Rough river DAM safety modification phase II: new outlet works and cutoff wall project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .
- Solicitation number
- W912QR25R0016
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KA Construction Of Dams
- Place of performance
- Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119 Falls of Rough, Kentucky 40119, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Louisville District is seeking a contractor for the Rough River Dam Safety Modification Phase II project, which involves construction of new outlet works and a cutoff wall at Rough River Dam in Falls of Rough, Kentucky. The comprehensive project requires all planning, programming, administration, management, supervision, communications, and inspection necessary to ensure compliance with contract requirements and applicable federal, state, and local regulations. The work includes constructing a continuous concrete cutoff wall between dam stations 9+00 to 25+40 with a minimum 24-inch width, tunnel construction through the dam's left abutment, mass excavation, and abandonment of existing outlet works. The procurement will be evaluated using a best value trade-off source selection process with a HUBZone 10% price evaluation preference, and proposals must demonstrate reasonable and realistic pricing across all line items in the price breakout schedule. The current proposal deadline is October 23, 2025, at 10:00 AM Eastern Standard Time, with submissions required through the PIEE system.
This procurement is structured as a full and open competition under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with no set-aside designation, though it includes preferential evaluation for HUBZone certified businesses and requires large businesses to submit subcontracting plans with minimum 20% small business participation. The project involves a substantial infrastructure modification with a target ceiling of $325 million and will be awarded as a single firm-fixed-price contract with Electronic Funds Transfer payment terms. Work will be performed at Rough River Lake, located at 14957 Falls of Rough Road, Falls of Rough, Kentucky 40119, and involves complex engineering challenges including tunnel construction, underwater excavation, specialized concrete placement in karstic limestone conditions, and coordination with multiple utility providers. The contractor must be registered in the System for Award Management (SAM.gov) prior to proposal submission and demonstrate capability to handle the technical complexities of dam safety modifications while maintaining operational continuity of the facility.
Notice text
7 versions
Update #7 · Latest ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECTThe contractor?s work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.
This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businesses shall submit a subcontracting plan.
LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119
In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor. One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors arecautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable andrealistic prices for all line items listed in the price breakout schedule.
Quotes are due on 23 October 2025 at 10:00 AM Eastern Standard Time
You may submit your quote following the PIEE instructions below. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.
North American Industry Classification System (NAICS) 237990 This NAICS code shall be listed on the contractor?s SAM account prior to submitting a quote/proposal/bid.All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission ofquote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer ? System for Award Management, which indicates ?All payments by the Government under thiscontract shall be made by electronic funds transfer (EFT).? Those not currently registered can obtain registration bygoing to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Update #6 ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECTThe contractor?s work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performedin strict compliance with the attached specifications and all other terms and conditions incorporated herein.This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businessesshall submit a subcontracting plan.LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor. One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors arecautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable andrealistic prices for all line items listed in the price breakout schedule.Quotes are due on 07 October 2025 at 10:00 AM Eastern Standard TimeYou may submit your quote following the PIEE instructions below. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.North American Industry Classification System (NAICS) 237990 This NAICS code shall be listed on thecontractor?s SAM account prior to submitting a quote/proposal/bid.All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission ofquote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer ? System for Award Management, which indicates ?All payments by the Government under thiscontract shall be made by electronic funds transfer (EFT).? Those not currently registered can obtain registration bygoing to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Update #5 ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECTThe contractor?s work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performedin strict compliance with the attached specifications and all other terms and conditions incorporated herein.This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businessesshall submit a subcontracting plan.LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor. One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors arecautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable andrealistic prices for all line items listed in the price breakout schedule.Quotes are due on 07 October 2025 at 10:00 AM Eastern Standard TimeYou may submit your quote following the PIEE instructions below. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.North American Industry Classification System (NAICS) 237990 This NAICS code shall be listed on thecontractor?s SAM account prior to submitting a quote/proposal/bid.All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission ofquote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer ? System for Award Management, which indicates ?All payments by the Government under thiscontract shall be made by electronic funds transfer (EFT).? Those not currently registered can obtain registration bygoing to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Update #4 ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECTThe contractor?s work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performedin strict compliance with the attached specifications and all other terms and conditions incorporated herein.This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businessesshall submit a subcontracting plan.LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor. One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors arecautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable andrealistic prices for all line items listed in the price breakout schedule.Quotes are due on 20 March 2025 at 10:00 AM Eastern Standard TimeYou may submit your quote following the PIEE instructions below. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.North American Industry Classification System (NAICS) 237990 This NAICS code shall be listed on thecontractor?s SAM account prior to submitting a quote/proposal/bid.All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission ofquote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer ? System for Award Management, which indicates ?All payments by the Government under thiscontract shall be made by electronic funds transfer (EFT).? Those not currently registered can obtain registration bygoing to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Update #3 ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECTThe contractor?s work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performedin strict compliance with the attached specifications and all other terms and conditions incorporated herein.This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businessesshall submit a subcontracting plan.LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor. One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors arecautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable andrealistic prices for all line items listed in the price breakout schedule.Quotes are due on 20 March 2025 at 10:00 AM Eastern Standard TimeYou may submit your quote following the PIEE instructions below. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.North American Industry Classification System (NAICS) 237990 This NAICS code shall be listed on thecontractor?s SAM account prior to submitting a quote/proposal/bid.All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission ofquote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer ? System for Award Management, which indicates ?All payments by the Government under thiscontract shall be made by electronic funds transfer (EFT).? Those not currently registered can obtain registration bygoing to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Update #2 ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECT
The contractor's work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performedin strict compliance with the attached specifications and all other terms and conditions incorporated herein.
This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businesses shall submit a subcontracting plan.
LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119
In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor.
One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors are cautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable and realistic prices for all line items listed in the price breakout schedule.
Quotes are due on 18 April 2025 at 10:00 AM Eastern Standard Time. You may submit your quote following the PIEE instructions. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.
North American Industry Classification System (NAICS) 237990. This NAICS code shall be listed on thecontractor's SAM account prior to submitting a quote/proposal/bid. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of proposal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer System for Award Management, which indicates; All payments by the Government under this contract shall be made by electronic funds transfer (EFT). Those not currently registered can obtain registration by going to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Update #1 ·
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECT
The contractor's work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performedin strict compliance with the attached specifications and all other terms and conditions incorporated herein.
This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businesses shall submit a subcontracting plan.
LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119
In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor.
One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors are cautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable and realistic prices for all line items listed in the price breakout schedule.
Quotes are due on 20 March 2025 at 10:00 AM Eastern Standard Time. You may submit your quote following the PIEE instructions. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.
North American Industry Classification System (NAICS) 237990. This NAICS code shall be listed on thecontractor's SAM account prior to submitting a quote/proposal/bid. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of proposal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer System for Award Management, which indicates; All payments by the Government under this contract shall be made by electronic funds transfer (EFT). Those not currently registered can obtain registration by going to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Rough river DAM safety modification phase II: new outlet works and cutoff wall project | Award Notice | |
| Rough river DAM safety modification phase II: new outlet works and cutoff wall project | Pre-Solicitation | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity