W912QR25R0016_CERT_Final_Vol6_ ProjGIR_14of16_G-0000.pdf

PDF 2 MB Posted

Attached to
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
Solicitation number
W912QR25R0016
Issued by

About this file

This is Volume 6 (Appendix G) of a Geotechnical Information Report (GIR) for the Rough River Dam Safety Modification Project Phase II, which contains analysis of downstream filter materials for the stilling basin abandonment. The document, dated December 20, 2024, was prepared by the US Army Corps of Engineers Louisville District under solicitation number W912QR25R0016.

The technical content focuses on perviousness and migration calculations for multiple filter layers to be placed in the abandoned stilling basin. The design specifies KYTC C-33 concrete sand at the base, followed by KYTC No. 57 stone, then KYTC No. 23 stone, and finally engineered fill (shot rock) on top. The analysis demonstrates that both the C-33 sand/No. 57 stone interface and the No. 57/No. 23 stone interface meet USACE and FEMA requirements for perviousness and particle migration prevention, with calculated values falling within acceptable ranges for dam safety filter design.

View the file

Other files

File Type Posted
W912QR25R0016_CERT_Final__Plans-0009.pdf PDF
W912QR25R0016_CERT_Final_Specs-0009.pdf PDF
W912QR25R0016_CERT_Final_V1A_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_V1B_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0008.pdf PDF
W912QR25R0016_CERT_Final__V3_CTWSTR_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0007.pdf PDF
W912QR25R0016-0006.pdf PDF
W912QR25R0016_CERT_Final_Plans-0005.pdf PDF
W912QR25R0016_CERT_Final_Specs-0005.pdf PDF
W912QR25R0016_CERT_Final_EnviroAssess-0005.pdf PDF
W912QR25R0016_CERT_Final_Plans-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0003.pdf PDF
W912QR25R0016_CERT_Final_Vol5_ MFR_ConcreteMatTest-0003.pdf PDF
W912QR25R0016_CERT_Final_Plans-0003.pdf PDF
Site Visit Sign In Sheet.docx DOCX document
W912QR25R0016_CERT_Final_Specs-0002.pdf PDF
Virtual Registration.pdf PDF
W912QR25R0016_CERT_Final_Specs-0001.pdf PDF
W912QR25R0016 0001.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_18of20_E2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_20of28_D1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_9of20_C2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_3of9_2B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_15of28_B1-0000.pdf PDF
W912QR25R0016_CERT_Final_V4c_Specs-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_13of16_F-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_7of16_B5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_1of20-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_10of20_C3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_16of16_I-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_1of16-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_3of28_A2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGBR_MainReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_10bof16_C2b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_19of20_E3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1941_GeoReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_8of9_4C-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_4of16_B2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_2of20_A-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1953_DesignMemo1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_1of28_MainReport-0000.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Rough River Dam Safety Modification Project Phase II - New Outlet Works and Cutoff Wall, Rough River Reservoir, Falls of Rough, KY

P2: 145870

Design-Bid-Build

Geotechnical Information Report (GIR) Vol. 6 (14 of 16) Appendix G

Certified Final

20 December 2024

W912QR25R0016

ARIMS: 1200

Disposition: Permanent

W912QR25R0016_CERT_Final_Vol6_ ProjGIR_14of16_G-0000

Rough River Dam Geotechnical Data Report for Tunnel Construction

Volume 6: Project GIR

Appendix G - Analysis of Downstream Filter (14 of 16)

ROUGH RIVER, FALLS OF ROUGH, KY

LOUISVILLE DISTRICT, LRD DIVISION

ROUGH RIVER, FALLS OF ROUGH, KY

LOUISVILLE DISTRICT, LRD DIVISION

Appendix A

SYNOPSIS OF CONSTRUCTION HISTORY AND PERFORMANCE

Appendix B

BORING LOCATION PLANS AND BORING LOGS

Appendix C

SOIL AND ROCK TESTING AND ANALYSES BY INVESTIGATION

Appendix D

INSTRUMENTATION AND MONITORING

Appendix E

ANALYSES OF THE UPSTREAM FILTER AND DEWATERING

Appendix F

ANALYSES OF THE DOWNSTREAM COFFERDAM AND DEWATERING

Appendix G

ANALYSES OF DOWNSTREAM FILTER FOR STILLING

BASIN ABANDONMENT

Appendix H

ANALYSES OF CUTOFF WALL WORK PLATFORM

Appendix I

ANALYSES OF UPLAND DISPOSAL AREA AND ARCHERY BERM

Project:

Study Type: District: LRL

Calculation Title:

Total Number of Pages (including cover sheet): 5

Prepared by: Office: LRL Date: 10/26/2020

Checked by: Office: LRL Date: 2/4/2021

Description and Purpose

Assumptions for Critical Input Parameters

Remarks, Conclusions, and Results

Revision History

Rev. No. DateDescription of Revision Approved by

The various filter layers satisfy the requirements for particle migration and perviousness.

Check partical migration and perviousness for draped filter materials to be placed in abandoned stilling basin Multiple layers of graded material will be placed, ranging from C33 concrete sand at the base, followed by KYTC No. 57 stone which will be overlain by KYTC No. 23 Stone which will utimately be overlain by engineered fill (shot rock)

Gradations were all obtained from KYTC design specifications. Since the materials that are being compared are all sand and gravel with less than 15% fines, simplified calculations based on the d85 and d15 values of of the relevant base and filter materials were utilized.

Steven Shifflett

Rough River Dam Safety Modification (Phase II) Project

Final Design

Filter Check - Abandoned Outlet Works

Joe Carnall

Calculation Cover Sheet Version 20181017 Page 1 of 5G-1

KYTC C-33

G-2

G-3

Project: Rough River DS Mod Prepared By: Joe Carnall Date: 10/26/2020 Location: Falls of Rough, KY Reviewed By: S. Shifflett Date: 2/4/2021 Status: Draft

Type Base Filter US (in) KYTC Concrete Sand KYTC No.57 d 15 d 85

Metric (mm) KYTC Concrete Sand KYTC No.57 d15 0.288 6 d85 1.8 20

Perviousness: 6mm/0.28mm 20.83

Migration: 6mm/1.8mm 3.33 Should be less than 4

Perviousness and Migration Calculations

C-33 Sand and No. 57 Stone - Perviousness and Migration

Perviousness: d15Filter/d15Base > 3 to 5 (USACE) Migration: d15filter/ d85Base <4 (FEMA) Notes

Should be greater than 3 to 5 1. KYTC Concrete Sand and KYTC No. 57 Stone pass perviousness and migration.

G-4

Project: Rough River DS Mod Prepared By: Joe Carnall Date: 10/26/2020 Location: Falls of Rough, KY Reviewed By: S. Shifflett Date: 2/4/2021 Status: Draft

Type Base Filter US (in) KYTC No. 57 KYTC No.23 d 15 d 85

Metric (mm) KYTC No. 57 KYTC No.23 d15 6 28 d85 20 55

Perviousness: 28mm/6.0mm 4.67

Migration: 20mm/28mm 1.40

Perviousness and Migration Calculations

C-33 Sand and No. 57 Stone - Perviousness and Migration

Perviousness: d15Filter/d15Base >3 to 5 (USACE) Migration: d15filter/ d85Base <4 (FEMA) Notes

1. KYTC No. 23 Stone and KYTC No. 57 Stone pass perviousness and migration.

Should be greater than 3 to 5

Should be less than 4

G-5

COVER Vol. 6 GIR 14of16
Appendix G
Appendix G (Analyses of Original Outlet Works Abandonment)

File details come from the government source that posted it. Updated .