0 492 28 68.5 486 16 22.5 488 30 80.0 474 21 62.5 450 18

25.5 490 17 70.0 484 17 24.0 487 19 85.0 469 19 64.0 448 17

27.0 489 17 71.5 483 18 25.5 485 18 90.0 464 20 65.5 447 21

73.0 481 15 27.0 484 9 95.0 459 20 67.0 445 18

74.5 480 13 100.0 454 19 68.5 444 18

76.0 478 12 103.0 451 19 70.0 442 24

104.5 449 20 71.5 441 18

106.0 448 21 73.0 439 17

107.5 446 24 74.5 438 19

109.0 445 15 76.0 436 21

110.5 443 15.0 77.5 435 22

112.0 442 14.0 79.0 433 22

83.5 429 18

88.0 424 23

89.5 423 24

MC

Elev.

(feet)

MC

Depth (feet)

Elev.

(feet)

Depth (feet)

Elev.

(feet)

MC

Depth (feet)

MC

Depth (feet)

Elev.

(feet)

MC

Elev.

(feet)

MC

Depth (feet)

Elev.

(feet)

Depth (feet)

Elev.

(feet)

MC

Depth (feet)

12 Nov 2008

Moisture Contents Profile Data

AD-106AD-105AD-104

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996) Williams, Carmen

04 Nov 2008 Rough River Dam, Green River Basin, Kentucky

512.3553.8 513.6

AD-103

554.1 510.5 510.4 Boring No.

TOG (feet)

AD-100 AD-101 AD-102

515.7

Version 04012005 Phase I Special Study (1996) Moisture Contents: Profile Data

C-20

Reviewed By: Date:

Approved By: Date:

Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

12 Nov 2008

Moisture Contents Profile Data

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996) Williams, Carmen

04 Nov 2008 Rough River Dam, Green River Basin, Kentucky

91.0 421 25

92.5 420 21

94.0 418 28

95.5 417 25

97.0 415 26

98.5 414 15

100.0 412 14

101.5 411 14

103.0 409 15

104.5 408 15

106.0 406 17

107.5 405 17

109.0 403 14

112.0 400 10

Version 04012005 Phase I Special Study (1996) Moisture Contents: Profile Data

C-21

Reviewed By: Date:

Approved By: Date:

Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

12 Nov 2008

Moisture Contents Profile Data

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996) Williams, Carmen

04 Nov 2008 Rough River Dam, Green River Basin, Kentucky

1.0 552 15 0.0 510 25 0.0 510 19 1.0 552 15 0.0 511 4

5.0 548 15 1.0 509 19 0.5 509 16 5.0 548 17 5.0 506 21

10.0 543 16 5.0 505 18 5.0 505 21 10.0 543 17 10.0 501 19

15.0 538 22 10.0 500 19 10.0 500 18 15.0 538 17 15.0 496 19

20.0 533 18 15.0 495 19 15.0 495 19 20.0 533 18 20.0 491 18

25.0 528 17 20.0 490 15 20.0 490 19 25.0 528 18 25.0 486 22

30.0 523 19 25.0 485 19 25.0 485 19 30.0 523 19 30.0 481 16

35.0 518 19 30.0 480 16 30.0 480 16 35.0 518 19 35.0 476 19

40.0 513 16 35.0 475 19 35.0 475 16 40.0 513 17 40.0 471 19

45.0 508 15 40.0 470 15 40.0 470 17 45.0 508 21 45.0 466 21

50.0 503 19 45.0 465 14 45.0 465 15 50.0 503 14 50.0 461 22

55.0 498 19 50.0 460 21 50.0 460 17 55.0 498 18 55.0 456 20

60.0 493 18 54.0 456 15 55.0 455 18 60.0 493 18 60.0 451 19

65.0 488 19 55.5 454 18 60.0 450 16 65.0 488 19 65.0 446 22

70.0 483 17 57.0 453 15 65.0 445 16 70.0 483 20 70.0 441 13

75.0 478 17 58.5 451 19 70.0 440 17 75.0 478 19 75.0 436 28

80.0 473 18 60.0 450 18 75.0 435 25 80.0 473 17 80.0 431 27

85.0 468 21 61.5 448 22 79.5 430 25 85.0 468 18 81.5 430 26

90.0 463 20 63.0 447 20 81.0 429 25 90.0 463 21 83.0 428 21

95.0 458 18 64.0 446 6 82.5 427 25 95.0 458 19 84.5 427 21

98.0 455 20 65.0 445 14 84.0 426 28 100.0 453 18 86.0 425 22

99.5 454 20 66.0 444 22 85.5 424 28 105.0 448 16 87.5 424 22

101.0 452 17 67.5 442 19 87.0 423 27 110.0 443 21 89.0 422 22

102.5 451 18 68.0 442 19 88.5 421 19 115.0 438 21 90.5 421 26

104.0 449 19 69.0 441 23 90.0 420 16 120.0 433 26 92.0 419 27

105.5 448 19 70.5 439 22 91.5 418 17 122.0 431 26 93.5 418 25

107.0 446 16 72.0 438 21 93.0 417 20 123.5 429 28 95.0 416 24

108.5 445 18 73.5 436 20 94.5 415 17 125.0 428 28 96.5 415 22

110.0 443 20 75.0 435 22 96.0 414 16 126.5 426 24 98.0 413 17

111.5 442 11 76.5 433 20 97.5 412 16 128.0 425 22

113.0 440 16 78.0 432 22 99.0 411 16 129.5 423 22

Depth (feet)

Elev.

(feet)

MC

Elev.

(feet)

MC

Depth (feet)

Elev.

(feet)

MC

Depth (feet)

Elev.

(feet)

Depth (feet)

Elev.

(feet)

AD-107

Depth (feet)

Elev.

(feet)

TOG (feet) 553.0

MC

MC

AD-108 AD-109

509.9 509.6

MC

Depth (feet)

Boring No. AD-110 AD-111

552.9 511.4

Depth (feet)

Elev.

(feet)

MC

Version 04012005 Phase I Special Study (1996) Moisture Contents: Profile Data

C-22

Reviewed By: Date:

Approved By: Date:

Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

12 Nov 2008

Moisture Contents Profile Data

Dam Safety Modification Study Meyer, Jonny

Phase I Special Study (1996) Williams, Carmen

04 Nov 2008 Rough River Dam, Green River Basin, Kentucky

114.5 439 19 78.5 431 21 100.5 409 10 131.0 422 24

116.0 437 20 79.5 430 18 102.0 408 16 132.5 420 25

117.5 436 20 81.0 429 18 103.5 406 11 134.0 419 25

119.0 434 21 82.5 427 17 104.0 406 22 135.5 417 25

120.5 433 20 84.0 426 20 105.5 404 17 137.0 416 26

122.0 431 21 85.5 424 17 106.5 403 12 138.5 414 25

123.5 430 19 87.0 423 17 140.0 413 25

125.0 428 20 88.5 421 18 141.5 411 21

126.5 427 20 90.0 420 17 143.0 410 21

128.0 425 26 91.5 418 18 144.5 408 25

129.5 424 24 93.0 417 18 146.0 407 20

131.0 422 30 94.5 415 18 147.5 405 19

132.5 421 24 96.0 414 18

134.0 419 26 97.5 412 18

135.5 418 18 99.0 411 21

137.0 416 17 100.5 409 20

138.5 415 17 102.0 408 19

140.0 413 19 103.5 406 19

141.5 412 20 105.0 405 20

143.0 410 17 106.5 403 18

144.5 409 18 108.0 402 14

146.0 407 18 108.5 401 9

147.5 406 18 109.5 400 14

149.0 404 17

150.5 403 20

152.0 401 11

153.5 400 14

Version 04012005 Phase I Special Study (1996) Moisture Contents: Profile Data

C-23

Reviewed By: Date:

Approved By: Date:

Moisture Contents Ref: ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

EM 1110-1-1804, Geotechnical Investigations , 1 January 2001.

Phase I Special Study (1996)

Meyer, Jonny Williams, Carmen 12 Nov 2008

04 Nov 2008 Rough River Dam, Green River Basin, Kentucky Dam Safety Modification Study

Moisture Contents Profile Data

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70

Moisture Content (percent)

E le va ti on fe et

, N A

V D

8)

AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

Dry Moist Wet

Version 04012005 Phase I Special Study (1996) Moisture Contents: Profile

C-24

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

4 14 27 32 18 4 15 25 19 15 4 9 16 14 17 15 17 21 15 19 16 17 21 6 18 11 18 19 19 17 16 18 21 17 19

14 15 17 18 17 17 22 19 18 17 19 21 11 18 18 17 17 16 18 19 19 18 18 20 16 16 17 21 17 16 17 15 19 18 22 17 18 18 19 16 20 20 19 19 19 19 16 18 16 15 15 19 18 21 19 16 16 19 19 17 17 16 19 16 15 18 16 19 16 17 19 19 18 19 19 16 16 15 15 17 21 21 18 15 21 16 19 19 14 15 14 22 15 12 13 16 19 21 17 18 20 18 20 15 20 18 15 18 18 19

15 18 19 18 16 19 22 20 22 17 15 16 20 18 21 17 19 19 21 18 18 18 17 19 17 21 22 18 20 21 20 20 21 20 18 18 19 19 18 20 18 19 24 20 16 20 17 21 21 18 21 24 19

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Embankment

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Embankment

C-25

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Embankment

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

Minimum 4 percent Average 17.8 percent Standard Deviation 3.2 percent Maximum 32 percent Median 18.0 percent Variance 10.4

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Embankment

C-26

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

4 4 5 10

Horizontal Drain (Blanket)

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

M oi st ur e C on te nt pe rc en t)

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Phase I Moisture Contents: Blanket

C-27

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

Horizontal Drain (Blanket)

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Minimum 4 percent Average 5.4 percent Standard Deviation 2.1 percent Maximum 10 percent Median 5.0 percent Variance 4.6

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Blanket

C-28

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

19 25 19 10 27 17 22 13 33 20 32 17 28 28 16 30 25 27 17 17 19 25 26 17 18 18 25 21

15 9 25 21 13 28 22 12 14 28 22

18 22 27 22 17 19 19 26 19 19 16 26 27

15 21 23 17 26 25 22 22 20 28 24 22 21 17 28 22

FW 20 16 24 17

FW 11 22 16 22

18 16 20 16 22

FW 19 22 10 24

FW 20 21 16 25

23 20 18 11 25 24 21 18 11 25

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Foundation

C-29

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

25 20 17 22 26 21 21 20 15 25 28 19 17 17 25 25 20 17 12 21 26 20 18 21 15 26 17 25 14 24 18 20 14 30 18 15 24 18 15 26 18 17 18 18 17 17 21 14 17 20

FW 19 19

20 19 17 20 18 18 18 14 18 9

Minimum 9 percent Average 20.1 percent Standard Deviation 4.7 percent Maximum 33 percent Median 20.0 percent Variance 22.4

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Foundation

C-30

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

19 25 19 27 17 22 13 33 20 32 17 28 28 16 30 25 27 17 17 19 25 26 17 18 18 25 21

15 9 25 21 13 28 22 12 14 28 22

18 22 27 22 19 19 26 19 16 26 27 23 17 26 25 22 20 28 24

17 28 22 24 17

10 24 20 16 25 20 11 25 21 25

Cohesive Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

M oi st ur e C on te nt pe rc en t)

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Phase I Moisture Contents: Cohesive

C-31

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

Cohesive Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

20 22 26 15 25 17 25

18 21 17 25

14 18 20 14 18

17 18 18 17 17 21 14 17 20

19 19 20 19

Minimum 9 percent Average 20.6 percent Standard Deviation 4.8 percent Maximum 33 percent Median 20.0 percent Variance 23.0

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Cohesive

C-32

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

15 21 22 21

FW 20 16

FW 11 22 16

18 16 20 16

FW 19 22

FW 21

23 18 24 18 11

Cohesionless Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

M oi st ur e C on te nt pe rc en t)

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

Phase I Moisture Contents: Cohesionless

C-33

Statistical Analysis of Moisture Contents

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

Cohesionless Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, Tim

25 17 21 21 20 28 19 17 25 20 17 12 26 20 15 26

15 24 15 26

FW

18 14 18 9

Minimum 9 percent Average 19.1 percent Standard Deviation 4.5 percent Maximum 30 percent Median 19.0 percent Variance 20.1

M oi st ur e C on te nt pe rc en t)

Phase I Moisture Contents: Cohesionless

C-34

Statistical Analysis of Specific Gravities

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

2.66 2.61 2.64 2.69 2.71 2.90 2.83 2.61 2.54 2.66 2.78 2.64

2.71 2.57 2.71 2.71 2.68 2.68 2.66 2.74 2.79 2.64

Minimum 2.54 Average 2.69 Standard Deviation 0.08 Maximum 2.90 Median 2.68 Variance 0.01

Embankment

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

S pe ci fi c G ra vi ty , S

G

15 Jan 2004 Rough River Dam, Green River Basin, Kentucky T. O'Leary 20 Jan 2004

R. Tinsley

Phase I Specific Gravities: Embankment

C-35

Statistical Analysis of Specific Gravities

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

2.63 2.69

Minimum 2.63 Average 2.66 Standard Deviation 0.04 Maximum 2.69 Median 2.66 Variance 0.00

15 Jan 2004 Rough River Dam, Green River Basin, Kentucky T. O'Leary 20 Jan 2004

R. Tinsley

Horizontal Drain (Blanket)

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

S pe ci fi c G ra vi ty , S

G

Phase I Specific Gravities: Blanket

C-36

Statistical Analysis of Specific Gravities

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

2.71 2.81 2.71 2.72 2.64 2.54 2.68 2.74 2.67 2.60 2.85

2.57 2.81 2.71 2.68 2.68 2.68 2.74 2.81 2.67

2.68 2.68 2.61 2.66 2.64 2.73

2.68 2.75 2.75 2.79 2.77 2.62

2.55 2.55 2.69 2.55 2.73

2.68 2.71 2.61

2.68 2.66 2.69

2.68 2.75 2.68 2.68

Minimum 2.54 Average 2.69 Standard Deviation 0.07 Maximum 2.85 Median 2.68 Variance 0.01

15 Jan 2004 Rough River Dam, Green River Basin, Kentucky T. O'Leary 20 Jan 2004

R. Tinsley

Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

S pe ci fi c G ra vi ty , S

G

Phase I Specific Gravities: Foundation

C-37

Statistical Analysis of Specific Gravities

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

2.71 2.81 2.71 2.64 2.54 2.67 2.60 2.85

2.57 2.81 2.68 2.81 2.67

2.68 2.66 2.64 2.73

2.75 2.79 2.77 2.62

2.55 2.69 2.55 2.73

2.68 2.61

2.66 2.69 2.68 2.68

Minimum 2.54 Average 2.68 Standard Deviation 0.08 Maximum 2.85 Median 2.68 Variance 0.01

Cohesive Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

S pe ci fi c G ra vi ty , S

G

15 Jan 2004 Rough River Dam, Green River Basin, Kentucky T. O'Leary 20 Jan 2004

R. Tinsley

Phase I Specific Gravities: Cohesive

C-38

Statistical Analysis of Specific Gravities

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

2.72 2.68 2.74

2.71 2.68 2.68 2.74

2.68 2.61

2.68 2.75 2.55

2.71 2.68

2.75

2.68

Minimum 2.55 Average 2.69 Standard Deviation 0.05 Maximum 2.75 Median 2.68 Variance 0.00

Cohesionless Foundation

Dam Safety Assurance Program Evaluation Report

Phase I Special Study Borings

S pe ci fi c G ra vi ty , S

G

15 Jan 2004 Rough River Dam, Green River Basin, Kentucky T. O'Leary 20 Jan 2004

R. Tinsley

Phase I Specific Gravities: Cohesionless

C-39

Reviewed By: Date:

Approved By: Date:

Atterberg Limits Ref: ASTM D4318 Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

ASTM D2216 Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock

32 16 42 24 36 18 37 18 32 17 46 28 34 17 43 22 29 10 31 14 32 12

31 13

33 19 34 18 38 21 34 13 33 14 35 17 32 12 28 11 34 17 26 8 22 4 20 5 31 11

23 6 21 5 25 10

39 21 32 15 38 18 32 14 34 11 26 7 28 10 27 7 33 12 31 11 41 21 30 11 38 21

AD-104

553.800

Depth (feet)

Elev.

(feet)

LL

PI

12 Nov 2008 12 Nov 2008

Meyer, Jonny Williams, Carmen

Dam Safety Modification Study Rough River Dam, Green River Basin, Kentucky Phase I Special Study (1996) Atterberg Limits Profile Data

Boring No.

PI

AD-103

510.400

AD-102

510.500

LL

Depth (feet)

Elev.

(feet)

LL

PI

LL

PI

Elev.

(feet)

Boring No.

TOG (feet)

AD-100

515.700

TOG (feet)

AD-101

554.100

Depth (feet)

Elev.

(feet)

Depth (feet)

Boring No.

TOG (feet)

LL

Depth (feet)

Elev.

(feet)

PI

AD-109

513.600 512.300 553.000 509.900 509.600

AD-105 AD-106 AD-107 AD-108

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

552.900 511.400

AD-110 AD-111

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Depth (feet)

Elev.

(feet)

LL

PI

Version 04012005 Phase I Special Study (1996) Atterberg: Profile Data

C-40

Project:

Location:

Prepared By: Date:

Checked By: Date:

Plasticity Chart Ref: ASTM D2487 Standard Practice for Classification of Soils for Engineering Purposes

CL lean clayAD-110 38 20 18

CL lean clay AD-110 39 18 21 CL lean clay

AD-109 34 17 17

CL lean clayAD-111 32 18 14

C. Williams 11/12/08

CL

CL

CL

CL

Plasticity Index

Rough River Phase I Special Study Borings Embankment D. Amlung 11/03/08 lean clay

AD-104 19

AD-104 15

lean clay lean clay AD-103 19 CL lean clay

AD-102 2143

CL lean clay

AD-101 1734

36 18

Test Location

Liquid Limit

Plastic Limit

Depth (feet)

Liquid Limit after Oven

Drying USCS Classification

LL PL PI

CL lean clayAD-100 1632 lean clayAD-109

CL lean clayAD-101 1842 lean clay

AD-102

CL lean clayAD-105 1433 19 CL lean clay

AD-108 17

AD-106 16

CL

CL

CL

CL

CL

CL

lean clay

32AD-107 20 12

lean clayAD-108 21 lean clay lean clay lean clay

AD-107

18AD-106

38 17

CL lean clayAD-111 32 17 15

0 10 20 30 40 50 60 70 80 90 100

Liquid Limit, LL

P la st ic it y

In de x, P

I

Version 04012005 Phase I Special Study (1996) Atterberg: Embankment

C-41

Project:

Location:

Prepared By: Date:

Checked By: Date:

Plasticity Chart Ref: ASTM D2487 Standard Practice for Classification of Soils for Engineering Purposes

- CL lean clayAD-111 30 19 11 lean clay lean clay

AD-110

15AD-109

34 23 lean clay

28AD-110 18 10

lean clayAD-110 21 lean clay

CL

CL

CL

CL

CL

CL

AD-110 20

AD-109 20

CL lean clay

CL-ML silty clayAD-108 1621 5 lean clayAD-110

CL lean clayAD-100 1731 lean clay

AD-101

CL lean clayAD-100 1846

Liquid Limit after Oven

Drying USCS Classification

LL PL PI

Test Location

Liquid Limit

Plastic Limit

Depth (feet)

CL lean clay

AD-101 2032

31 18 lean clay

AD-107 18 CL-ML silty clay

AD-106 1826

silty clay

AD-108 15

AD-107 17

silty clay

Rough River Phase I Special Study Borings Foundation D. Amlung 11/03/08 C. Williams 11/12/08

CL-ML

CL-ML

CL

CL

Plasticity Index

AD-111 26 19 7 CL-ML silty clay AD-111 27 20 7 CL-ML silty clay

CL lean clayAD-111 31 20 11

0 10 20 30 40 50 60 70 80 90 100

Liquid Limit, LL

P la st ic it y

In de x, P

I

Version 04012005 Phase I Special Study (1996) Atterberg: Foundation

C-42

Modified By: Date:

Statistical Analysis of Normalized Standard Penetration Test (SPT) Resistances, (N1)60-values

Loc. AD-100 AD-101 AD-102 AD-103 AD-104 AD-105 AD-106 AD-107 AD-108 AD-109 AD-110 AD-111

43 31 15 12 24 26 189 32 9 12 30 33 71 25 18 14 25 12 12 23 27 12 27 14 33 22 16 20 16 14 17 25 21 15 22 22 12 36 19 25 21 19 14 15 19 13 16 15 16 25 10 18 18 20 17 13 21 14 16 20 11 14 23 26 15 13 14 13 22 16 12 13 12 22 20 26 27 15 12 17 26 16 11 20 16 19 20 17 17 19 14 16 16 14 11 12 27 15 18 38 19 9 19 15 22 12 15 15 19 14 23 14 51 21 14 13 17 13 7 16 15 108 16 10 17 15 11 16 10 27 23 36 19 14 13 18 15 14 16 12 9 21 14 10 11 15 18 13 13 7 8 13 15 19 10 12 10 13 9

21 11 18 11 12 9 13 10 11 5 17 7 17 10 12 10 12 9 12 7 17 15 31 6 12 10 10 8 9 5 38 12 40 13 12 6 41 7 10 6 78 9 92 9 14 6 20 9 9 6

28 11 15 10 12 11 9 6 21 9 20 11 7 13 6 8

7 7 5 9 8 10 5 8 7 10 6 8 8 9 8 9 9 4 7 6 4 7 7 7 4 8 5 6

11 5 7 4 15 7 6 2 8 3 10 6 8 2 7 3 11 3 10 2 5 3 11 8 3 12 5 20 4 4 8 10 12 5 3 4 8 31 7 7 4 19 13 6

10 4 12 20 6 13 4 11 7 19 2 7 8 28 3 9 5 12 1 9 6 12 2 6 5 9 5 4 10 9 12 6 8

21 5 7 34 6 7 9 14 7 7 9 11

10 7 7 20 5 18 25 11 18 7

Minimum 1 bpf Average 15 bpf Standard Deviation 14 bpf Maximum 189 bpf Median 12 bpf Variance 208

Overall Summary Phase I Special Study Borings

N or m al iz ed

S ta nd ar d P en et ra ti on T es t (

S P

T

R es is ta nc es

N

1)

-v al ue s

(b pf

01 Dec 2003 Rough River Dam, Green River Basin, Kentucky Evans, Aaron 01 Dec 2003

O'Leary, TimDam Safety Assurance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .