This is a set of certified final engineering plans and drawings for the Rough River Dam Safety Modification Phase II project at Falls of Rough, Kentucky. The drawings detail construction requirements for a new outlet works and cutoff wall, including contractor work limits, site plans, utility plans, instrumentation plans, and critical area details.
Key aspects include: detailed specifications for abandoning the existing outlet conduit and control tower, including installation of emergency bulkheads and grouting procedures; critical area sequences requiring special panel/secant construction methods; instrumentation requirements for blasting areas with seismograph locations; and utility coordination requirements with multiple providers (Veolia Water, Grayson County Water, Mediacom, AT&T, Meade County RECC, and Lumen). The plans show detailed elevations, cross-sections and construction sequences, particularly for Critical Area A where the cutoff wall intersects the existing conduit between stations 22+40 and 22+70. The drawings include specific requirements for reservoir pool levels during construction phases and detailed procedures for abandoning the existing outlet works while maintaining dam safety.
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HWY 7
ACCES
S F
ROM
SHORT C
REEK
HWY 79
ACCESS FROM
AXTEL
B
C D
A
F
E N 2 107 466.34
E 1 421 064.64 N 2 107 721.19
E 1 421 240.86
N 2 108 213.69
E 1 421 344.87
N 2 107 802.31
E 1 420 874.08
N 2 107 707.75
E 1 420 766.25
N 2 107 619.37
E 1 420 779.63
N 2 108 041.41
E 1 420 877.49
N 2 108 056.72
E 1 420 770.64 N 2 108 283.21
E 1 420 809.78
N 2 108 363.75
E 1 420 792.53
N 2 108 294.78
E 1 421 401.88
N 2 109 554.21
E 1 420 928.47
N 2 110 105.73
E 1 420 664.28
N 2 109 631.77
E 1 421 360.46
N 2 109 238.06
E 1 421 369.58
N 2 110 328.75
E 1 423 298.69
A
B
C
D
F
E
N 2 108 938.10
E 1 422 034.38
N 2 108 858.14 E 1 422 127.85
N 2 108 807.53 E 1 422 131.18
N 2 108 694.01
E 1 422 034.09
N 2 108 645.15
E 1 422 091.20
N 2 108 779.97
E 1 422 208.22
N 2 110 186.17
E 1 423 017.04
N 2 110 176.21
E 1 423 167.91
N 2 110 041.01
E 1 423 581.09
N 2 110 186.17
E 1 423 017.04
N 2,110,442.53
E 1,422,613.74
N 2,110,337.98
E 1,422,816.81
AM
AJ
AK
N 2,109,163.84
E 1,422,225.61
N 2,109,090.62
E 1,422,267.22
RESTRICTED LIMITS
N 2110376.96
E 1421405.49
N 2110258.14
E 1421543.33
N 2110265.24
E 1421588.46
N 2110175.28
E 1421630.54
N 2109958.80
E 1421774.97
N 2109877.32
E 1421989.65 N 2109867.60
E 1421939.23
N 2109740.01
E 1422025.93
N 2109573.81
E 1422014.98
N 2109912.23
E 1422234.71
N 2109344.57
E 1422186.42
N 2109314.17
E 1423482.50
N 2110067.69
E 1423603.91
7 6
N 2 109 478.21
E 1 422 038.61
N 2 109 642.39
E 1 422 054.90
N 2 109 770.10
E 1 422 055.06
N 2 109 872.87
E 1 421 985.85
N 2 110 447.05
E 1 422 549.97
N 2 110 683.02
E 1 422 148.82
N 2 110 779.44
E 1 421 967.34
N 2 110 831.10
E 1 421 829.57
N 2 110 871.68
E 1 421 696.24
N 2 110 914.86
E 1 421 348.78
N 2 110 869.47
E 1 421 308.61
N 2 110 793.32
E 1 421 197.75
N 2 110 683.05
E 1 421 111.39
N 2 110 602.42
E 1 421 122.95
N 2 110 254.87
E 1 420 939.08
N 2 110 093.57
E 1 421 048.16
N 2 110 394.36
E 1 421 326.11
N 2 110 452.47
E 1 421 248.22
N 2 109 982.31
E 1 421 800.33
N 2 110 233.97
E 1 421 622.74
N 2 109 425.49
E 1 422 171.73AJ
H
G
I
G N 2 108 637.19
E 1 422 010.67
H N 2 108 653.08
E 1 421 926.16
I N 2 108 702.10
E 1 421 959.29
N 2 108 370.70
E 1 421 124.84
N 2 108 308.80
E 1 421 119.10
N 2 108 308.76
E 1 421 205.56
N 2 108 371.49
E 1 421 205.72 9
N 2 108 725.06
E 1 421 774.73
N 2 109 047.88
E 1 421 627.54
N 2 109 076.06
E 1 421 663.23
N 2 109 114.42
E 1 421 709.39
N 2 109 143.08
E 1 421 731.02
N 2 109 278.00
E 1 421 650.11
N 2 109 467.16
E 1 421 525.37
N 2 109 342.08
E 1 421 367.17
AK
AL
AL
N 2,108,992.17
E 1,422,216.41
AM
N 2,108,956.65
E 1,422,257.93
N 2 108 237.74
E 1 422 461.33
N 2 108 055.71
E 1 422 547.54 N 2 108 197.01
E 1 422 710.74
N 2 108 913.44
E 1 423 179.65
N 2 107 685.37
E 1 422 764.21
N 2 107 927.53
E 1 422 737.62
N 2 107 916.29
E 1 423 130.19
N 2 108 004.58
E 1 422 805.20
N 2 108 198.73
E 1 421 635.40
N 2 108 070.72
E 1 421 524.92
N 2110465.30
E 1421319.48
N 2110547.55
E 1421388.23
N 2110417.92
E 1421782.77
N 2110281.99
E 1422037.37
N 2110192.82
E 1422066.90
N 2 107 807.79
E 1 420 756.88
N 2 108 151.22
E 1 420 780.90
0' C
E M
E T E R
Y B
U F F E R
N 2 107 706.92
E 1 420 967.72
N 2 108 123.60
E 1 420 973.67
N 2,108,509.50
E 1,422,273.41
1,422,342.44 E
2,108,549.53 N
1,422,372.36 E
2,108,572.75 N
1,422,149.62 E
2,108,641.94 N
1,422,180.32 E
2,108,677.49 N
C B
C B
W A
L L
W A
L L
W W
W
C B
C B
C B
C B
T E
N N
IS
C O
U R
T S
T E
N N
IS
C O
U R
T S
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
REQUIRED PER STAGING AREA USE PLAN.
PER SECTION 01 52 13.20 08. ON-SITE LAB FACILITY IS
5. THE LABORATORY TESTING FACILITIES SHALL BE INSTALLED
THIS CONTRACT.
THE GOVERNMENT TRAILER SHALL BE INSTALLED UNDER
FACILITIES FOR GOVERNMENT TRAILER REQUIREMENTS.
SEE SPECIFICATION SECTION 01 52 13.20 08 GOVERNMENT
CONTRACTOR TRAILER REQUIREMENTS.
CONSTRUCTION FACILITIES AND CONTROLS FOR
SPECIFICATION SECTION 01 50 00 TEMPORARY
LOCATED IN STAGING AREAS AT SIMILAR LOCATION. SEE
4. CONTRACTOR AND GOVERNMENT TRAILERS SHALL BE
ANY UTILITY WORK WITH UTILITY COMPANY.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
AREAS INCLUDING DISPOSAL AREAS SHALL BE SEEDED.
OTW SPOILPLANS. ALL OTHER DISTURBED
RESTORE SPOIL AREA TO THE CONDITION IDENTIFIED IN THE
PRIOR TO THE END OF CONSTRUCTION, CONTRACTOR SHALL
REQUIRMENTS IN SPECIFICATIONS SECTION 01 57 19.00 06.
SPOIL AREA SHALL MEET ALL EROSION CONTROL AND PERMIT
ALL REQUIREMENTS IN SPECIFICATIONS SECTION 02 41 00.
SPECIFICATION SECTION 31 11 00. DEMOLITION SHALL MEET
GRUBBING SHALL MEET ALL REQUIREMENTS IN
TEMPORARY GRAVEL ACCESS ROADS. CLEARING AND
INCLUDE CLEARING TREES AND VEGETATION AND INSTALLING
WITH MATERIAL PROCESSING NEEDS. MODIFICATIONS MAY
DESIGNATED SPOIL AREA LIMITS IN ORDER TO ASSIST
3. CONTRACTOR MAY MODIFY AREA WITHIN
SECTION 01 35 00.00 08 SPECIAL PROCEDURES.
CONSTRUCTION FACILITIES AND CONTROLS AND PER
SPECIFICATION SECTIONS 01 50 00 TEMPORARY
A CONSTRUCTION SITE PLAN IN ACCORDANCE WITH
2. PRIOR TO START OF WORK, CONTRACTOR SHALL SUBMIT
MASS EXCAVATION.
SECTION 31 00 00.00 06 EARTHWORK AND 31 23 05.00 06
SHALL BE IN ACCORDANCE WITH SPECIFICATION
1. DISPOSITION OF SPOIL MATERIAL IN DISPOSAL AREAS
REMAIN OPEN AT ALL TIMES.
ACCESS. PUBLIC ACCESS TO THE STATE PARK SHALL
ENTRANCE SHALL NOT BE USED FOR CONSTRUCTION,
14. ROUGH RIVER STATE PARK ENTRANCE. THE STATE PARK
KENTUCKY TRANSPORATION CABINET.
COORDINATED WITH THE CONTRACTING OFFICE AND THE
ANY TEMPORARY CLOSURES OF THE HIGHWAY SHALL BE
CONSTRUCTION CONDITION UPON PROJECT COMPLETION.
CONSTRUCTION. THE ROAD SHALL BE REPAIRED TO PRE-
PHOTOGRAPHED AND DOCUMENTED PRIOR TO
13. EXISTING STATE HIGHWAY 79. CONDITION SHALL BE
12. EXISTING CHANNEL FILL SPOIL AREA.
11. SPILLWAY ACCESS ROAD (CONTRACTOR TO DESIGN)
10. ORIGINAL HIGHWAY 79 ON DAM CREST STAGING AREA.
PERSONNEL TO THE TAILWATER REMAINS OPEN AT ALL TIMES.
9. CONTRACTOR MUST ENSURE ACCESS FOR LAKE OPERATION
THE CONTRACTOR.
NOT BE AVAILABLE FOR LAYDOWN, STORAGE, OR PARKING BY
THE PUBLIC DURING CONSTRUCTION. THE PARKING LOT SHALL
8. THE PROJECT OFFICE PARKING LOT SHALL REMAIN OPEN TO
ROAD SHALL BE REMOVED DURING CONSTRUCTION.
7. CONTRACTOR MAY USE ROAD FOR ACCESS TO TAILWATER.
F6/STR CP501 FOR NEW ASPHALT PAVEMENT SECTION.
WILL REQUIRE FULL DEPTH REPLACEMENT. SEE DETAIL
PRE-CONSTRUCTION CONDITION. ANY FAILED PAVEMENT
CONTRACTOR SHALL RESTORE ROAD TO
CONSTRUCTION. PRIOR TO THE END OF CONSTRUCTION,
OF ROAD CONDITION PRIOR TO THE START OF
AREAS. CONTRACTOR SHALL TAKE PHOTO DOCUMENTATION
6. CONTRACTOR MAY USE ROAD FOR ACCESS TO TAILWATER
ATOP THE RAISED SPOIL AREA.
AREA. WEST SPILLWAY ACCESS TO BE CONSTRUCTED
AND EXIT CHANNEL EXCAVATION TO BE PLACED TO RAISE
5. OLD CAMPGROUND SPOIL AREA. SPOIL FROM TUNNEL
TRANSPORTATION CABINET (KYTC).
FOR OBTAINING ANY ACCESS PERMITS FROM THE KENTUCKY
FROM SPILLWAY ACCESS. CONTRACTOR IS RESPONSIBLE
TO THE SPOIL AREA SHALL BE FROM HIGHWAY 79 OR
THE ROAD FOR ACCESS TO THE SPOIL AREA. ACCESS
4. ROAD TO REMAIN OPEN. CONTRACTOR SHALL NOT USE
D7/CTW GC502.
ENTRANCE/EXIT ALONG HIGHWAY 79. SEE DETAIL
PROVIDE TEMPORARY GRAVEL CONSTRUCTION
3. PROJECT STAGING AREA. OWNED BY USACE.
D7/CTW GC502. SEE NOTE 3.
ENTRANCE/EXIT ALONG HIGHWAY 79. SEE DETAIL
PROVIDE TEMPORARY GRAVEL CONSTRUCTION
2. PROJECT "UPLAND SPOIL AREA". OWNED BY USACE.
"UPLAND SPOIL AREA" (2 - BELOW).
THE SPILLWAY ACCESS OR THRU USACE OWNED
OF KENTUCKY. SEE NOTE 3. TO BE ACCESSED USING
1. PROJECT "UPLAND SPOIL AREA". OWNED BY STATE
CONTRACTOR WORK LIMITS
PROPERTY LINE
2 - WAY ACCESS ROUT
RESTRICTED LIMITS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
C O
N T
R A
C T
O R
W O
R K
L
IM
IT
E
R T
IF
IE
D F
IN
A
L
V-003
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S I
D
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
CONTRACTOR WORK LIMITS
1"=200'SCALE:
NORTH
PLAN
400'0 200'
R E
V
IS
IO
N
M A
D E
I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
A1
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
550 550 550 550 550
550 550 550 550
550 550 550 550
550 5
445 4
455 455 455
460 460
465 465 465 465
470 470 470 470
470 470
475 475
475 4
475 475
480 480
480 480 480 480
480 480 480
485 485 485
485 485
485 485
490 490 490 490 490 490 490
490 490 490 490 490
495 495 495
495 495
495 495 495 495 495 495
495 495
495 495
500 500
500 500 500
500 500 500 500 500 500 500
0 500
505 505 505 505 505
505 505
505 505
505 505
505 5
505 505 505 505 505 505 505
510 510
510 510
510 510 510 510
510 510 510 510 510 510 510
515 515 515 515 515 515
515 515 515 515 515
515 515 515 515 515 515 515
520 520 520
520 520 520 520 520 520 520 520
520 520
520 520
520 520 520 520 520 520 5
525 5
525 525 525 525 525 525 525 525
525 525
525 525
525 525 525 525 525 525 525 525
530 530 530 530 530 530 530
530 530 530 530 530 530
530 530 530 530 530 530 530 530 530 530 530
535 535 535 535 535 535 535 535
535 535 535 535
535 535 535 535 535 535 535 535 535 535
0 540
540 540 540 540
540 540 540 540 540 540 540 540
0 540
0 540
540 540 540 540 540 540 540 540 540 540 540
540 540
545 545
545 545
545 545 545 545 545 545 545 545
545 545 545 545 545 545 545 545 545 545 545
550 550 550 550 550
550 550 550 550 550 550 550 550 550
550 550 550 550
550 550 550
0 550
0 5
5 555
555 555
555 55
555 555
555 555 555 555 555 555 555 555 555 555 555 555 555
0 560
570 570
625 6
5 62
R
IP
R A P D
R A
IN
A G
E
R
IP
R A P D
R A
IN
A G
E
C B
C B
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W A
L L
P L
A Y
G R
O U
N D
C E
M E T E R
Y
W A
L L
W W
W
C B
C B
C B
C B
T E
N N
IS
C O
U R
T S
T E
N N
IS
C O
U R
C
M P
" C
E
V .4
E .7
N
.5
U S
G S
"O L D C
A M
P G
R O
U N
D S
P O
IL
A
R E
A
"UPLAND SPOIL AREA"
RESERVOIR
DAM
DAM
DAM
CS109
CS110
CS111
CS112
CS113
CS114
CS115
CS116
CS117CS117
CS118 CS119
CS120
CS121
CS122
CS123
CS124
C E
M E
TE
R Y
CONTRACTOR
STAGING AREA
KY P
ARKS A
IRFIE
LD
ROUGH RIVER
STATE PARK
GENERAL SHEET NOTES
LEGEND
CONTRACTOR WORK LIMITS
RESTRICTED WORK LIMITS
RESTRICTED DURING CONSTRUCTION.
5. PUBLIC ACCESS TO THE TAILWATER AREA SHALL BE
PROJECT.
SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE
4. UTILITY SERVICES FOR EXISTING USACE AND KY PARKS DEPT.
FOR THE DURATION OF THE PROJECT.
AND PEDESTRIAN ACCESS TO THE FACILITY ARE REQUIRED
MAINTENANCE OF THE DAM. SAFE AND ADEQUATE VEHICULAR
TO EXECUTE OPERATIONS RELATED TO OPERATION AND
MAINTENANCE STAFF AND PARK RANGERS WILL CONTINUE
PUBLIC DURING WORKING HOURS. ADDITIONALLY, THE
3. THE ROUGH RIVER PROJECT OFFICE WILL BE OPEN TO THE
MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT.
USACE AND KY PARKS DEPT. BUILDINGS SHALL BE
2. SAFE AND ADEQUATE VEHICULAR ACCESS TO THE EXISTING
1. ALL DIMENSION ARE IN U.S. SURVEY FEET.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
PUBLIC RESTROOM
EXISTING
PICNIC SHELTER
EXISTING
PLAYGROUND
EXISTING
(SEE OTW PLANS)
NEW PICNIC SHELTER
(SEE OTW PLANS)
NEW RESTROOM FACILITY
(SEE OTW PLANS)
NEW STILLING BASIN
(SEE OTW PLANS)
NEW TUNNEL
(SEE OTW PLANS)
NEW CONTROL TOWER
(SEE OTW PLANS)
NEW APPROACH CHANNEL
MAINTENANCE BUILDING
STATE PARK
SPILLWAY
RETREAT CHANNEL
ROUGH RIVER
OUTLET CONDUIT
EXISTING
STILLING BASIN
EXISTING
(SEE OTW PLANS)
NEW RETREAT CHANNEL
USACE MAINTENANCE BUILDING
TOWER BRIDGE
CONTROL TOWER
EXISTING
USACE BUILDING
USACE VISITORS CENTER
USACE PROJECT OFFICE
CONTRACTOR ACCESS
RELOCATED HWY 79
WORK PLATFORM
SHOWER FACILITY
EXISTING CAMP
STATE PARK)
PARK (ROUGH RIVER
ACCESS TO KY STATE
NEW CUTOFF WALL
O V
E R
A L
L S
IT
E
P L
A N
CS101
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
IS
R T
IF
IE
D F
IN
A
L
OTW
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
U T
L E
T W
O R
K S
NORTH
PLAN
400'0 200'
OVERALL SITE PLAN - OTW
SCALE: 1"=200'
A1
R E
V
IS
IO
N
M A
D E
I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
U G
H R
IV
E R D
A M S
P
IL
L W
A Y
U D
U D
U D
(TO REMAIN)
EX. FENCE
EX. ASPHALT
U D
U D
E X
B R
IC
K P
A V
E D P
A R
K
IN
G E
X
B R
IC
K P
A V
E D P
A R
K
IN
G
E X
A S
P H
A L T R
O A
D
E X
A S
P H
A L T
P A
R K
IN
G
E X
U S
A C
E V
IS
IT
O R C
E N
T E
R
E X
U S
A C
E V
IS
IT
O R C
E N
T E
R
EX. STATE PARK
MAINTENANCE BUILDING
CONCRETE SPILLWAY
CONTROL SILL(ELEV 424 ACROSS CENTER)
.7 6 5
.3 6 5 .6
.2
.6
.0
.5
.8 5 5 .0
.5
.2
E = 120.81'
T = 178.87'
L = 171.09'
R = 72.00'
E = 1422573.85
N = 2108385.92
PI Sta. = 5+88.18
CURVE NO. 1
12' 12'
N 2 108 480.83
E 1 422 294.22
N 2 108 607.63
E 1 422 465.33
N 2 108 770.09
E 1 422 336.73
N 2 108 634.48
E 1 422 580.04
N 2 108 610.18
E 1 422 581.61
DISTURB LIMITS
TOWER ACCESS CL
'-0
R
MATCH EXISTING
STA. 3+10.54
DISTURB LIMIT
N 2 108 423.36
N 2 108 423.78
E 1 422 463.37
N 2 108 474.54
E 1 422 487.32
N 2 108 459.67
E 1 422 468.48
N 2 108 554.20
E 1 422 598.35
2+00
3+00
4+00
PC
Sta. 4+09.31
P
TS
ta . 5
.4
PI
Sta. 1+94.99N 2 108 694.50E 1 422 330.19
E = 4.14'
T = 10.00'
L =15.71'
R = 10.00'
E = 1422349.48
N = 2108719.29
PI STA. = 0+18.50
CURVE NO. 1
SIDEWALK
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
WINTER POOL ELEV. = 470
RESTRICTED SUMMER POOL ELEV. = 490
NORMAL SUMMER POOL ELEV. = 495
3. ROUGH RIVER RESERVOIR -
2. SPOT COORDINATES ARE TO EDGE OF PAVEMENT.
ARE TO THE EDGE OF PAVEMENT.
1. ALL DIMENSIONS ARE IN U.S. SURVEY FEET. DIMENSIONS
SEE CROSS SECTIONS ON SHEETS OTW CG751 to CG753.
SEE DETAIL D8 ON SHEET OTW CS501 AND
36. DOWNSTREAM DAM TOE RIPRAP PROTECTION TO EL. 472.00.
SEE DETAILS ON SHEET OTW CS509.
35. NEW CONCRETE BOAT RAMP WITH INTEGRAL CURB.
34. NEW STAFF GAGE. SEE DETAIL E5 ON SHEET STR CI501.
PORTAL FACE. SEE VOL 2 OTW-TU-S-502.
33. PERMANENT ANCHORED WIRE MESH AT DOWNSTREAM
32. BOLLARD, SEE SHEET CS501, DETAIL A8.
SEE VOLUME 2 SHEET OTW_CT S-800 FOR DETAIL.
31. BIG CLIFTY UPPER SHALE CONCRETE BULKHEAD,
SHEET OTW CP401.
DETAIL F5 ON SHEET OTW CS508 AND JOINT PLAN ON
30. STILLING BASIN BENCH CONCRETE PAVEMENT, SEE
SEE DETAIL A5 ON SHEET OTW CS508.
29. NEW 6' X 6' CONCRETE PAD FOR USGS GAGE STATION.
ON STR CG504.
28. ARTICULATED CONCRETE BLOCK (A.C.B.) SEE DETAILS
31 09 13.00 06 FOR MORE DETAILS.
WITH EXISTING BUBLER. SEE SPECIFICATION SECTION
MUST BE IN OPERATION FOR ONE MONTH CONCURRENT
STATION SLAB DETAIL ON SHEET OTW GS508. NEW BUBLER
27. NEW CONDUIT FOR USGS BUBBLER INSTRUMENT. SEE GAGE
26. NOT USED
25. RELOCATED PLAYGROUND.
INSTRUMENT. SEE DETAIL A1 ON SHEET STR CI503.
24. NEW CONCRETE PAD FOR RELOCATED SEISMIC
SHEETS.
23. EXISTING CONDUIT ABANDONMENT, SEE CTW CG500
B5 ON SHEET OTW CS501.
22. EXISTING STILLING BASIN TO BE FILLED. SEE DETAIL
FILTER SECTION IN DETAIL E5 ON SHEET OTW CS501.
21. AREA TO RECEIVE DRAPED FILTER. SEE DRAPED
OTW CS501.
20. RIPRAP LINED DITCH. SEE DETAIL C8 ON SHEET
SHEET STR CS515.
19. NEW TERMINAL SECTION NO. 1. SEE DETAIL A6,
STR CS516 AND CS517.
18. NEW GUARDRAIL END TREATMENT TYPE 1. SEE
SEE DETAIL ON SHEET OTW_BR S-702.
17. NEW THRIE BEAM GUARDRAIL TRANSITION AT BRIDGE.
A1, SHEET STR CS506.
16. NEW STEEL "w" BEAM GUARDRAIL. SEE DETAIL
EXCAVATIONS). SEE DETAILS ON SHEET OTW CS507.
15. TURF REINFORCEMENT MATTRESS. (ABOVE ROCK
SEE DETAIL ON SHEET OTW CS508.
REINFORCED CONCRETE GENERATOR PAD (20'x10').
14. TOWER GENERATOR LOCATION
13. NEW SHELTER FACILITY. SEE VOLUME 2 PLAN SET.
12. NEW RESTROOM FACILITY. SEE VOLUME 2 PLAN SET.
11. 6' WIDE EARTH SHOULDER.
10. CONCRETE SIDEWALK. SEE DETAIL D1 ON SHEET STR CS502.
9. 4" WHITE PARKING STRIPE.
SEE DETAIL E5 ON SHEET STR CM501.
8. HANDICAPPED PARKING PAVEMENT MARKINGS.
SEE DETAILS ON SHEET STR CS504.
7. MANUAL SWING VEHICLE GATE, 26' OPENING.
DETAILS ON SHEETS OTW CS504 AND CS505.
6. SECURITY FENCE FE6-TR-84. SEE FENCE
SEE SHEET OTW CG517.
SEE SHEET OTW CG514. (r) RETREAT CHANNEL,
5. PERMANENT DRAPED WIRE MESH. (a) APPROACH, 35 59 15.00 06. BOOM TO EXTEND TO ELEV. 535.0.
4. MARINE SAFETY BOOM. SEE SPECIFICATION
3. PAVEMENT EDGE KEY. SEE DETAIL B6 ON SHEET STR CP501.
2. TOWER BRIDGE. SEE VOLUME 2 PLAN SET.
SEE DETAIL F1 ON SHEET OTW CS501.
1. MEDIUM DUTY ASPHALT ACCESS ROAD PAVEMENT.
CONTRACTOR WORK LIMITS
NEW DITCH
RESTRICTED WORK LIMITS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
IT
E P
L A
N
O
F
R T
IF
IE
D F
IN
A
L
OTW
CS114
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
T
L E
T W
O R
K S
SITE PLAN - OTW
1"=20'SCALE:
MATCH LINE SEE SHEET CS113
M A
T C
H L
IN
E
S E
E S
H E
E T
C S
NORTH
PLAN
20' 40'0
SEE STR PLANS
RELOCATION WORK
FOR STATE ROAD
R E
V
IS
IO
N
M A
D E
I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
A1
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
W
C
C O
C O
C
OW
W
C O
C
OW
W
W
W W
W
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
L P
ABANDONED ABANDONED ABANDONED ABANDONED
A B A N
D O
N E D
A B
A N
D O
N E
D
A B
A N
D O
N E
D
LOCATION
ESTIMATED
LOCATION
ESTIMATED
B
W
W W
W
W I
I I
E
I I
II I
I
P
BP
B
E
D
INVERT ELEVATION = 532.42'
INCOMING INV = 557.85'
OUTGOING INV = 556.95'
RIM EL = 560.67'
INSTRUMENT
SEISMIC
HEADWALL
EXISTING
2" P V C
" P
V C
2" PVC
2" PVC
" P
V C
" P
V C
C B
C O
C O
C O
C O
R
IP
R A P D
R A
IN
A G
E
R
IP
R A P D
R A
IN
A G
E
C B
C B
HWY 79
HWY 79
HWY 79
R O
U G
H R
IV
E R D
A M S
P
IL
L W
A Y
R O
U G
H R
IV
E R D
A M S
P
IL
L W
A Y
LANDIN
G
STRIP
ROUGH RIVER LAKE
R O
U G
H R
IV
E R L
A K
E
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
G A T E
G A T E
G A T E
UD
UD UD
U D
UD
U D
U D
U D
U D
UD
U
D
UD
U D
O A
K
W A
L L
P L
A Y
G R
O U
N D
D E
N S E T
R E E S
D E
N S E T
R E E S
P L
A Y
G R
O U
N D
C E
M E T E R
Y
W A
L L
' C
H A
IN
L
IN
K
' C
H A
IN
L
IN
K
' C
H A
IN
L
IN
K
' C
H A
IN
L
IN
K
4' CHAIN LIN
K
PEDISTRIAN
GATE
M A
N U
A L
G A
T E
M A
N U
A L
G A
T E
' C
H A
IN
L
IN
K
' C
H A
IN
L
IN
K
' C
H A
IN
L
IN
K
' C
H A
IN
L
IN
K
4' CHAIN LIN
K
PEDISTRIAN
GATE
M A
N U
A L
G A
T E
M A
N U
A L
G A
T E
CHAIN LINK
W W
W
C B
C B
C B
C B
T E
N N
IS
C O
U R
T S
T E
N N
IS
C O
U R
C
" C
I
D G E
F O
X . 12" H
D P E S
T O
R M
EX. 1
8" C
MP
E X . 1
" H
D P
E S
T O
R M
L.P.
L.P.
P.P.
TRENCH
EX. UTIL.
CONC. PAD
EX. 5' X 6'
(TO REMAIN)
EX. FENCE
(TO REMAIN)
EX. GATE
E X . C
O N
C
EX. CONC.
BENCH
EX. PARK
STAND PIPE
EX. CMP
STAND PIPE
EX. CMP
STAND PIPE
EX. CMP
EX.
4" R
C P
L.P.
TRENCH
EX. UTIL.
FOUNDATIONS
EX. CONC.
GUARDRAIL
EX. COMPOSITE
EX.
CAMP
SIT
E
EX.
CAMP
SIT
E
EX.
CAMP
SIT
E
E X . A
S P
H A
L T P
A T
H
EX. D
IRT T
RAIL
TREATMENT PLANT
EX. SHOWER HOUSE
SIGN
CAMPGROUND
EX.
CONC. PAD
EX. 5' X 6'
EX. ASPHALT
U D
U D
E X
B R
IC
K P
A V
E D P
A R
K
IN
G E
X
B R
IC
K P
A V
E D P
A R
K
IN
G
E X
A S
P H
A L T R
O A
D
E X . A
S P H
A
LT
R
D
C O
N S
TR
U C
TI
O N A
C C E S S
E X
A S
P H
A L T R
D
E X
A S P
H A
L T R
D (C
O N
S T
R U
C T
IO
N A
C C
E S S
EX.
A
SP
HALT
R D.
(C
O
NSTRUCTI
O N
ACCES
S)
EXIST.
SHELTER
(REMOVE)
EXIST.
PLAY GROUND
(RELOCATE)
EX. R
IPRAP DI
TCH
EXIST. ASPHALT PARKING
E X
IS
T . A
S P
H A
L T R
O A
D
E X
IS
T . A
S P
H A
L T P
A R
K
IN
G
E X . 12" H
D P E S
T O
R M
EX. 1
8" C
MP
E X . 1
" H
D P
E S
T O
R M
L.P.
L.P.
P.P.
EX. GRAVEL
PARKING AREA
E X . R
IP
R
A P S
L O
P E
E X . A
S P
H A
L T R
D
E X . A
S P H
A
LT
R
D
L.P.
P.P.
EX.
" C
MP
L.P.
L.P.
E X . A
S P H
A
LT R
D
E X C
A M P E R
S L
IP
T Y P
E X . A
S P
H A L T R
D
E X . A
S P
H A
L T R
D
E X . C
A M
P G
R O
U N
D A
R E
A
E X . C
A M
P G
R O
U N
D A
R E
A
EX. CAMPER
SLIP (TYP.)
E X . A
S P
H A
L T R
D
E X . C
A M
P G
R O
U N
D A
R E
A
E X . C
A M
P G
R O
U N
D A
R E
A
E X
A S P
H A
L T P
A T
H
P.P.
E X . A
S P
H A
L T R
D
E X . A
S P
H A
L T R
D
E X . 1
" C
M P
E X . 1
" C
M P
E X A S P
H A
L T R
D
EX. CAMPER
SLIP (T
YP.)
E X . A
S P
H A
L T P
A T
H
R O
U G
H R
IV
E R
F L
O W
R O
U G
H R
IV
E R
F L
O W
R O
U G
H R
IV
E R
F L
O W
R O
U G
H R
IV
E R
F L O
W
R O
U G
H R
IV
E R
F L O
W
LOCATION
SPRING
POSSIBLE
EXIST.
REST
ROOM
CAN PLATFORM
EX. TIMBER GARBAGE
CAN PLATFORM
EX. TIMBER GARBAGE
CAN PLATFORM
EX. TIMBER GARBAGE
BOX
EX. ELEC.
E X
. A S
P H
A L
T
E X
. A S
P H
A L
T
EX.
RIP
RAP D
ITCH
RESERVOIR
RESERVOIR
HWY 79 HWY 79 HWY 79 HWY 79 HWY 79
HWY 79
P A
R K E
N T
R A
N C
E
E X
A S
P H
A L T
P A
R K
IN
G
E X
U S
A C
E V
IS
IT
O R C
E N
T E
R
E X
U S
A C
E V
IS
IT
O R C
E N
T E
R
EX. STATE PARK
MAINTENANCE BUILDING
PROJECT OFFICE
ASPHALT PARKING LOT
BRICK PAVER
PARKING LOT
EX. SHELTER
CONCRETE SPILLWAY
CONTROL SILL(ELEV 424 ACROSS CENTER)
.7 6 5
.3 6 5 .6
.2
.6
.0
.5
.8 5 5 .0
.5
.2
EXISTING OUTLET CHANNEL
E X
IS
T
IN
G O
U T
L E
T C
H A
N N
E L
E X A S P
H A
L T R
D
(O L D C
A M
P G
R O
U N
D R
O A
D
ASPHALT PATH
LOCATION
SPRING
POSSIBLE
LOCATION
SPRING
POSSIBLE
LOCATION
SPRING
POSSIBLE
AREA
SEEPAGE
AREA
SEEPAGE
AREA
SEEPAGE
AREA
SEEPAGE
DAM
DAM
ASPHALT PARKING LOT
DAM
DAM
DAM
DAM
DAM
DAM
E X
IS
T
IN
G C
O N
D U
IT
EXISTING PARAPET WALL
WALL
EXISTING PARAPET
WALL
EXISTING PARAPET
WALL
EXISTING PARAPET
EX. RI
PRAP DIT
CH
EX. RIP
RAP DITCH
EX. R
IPRAP D
ITCH
EX.
R
IP
R
AP
D
IT
C H
EX. RIP
RAP DITCH
EX.
RIP
RAP D
ITCH
E X . R
IP
R A P
D
IT
C H
EX. RIPRAP DITCH
E X . A .C .B . D
IT
C H
E X . R
IP
R A P D
IT
C H
HWY 79
(BRIDGE DECK)
HWY 79
(ASPHALT)
E X . R
IP
R
A P D
IT
C H
E X . R
IP
R
A P D
IT
C H
E X . A .C .B . D
IT
C H
RESERVOIR
RESERVOIR
STATION & BUBBLER
EX. USGS GAGE
SMALL
POND
U S
G S
N
.5
E .7
E L E
V .4
STAFF GAGE
EX. USGS
MONITORING EQUIP
ABANDONED WATER
E X
IS
T . C
O N
C R
E T
E K
N E
E W
A L L
CU102
CU103
CU104 CU105
CU106
CU107 CU108
CU109
CU110
CU111 CU112
CU113 CU114
CU115
CU116
PUBLIC RESTROOM
EXISTING
PICNIC SHELTER
EXISTING
PLAYGROUND
EXISTING
(SEE OTW PLANS)
NEW PICNIC SHELTER
(SEE OTW PLANS)
NEW RESTROOM FACILITY
(SEE OTW PLANS)
NEW STILLING BASIN
(SEE OTW PLANS)
NEW TUNNEL
(SEE OTW PLANS)
NEW CONTROL TOWER
(SEE OTW PLANS)
NEW APPROACH CHANNEL
"O L D C
A M
P G
R O
U N
D S
P O
IL
A
R E
A
"UPLAND SPOIL AREA"
MAINTENANCE BUILDING
STATE PARK
RESERVOIR
DAM
SPILLWAY
RETREAT CHANNEL
ROUGH RIVER
OUTLET CONDUIT
EXISTING
STILLING BASIN
EXISTING
(SEE OTW PLANS)
NEW RETREAT CHANNEL
USACE MAINTENANCE BUILDING
TOWER BRIDGE
CONTROL TOWER
EXISTING
USACE BUILDING
USACE VISITORS CENTER
USACE PROJECT OFFICE
CONTRACTOR ACCESS
RELOCATED HWY 79
WORK PLATFORM
SHOWER FACILITY
EXISTING CAMP
DAM
DAM
STATE PARK)
PARK (ROUGH RIVER
ACCESS TO KY STATE
NEW CUTOFF WALL
GENERAL SHEET NOTES
LEGEND
(EMAIL) JOHN.PELLEGRINO@LUMEN.COM
(PHONE) 215-888-9753
MR. JOHN PELLEGRINO
7. FIBER OPTIC UTILITY: LUMEN
(EMAIL) MFRENCH@MCRECC.COM
(PHONE) 270-422-2162 X3169
MR. MIKE FRENCH
6. ELECTRIC UTILITY: MEADE COUNTY RECC
(EMAIL) TG2580@ATT.COM
(PHONE) 270-302-7267
MR. THOMAS GREATHOUSE (LEE)
5. TELEPHONE UTILITY: AT&T
(EMAIL) BRAMEY@MEDIACOMCC.COM
(PHONE) 270-527-9939
MR. BRIAN RAMEY
4. CABLE UTILITY: MEDIACOM
RESORT.
3. SANITARY SEWER UTILITY: ROUGH RIVER DAM STATE
EMAIL KSHAW@GRAYSONWATER.COM
P.O.C. - MR KEVIN SHAW, 270-259-2917
GRAYSON COUNTY WATER
(EMAIL) DAVID.WAKEFIELD@VEOLIAWATERNA.COM
P.O.C. - MR. DAVID WAKEFIELD, (PHONE) 270-756-9091
VEOLIA WATER - HARDINSBURG, KY
2. WATER UTILITIES:
TO WORK.
NOTIFIED OF ANY CONFLICTS OR DISCREPANCIES PRIOR
CONTRACT. THE CONTRACTING OFFICER SHOULD BE
EXISTING UTILITIES THAT RELATE TO WORK IN THIS
COORDINATING ALL UTILITIES AND FIELD VERIFYING ALL
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTRACTOR WORK LIMITS
RESTRICTED WORK LIMITS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
H
H
H
H
H
C
V
E R
A L
L U
T
IL
IT
Y
P L
A N
R T
IF
IE
D F
IN
A
L
OTW
CU101
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
OVERALL UTILITY PLAN - OTW
1"=200'SCALE: 400'0 200'
NORTH
PLAN
A M
D T
U
T
IL
IT
Y
C O
N T
A C
T I
N F
O R
M A
T
IO
N U
P D
A T
E F
E B
A1
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
S1
S8
S2
S3
S4
S5
S6
S7
BLASTING AREA
STILLING BASIN
STILLING BASIN
NEW CONTROL TOWER
BLASTING AREA
CONTROL TOWER
NO VESSELS WITHIN 1500'
UNDERWATER BLASTING
EX. CONTROL TOWER
PARK BEACH
KENTUCKY STATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
IN
T R
U M
E N
T A
T
IO
N P
L A
N
(O V
E R
A L
R T
IF
IE
D F
IN
A
L
OTW
CG502
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
S S
H
IF
F L
E T
T
J.
F
A Y
S
W
IL
E S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
S T
IN
G
A R
E A
UNDERWATER BLASTING PLAN.
THE GOVERNMENT APPROVED
BE PLACED IN ACCORDANCE WITH
NOT SHOWN. HYDROPHONES SHALL
HYDROPHONE LOCATIONS ARE
IN THE EVENT OF CONFLICTS
GOVERN OVER BLASTING PLANS
SPECIFICATION REQUIREMENTS
SEISMOGRAPH
BLASTING AREA
CONTROL TOWER
BLASTING AREA
STILLING BASIN
BLASTING
UNDERWATER
A1
SCALE: 1"=80'
BLASTING AREA INSTRUMENTATION PLAN
NORTH
PLAN
80' 160'0
1. 2.
R E
V
IS
IO
N
S P
E R
A M
D T
NOTES:
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
9+00 9+20 9+40 9+60 9+80 10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60 11+80 12+00 12+20 12+40 12+60 12+80 13+00 13+20 13+40 13+60 13+80 14+00 14+20 14+40 14+60 14+80 15+00 15+20 15+40 15+60 15+80 16+00 16+20 16+40 16+60 16+80 17+00 17+20 17+40 17+60 17+80 18+00 18+20
600600
HANEY LIMESTONE
HARDINSBURG SANDSTONE
BEECH CREEK LIMESTONE
REELSVILLE LIMESTONE
SAMPLE SANDSTONE
BEAVER BEND LIMESTONE
ELWREN SHALE
BIG CLIFTY LOWER SHALE SEAM
BEECH CREEK LIMESTONE
ELWREN SHALE
REELSVILLE LIMESTONE
SAMPLE SANDSTONE
BEAVER BEND LIMESTONE
BOTTOM ELEV = 475.0
TOP ELEV = 552.0
STA. 9+00 - 10+40
BOTTOM ELEV = 398.0
TOP ELEV = 552.0
STA 15+50 - 17+50
BOTTOM ELEV = 430.0
TOP ELEV = 552.0
STA 12+50 - 15+50
BOTTOM ELEV = 450.0
TOP ELEV = 552.0
STA 11+60 - 12+50
BOTTOM ELEV = 470.0
TOP ELEV = 552.0
STA 10+40 - 11+60
SHALE SEAM
BIG CLIFTY LOWER
W/SHALE SEAMS
BIG CLIFTY SANDSTONE
BOTTOM ELEV = 430.0
TOP ELEV = 552.0
STA 12+50 - 15+50
STATION 13+00
STATION 10+40 TO
CRITICAL AREA B1
W/SHALE SEAMS
BIG CLIFTY SANDSTONE
STATION 15+50
STATION 13+50 TO
CLOSURE AREA
STATION 15+50
STATION 13+50 TO
CLOSURE AREA
CUTOFF WALL ALIGNMENT
EXISTING GRADE AT
CUTOFF WALL ALIGNMENT
EXISTING GRADE AT
(SEE SHEETS RF124/125)
EXISTING OVERBURDEN
HANEY PROFILE RF126/127
(SEE SHEETS RF124/125)
EXISTING OVERBURDEN
EL. 552.3
TOP OF CUTOFF WALL
TEST SECTION AREA
EL. 439.3 ft
EL. 454.3ft
EL. 439.3 ft EL. 438.3 ft
OFFICIAL UPSTREAM PROFILE APPROVED
600600
18+20 18+40 18+60 18+80 19+00 19+20 19+40 19+60 19+80 20+00 20+20 20+40 20+60 20+80 21+00 21+20 21+40 21+60 21+80 22+00 22+20 22+40 22+60 22+80 23+00 23+20 23+40 23+60 23+80 24+00 24+20 24+40 24+60 24+80 25+00 25+20 25+40 25+60 25+80 26+00
ELWREN SHALE
ELWREN SHALE
REELSVILLE LIMESTONE
SAMPLE SANDSTONE
BEAVER BEND LIMESTONE
HARDINSBURG SANDSTONE
HANEY LIMESTONE
BEECH CREEK LIMESTONE
ELWREN SHALE
REELSVILLE LIMESTONE
SAMPLE SANDSTONE
BEAVER BEND LIMESTONE
BOTTOM ELEV = 484.0
TOP ELEV = 552.0
STA. 24+60 - 25+40
BOTTOM ELEV = 409.0
TOP ELEV = 552.0
STA. 22+70 - 24+60
W/SHALE SEAMS
BIG CLIFTY SANDSTONE
SHALE SEAM
BIG CLIFTY LOWER
STATION 19+20
STATION 17+50 TO
CRITICAL AREA B2
STATION 25+00
STATION 23+80 TO
CRITICAL AREA B4
CUTOFF WALL ALIGNMENT
EXISTING GRADE AT CUTOFF WALL ALIGNMENT
EXISTING GRADE AT
(SEE SHEETS RF124/125)
EXISTING OVERBURDEN
(SEE SHEETS RF124/125)
EXISTING OVERBURDEN
PER SPEC SECTION 31 00 00.00 06
ROCK EXCAVATION REQUIRED
EL. 552.3
TOP OF CUTOFF WALL
FILLED
CONDUIT
DEMOLISHED
RESTRICTION
BEGIN VALLEY
STA. 19+50
RESTRICTION
END VALLEY
STA. 23+50
BOTTOM ELEV = 360.0
TOP ELEV = 552.0
STA 17+50 - 22+36.77
30' MAX. LENGTH
"CRITICAL AREA A"
STA 22+40 - 22+70
STATION 22+40 TO 22+70
30' MAX. LENGTH
CRITICAL AREA
BOTTOM ELEV = 360.0
TOP ELEV = 552.0
STA 17+50 - 22+40
STATION 22+40
STATION 21+80 TO
CRITICAL AREA B3
APPROXIMATE OVERBURDEN LIMIT
EMBANKMENTEMBANKMENT
BEAVER BEND LIMESTONE
SAMPLE SANDSTONE
REELSVILLE LIMESTONE
ELWREN SHALE
BIG CLIFTY LOWER SHALE SEAM
HANEY LIMESTONE
BIG CLIFTY UPPER SHALE SEAM
BIG CLIFTY SANDSTONE
BIG CLIFTY SANDSTONE WITH INTERBEDDED SHALE
HARINSBURG SANDSTONE
BEECH CREEK LIMESTONE
TUNNEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
GENERAL SHEET NOTES
LEGEND
THE CUTOFF WALL ALIGNMENT AT STATION 9+85.82.
9. THE OUTLET WORKS ALIGNMENT STATION 12+64.75 CROSSES
AND MONITORED DURING CONSTRUCTION.
IN THE BEDROCK CONTACT ELEVATION MUST BE ANTICIPATED
7.5 FEET UPSTREAM OF THE DAM CENTERLINE. VARIATIONS
AND GROUTING ALONG THE UPSTREAM GROUT LINE OFFSET
GENERALIZED PROFILE BASED ON THE PHASE IB DRILLING
8. THE GEOLOGIC PROFILE SHOWN ON CTW-CG200/203 IS A
SPECIFICATIONS).
EXPLORATORY DRILLING/GROUT LOGS., IN VOL. 6 OF THE
INTERPRETIVE REPORT (GIR) AND THE PHASE 1B
BORING LOGS ARE AVAILABLE IN THE GEOTECHNICAL
17+00 TO 23+00 ARE SHOWN ON SHEETS RF124 AND RF125.
7. THE OVERBURDEN PROFILES BETWEEN STATIONS
THE SITE PLANS.
CENTERLINE BY 3 FEET UPSTREAM AND IS SHOWN ON
6. CUTOFF WALL ALIGNMENT IS OFFSET FROM THE DAM
ALIGNMENT.
MINIMUM REQUIRED DEPTH AT ANY LOCATION ALONG THE
5. THE CUTOFF WALL DEPTH SHOWN REPRESENTS THE
03 37 29 AND 03 00 00.
CONCRETE SHALL MEET REQUIREMENTS IN SPECIFICATIONS
WITH SPECIFICATION 31 56 10.00 06. CUTOFF WALL
4. CUTOFF WALL SHALL BE CONSTRUCTED IN ACCORDANCE
SPECIFICATION 31 56 10.00 06.
ANTICIPATED AND SHALL BE ADDRESSED PER
IS SHOWN ON THE CTW PROFILE. VARIATIONS ARE
3. ANTICIPATED TOP OF BEDROCK FOR THE CUTOFF WALL
31 56 10.00 06 CUTOFF WALL CONSTRUCTION.
MEETING SHALL BE PERFORMED PER SPECIFICATION
AREAS B1-B4, A SPECIAL PREPARATORY AND INITIAL
2. PRIOR TO THE START OF CONSTRUCTION IN CRITICAL
CRITICAL AREA A REQUIREMENTS.
1. SEE SHEETS CTW CG502 - CG508 FOR SPECIAL
CLOSURE AREAS
TEST SECTION AREA
CRITICAL AREAS B
CRITICAL AREA A
V
E R
A L
L
C U
T O
F F
W A
L L
P
R O
F
IL
R T
IF
IE
D F
IN
A
L
CTW
CG200
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
S S
H
IF
F L
E T
T
A
H A
M
IL
T O
N
J
E S
T E
R L
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A1
SCALE: 1"=40'
OVERALL PROFILE - CUTOFF WALL
40' 80'0
M A
T C
H T
O S
T A
T
IO
N
B
E L
O W
M A
T C
H T
O S
T A
T
IO
N
A
B O
V E
R E
V
IS
IO
N
M A
D E
I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
14+60 14+80 15+00 15+20 15+40 15+60 15+80 16+00 16+20 16+40 16+60 16+80 17+00 17+20 17+40 17+60 17+80 18+00 18+20 18+40 18+60 18+80 19+00 19+20 19+40 19+60 19+80 20+00 20+20
ELWREN SHALE
BIG CLIFTY LOWER SHALE SEAM
BEECH CREEK LIMESTONE
ELWREN SHALE
REELSVILLE LIMESTONE
SAMPLE SANDSTONE
BEAVER BEND LIMESTONE
BOTTOM ELEV = 398.0
TOP ELEV = 552.0
STA 15+50 - 17+50STA 12+50 - 15+50
TOP ELEV = 552.0
BOTTOM ELEV = 430.0
CRITICAL AREA B2
STATION 17+50 TO
STATION 19+20
BIG CLIFTY SANDSTONE
W/SHALE SEAMS
CLOSURE AREA
STATION 13+50 TO
STATION 15+50
CUTOFF WALL ALIGNMENT
EXISTING GRADE AT
EXISTING OVERBURDEN
(SEE SHEETS RF124/125)
EXISTING OVERBURDEN
(SEE SHEETS RF124/125)
TEST SECTION AREA
RESTRICTION
BEGIN VALLEY
STA. 19+50
BOTTOM ELEV = 360.0
TOP ELEV = 552.0
STA 17+50 - 22+36.77
PIPE
12" PERFORATED
SAND, SILT, CLAY
OVERBURDEN -
APPROXIMATE OVERBURDEN LIMIT
EMBANKMENTEMBANKMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
T O
F F
W A
L L
P R
O F
IL
R T
IF
IE
D F
IN
A
L
CTW
CG202
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
S S
H
IF
F L
E T
T
B S
A Y
L O
R
J
E S
T E
R L
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A1
SCALE: 1"=20'
PROFILE
20' 40'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C G
M A
T C
H L
IN
E
S E
E S
H E
E T
C G
3. OVERBURDEN PROFILES ARE SHOWN ON SHEETS RF124 THRU RF126
2. SPECIAL PANEL/SECANT IS REQUIRED TO EXTEND FULLY BEYOND THE CONDUIT AND MUST NOT EXCEED 30 FEET IN WIDTH.
ORIGINAL DAM CONSTRUCTION ARE SHOWN ON SHEETS CTW RF132 THRU RF139.
1. REFERENCE DRAWINGS APPLICABLE TO THE CUTOFF WALL ARE SHOWN ON RF101 - RF139. OBSTRUCTIONS FROM THE
NOTES:
R E
V
IS
IO
N
M A
D E
I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
N D
U
IT
+0
+0
LOCATED IN RELATION TO THE ORIGINAL DAM CENTERLINE.
2. HIGHWAY 79 CENTERLINE LOCATION IS RELATIVELY
1. ALL ELEVATION REFERENCES ARE TO NGVD29.NOTES:
I N
C H C
U T O F F W
A L L
C /L F
O R I N
C H C
U T O F F W
A L L
S E E P R
IN
G
E X
IS
T
IN
G
(A
T
IV
E
R E L O
C A T E
D H
IG
H W
A Y
T O C
O N
D U
IT
T O S
T
IL
L
IN
G B
A S
IN
CL
CL CONDUIT
F
LO
W
F
LO
W
O L D H
IG
H W
A Y
O L D H
IG
H W
A Y
PLAN VIEW OF CRITICAL AREA A
GENERAL SEQUENCE OF ABANDONING THE CONDUIT
S P E C
IA
L P A
N E L
I N
C H C
U T -O
F F W
A L L
P A R
A P E T W
A L L
D O
W N S T R E
A M G
R O
U T L
IN
E
U P S T R E
A M G
R O
U T L
IN
E
B E
G
IN
C
R
IT
IC
A L
A R E
A A
S T A
E N
D C
R
IT
IC
A L
A R E
A A
S T A
E N
D C
O N
D U
IT
G
R O
U T
IN
G
S T A
B E
G
IN
C
O N
D U
IT
G
R O
U T
IN
G
S T A
19. ADVANCE SPECIAL PANEL/SECANT VERIFICATION HOLES PER SPECIFICATION 31 56 10.00 06 CUT-OFF WALL CONSTRUCTION.
18. TIE CRITICAL AREA A INTO MAINLINE CUTOFF WALL PER SPECIFICATION 31 56 10.00 06.
CONSTRUCTION AND 03 37 29 CONCRETE FOR CUT-OFF WALLS. CURE CONCRETE TO 75% OF THE DESIGN STRENGTH.
17. ADVANCE ROCK EXCAVATION AND A CONCRETE PANEL/SECANTS AT CRITICAL AREA A IN ACCORDANCE WITH SPECIFICATIONS 31 56 10.00 06 CUT-OFF WALL
LOW STRENGTH GEL.
IN ADVANCE. THE SELF HARDENING SLURRY SHALL SOLIDIFY THE SLURRY WITHIN 2 HOURS AFTER INTRODUCING THE HARDENER TO FORM AN EASILY EXCAVATABLE,
16. THE CONTRACTOR SHALL DEVELOP, TEST AND SUBMIT A SELF HARDENING SLURRY FOR APPROVAL TO THE GOVERNMENT FOR USE IN CRITICAL AREA A 60 DAYS
CUTOFF WALL LIMITS PRIOR TO DEMOLITION. IF LARGE DIAMETER TOOLING OR SHAFTS ARE PROPOSED, THE EXCAVATION SHALL BE FILLED WITH SLURRY.
15. SEVER THE CONDUIT PER THE GOVERNMENT ACCEPTED MEANS AND METHODS. ACCEPTED MEANS REQUIRE THE CONDUIT TO BE CUT OR CORED BEYOND THE
METHODS FOR REMOVAL OF THE CONDUIT SHALL BE SUBMITTED BY THE CONTRACTOR WITH THE PROPOSAL FOR EVALUATION AND CONSIDERATIONS.
14. PREPARE THE WORK PLATFORM FOR DEMOLITION OF THE CONDUIT (i.e. PROJECTION OF CONDUIT TO PLATFORM SURFACE, JIGS, FRAMES, ETC). THE MEANS AND
THE GOVERNMENT WILL DRAW THE RESERVOIR DOWN TO SUMMER POOL (ELEVATION 495.0).
13. CONDUCT INITIAL MEETING INCLUDING A REVIEW OF EMERGENCY PROCEDURES FOR CRITICAL AREA A WORK PER SPECIFICATION 01 35 00.00 08 SPECIAL PROCEDURES.
DRILLING AND GROUTING.
12. A DOUBLE LINE GROUT CURTAIN SHALL BE ADVANCED AS SHOWN ON THE VOLUME 3 PLANS AND IN ACCORDANCE WITH SPECIFICATION 31 32 23.00 06 SLURRY CONTROL
CRITICAL AREA A - CUTOFF WALL EXECUTION PHASE:
11. FOLLOW PROCEDURES OUTLINED ON SHEETS OTW-CG502 THROUGH OTW-CG508
10. THE SERVICE GATES SHALL BE LOWERED INTO THE DOWN POSITION FOR ABANDONMENT.
EACH HOLE IS REQUIRED TO HAVE AN ADDITIONAL 3 AIR VENT HOLES AT LEAST 4 INCHES IN DIAMETER. PACKERS AND PLUGS MUST BE PROVIDED FOR EACH OPENING.
9. THREE 8-INCH CORE HOLES SHALL BE PLACED THROUGH THE CONCRETE FLOOR IN THE LOWEST TWO LEVELS OF THE TOWER AT THE 462.5 AND 449 LEVELS, RESPECTIVELY.
8. THE LOWER 3 TOWER LEVELS (EL. 449-507) SHALL BE STRIPPED OF ALL NON-ESSENTIAL ITEMS AND PREPPED FOR ABANDONMENT, INCLUDING REMOVAL OF HYDRAULIC FLUID.
PULL OFF ADHESION.
7. INTERIOR BY-PASS VALVES SHALL BE COATED WITH A 2 PART EPOXY BASED RESIN, MEETING THE REQUIREMENTS OF ASTM D4541 WITH AT LEAST 1,500 PSI
PIPE DOWNSTREAM OF THE MOST DOWNSTREAM VALVE SHALL BE REMOVED. CUT 12-INCH OPENINGS INTO THE AIR VENT PIPES AT APPROVED LOCATIONS.
6. THE BYPASS BULKHEADS SHALL BE INSTALLED. ALL VALVES SHALL BE CLOSED AND SEALED SHUT PER REQUIREMENTS OF NOTE 7. THE BY-PASS
5. IF LEAKAGE IS EXCESSIVE, ADDITIONAL EXTERIOR SEALING METHODS ARE REQUIRED INCLUDING FABRICATING SPECIAL PLATES, WEDGES, SEALS, OR COATINGS TO REDUCE LEAKAGE.
IS NOT REQUIRED TO VERIFY THE LEAKAGE.
4. THE SEAL OF THE 3 EMERGENCY BULKHEADS SHALL BE VERIFIED BY OPENING EACH SERVICE GATE ONE AT A TIME TO VERIFY LEAKAGE. ENTRY INTO THE CONDUIT
PLACE (QUICK RELEASE CLIPS, RE-SPOOLING CABLES, ETC.)
PLACED INTO THE BULKHEAD SLOTS. THE CONTRACTOR SHALL BE REQUIRED TO MODIFY EXISTING CRANE STRUCTURES TO FACILITATE PLACEMENT OF ALL 3 BULKHEADS IN
PERFORM NON-DESTRUCTIVE TESTING AND REPAIRS TO THE EXISTING BULKHEAD PER CG509. THE EXISTING BULKHEAD AND THE TWO NEW BULKHEADS SHALL BE PERMANENTLY
FOR APPROVAL AT LEAST 120 DAYS PRIOR TO FABRICATION, FABRICATED ACCORDING TO THE REQUIREMENTS OF SPECIFICATION 05 59 20.
TO PROTECT PERSONNEL ENTERING THE CONDUIT AGAINST RESERVOIR LOADINGS UP TO ELEVATION 510. THE BULKHEAD DESIGN MUST BE SUBMITTED TO THE GOVERNMENT
THE ABILITY TO CLOSE UNDER FLOW, BUT MUST PROVIDE PROTECTION AGAINST HYDROSTATIC PRESSURES TO ATLEAST RESERVOIR ELEVATON 510.0 AS AN UNUSUAL LOAD CONDITION.
TO THE REQUIREMENTS OF EM 1110-2-2107 UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER. THE NEW BULKHEADS ARE NOT REQUIRED TO HAVE
AREA FROM LEAKS (LESS THAN 5 GPM FLOW). THE BULKHEADS MUST BE REPLICAS OF THE EXISTING BULKHEADS OR SIMILAR TO THE EXISTING BULKHEADS, CONFORMING
3. THE CONTRACTOR SHALL FABRICATE 2 ADDITIONAL EMERGENCY BULKHEADS SUFFICIENT TO WITHSTAND THE DESIGN LOADS AND ADEQUATELY SEAL THE
FROM MONOLITH 11 TO 15 TO DEFINE 3-D POSITION OF THE CONDUIT AND PROJECT THE CONDUIT GEOMETRY TO THE WORK PLATFORM.
OTHER METHODS TO ENSURE A SUFFICIENT BOND FOR NEW GROUT TO THE EXISTING CONCRETE. SURVEY THE INNER BARREL OF CONDUIT
THE EXISTING STILLING BASIN TO FACILITATE INTERIOR CONDUIT CLEANING FROM MONOLITHS 11 TO 15. THE CONDUIT SHALL BE CLEANED WITH AIR, WATER, OR
2. ABANDONMENT ACTIVITIES CANNOT COMMENCE UNTIL THE NEW OUTLET WORKS IS FULLY APPROVED BY THE GOVERNMENT. THE CONTRACTOR SHALL DE WATER
1. THE CONTRACTOR SHALL CONSTRUCT A DOWNSTREAM STILLING BASIN COFFERDAM PROTECTING TO AN ELEVATION OF 440 ACROSS THE STILLING BASIN END SILL.
CRITICAL AREA A - EXISTING OUTLET WORKS ABANDONMENT:
A1
NTS
LIMESTONE
BEECH CREEK
TOP OF ROCK = EL. ~425.5
MONOLITH 11
MONOLITH 12
INV. EL. ~428.4
B.O.C. EL. ~426.6
420420
350-35 10 15 20-30
FLOW
MONOLITH 13
25 30-25 5-5-10-15-20
CROWN EL. ~441.4
EL. ~440.4
EXISTING PROFILE OF CONDUIT C/L (LEFT)
EL. 425.8' EL. 424.7'
DAM
ORIGINAL
C
LUPSTREAM DOWNSTREAM
JOINT 11/12
JOINT 12/13
JOINT 13/14
SEEP RING
EXISTING
MUD MAT THICKNESS VARIES
CONDUIT
F13
NTS
CRITICAL AREA "A" PLAN VIEW
(A C T
IV
E
R E L O
C A T E
D H
IG
H W
A Y
HIGHWAY 79 CL
24" CUTOFF WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
IT
IC
A L
A R
E A
A
S E
Q U
E N
C E
O F
W O
K
R T
IF
IE
D F
IN
A
L
CTW
CG502
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
S S
H
IF
F L
E T
T
S S
H
IF
F L
E T
T
J
E S
T E
R L
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
V
IS
IO
N
S P
E R
A M
D T
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
E3
A3
120240360 120 240 360
UPSTREAM DOWNSTREAM
FLOOD POOL = 524'
SUMMER POOL = 495'
WINTER POOL = 470'
EL555.5'
SHALE
REELSVILLE LIMESTONE
120240360
121 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27Barrel Outlet
Section Transition
UPSTREAM DOWNSTREAM
FLOOD POOL = 524'
SUMMER POOL = 495'
WINTER POOL = 470'
EL555.5'
BIG CLIFTY SANDSTONE
SHALE
HANEY LIMESTONE
HARDENSBURG SANDSTONE
VENT PIPES (3)
SHALE121 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
ABANDON STILLING BASIN
MUD MAT
120240360 120 240 360
SHALE
REELSVILLE LIMESTONE
120240360
ELWREN SHALEELWREN SHALE
ELWREN SHALE
REELSVILLE LS
REELSVILLE LS
BEECH CREEK LS
BIG CLIFTY LOWER SHALE
BIG CLIFTY LOWER SHALE
BEECH CREEK LS
REELSVILLE LS
DETAIL 5 - PROCEDURE FOR OUTLET WORKS ABANDONMENT - U/S CONDUIT
DETAIL 6 - PROCEDURE FOR OUTLET WORKS ABANDONMENT - D/S CONDUIT
BIG CLIFTY SANDSTONE
BIG CLIFTY SANDSTONE
UNTIL A PRESSURE OF 5 PSI IS OBTAINED PER EM 1110-2-2902.
ANY REMAINING VOID SPACES THROUGH REDUNDANT GROUT PIPES POSITIONED AT THE DOWNSTREAM BULKHEAD
11. 24 HOURS AFTER INTIAL GROUTING HOOK UP, PUMP BALANCED, STABLE GROUT "B-MIX" INTO
10. CONTINUE PLACEMENT UNTIL MATERIAL RETURN OCCURS IN THE TOWER AIR VENT PIPES.
THROUGH THE AIR VENT PIPES IN THE DOWNSTREAM BULKHEAD. CLOSE THE AIR VENT PIPES AT THE BULKHEAD.
OF 10^(-6) CM/S THROUGH EACH BY-PASS PIPE CONCURRENTLY UNTIL CONCRETE RETURN IS OBSERVED
(MAXIMUM STRENGTH OF 1500 PSI AT 28 DAYS) AND A MINIMUM PERMEABILITY
9. PLACE B-MIX GROUT, CLSM, OR CELLULAR CONCRETE HAVING A STRENGTH LESS THAN 1,500 PSI
CONTROL TOWER ABANDONMENT GENERAL NOTES (con't):
SCALE: NTS
SCALE: NTS
BULKHEAD FORMWORK
DOWNSTREAM OUTLET
PIPE 11 AND 12 = 2.25 INCH GROUT PIPE FROM 180 FEET EXTENDING TO THE EXISTING GROUT.
PIPE 9 AND 10 = 2.25 INCH GROUT PIPE FROM 90-180 FEET UPSTREAM OF THE BULKHEAD.
PIPE 7 AND 8 = 2.25 INCH GROUT PIPE FROM 0-90 FEET UPSTREAM OF THE BULKHEAD.
CROWN OF THE CONDUIT. INSTALL 6 SLOTTED GROUT PIPES, 2.25 INCHES MINIMUM, AS FOLLOWS:
MINIMUM, TYPE OF PIPE, SLOT CONFIGURATION, FINAL DIAMETER SUBMITTED FOR APPROVAL) ALONG THE
13. EXAMPLE CONFIGURATION AT THE HEADWALL EXIT, INCLUDE 3 SLOTTED AIR VENT PIPES (1.5 INCH DIAMETER
12. CONSTRUCT A DOWNSTREAM OUTLET BULKHEAD PER THE REQUIREMENTS OF NOTE 7 ON CTW-CG504.
CONTROL TOWER ABANDONMENT GENERAL NOTES (con't):
TO INTERCEPT AND RE-ESTABLISH ROOF DRAIN.
BE FILLED WITH APPROVED MATERIAL. CORE EXTERIOR HOLE AT 507
16. CONTROL TOWER ABOVE ELEVATION 449 TO 507 OF THE OPERATING LEVEL SHALL
15. REMOVE SALVAGEABLE EQUIPMENT FROM LOWER THREE CONTROL TOWER LEVELS.
14. ABANDON THE STILLING BASIN PER CONTRACT SPECIFICATIONS.
CONTROL TOWER ABANDONMENT GENERAL NOTES (con't):
BULKHEAD FORMWORK
MONOLITH 13
GROUT VENT AND PIPES
26.25 42.50
SECTION
TRANSITION
26.83
TYPE II
15.67
TYPE II @ 20' = 80'
4 CONDUIT MONO 13 CONRETE CONDUIT TYPE I @ 20' = 260' 8 MONO TYPE I @ 20' = 160'
TYPE II
19.35'
TYPE II @ 20' = 80'
4 CONDUIT MONO
TYPE II
15.67
SECTION
TRANSITION
26.8342.5026.25 13 CONRETE CONDUIT TYPE I @ 20' = 260' 8 MONO TYPE I @ 20' = 160'
TYPE II
19.35'
COINCIDE WITH THE HWY 79 CENTERLINE.
CONSTRUCTION. THE CENTERLINE SHOWN AT 0 OFFSET DOES NOT
CONSTRUCTION, CREST ADJUSTMENTS, AND PHASE 1A AND 1B
DETAILS ON THIS SHEET DEPICT THE DAM PRIOR TO PARAPET WALL
NOTE:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S S
H
IF
F L
E T
T
N O
V E
M B
E R
N C
R E
T E
P L
A C
E M
E N
R T
IF
IE
D F
IN
A
L
CTW
CG505
F A
L L
S O
F R
O U
G H
K
E N
T U
C K
Y
R O
U G
H R
IV
E
R D
A M
D A
M S
A F
E T
Y M
O D
IF
IC
A T
IO
N
P H
A S
E I
I
P
S S
H
IF
F L
E T
T
S S
H
IF
F L
E T
T
J
E S
T E
R L
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
N
D U
IT
A
B A
N D
O N
M E
N
V
IS
IO
N
S P
E R
A M
D T
W
2Q R
R
_C
ER
T_ Fi na l_
Pl an s-
| OTW V003 |
| OTW CS101 |
| OTW CS114 |
| OTW CU101 |
| OTWC G502 |
| CTWC G200 |
| CTW CG202 |
| CTW CG502 |
| CTW CG505 |
File details come from the government source that posted it. Updated .