W912QR25R0016_CERT_Final_Specs-0004.pdf

PDF 2 MB Posted

Attached to
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
Solicitation number
W912QR25R0016
Issued by

About this file

This document is an amendment to a federal solicitation for the Rough River Dam Safety Modification Phase II project located in Falls of Rough, Kentucky. The U.S. Army Corps of Engineers is seeking a contractor to complete new outlet works and a concrete cutoff wall, with a total project cost to be determined through a price breakout schedule. Key project components include constructing a 24-inch wide concrete cutoff wall between stations 9+00 and 25+40, demolishing and abandoning an existing outlet works, and performing specialized excavation and concrete placement.

The solicitation requires a full and open competitive procurement with a HUBZone 10% price evaluation, and all large businesses must submit a subcontracting plan. Quotes are due on March 20, 2025, at 10:00 AM Eastern Standard Time. Contractors must be registered in the System for Award Management (SAM) and will be paid via electronic funds transfer. The project involves complex engineering work including dam safety modifications, concrete wall construction, grouting, and site restoration, with specialized requirements for excavation techniques, concrete placement, and environmental controls. The North American Industry Classification System (NAICS) code for this project is 237990.

View the file

Other files

File Type Posted
W912QR25R0016_CERT_Final__Plans-0009.pdf PDF
W912QR25R0016_CERT_Final_Specs-0009.pdf PDF
W912QR25R0016_CERT_Final_V1A_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_V1B_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0008.pdf PDF
W912QR25R0016_CERT_Final__V3_CTWSTR_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0007.pdf PDF
W912QR25R0016-0006.pdf PDF
W912QR25R0016_CERT_Final_Plans-0005.pdf PDF
W912QR25R0016_CERT_Final_Specs-0005.pdf PDF
W912QR25R0016_CERT_Final_EnviroAssess-0005.pdf PDF
W912QR25R0016_CERT_Final_Plans-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0003.pdf PDF
W912QR25R0016_CERT_Final_Vol5_ MFR_ConcreteMatTest-0003.pdf PDF
W912QR25R0016_CERT_Final_Plans-0003.pdf PDF
Site Visit Sign In Sheet.docx DOCX document
W912QR25R0016_CERT_Final_Specs-0002.pdf PDF
Virtual Registration.pdf PDF
W912QR25R0016_CERT_Final_Specs-0001.pdf PDF
W912QR25R0016 0001.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_18of20_E2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_20of28_D1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_9of20_C2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_3of9_2B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_15of28_B1-0000.pdf PDF
W912QR25R0016_CERT_Final_V4c_Specs-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_13of16_F-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_14of16_G-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_7of16_B5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_1of20-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_10of20_C3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_16of16_I-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_1of16-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_3of28_A2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGBR_MainReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_10bof16_C2b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_19of20_E3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1941_GeoReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_8of9_4C-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_4of16_B2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_2of20_A-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1953_DesignMemo1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_1of28_MainReport-0000.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: ADYSON MEDLEY

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0016

X 9B. DATED (SEE ITEM 11)

20-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0004

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Mar-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912QR

FACILITY CODECODE

EMAIL:TEL:

W912QR25R0016_CERT_Final_Specs-0004

W912QR25R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004 CHANGES

Solicitation W912QR25R0016 for Rough River Dam Modification is hereby amended with the following changes:

1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

00 10 00 PRICE BREAKOUT SCHEDULE

01 52 13.20 06 GOVERNMENT FACILITIES

31 32 23.00 06 SLURRY CONTROL DRILLING AND GROUTING

31 41 16 METAL SHEET PILING

31 56 10.00 06 CUTOFF WALL CONSTRUCTION

2. The following PLANS have been revised and replaced in their entirety:

OTW_CT A601 PARTITION SCHEDULE AND DETAILS

OTW CD114 OUTLET WORKS DEMOLITION PLAN 6 OF 18

OTW CS117 OUTLET WORKS SITE PLAN 9 OF 16

OTW CS120 OUTLET WORKS SITE PLAN 12 OF 16

OTW CS121 OUTLET WORKS SITE PLAN 13 OF 16

OTW CS508 CONCRETE PAVEMENT SECTIONS

OTW_SB S-202 STILLING BASIN ELEVATIONS

CTW CG204 PHASE II FOUNDATION GROUTING UPSTREAM

CTW CG205 PHASE II FOUNDATION GROUTING DOWNSTREAM

STR CD103 STATE ROAD RELOCATION DEMOLITION PLAN

STR CP103 STATE ROAD RELOCATION PAVEMENT PLAN

STR CP501 STATE ROAD RELOCATION PAVEMENT DETAILS

3. The following Wage Rates have been updated and are included herein:

KY20250038

KY20250041

KY20250061

(End of Summary of Changes)

Rough River Dam Modification Phase 2 – New Outlet Works and Cutoff Wall March 2025

P2# 145870 Page 1 CERTIFIED FINAL

AMENDMENT 0004

Section 00 10 00

Amendment 0004

Price Breakout Schedule

Project: Rough River Dam, Dam Safety Modification, Phase 2- New Outlet Works and Cutoff Wall

Location: Rough River Dam, Falls of Rough, KY

Offeror’s Name:________________________________________

Base Bid Items

CLIN 0001 Outlet Works (OTW) and General Site Work Item No.

Description Qty. Unit Unit Price

Total Price

1 General Mobilization/Demobilization 1 Job N/A $________ 2 General Site Work 1 Job N/A $________ 3 Develop Data Management System 1 Job N/A $________

4 Maintain Data Management System Closeout, and Turnover of Final Products 1 Job N/A

5 Instrumentation Monitoring Program 1 Job N/A $________

6 Temporary Storm Water Pollution Control /Clearing and Grubbing 1 Job N/A

7 Demolition 1 Job N/A $________ 8 Control Tower Cofferdam 1 Job N/A $________ 9 Stilling Basin Sheetpile Wall and Cofferdam 1 Job N/A $________

10 Underwater Dredging, Disposal 9,800 Cubic Yards $________

11 Underwater Rock Blasting, Excavation and Disposal – Approach Channel 28,000 Cubic Yards

12 Common Excavation and Disposal 97,500 Cubic Yards $________ 13 Mechanical Excavation and Disposal 3,000 Cubic Yards $________

14 Surface Rock Blasting, Excavation and Disposal

– Control Tower and Approach 90,000 Cubic Yards

15 Surface Rock Blasting, Excavation and Disposal

– Stilling Basin and Apron 30,000 Cubic Yards

16 Tunnel/Portal Mechanical Excavation, Disposal, Initial Support, and Incidentals 11,000 Cubic Yards

17 Rock Slope Reinforcement and Permanent Rockfall Protection 1 Job N/A

18 Haney Limestone Concrete Bulkheads 750 Cubic Yards $________ 19 Retreat Channel Lining 1 Job N/A $________

P2# 145870 Page 2 CERTIFIED FINAL

Work Item No.

Description Qty. Unit Unit Price

Total Price

20 Outlet Works Access Roads and Miscellaneous incidentals 1 Job N/A

21 Control of Water and Dewatering 1 Job N/A $________

Total CLIN 0001 Outlet Works (OTW) and General Site $________

CLIN 0002 Outlet Works OTW - Permanent Facilities

Item No.

Description Qty. Unit Unit Price

Total Price

22 Mass Concrete: Mix 1 (Lower Control Tower) 2,120 Cubic Yards $________

23 Facing Concrete: Mix 2 (Lower Control Tower) 1,100 Cubic Yards $________

24 Facing Concrete: Mix 2A (Stilling Basin and Tunnel Liner) 8,500 Cubic Yards

25 Structural Concrete: Mix 3 (General Structural Concrete) 3,500 Cubic Yards

26 Interior Structural Concrete: Mix 4 (Post Tensioned Structural Concrete) 350 Cubic Yards

27 Foundation Preparation and Protection – Control Tower Excavation 1 Job N/A

28 Foundation Preparation and Protection – Stilling Basin and Apron Excavation 1 Job N/A

29 Complete and Fully Functioning Control Tower 1 Job N/A $________

30 Complete and Fully Functioning Service Bridge 1 Job N/A $________

31 Fabrication and Installation of Hydraulic Steel Structures 1 Job N/A

32 Tunnel/Portal Permanent Support 1 Job N/A $________ 33 Complete and Fully Functioning Stilling Basin 1 Job N/A $________

34 Complete and Functioning Mobile Lab 1 Job N/A

35 Not Used 1 Job N/A

36 Outlet Works Approval, Demonstration, and Acceptance 1 Job N/A

P2# 145870 Page 3 CERTIFIED FINAL

Total CLIN 0002 Outlet Works OTW - Permanent Facilities

Amendment 0004**********************************************************************

CLIN 0003 Control Tower Grout Curtain, Slurry Control Drilling, and Grouting Work Item No.

Description Qty. Unit Unit Price

Total Price

Soil Drilling - Dam and Control Tower Excavation Grout Boreholes, 20 Degree Angled Holes

11,500 Linear Foot

Rock Drilling - Dam and Control Tower Excavation Grout Boreholes, 20 Degree Angled Holes.

14,000 Linear Foot

39 Rock and Concrete Coring - Dam Grout Boreholes, 20 Degree Angled Holes 1,550 Linear Foot

40 Optical and Acoustical Televiewer Surveys 7,000 Linear Foot $________

41 Water Pressure Testing 295 Each $________

42 Reconnections and Redrilling for Down Stage Grouting 8,000 Linear Foot

43 Grouting Placement 1,200 Hours $________ 44 Grout Mix A 90,000 Gallons $________ 45 Grout Mix B 35,000 Gallons $________

46 Grout Mix C 110,000 Gallons $________

47 Grout Mix D 20,000 Gallons $________

48 Grout Mix E 20,000 Gallons $________

49 Automated Grouting Control/Data Collection System 1 Job N/A

Total CLIN 0003 Control Tower Grout Curtain, Slurry Control Drilling, and Grouting

**********************************************************************Amendment 0004

CLIN 0004 General Cutoff Wall (CTW) Work Item No.

Description Qty. Unit Unit Price

Total Price

50 Cutoff Wall Mobilization/Demobilization 1 Job N/A

51 Work Platform Construction, and Maintenance 1 Job N/A $________

P2# 145870 Page 4 CERTIFIED FINAL

Work Item No.

Description Qty. Unit Unit Price

Total Price

52 Instrumentation Relocations, Modifications, Installations, and Restoration 1 Job N/A

53 Gov. Dir. Stand-by Time for Cutoff Wall Construction 12 Hours

54 Cutoff Wall Complete – soil, rock, over excavation, concrete 26,000 Square

Yards

55 Verification Holes – Concrete Coring, CCTV, O/ATV, Washing Holes – Quantity For Each. 12,500 Linear Foot

56 Permeability Tests and Analysis 76 Each

57 Existing Outlet Works Abandonment 1 Job N/A

58 Critical Area A – Existing Conduit Demolition at Cutoff Wall 1 Job N/A

59 Critical Area A – Complete Cutoff Wall 650 Square Yards

Total CLIN 0004 General Cutoff Wall (CTW)

CLIN 0005 State Road Relocation (STR)

Item No.

Description Qty. Unit Unit Price

Total Price

60 Dam Restoration 1 Job N/A

61 Highway 79 Relocation 1 Job N/A

62 Downstream Draped Filter Drain and Tailwater Abandonment 1 Job N/A

Total CLIN 0005 State Road Relocation (STR)

Total Bid Price

GENERAL:

* Work items are grouped into 5 Contract Line Item Numbers (CLIN) linked to each feature of work.

** Please refer to the specifications for full work item descriptions for any particular item.

*** Proposals will be evaluated based on the total base price.

P2# 145870 Page 5 CERTIFIED FINAL

ITEM NOTES:

Item No. 1: This item includes all mobilization/demobilization costs for the project, including all costs and labor associated with mobilization/demobilization of all personnel, equipment, materials, facilities, construction and removal of all temporary features except for costs associated with CUTOFF WALL

MOBILIZATION/DEMOBILIZATION.

Item No. 2: This item includes general site work identified by name in the plans and specifications and covers any other items not specifically included by other price breakout items.

Item No. 3: This item includes all costs associated with the development and implementation of the Data Management System in accordance with the plans and specifications.

Item No. 4: This item includes all costs to maintain the Data Management System in a fully functional state and to update data in the system through project and data management closeout as required in the plans and specifications. This item includes closeout and turnover of the final work products to the Government.

Item No. 5: This item includes all costs associated with instrumentation monitoring, instrumentation readings, instrumentation reporting, and coordination as defined in the Joint Instrumentation and Monitoring Program, the Instrumentation and Monitoring Specification, and plans as required during completion of construction activities for both existing and proposed instruments.

Item No. 6: This item includes all costs associated with stormwater pollution control, clearing and grubbing activities, and associated permits required in the plans and specifications.

Item No. 7: This item includes all costs associated with demolition activities required in the plans and specifications.

Item No. 8: This item includes all costs associated with construction, maintenance and disposal of the lime stabilized cofferdam at the control tower as required in the plans and specifications.

Item No. 9: This item includes all costs associated with planning, construction, maintenance, and removal of the sheetpile seepage cutoff and cofferdam at the stilling basin as required in the plans and specifications.

Item No. 10: This item includes all costs associated with underwater dredging and disposal, as required in the approach channel, retreat channel, and retreat channel tie-in.

Item No. 11: This item includes all costs associated with underwater excavation and disposal of intact rock via mechanical excavation and/or blasting in the approach channel.

Item No. 12: This item includes all costs associated with common excavation and disposal of earth, loose rock, and other materials defined as common excavation as required in the plans and specifications.

Item No. 13: This item includes all costs associated with the mechanical excavation and disposal of intact rock in the dry as required in the plans and specifications.

Item No. 14: This item includes all costs associated with surface rock blasting, excavation and disposal of intact rock in the approach channel and control tower areas as required in the plans and specifications.

Item No. 15: This item includes all costs associated with surface rock blasting, excavation and disposal of intact rock in the stilling basin and apron areas as required in the plans and specifications.

P2# 145870 Page 6 CERTIFIED FINAL

Item No. 16: This item includes all costs associated with tunnel/portal mechanical excavation, disposal, mapping, initial support to protect the excavation, and other tunnel incidental items as required in the plans, specifications, and tunneling work plan.

Item No. 17: This item includes all costs associated with rock slope reinforcement and permanent rockfall protection, including spot treatment, as required in the plans and specifications.

Item No. 18: This item includes all costs associated with Haney Limestone bulkhead construction for slope stabilization in the Haney Limestone due to encountered karst as required in the plans and specifications.

Item No. 19: This item includes all costs associated with retreat channel lining and slope protection;

including excavation, grading, disposal, and construction of the retreat channel tie-in, as required in the plans and specifications.

Item No. 20: This item includes all costs associated with outlet works access roads and other access road related incidental items as required in the plans and specifications.

Item No. 21: This item includes all costs associated with control of water and dewatering as required in the plans and specifications.

Item No. 22: This item includes all costs for batching, mixing, transporting, placing, testing, and protecting concrete including formwork, reinforcement, embedded items, and other incidentals associated with Mass Concrete Mix 1 for the lower control tower as required in the plans and specifications.

Item No. 23: This item includes all costs for batching, mixing, transporting, placing, testing, and protecting concrete including formwork, reinforcement, embedded items, and other incidentals associated with Facing Concrete Mix 2 for the lower control tower as required in the plans and specifications.

Item No. 24: This item includes all costs for batching, mixing, transporting, placing, testing, and protecting concrete including formwork, reinforcement, embedded items, and other incidentals associated with Facing Concrete Mix 2A for the tunnel liner and stilling basin as required in the plans and specifications.

Item No. 25: This item includes all costs for batching, mixing, transporting, placing, testing, and protecting concrete including formwork, reinforcement, embedded items, and other incidentals associated with Structural Concrete Mix 3 for general structural concrete as required in the plans and specifications.

Item No. 26: This item includes all costs for batching, mixing, transporting, placing, testing, and protecting concrete including formwork, reinforcement, embedded items, post tensioning, and other incidentals associated with Interior Structural Concrete Mix 4 for post tensioned structural concrete as required in the plans and specifications.

Item No. 27: This item includes all costs associated with foundation preparation and protection in the control tower excavation and approach channel as required in the plans and specifications.

Item No. 28: This item includes all costs associated with foundation preparation and protection in the stilling basin and apron excavation as required in the plans and specifications.

Item No. 29: This item includes all costs associated with providing a complete and fully functioning control tower as required in the plans and specifications and covers any other items related to the control tower not specifically included by other price breakout items including Mass Concrete, Facing Concrete Mix 2/2A, Structural Concrete Mix 3, Interior Structural Concrete Mix 4, fabrication and installation of hydraulic steel structures, or a complete and fully functioning service bridge.

P2# 145870 Page 7 CERTIFIED FINAL

Item No. 30: This item includes all costs associated with providing a complete and fully functioning service bridge as required in the plans and specifications and covers any other items related to the service bridge not specifically included by other price breakout items including Mass Concrete, Structural Concrete Mix 3, or a complete and fully functioning control tower.

Item No. 31: This item includes all costs associated with fabrication and installation of hydraulic steel structures as required in the plans and specifications.

Item No. 32: This item includes all costs associated with tunnel/portal permanent support as required in the plans and specifications including steel sets, permanent dowels, and tunnel liner contact grouting. This item does not include costs associated with Mass Concrete, Facing Concrete Mix 2/2A, Structural Concrete Mix 3, Structural Concrete Mix 4, initial support, or rock slope reinforcement/rockfall protection.

Item No. 33: This item includes all costs associated with providing a complete and fully functioning stilling basin as required in the plans and specifications and covers any other items related to the stilling basin not specifically included by other price breakout items including Mass Concrete, Facing Concrete Mix 2/2A, Structural Concrete Mix 3, or fabrication and installation of hydraulic steel structures.

Item No. 34: This item includes all costs associated with providing a complete and fully functioning laboratory and laboratory facilities as required in the plans and specifications, including equipment and staffing. This item does not include costs covered for specific tests as those costs are covered as subsidiary task to other items.

Amendment 0001**********************************************************************

Item No. 35: Not used.

**********************************************************************Amendment 0001

Item No. 36: This item includes all costs associated with new outlet works approval, demonstration and acceptance to commission the new outlet works as required in the plans and specifications.

Item No. 37: This item includes all costs associated with soil drilling for the dam and control tower grout curtain boreholes as required in the plans and specifications.

Item No. 38: This item includes all costs associated with rock drilling for the dam and control tower grout curtain boreholes as required in the plans and specifications.

Item No. 39: This item includes all costs associated with rock and concrete coring for the dam grout curtain boreholes as required in the plans and specifications.

Item No. 40: This item includes all costs associated with Optical and Acoustical televiewer surveys as required for select boreholes in the plans and specifications.

Item No. 41: This item includes all costs associated with water pressure testing for foundation grouting as required in the plans and specifications.

Item No. 42: This item includes all costs associated with reconnections and redrilling for downstage grouting as required in the plans and specifications.

Item No. 43: This item includes all costs associated with grouting placement for the dam and control tower grout curtains as required in the plans and specifications.

Amendment 0004**********************************************************************

P2# 145870 Page 8 CERTIFIED FINAL

Item No. 44: This item includes all costs associated with production and testing of Grout Mix A for the dam and control tower grout curtains as required in the plans and specifications.

Item No. 45: This item includes all costs associated with production and testing of Grout Mix B for the dam and control tower grout curtains as required in the plans and specifications.

Item No. 46: This item includes all costs associated with production and testing of Grout Mix C for the dam and control tower grout curtains as required in the plans and specifications.

Item No. 47: This item includes all costs associated with production and testing of Grout Mix D for the dam and control tower grout curtains as required in the plans and specifications.

Item No. 48: This item includes all costs associated with production and testing of Grout Mix E for the dam and control tower grout curtains as required in the plans and specifications.

**********************************************************************Amendment 0004

Item No. 49: This item includes all costs associated with the automated grouting control/data collection system for the dam and control tower grout curtains as required in the plans and specifications.

Item No. 50: This item includes all costs associated with all cutoff wall mobilization/demobilization costs for the project, including all costs and labor associated with mobilization/demobilization of all personnel, equipment, materials, facilities, construction and removal of all temporary features except for costs associated with MOBILIZATION/DEMOBILIZATION for the general project.

Item No. 51: This item includes all costs associated with work platform construction, maintenance, and removal as required in the plans and specifications.

Item No. 52: This item includes all costs associated with instrumentation relocations, modifications, installations and restoration as required in the plans and specifications.

Item No. 53: This item includes all costs associated with government directed standby time for cutoff wall construction.

Item No. 54: This item includes all costs associated with a complete cutoff wall including soil and rock excavation, necessary over excavation, and concrete placement as required in the plans and specifications.

Item No. 55: This item includes all costs associated with cutoff wall verification holes including concrete coring, CCTV, O/ATV, washing holes, for each borehole as required in the plans and specifications. Each of these operations are required for each borehole and the footage for each borehole for all of these methods must only be counted once for the completed borehole after all methods are completed. Separate footage payment will not be made for each method in the borehole individually.

Item No. 56: This item includes all costs associated with cutoff wall falling head permeability tests as required in the plans and specifications.

Item No. 57: This item includes all costs associated with existing outlet works abandonment as required in the plans and specifications.

Item No. 58: This item includes all costs associated with demolition of the existing conduit at Critical Area A as required in the plans and specifications and per the contractor’s approved methods.

Item No. 59: This item includes all costs associated with installation of a complete cutoff wall at Critical Area A as required in the plans and specifications.

Item No. 60: This item includes all costs associated with dam restoration as required in the plans and specifications.

P2# 145870 Page 9 CERTIFIED FINAL

Item No.61: This item includes all costs associated with state road relocation as required in the plans and specifications.

Item No. 62: This item includes all costs associated with installation of a downstream draped filter drain and tailwater abandonment as required in the plans and specifications.

"General Decision Number: KY20250038 03/07/2025

Superseded General Decision Number: KY20240038

State: Kentucky

Construction Type: Highway

Counties: Anderson, Bath, Bourbon, Boyd, Boyle, Bracken, Breckinridge, Bullitt, Carroll, Carter, Clark, Elliott, Fayette, Fleming, Franklin, Gallatin, Grant, Grayson, Greenup, Hardin, Harrison, Henry, Jefferson, Jessamine, Larue, Lewis, Madison, Marion, Mason, Meade, Mercer, Montgomery, Nelson, Nicholas, Oldham, Owen, Robertson, Rowan, Scott, Shelby, Spencer, Trimble, Washington and Woodford Counties in Kentucky.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 1/13 conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 03/07/2025

* BRIN0004-003 06/01/2024

BRECKENRIDGE COUNTY

Rates Fringes

BRICKLAYER.......................$ 33.70 16.57

* BRKY0001-005 06/01/2024

BULLITT, CARROLL, GRAYSON, HARDIN, HENRY, JEFFERSON, LARUE,

MARION, MEADE, NELSON, OLDHAM, SHELBY, SPENCER, & TRIMBLE

COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 35.00 17.13

* BRKY0002-006 06/01/2024

BRACKEN, GALLATIN, GRANT, MASON & ROBERTSON COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 35.00 17.13

* BRKY0007-004 06/01/2024

BOYD, CARTER, ELLIOT, FLEMING, GREENUP, LEWIS & ROWAN COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 41.05 21.79

* BRKY0017-004 06/01/2024

ANDERSON, BATH, BOURBON, BOYLE, CLARK, FAYETTE, FRANKLIN,

HARRISON, JESSAMINE, MADISON, MERCER, MONTGOMERY, NICHOLAS,

OWEN, SCOTT, WASHINGTON & WOODFORD COUNTIES:

Rates Fringes

BRICKLAYER.......................$ 35.00 17.13

CARP0064-001 04/01/2024

Rates Fringes

CARPENTER........................$ 32.90 23.33

Diver............................$ 49.73 23.33

PILEDRIVERMAN....................$ 33.40 23.33

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 2/13

ELEC0212-008 06/05/2024

BRACKEN, GALLATIN and GRANT COUNTIES

Rates Fringes

ELECTRICIAN......................$ 35.43 22.05

ELEC0212-014 11/27/2023

BRACKEN, GALLATIN & GRANT COUNTIES:

Rates Fringes

Sound & Communication Technician.......................$ 27.20 14.54

ELEC0317-012 06/03/2024

BOYD, CARTER, ELLIOT & ROWAN COUNTIES:

Rates Fringes

ELECTRICIAN (Wiremen)............$ 38.30 23.12

ELEC0369-007 05/29/2024

ANDERSON, BATH, BOURBON, BOYLE, BRECKINRIDGE, BULLITT, CARROLL,

CLARK, FAYETTE, FRAONKLIN, GRAYSON, HARDIN, HARRISON, HENRY,

JEFFERSON, JESSAMINE, LARUE, MADISON, MARION, MEADE, MERCER,

MONTGOMERY, NELSON, NICHOLAS, OLDHAM, OWEN, ROBERTSON, SCOTT,

SHELBY, SPENCER, TRIMBLE, WASHINGTON, & WOODFORD COUNTIES:

Rates Fringes

ELECTRICIAN......................$ 37.88 21.38

ELEC0575-002 05/29/2023

FLEMING, GREENUP, LEWIS & MASON COUNTIES:

Rates Fringes

ELECTRICIAN......................$ 37.00 22.26

ENGI0181-018 07/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.05 19.10

GROUP 2.....................$ 37.19 19.10

GROUP 3.....................$ 37.64 19.10

GROUP 4.....................$ 36.87 19.10

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - A-Frame Winch Truck; Auto Patrol; Backfiller;

Batcher Plant; Bituminous Paver; Bituminous Transfer Machine; Boom Cat; Bulldozer; Mechanic; Cableway; Carry-All Scoop; Carry Deck Crane; Central Compressor Plant; Cherry Picker; Clamshell; Concrete Mixer (21 cu. ft. or Over);

Concrete Paver; Truck-Mounted Concrete Pump; Core Drill;

Crane; Crusher Plant; Derrick; Derrick Boat; Ditching &

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 3/13

Trenching Machine; Dragline; Dredge Operator; Dredge Engineer; Elevating Grader & Loaders; Grade-All; Gurries;

Heavy Equipment Robotics Operator/Mechanic; High Lift;

Hoe-Type Machine; Hoist (Two or More Drums); Hoisting Engine (Two or More Drums); Horizontal Directional Drill Operator; Hydrocrane; Hyster; KeCal Loader; LeTourneau;

Locomotive; Mechanic; Mechanically Operated Laser Screed;

Mechanic Welder; Mucking Machine; Motor Scraper; Orangepeel Bucket; Overhead Crane; Piledriver; Power Blade; Pumpcrete;

Push Dozer; Rock Spreader, attached to equipment; Rotary Drill; Roller (Bituminous); Rough Terrain Crane; Scarifier;

Scoopmobile; Shovel; Side Boom; Subgrader; Tailboom;

Telescoping Type Forklift; Tow or Push Boat; Tower Crane (French, German & other types); Tractor Shovel; Truck Crane; Tunnel Mining Machines, including Moles, Shields or similar types of Tunnel Mining Equipment

GROUP 2 - Air Compressor (Over 900 cu. ft. per min.);

Bituminous Mixer; Boom Type Tamping Machine; Bull Float;

Concrete Mixer (Under 21 cu. ft.); Dredge Engineer;

Electric Vibrator; Compactor/Self-Propelled Compactor;

Elevator (One Drum or Buck Hoist); Elevator (When used to Hoist Building Material); Finish Machine; Firemen & Hoist (One Drum); Flexplane; Forklift (Regardless of Lift Height); Form Grader; Joint Sealing Machine; Outboard Motor Boat; Power Sweeper (Riding Type); Roller (Rock); Ross Carrier; Skid Mounted or Trailer Mounted Conrete Pump; Skid Steer Machine with all Attachments; Switchman or Brakeman;

Throttle Valve Person; Tractair & Road Widening Trencher;

Tractor (50 H.P. or Over); Truck Crane Oiler; Tugger;

Welding Machine; Well Points; & Whirley Oiler

GROUP 3 - All Off Road Material Handling Equipment, including Articulating Dump Trucks; Greaser on Grease Facilities servicing Heavy Equipment

GROUP 4 - Bituminous Distributor; Burlap & Curing Machine;

Cement Gun; Concrete Saw; Conveyor; Deckhand Oiler; Grout Pump; Hydraulic Post Driver; Hydro Seeder; Mud Jack; Oiler;

Paving Joint Machine; Power Form Handling Equipment; Pump;

Roller (Earth); Steerman; Tamping Machine; Tractor (Under 50 H.P.); & Vibrator

CRANES - with booms 150 ft. & Over (Including JIB), and where the length of the boom in combination with the length of the piling leads equals or exceeds 150 ft. - $1.00 over Group 1 rate

EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID

10%

ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK.

IRON0044-009 06/01/2024

BRACKEN, GALLATIN, GRANT, HARRISON, ROBERTSON,

BOURBON (Northern third, including Townships of Jackson, Millersburg, Ruddel Mills & Shawhan);

CARROLL (Eastern third, including the Township of Ghent);

FLEMING (Western part, excluding Townships of Beechburg, Colfax, Elizaville, Flemingsburg, Flemingsburg Junction, Foxport, Grange City, Hillsboro, Hilltop, Mount Carmel, Muses Mills, Nepton, Pecksridge, Plummers Landing, Plummers Mill, Poplar Plains, Ringos Mills, Tilton & Wallingford);

MASON (Western two-thirds, including Townships of Dover, 3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 4/13

Lewisburg, Mays Lick, Maysville, Minerva, Moranburg, Murphysville, Ripley, Sardis, Shannon, South Ripley & Washington);

NICHOLAS (Townships of Barefoot, Barterville, Carlisle, Ellisville, Headquarters, Henryville, Morningglory, Myers & Oakland Mills);

OWEN (Townships of Beechwood, Bromley, Fairbanks, Holbrook, Jonesville, Long Ridge, Lusby's Mill, New, New Columbus, New Liberty, Owenton, Poplar Grove, Rockdale, Sanders, Teresita & Wheatley);

SCOTT (Northern two-thirds, including Townships of Biddle, Davis, Delaplain, Elmville, Longlick, Muddy Ford, Oxford, Rogers Gap, Sadieville, Skinnersburg & Stonewall)

Rates Fringes

IRONWORKER

Fence Erector...............$ 33.60 23.00 Structural..................$ 35.37 23.00

IRON0070-006 06/01/2024

ANDERSON, BOYLE, BRECKINRIDGE, BULLITT, FAYETTE, FRANKLIN,

GRAYSON, HARDIN, HENRY, JEFFERSON, JESSAMINE, LARUE, MADISON,

MARION, MEADE, MERCER, NELSON, OLDHAM, SHELBY, SPENCER,

TRIMBLE, WASHINGTON & WOODFORD

BOURBON (Southern two-thirds, including Townships of Austerlity, Centerville, Clintonville, Elizabeth, Hutchison, Littlerock, North Middletown & Paris);

CARROLL (Western two-thirds, including Townships of Carrollton, Easterday, English, Locust, Louis, Prestonville & Worthville);

CLARK (Western two-thirds, including Townships of Becknerville, Flanagan, Ford, Pine Grove, Winchester & Wyandotte);

OWEN (Eastern eighth, including Townships of Glenmary, Gratz, Monterey, Perry Park & Tacketts Mill);

SCOTT (Southern third, including Townships of Georgetown, Great Crossing, Newtown, Stampling Ground & Woodlake);

Rates Fringes

IRONWORKER.......................$ 34.59 25.00

IRON0769-007 06/01/2024

BATH, BOYD, CARTER, ELLIOTT, GREENUP, LEWIS, MONTGOMERY & ROWAN

CLARK (Eastern third, including townships of Bloomingdale, Hunt, Indian Fields, Kiddville, Loglick, Rightangele & Thomson);

FLEMING (Townships of Beechburg, Colfax, Elizaville, Flemingsburg, Flemingsburg Junction, Foxport, Grange City, Hillsboro, Hilltop, Mount Carmel, Muses Mills, Nepton, Pecksridge, Plummers Landing, Plummers Mill, Poplar Plains, Ringos Mills, Tilton & Wallingford);

MASON (Eastern third, including Townships of Helena, Marshall, Orangeburg, Plumville & Springdale);

NICHOLAS (Eastern eighth, including the Township of Moorefield Sprout)

Rates Fringes

IRONWORKER

ZONE 1......................$ 37.66 29.24

ZONE 2......................$ 38.06 29.24

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 5/13

ZONE 3......................$ 39.66 29.24

ZONE 1 - (no base rate increase) Up to 10 mile radius of Union Hall, 1643 Greenup Ave, Ashland, KY.

ZONE 2 - (add $0.40 per hour to base rate) 10 to 50 mile radius of Union Hall, 1643 Greenup Ave, Ashland, KY.

ZONE 3 - (add $2.00 per hour to base rate) 50 mile radius & over of Union Hall, 1643 Greenup Ave, Ashland, KY.

LABO0189-003 07/01/2024

BATH, BOURBON, BOYD, BOYLE, BRACKEN, CARTER, CLARK, ELLIOTT,

FAYETTE, FLEMING, FRANKLIN, GALLATIN, GRANT, GREENUP, HARRISON,

JESSAMINE, LEWIS, MADISON, MASON, MERCER, MONTGOMERY, NICHOLAS,

OWEN, ROBERTSON, ROWAN, SCOTT, & WOOLFORD COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 23.96 18.58

GROUP 2.....................$ 24.21 18.58

GROUP 3.....................$ 24.26 18.58

GROUP 4.....................$ 24.86 18.58

LABORERS CLASSIFICATIONS

GROUP 1 - Aging & Curing of Concrete; Asbestos Abatement Worker; Asphalt Plant; Asphalt; Batch Truck Dump; Carpenter Tender; Cement Mason Tender; Cleaning of Machines;

Concrete; Demolition; Dredging; Environmental - Nuclear, Radiation, Toxic & Hazardous Waste - Level D; Flagperson;

Grade Checker; Hand Digging & Hand Back Filling; Highway Marker Placer; Landscaping, Mesh Handler & Placer; Puddler;

Railroad; Rip-rap & Grouter; Right-of-Way; Sign, Guard Rail & Fence Installer; Signal Person; Sound Barrier Installer;

Storm & Sanitary Sewer; Swamper; Truck Spotter & Dumper;

Wrecking of Concrete Forms; General Cleanup

GROUP 2 - Batter Board Man (Sanitary & Storm Sewer);

Brickmason Tender; Mortar Mixer Operator; Scaffold Builder;

Burner & Welder; Bushammer; Chain Saw Operator; Concrete Saw Operator; Deckhand Scow Man; Dry Cement Handler;

Environmental - Nuclear, Radiation, Toxic & Hazardous Waste

- Level C; Forklift Operator for Masonary; Form Setter;

Green Concrete Cutting; Hand Operated Grouter & Grinder Machine Operator; Jackhammer; Pavement Breaker; Paving Joint Machine; Pipelayer; Plastic Pipe Fusion; Power Driven Georgia Buggy & Wheel Barrow; Power Post Hole Digger;

Precast Manhole Setter; Walk-Behind Tamper; Walk-Behind Trencher; Sand Blaster; Concrete Chipper; Surface Grinder;

Vibrator Operator; Wagon Driller

GROUP 3 - Asphalt Luteman & Raker; Gunnite Nozzleman;

Gunnite Operator & Mixer; Grout Pump Operator; Side Rail Setter; Rail Paved Ditches; Screw Operator; Tunnel (Free Air); Water Blaster

GROUP 4 - Caisson Worker (Free Air); Cement Finisher;

Environmental - Nuclear, Radiation, Toxic & Hazardous Waste

- Levels A & B; Miner & Driller (Free Air); Tunnel Blaster;

& Tunnel Mucker (Free Air); Directional & Horizontal

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 6/13

Boring; Air Track Drillers (All Types); Powdermen & Blasters; Troxler & Concrete Tester if Laborer is Utilized

LABO0189-008 07/01/2024

ANDERSON, BULLITT, CARROLL, HARDIN, HENRY, JEFFERSON, LARUE,

MARION, MEADE, NELSON, OLDHAM, SHELBY, SPENCER, TRIMBLE &

WASHINGTON COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 23.96 18.58

GROUP 2.....................$ 24.21 18.58

GROUP 3.....................$ 24.26 18.58

GROUP 4.....................$ 24.86 18.58

LABORERS CLASSIFICATIONS

GROUP 1 - Aging & Curing of Concrete; Asbestos Abatement Worker; Asphalt Plant; Asphalt; Batch Truck Dump; Carpenter Tender; Cement Mason Tender; Cleaning of Machines;

Concrete; Demolition; Dredging; Environmental - Nuclear, Radiation, Toxic & Hazardous Waste - Level D; Flagperson;

Grade Checker; Hand Digging & Hand Back Filling; Highway Marker Placer; Landscaping, Mesh Handler & Placer; Puddler;

Railroad; Rip-rap & Grouter; Right-of-Way; Sign, Guard Rail & Fence Installer; Signal Person; Sound Barrier Installer;

Storm & Sanitary Sewer; Swamper; Truck Spotter & Dumper;

Wrecking of Concrete Forms; General Cleanup

GROUP 2 - Batter Board Man (Sanitary & Storm Sewer);

Brickmason Tender; Mortar Mixer Operator; Scaffold Builder;

Burner & Welder; Bushammer; Chain Saw Operator; Concrete Saw Operator; Deckhand Scow Man; Dry Cement Handler;

Environmental - Nuclear, Radiation, Toxic & Hazardous Waste

- Level C; Forklift Operator for Masonary; Form Setter;

Green Concrete Cutting; Hand Operated Grouter & Grinder Machine Operator; Jackhammer; Pavement Breaker; Paving Joint Machine; Pipelayer; Plastic Pipe Fusion; Power Driven Georgia Buggy & Wheel Barrow; Power Post Hole Digger;

Precast Manhole Setter; Walk-Behind Tamper; Walk-Behind Trencher; Sand Blaster; Concrete Chipper; Surface Grinder;

Vibrator Operator; Wagon Driller

GROUP 3 - Asphalt Luteman & Raker; Gunnite Nozzleman;

Gunnite Operator & Mixer; Grout Pump Operator; Side Rail Setter; Rail Paved Ditches; Screw Operator; Tunnel (Free Air); Water Blaster

GROUP 4 - Caisson Worker (Free Air); Cement Finisher;

Environmental - Nuclear, Radiation, Toxic & Hazardous Waste

- Levels A & B; Miner & Driller (Free Air); Tunnel Blaster;

& Tunnel Mucker (Free Air); Directional & Horizontal Boring; Air Track Drillers (All Types); Powdermen & Blasters; Troxler & Concrete Tester if Laborer is Utilized

LABO0189-009 07/01/2024

BRECKINRIDGE & GRAYSON COUNTIES

Rates Fringes

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 7/13

Laborers:

GROUP 1.....................$ 23.96 18.58

GROUP 2.....................$ 24.21 18.58

GROUP 3.....................$ 24.26 18.58

GROUP 4.....................$ 24.86 18.58

LABORERS CLASSIFICATIONS

GROUP 1 - Aging & Curing of Concrete; Asbestos Abatement Worker; Asphalt Plant; Asphalt; Batch Truck Dump; Carpenter Tender; Cement Mason Tender; Cleaning of Machines;

Concrete; Demolition; Dredging; Environmental - Nuclear, Radiation, Toxic & Hazardous Waste - Level D; Flagperson;

Grade Checker; Hand Digging & Hand Back Filling; Highway Marker Placer; Landscaping, Mesh Handler & Placer; Puddler;

Railroad; Rip-rap & Grouter; Right-of-Way; Sign, Guard Rail & Fence Installer; Signal Person; Sound Barrier Installer;

Storm & Sanitary Sewer; Swamper; Truck Spotter & Dumper;

Wrecking of Concrete Forms; General Cleanup

GROUP 2 - Batter Board Man (Sanitary & Storm Sewer);

Brickmason Tender; Mortar Mixer Operator; Scaffold Builder;

Burner & Welder; Bushammer; Chain Saw Operator; Concrete Saw Operator; Deckhand Scow Man; Dry Cement Handler;

Environmental - Nuclear, Radiation, Toxic & Hazardous Waste

- Level C; Forklift Operator for Masonary; Form Setter;

Green Concrete Cutting; Hand Operated Grouter & Grinder Machine Operator; Jackhammer; Pavement Breaker; Paving Joint Machine; Pipelayer; Plastic Pipe Fusion; Power Driven Georgia Buggy & Wheel Barrow; Power Post Hole Digger;

Precast Manhole Setter; Walk-Behind Tamper; Walk-Behind Trencher; Sand Blaster; Concrete Chipper; Surface Grinder;

Vibrator Operator; Wagon Driller

GROUP 3 - Asphalt Luteman & Raker; Gunnite Nozzleman;

Gunnite Operator & Mixer; Grout Pump Operator; Side Rail Setter; Rail Paved Ditches; Screw Operator; Tunnel (Free Air); Water Blaster

GROUP 4 - Caisson Worker (Free Air); Cement Finisher;

Environmental - Nuclear, Radiation, Toxic & Hazardous Waste

- Levels A & B; Miner & Driller (Free Air); Tunnel Blaster;

& Tunnel Mucker (Free Air); Directional & Horizontal Boring; Air Track Drillers (All Types); Powdermen & Blasters; Troxler & Concrete Tester if Laborer is Utilized

PAIN0012-005 06/11/2005

BATH, BOURBON, BOYLE, CLARK, FAYETTE, FLEMING, FRANKLIN,

HARRISON, JESSAMINE, MADISON, MERCER, MONTGOMERY, NICHOLAS,

ROBERTSON, SCOTT & WOODFORD COUNTIES:

Rates Fringes

PAINTER

Bridge/Equipment Tender and/or Containment Builder..$ 18.90 5.90 Brush & Roller..............$ 21.30 5.90 Elevated Tanks;

Steeplejack Work; Bridge & Lead Abatement..............$ 22.30 5.90 Sandblasting &

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 8/13

Waterblasting...............$ 22.05 5.90 Spray.......................$ 21.80 5.90

PAIN0012-017 05/01/2015

BRACKEN, GALLATIN, GRANT, MASON & OWEN COUNTIES:

Rates Fringes

PAINTER (Heavy & Highway Bridges - Guardrails - Lightpoles - Striping) Bridge Equipment Tender and Containment Builder.....$ 20.73 9.06 Brush & Roller..............$ 23.39 9.06 Elevated Tanks;

Steeplejack Work; Bridge & Lead Abatement..............$ 24.39 9.06 Sandblasting & Water Blasting....................$ 24.14 9.06 Spray.......................$ 23.89 9.06

PAIN0118-004 06/01/2018

ANDERSON, BRECKINRIDGE, BULLITT, CARROLL, GRAYSON, HARDIN,

HENRY, JEFFERSON, LARUE, MARION, MEADE, NELSON, OLDHAM, SHELBY,

SPENCER, TRIMBLE & WASHINGTON COUNTIES:

Rates Fringes

PAINTER

Brush & Roller..............$ 22.00 12.52 Spray, Sandblast, Power Tools, Waterblast & Steam Cleaning....................$ 23.00 12.52

PAIN1072-003 12/01/2024

BOYD, CARTER, ELLIOTT, GREENUP, LEWIS and ROWAN COUNTIES

Rates Fringes

Painters:

Bridges; Locks; Dams;

Tension Towers & Energized Substations.................$ 37.53 23.95 Power Generating Facilities.$ 34.29 23.95

PLUM0248-003 06/01/2024

BOYD, CARTER, ELLIOTT, GREENUP, LEWIS & ROWAN COUNTIES:

Rates Fringes

Plumber and Steamfitter..........$ 41.50 25.01

PLUM0392-007 06/01/2024

BRACKEN, CARROLL (Eastern Half), GALLATIN, GRANT, MASON, OWEN &

ROBERTSON COUNTIES:

Rates Fringes

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 9/13

Plumbers and Pipefitters.........$ 40.70 26.75

PLUM0502-003 08/01/2024

BRECKINRIDGE, BULLITT, CARROLL (Western Half), FRANKLIN (Western three-fourths), GRAYSON, HARDIN, HENRY, JEFFERSON, LARUE, MARION, MEADE, NELSON, OLDHAM, SHELBY, SPENCER, TRIMBLE &

WASHINGTON COUNTIES

Rates Fringes

PLUMBER..........................$ 41.90 24.89

* SUKY2010-160 10/08/2001

Rates Fringes

Truck drivers:

GROUP 1.....................$ 16.57 ** 7.34

GROUP 2.....................$ 16.68 ** 7.34

GROUP 3.....................$ 16.86 ** 7.34

GROUP 4.....................$ 16.96 ** 7.34

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Mobile Batch Truck Tender

GROUP 2 - Greaser; Tire Changer; & Mechanic Tender

GROUP 3 - Single Axle Dump; Flatbed; Semi-trailer or Pole Trailer when used to pull building materials and equipment;

Tandem Axle Dump; Distributor; Mixer; & Truck Mechanic

GROUP 4 - Euclid & Other Heavy Earthmoving Equipment & Lowboy; Articulator Cat; 5-Axle Vehicle; Winch & A-Frame when used in transporting materials; Ross Carrier; Forklift when used to transport building materials; & Pavement Breaker

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 10/13 preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

3/27/25, 8:10 AM SAM.gov https://sam.gov/wage-determination/KY20250038/1 11/13

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived…