This document is an Index of Drawings for the Rough River Dam Safety Modification Phase II project by the U.S. Army Corps of Engineers, Louisville District. The comprehensive drawing set covers multiple aspects of the dam renovation, including outlet works, traffic control, state road relocation, erosion control, and utility modifications. The project involves complex construction activities such as tower excavation, tunnel construction, cofferdam removal, and infrastructure upgrades, with detailed plans spanning multiple volumes and addressing various engineering disciplines.

The drawings are categorized into distinct sections including Civil (OTW), Cut-Off Wall (CTW), State Road Relocation (STR), and General site plans, with specific focus on elements like spillway access roads, erosion control measures, and site-specific grading and excavation sequencing. The project appears to be a comprehensive dam safety improvement initiative, with multiple bid options and phased construction approaches, designed to enhance the dam's structural integrity and surrounding infrastructure while maintaining operational continuity of the Rough River Dam facility.

View the file

Other files

File Type Posted
W912QR25R0016_CERT_Final__Plans-0009.pdf PDF
W912QR25R0016_CERT_Final_Specs-0009.pdf PDF
W912QR25R0016_CERT_Final_V1B_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0008.pdf PDF
W912QR25R0016_CERT_Final__V3_CTWSTR_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0007.pdf PDF
W912QR25R0016-0006.pdf PDF
W912QR25R0016_CERT_Final_Plans-0005.pdf PDF
W912QR25R0016_CERT_Final_Specs-0005.pdf PDF
W912QR25R0016_CERT_Final_EnviroAssess-0005.pdf PDF
W912QR25R0016_CERT_Final_Plans-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0003.pdf PDF
W912QR25R0016_CERT_Final_Vol5_ MFR_ConcreteMatTest-0003.pdf PDF
W912QR25R0016_CERT_Final_Plans-0003.pdf PDF
Site Visit Sign In Sheet.docx DOCX document
W912QR25R0016_CERT_Final_Specs-0002.pdf PDF
Virtual Registration.pdf PDF
W912QR25R0016_CERT_Final_Specs-0001.pdf PDF
W912QR25R0016 0001.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_18of20_E2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_20of28_D1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_9of20_C2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_3of9_2B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_15of28_B1-0000.pdf PDF
W912QR25R0016_CERT_Final_V4c_Specs-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_13of16_F-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_14of16_G-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_7of16_B5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_1of20-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_10of20_C3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_16of16_I-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_1of16-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_3of28_A2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGBR_MainReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_10bof16_C2b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_19of20_E3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1941_GeoReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_8of9_4C-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_4of16_B2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_2of20_A-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1953_DesignMemo1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_1of28_MainReport-0000.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase II Boring LogsOTW BS132145870_OTW-BS132xxx.dgn

Phase II Boring LogsOTW BS131145870_OTW-BS131xxx.dgn

Phase II Boring LogsOTW BS130145870_OTW-BS130xxx.dgn

Phase II Boring LogsOTW BS129145870_OTW-BS129xxx.dgn

Phase II Boring LogsOTW BS128145870_OTW-BS128xxx.dgn

Phase II Boring LogsOTW BS127145870_OTW-BS127xxx.dgn

Phase II Boring LogsOTW BS126145870_OTW-BS126xxx.dgn

Phase II Boring LogsOTW BS125145870_OTW-BS125xxx.dgn

Phase II Boring LogsOTW BS124145870_OTW-BS124xxx.dgn

Phase II Boring LogsOTW BS123145870_OTW-BS123xxx.dgn

Phase II Boring LogsOTW BS122145870_OTW-BS122xxx.dgn

Phase II Boring LogsOTW BS121145870_OTW-BS121xxx.dgn

Phase I Boring LogsOTW BS120145870_OTW-BS120xxx.dgn

Phase I Boring LogsOTW BS119145870_OTW-BS119xxx.dgn

Phase I Boring LogsOTW BS118145870_OTW-BS118xxx.dgn

Phase I Boring LogsOTW BS117145870_OTW-BS117xxx.dgn

Phase I Boring LogsOTW BS116145870_OTW-BS116xxx.dgn

Phase I Boring LogsOTW BS115145870_OTW-BS115xxx.dgn

Phase I Boring LogsOTW BS114145870_OTW-BS114xxx.dgn

Phase I Boring LogsOTW BS113145870_OTW-BS113xxx.dgn

Phase I Boring LogsOTW BS112145870_OTW-BS112xxx.dgn

Phase I Boring LogsOTW BS111145870_OTW-BS111xxx.dgn

Phase I Boring LogsOTW BS110145870_OTW-BS110xxx.dgn

Phase I Boring LogsOTW BS109145870_OTW-BS109xxx.dgn

Phase I Boring LogsOTW BS108145870_OTW-BS108xxx.dgn

Phase I Boring LogsOTW BS107145870_OTW-BS107xxx.dgn

Phase I Boring LogsOTW BS106145870_OTW-BS106xxx.dgn

Phase I Boring LogsOTW BS105145870_OTW-BS105xxx.dgn

Phase I Boring LogsOTW BS104145870_OTW-BS104xxx.dgn

Phase I Boring LogsOTW BS103145870_OTW-BS103xxx.dgn

Phase I Boring LogsOTW BS102145870_OTW-BS102xxx.dgn

Phase I Boring LogsOTW BS101145870_OTW-BS101xxx.dgn

USCS Data SheetOTW BS100145870_OTW-BS100xxx.dgn

Boring Location Plan - 3 of 3OTW BS004145870_OTW-BS004xxx.dgn

Boring Location Plan - 2 of 3OTW BS003145870_OTW-BS003xxx.dgn

Boring Location Plan - 1 of 3OTW BS002145870_OTW-BS002xxx.dgn

Overall Boring Location PlanOTW BS001145870_OTW-BS001xxx.dgn

GEOTECHNICAL

PHASE 4- TRAFFIC CONTROLTC406145870_TC406xxx.dgn

PHASE 4- TRAFFIC CONTROLTC405145870_TC405xxx.dgn

PHASE 4- TRAFFIC CONTROLTC404145870_TC404xxx.dgn

PHASE 4- TRAFFIC CONTROLTC403145870_TC403xxx.dgn

PHASE 4- TRAFFIC CONTROLTC402145870_TC402xxx.dgn

PHASE 4- OVERALL TRAFFIC CONTROLTC401145870_TC401xxx.dgn

PHASE 3- TRAFFIC CONTROLTC306145870_TC306xxx.dgn

PHASE 3- TRAFFIC CONTROLTC305145870_TC305xxx.dgn

PHASE 3- TRAFFIC CONTROLTC304145870_TC304xxx.dgn

PHASE 3- TRAFFIC CONTROLTC303145870_TC303xxx.dgn

PHASE 3- TRAFFIC CONTROLTC302145870_TC302xxx.dgn

PHASE 3- OVERALL TRAFFIC CONTROL TC301145870_TC301xxx.dgn

PHASE 2- TRAFFIC CONTROLTC206145870_TC206xxx.dgn

PHASE 2- TRAFFIC CONTROLTC205145870_TC205xxx.dgn

PHASE 2- TRAFFIC CONTROLTC204145870_TC204xxx.dgn

PHASE 2- TRAFFIC CONTROLTC203145870_TC203xxx.dgn

PHASE 2- TRAFFIC CONTROLTC202145870_TC202xxx.dgn

PHASE 2- OVERALL TRAFFIC CONTROLTC201145870_TC201xxx.dgn

PHASE 1- TRAFFIC CONTROLTC106145870_TC106xxx.dgn

PHASE 1- TRAFFIC CONTROLTC105145870_TC105xxx.dgn

PHASE 1- TRAFFIC CONTROLTC104145870_TC104xxx.dgn

PHASE 1- TRAFFIC CONTROLTC103145870_TC103xxx.dgn

PHASE 1- TRAFFIC CONTROLTC102145870_TC102xxx.dgn

PHASE 1- OVERALL TRAFFIC CONTROL PLANTC101145870_TC101xxx.dgn

GENERAL TRAFFIC CONTROL NOTESTC001145870_TC001xxx.dgn

TRAFFIC CONTROL

CONTRACTOR WORK LIMITS - LAKE ACCESSV-004145870_V-004xxx.DGN

CONTRACTOR WORK LIMITSV-003145870_V-003xxx.DGN

CONTROL POINT DESCRIPTIONS AND COORDINATESV-002145870_V-002xxx.DGN

CONTROL POINT LOCATIONSV-001145870_V-001xxx.DGN

SURVEY

HISTORICAL PROPERTY PLANGI013145870_GI013XXX.dgn

SITE PHOTOGRAPHSGI012145870_GI012XXX.dgn

SITE PHOTOGRAPHSGI011145870_GI011XXX.dgn

SITE PHOTOGRAPHSGI010145870_GI010XXX.dgn

EXCAVATION SEQUENCINGGI009145870_GI009XXX.dgn

STANDARD SYMBOLSGI008145870_GI008XXX.dgn

GENERAL NOTESGI007145870_GI007XXX.dgn

AERIAL PHOTOGRAPHGI006145870_GI006XXX.dgn

LOCATION AND AREA MAPSGI005145870_GI005XXX.dgn

INDEX OF DRAWINGS VOL. 3GI004145870_GI004XXX.dgn

INDEX OF DRAWINGS VOL. 2GI003145870_2022_S_USC SITE

INDEX OF DRAWINGS VOL. 1GI002A145870_GI002AXX.dgn

INDEX OF DRAWINGS VOL. 1GI002145870_GI002XXX.dgn

COVER SHEETGI001A145870_GI001XXX.dgn

GENERAL

OUTLET WORKS DEMOLITION PLAN 10 OF 18OTW CD118145870_OTW CD118xxx.dgn

OUTLET WORKS DEMOLITION PLAN 9 OF 18OTW CD117145870_OTW CD117xxx.dgn

OUTLET WORKS DEMOLITION PLAN 8 OF 18OTW CD116145870_OTW CD116xxx.dgn

OUTLET WORKS DEMOLITION PLAN 7 OF 18OTW CD115145870_OTW CD115xxx.dgn

OUTLET WORKS DEMOLITION PLAN 6 OF 18OTW CD114145870_OTW CD114xxx.dgn

OUTLET WORKS DEMOLITION PLAN 5 OF 18OTW CD113145870_OTW CD113xxx.dgn

OUTLET WORKS DEMOLITION PLAN 4 OF 18OTW CD112145870_OTW CD112xxx.dgn

OUTLET WORKS DEMOLITION PLAN 3 OF 18OTW CD111145870_OTW CD111xxx.dgn

OUTLET WORKS DEMOLITION PLAN 2 OF 18OTW CD110145870_OTW CD110xxx.dgn

OUTLET WORKS DEMOLITION PLAN 1 OF 18OTW CD109145870_OTW CD109xxx.dgn

OVERALL DEMOLITION PLANOTW CD101145870_OTW CD101xxx.dgn

EROSION CONTROL DETAILS - TURBIDITY CURTAINOTW GC503145870_OTW GC503xxx.dgn

EROSION CONTROL DETAILSOTW GC502145870_OTW GC502xxx.dgn

EROSION CONTROL DETAILSOTW GC501145870_OTW GC501xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 16 OF 16OTW GC124145870_OTW GC124xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 15 OF 16OTW GC123145870_OTW GC123xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 14 OF 16OTW GC122145870_OTW GC122xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 13 OF 16OTW GC121145870_OTW GC121xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 12 OF 16OTW GC120145870_OTW GC120xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 11 OF 16OTW GC119145870_OTW GC119xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 10 OF 16OTW GC118145870_OTW GC118xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 9 OF 16OTW GC117145870_OTW GC117xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 8 OF 16OTW GC116145870_OTW GC116xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 7 OF 16OTW GC115145870_OTW GC115xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 6 OF 16OTW GC114145870_OTW GC114xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 5 OF 16OTW GC113145870_OTW GC113xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 4 OF 16OTW GC112145870_OTW GC112xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 3 OF 16OTW GC111145870_OTW GC111xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 2 OF 16OTW GC110145870_OTW GC110xxx.dgn

OUTLET WORKS EROSION CONTROL PLAN 1 OF 16OTW GC109145870_OTW GC109xxx.dgn

OUTLET WORKS OVERALL EROSION CONTROL PLANOTW GC101145870_OTW GC101xxx.dgn

CIVIL

STILLING AREA DEWATERING DETAILSOTW GS504145870_OTW-GS504xxx.dgn

SPOIL AREA PLANOTW GS503145870_OTW-GS503xxx.dgn

SPILLWAY HAUL ROUTE PHOTOSOTW GS502145870_OTW-GS502xxx.dgn

SPOIL AREA DETAILSOTW GS501145870_OTW-GS501xxx.dgn

RESERVOIR SPOIL AREAOTW GS122145870_OTW-GS122xxx.dgn

SITE PLAN 2 OF 2 DS TUNNEL ACCESS RAMP, SP WALL, &DEWATERINGOTW GS121145870_OTW-GS121xxx.dgn

SITE PLAN 1 OF 2 DS TUNNEL ACCESS RAMP, SP WALL, &DEWATERINGOTW GS120145870_OTW-GS120xxx.dgn

OVERALL SITE PLAN DS TUNNEL ACCESS RAMP, SP WALL, & DEWATERINGOTW GS119145870_OTW-GS119xxx.dgn

SITE PLAN 11 OF 11 - SPILLWAY ACCESS ROADOTW GS118145870_OTW-GS118xxx.dgn

SITE PLAN 10 OF 11 - SPILLWAY ACCESS ROADOTW GS117145870_OTW-GS117xxx.dgn

SITE PLAN 9 OF 11 - SPILLWAY ACCESS ROADOTW GS116145870_OTW-GS116xxx.dgn

SITE PLAN 8 OF 11 - SPILLWAY ACCESS ROADOTW GS115145870_OTW-GS115xxx.dgn

SITE PLAN 7 OF 11 - SPILLWAY ACCESS ROADOTW GS114145870_OTW-GS114xxx.dgn

SITE PLAN 6 OF 11 - SPILLWAY ACCESS ROADOTW GS113145870_OTW-GS113xxx.dgn

SITE PLAN 5 OF 11 - SPILLWAY ACCESS ROADOTW GS112145870_OTW-GS112xxx.dgn

SITE PLAN 4 OF 11 - SPILLWAY ACCESS ROADOTW GS111145870_OTW-GS111xxx.dgn

SITE PLAN 3 OF 11 - SPILLWAY ACCESS ROADOTW GS110145870_OTW-GS110xxx.dgn

SITE PLAN 2 OF 11 - SPILLWAY ACCESS ROADOTW GS109145870_OTW-GS109xxx.dgn

SITE PLAN 1 OF 11 - SPILLWAY ACCESS ROADOTW GS108145870_OTW-GS108xxx.dgn

OVERALL SITE PLAN - SPILLWAY ACCESS ROADOTW GS107145870_OTW-GS107xxx.dgn

SITE PLAN 2 OF 2 - UPLAND SPOIL AREAOTW GS106145870_OTW-GS106xxx.dgn

SITE PLAN 1 OF 2 - UPLAND SPOIL AREAOTW GS105145870_OTW-GS105xxx.dgn

OVERALL SITE PLAN - UPLAND SPOIL AREAOTW GS104145870_OTW-GS104xxx.dgn

COFFERDAM SITE PLAN SHEET 2 OF 2OTW GS103145870_OTW-GS103xxx.dgn

COFFERDAM SITE PLAN SHEET 1 OF 2OTW GS102145870_OTW-GS102xxx.dgn

OVERALL COFFERDAM SITE PLANOTW GS101145870_OTW-GS101xxx.dgn

GENERAL SITE

Test Pit - TP2005OTW BS158145870_OTW-BS158xxx.dgn

Test Pit - TP2004OTW BS157145870_OTW-BS157xxx.dgn

Test Pit - TP2003OTW BS156145870_OTW-BS156xxx.dgn

Test Pit - TP2002OTW BS155145870_OTW-BS155xxx.dgn

Test Pit - TP2001OTW BS154145870_OTW-BS154xxx.dgn

Test Pit - TP1932, TP1933OTW BS153145870_OTW-BS153xxx.dgn

Test Pit - TP1930, TP1931OTW BS152145870_OTW-BS152xxx.dgn

Test Pit - TP1928, TP1929OTW BS151145870_OTW-BS151xxx.dgn

Test Pit - TP1926, TP1927OTW BS150145870_OTW-BS150xxx.dgn

Phase II Boring LogsOTW BS149145870_OTW-BS149xxx.dgn

Phase II Boring LogsOTW BS148145870_OTW-BS148xxx.dgn

Phase II Boring LogsOTW BS147145870_OTW-BS147xxx.dgn

Phase II Boring LogsOTW BS146145870_OTW-BS146xxx.dgn

Phase II Boring LogsOTW BS145145870_OTW-BS145xxx.dgn

Phase II Boring LogsOTW BS144145870_OTW-BS144xxx.dgn

Phase II Boring LogsOTW BS143145870_OTW-BS143xxx.dgn

Phase II Boring LogsOTW BS142145870_OTW-BS142xxx.dgn

Phase II Boring LogsOTW BS141145870_OTW-BS141xxx.dgn

Phase II Boring LogsOTW BS140145870_OTW-BS140xxx.dgn

Phase II Boring LogsOTW BS139145870_OTW-BS139xxx.dgn

Phase II Boring LogsOTW BS138145870_OTW-BS138xxx.dgn

Phase II Boring LogsOTW BS137145870_OTW-BS137xxx.dgn

Phase II Boring LogsOTW BS136145870_OTW-BS136xxx.dgn

Phase II Boring LogsOTW BS135145870_OTW-BS135xxx.dgn

Phase II Boring LogsOTW BS134145870_OTW-BS134xxx.dgn

Phase II Boring LogsOTW BS133145870_OTW-BS133xxx.dgn

PROFILE EXISTING CHANNEL FILL (BID OPTION 3)OTW CG233145870_OTW CG233xxx.dgn

PROFILE EXISTING CHANNEL FILL (BID OPTION 3)OTW CG232145870_OTW CG232xxx.dgn

PROFILE EXISTING CHANNEL FILL GROIN DITCHES (BID OPTION 3)OTW CG231145870_OTW CG231xxx.dgn

PROFILE SHEET PILE WALLOTW CG230145870_OTW CG230xxx.dgn

PROFILE TUNNEL ACCESS RAMPOTW CG229145870_OTW CG229xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG228145870_OTW CG228xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG227145870_OTW CG227xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG226145870_OTW CG226xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG225145870_OTW CG225xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG224145870_OTW CG224xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG223145870_OTW CG223xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG222145870_OTW CG222xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG221145870_OTW CG221xxx.dgn

PROFILE CONTRACTOR SPILLWAY ACCESS ROADOTW CG220145870_OTW CG220xxx.dgn

PROFILE UPLAND SPOIL AREA PERIMETEROTW CG219145870_OTW CG219xxx.dgn

PROFILE UPLAND SPOIL AREA PERIMETEROTW CG218145870_OTW CG218xxx.dgn

PROFILE UPLAND SPOIL AREA PERIMETEROTW CG217145870_OTW CG217xxx.dgn

PROFILE CONTRACTOR ACCESS ROADOTW CG216145870_OTW CG216xxx.dgn

PROFILE TOWER GROUT CURTAINOTW CG215145870_OTW CG215xxx.dgn

PROFILE TOWER GROUT CURTAINOTW CG214145870_OTW CG214xxx.dgn

PROFILE UPSTREAM COFFERDAM AND BRIDGE ABUTMENT GROUT CURTAINOTW CG213145870_OTW CG213xxx.dgn

PROFILE WEST STILLING BASIN ACCESS AND CRANE ROADOTW CG212145870_OTW-CG212xxx.dgn

PROFILE WEST STILLING BASIN ACCESSOTW CG211145870_OTW-CG211xxx.dgn

PROFILE EAST STILLING BASIN ACCESSOTW CG210145870_OTW-CG210xxx.dgn

PROFILE EAST STILLING BASIN ACCESSOTW CG209145870_OTW-CG209xxx.dgn

PROFILE TOWER ACCESSSOTW CG208145870_OTW-CG208xxx.dgn

PROFILE TOWER ACCESSSOTW CG207145870_OTW-CG207xxx.dgn

PROFILE OUTLET WORKSOTW CG206145870_OTW-CG206xxx.dgn

PROFILE OUTLET WORKSOTW CG205145870_OTW-CG205xxx.dgn

PROFILE OUTLET WORKSOTW CG204145870_OTW-CG204xxx.dgn

PROFILE OUTLET WORKSOTW CG203145870_OTW-CG203xxx.dgn

PROFILE OUTLET WORKSOTW CG202145870_OTW-CG202xxx.dgn

PROFILE OUTLET WORKSOTW CG201145870_OTW-CG201xxx.dgn

OUTLET WORKS GRADING PLAN 16 OF 16OTW CG124145870_OTW-CG124xxx.dgn

OUTLET WORKS GRADING PLAN 15 OF 16OTW CG123145870_OTW-CG123xxx.dgn

OUTLET WORKS GRADING PLAN 14 OF 16OTW CG122145870_OTW-CG122xxx.dgn

OUTLET WORKS GRADING PLAN 13 OF 16OTW CG121145870_OTW-CG121xxx.dgn

OUTLET WORKS GRADING PLAN 12 OF 16OTW CG120145870_OTW-CG120xxx.dgn

OUTLET WORKS GRADING PLAN 11 OF 16OTW CG119145870_OTW-CG119xxx.dgn

OUTLET WORKS GRADING PLAN 10 OF 16OTW CG118145870_OTW-CG118xxx.dgn

OUTLET WORKS GRADING PLAN 9 OF 16OTW CG117145870_OTW-CG117xxx.dgn

OUTLET WORKS GRADING PLAN 8 OF 16OTW CG116145870_OTW-CG116xxx.dgn

OUTLET WORKS GRADING PLAN 7 OF 16OTW CG115145870_OTW-CG115xxx.dgn

OUTLET WORKS GRADING PLAN 6 OF 16OTW CG114145870_OTW-CG114xxx.dgn

OUTLET WORKS GRADING PLAN 5 OF 16OTW CG113145870_OTW-CG113xxx.dgn

OUTLET WORKS GRADING PLAN 4 OF 16OTW CG112145870_OTW-CG112xxx.dgn

OUTLET WORKS GRADING PLAN 3 OF 16OTW CG111145870_OTW-CG111xxx.dgn

OUTLET WORKS GRADING PLAN 2 OF 16OTW CG110145870_OTW-CG110xxx.dgn

OUTLET WORKS GRADING PLAN 1 OF 16OTW CG109145870_OTW-CG109xxx.dgn

OUTLET WORKS OVERALL GRADING PLANOTW CG101145870_OTW-CG101xxx.dgn

JOINT DETAILS AND REINFORCEMENTOTW CP501145870_OTW CP501xxx.dgn

STILLING BASIN AREA JOINT PLAN 2 OF 2OTW CP403145870_OTW CP403xxx.dgn

STILLING BASIN AREA JOINT PLAN 1 OF 2OTW CP402145870_OTW CP402xxx.dgn

STILLING BASIN AREA OVERALL JOINT PLANOTW CP401145870_OTW CP401xxx.dgn

BOAT RAMP DETAILS 2 OF 2OTW CS510145870_OTW-CS510xxx.dgn

BOAT RAMP DETAILS 1 OF 2OTW CS509145870_OTW-CS509xxx.dgn

CONCRETE PAVEMENT SECTIONSOTW CS508145870_OTW-CS508xxx.dgn

TURF MAT DETAILSOTW CS507145870_OTW-CS507xxx.dgn

TURF MAT DETAILSOTW CS506145870_OTW-CS506xxx.dgn

SWING GATE DETAILSOTW CS505145870_OTW-CS505xxx.dgn

FENCE DETAILSOTW CS504145870_OTW-CS504xxx.dgn

BRIDGE APPROACH SLAB DETAILSOTW CS502145870_OTW-CS502xxx.dgn

DETAILS OUTLET WORKSOTW CS501145870_OTW-CS501xxx.dgn

OUTLET WORKS SITE PLAN 16 OF 16OTW CS124145870_OTW-CS124xxx.dgn

OUTLET WORKS SITE PLAN 15 OF 16OTW CS123145870_OTW-CS123xxx.dgn

OUTLET WORKS SITE PLAN 14 OF 16OTW CS122145870_OTW-CS122xxx.dgn

OUTLET WORKS SITE PLAN 13 OF 16OTW CS121145870_OTW-CS121xxx.dgn

OUTLET WORKS SITE PLAN 12 OF 16OTW CS120145870_OTW-CS120xxx.dgn

OUTLET WORKS SITE PLAN 11 OF 16OTW CS119145870_OTW-CS119xxx.dgn

OUTLET WORKS SITE PLAN 10 OF 16OTW CS118145870_OTW-CS118xxx.dgn

OUTLET WORKS SITE PLAN 9 OF 16OTW CS117145870_OTW-CS117xxx.dgn

OUTLET WORKS SITE PLAN 8 OF 16OTW CS116145870_OTW-CS116xxx.dgn

OUTLET WORKS SITE PLAN 7 OF 16OTW CS115145870_OTW-CS115xxx.dgn

OUTLET WORKS SITE PLAN 6 OF 16OTW CS114145870_OTW-CS114xxx.dgn

OUTLET WORKS SITE PLAN 5 OF 16OTW CS113145870_OTW-CS113xxx.dgn

OUTLET WORKS SITE PLAN 4 OF 16OTW CS112145870_OTW-CS112xxx.dgn

OUTLET WORKS SITE PLAN 3 OF 16OTW CS111145870_OTW-CS111xxx.dgn

OUTLET WORKS SITE PLAN 2 OF 16OTW CS110145870_OTW-CS110xxx.dgn

OUTLET WORKS SITE PLAN 1 OF 16OTW CS109145870_OTW-CS109xxx.dgn

OUTLET WORKS OVERALL SITE PLANOTW CS101145870_OTW-CS101xxx.dgn

OUTLET WORKS DEMOLITION PLAN 18 OF 18OTW CD126145870_OTW CD126xxx.dgn

OUTLET WORKS DEMOLITION PLAN 17 OF 18OTW CD125145870_OTW CD125xxx.dgn

OUTLET WORKS DEMOLITION PLAN 16 OF 18OTW CD124145870_OTW CD124xxx.dgn

OUTLET WORKS DEMOLITION PLAN 15 OF 18OTW CD123145870_OTW CD123xxx.dgn

OUTLET WORKS DEMOLITION PLAN 14 OF 18OTW CD122145870_OTW CD122xxx.dgn

OUTLET WORKS DEMOLITION PLAN 13 OF 18OTW CD121145870_OTW CD121xxx.dgn

OUTLET WORKS DEMOLITION PLAN 12 OF 18OTW CD120145870_OTW CD120xxx.dgn

OUTLET WORKS DEMOLITION PLAN 11 OF 18OTW CD119145870_OTW CD119xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG664145870_OTW CG664xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG663145870_OTW CG663xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG662145870_OTW CG662xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG661145870_OTW CG661xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG660145870_OTW CG660xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG659145870_OTW CG659xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG658145870_OTW CG658xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG657145870_OTW CG657xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG656145870_OTW CG656xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG655145870_OTW CG655xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG654145870_OTW CG654xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG653145870_OTW CG653xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG652145870_OTW CG652xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG651145870_OTW CG651xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG650145870_OTW CG650xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG649145870_OTW CG649xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG648145870_OTW CG648xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG647145870_OTW CG647xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG646145870_OTW CG646xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG645145870_OTW CG645xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG644145870_OTW CG644xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG643145870_OTW CG643xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG642145870_OTW CG642xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG641145870_OTW CG641xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG640145870_OTW CG640xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG639145870_OTW CG639xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG638145870_OTW CG638xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG637145870_OTW CG637xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG636145870_OTW CG636xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG635145870_OTW CG635xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG634145870_OTW CG634xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG633145870_OTW CG633xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG632145870_OTW CG632xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG631145870_OTW CG631xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG630145870_OTW CG630xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG629145870_OTW CG629xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG628145870_OTW CG628xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG627145870_OTW CG627xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG626145870_OTW CG626xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG625145870_OTW CG625xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG624145870_OTW CG624xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG623145870_OTW CG623xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG622145870_OTW CG622xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG621145870_OTW CG621xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG620145870_OTW CG620xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG619145870_OTW CG619xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG618145870_OTW CG618xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG617145870_OTW CG617xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG616145870_OTW CG616xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG615145870_OTW-CG615xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG614145870_OTW-CG614xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG613145870_OTW-CG613xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG612145870_OTW-CG612xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG611145870_OTW-CG611xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG610145870_OTW-CG610xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG609145870_OTW-CG609xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG608145870_OTW-CG608xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG607145870_OTW-CG607xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG606145870_OTW-CG606xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG605145870_OTW-CG605xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG604145870_OTW-CG604xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG603145870_OTW-CG603xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG602145870_OTW-CG602xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG601145870_OTW-CG601xxx.dgn

ROADWAY DRAINAGE DETAILSOTW CG526145870_OTW CG526xxx.dgn

TRENCH DRAIN DETAILSOTW CG525145870_OTW CG525xxx.dgn

STILLING BASIN EXCAVATIONOTW CG517145870_OTW CG517xxx.dgn

TOWER EXCAVATIONOTW CG515145870_OTW CG515xxx.dgn

TOWER EXCAVATIONOTW CG514145870_OTW CG514xxx.dgn

TOWER EXCAVATIONOTW CG513145870_OTW CG513xxx.dgn

TOWER EXCAVATIONOTW CG512145870_OTW CG512xxx.dgn

TUNNEL GEOLOGIC SECTIONSOTW CG511145870_OTW CG511xxx.dgn

TUNNEL GEOLOGIC SECTIONSOTW CG510145870_OTW CG510xxx.dgn

TUNNEL GEOLOGIC SECTIONSOTW CG509145870_OTW CG509xxx.dgn

EXCAVATION DETAILSOTW CG508145870_OTW CG508xxx.dgn

EXCAVATION DETAILSOTW CG507145870_OTW CG507xxx.dgn

EXCAVATION DETAILSOTW CG506145870_OTW CG506xxx.dgn

EXCAVATION DETAILSOTW CG505145870_OTW CG505xxx.dgn

EXCAVATION DETAILSOTW CG504145870_OTW CG504xxx.dgn

EXCAVATION DETAILSOTW CG503145870_OTW CG503xxx.dgn

BLASTING AREA INSTRUMENTATION PLAN (OVERALL)OTW CG502145870_OTW CG502xxx.dgn

EXCAVATION PLAN (OVERALL)OTW CG501145870_OTW CG501xxx.dgn

STILLING BASIN GRADING PLANOTW CG401145870_OTW CG401xxx.dgn

STILLING AREA PIPE PROFILESOTW CG237145870_OTW CG237xxx.dgn

STORMLINE PROFILESOTW CG236145870_OTW CG236xxx.dgn

PROFILES - SIDEWALK AND INTERCEPT DITCHOTW CG235145870_OTW CG235xxx.dgn

PROFILE EXISTING CHANNEL FILL (BID OPTION 3)OTW CG234145870_OTW CG234xxx.dgn

FILE NAME

SHEET

REF DESCRIPTION FILE NAME FILE NAME FILE NAME

SHEET

REF

SHEET

REF

SHEET

REFDESCRIPTION DESCRIPTION DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S S

H

IF

F L

E T

T

N O

V E

M B

E R

IN

D

E X

O F

D R

A W

IN

G

S

V O

L U

M E

C

R T

IF

IE

D F

IN

A

L

GI002

F A

L L

S O

F R

O U

G H

K

E N

T U

C K

Y

R O

U G

H R

IV

E

R D

A M

D A

M S

A F

E T

Y M

O D

IF

IC

A T

IO

N

P H

A S

E I

I

P

B D

O R

S C

H

B S

A Y

L O

R

R H

A R

R

IS

A N

S I

O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

INDEX OF DRAWINGS - VOLUME 1

SCALE: NTS

R E

V

IS

IO

N

I N

A C

C O

R D

A N

C E

W

IT

H A

M D

T

A1

W

2Q R

R

_C

ER

T_ Fi na l_

V1 A_

O

TW

_P la ns -0

DOWNSTREAM DAM FACE CROSS SECTIONS (BID OPTION 3)OTWCG751145870_OTW CG751xxx.dgn

DOWNSTREAM DAM FACE CROSS SECTIONS (BID OPTION 3)OTW CG750145870_OTW CG750xxx.dgn

DOWNSTREAM DAM FACE CROSS SECTIONS (BID OPTION 3)OTW CG749145870_OTW CG749xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG748145870_OTW CG748xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG747145870_OTW CG747xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG746145870_OTW CG746xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG745145870_OTW CG745xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG744145870_OTW CG744xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG743145870_OTW CG743xxx.dgn

EXISTING CHANNEL FILL CROSS SECTIONS (BID OPTION 3)OTW CG742145870_OTW CG742xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG741145870_OTW CG741xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG740145870_OTW CG740xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG739145870_OTW CG739xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG738145870_OTW CG738xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG737145870_OTW CG737xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG736145870_OTW CG736xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG735145870_OTW CG735xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG734145870_OTW CG734xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG733145870_OTW CG733xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG732145870_OTW CG732xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG731145870_OTW CG731xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG730145870_OTW CG730xxx.dgn

WEST STILLING AREA ACCESS CROSS SECTIONSOTW CG729145870_OTW CG729xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG728145870_OTW CG728xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG727145870_OTW CG727xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG726145870_OTW CG726xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG725145870_OTW CG725xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG724145870_OTW CG724xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG723145870_OTW CG723xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG722145870_OTW CG722xxx.dgn

EAST STILLING AREA ACCESS CROSS SECTIONSOTW CG721145870_OTW CG721xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG720145870_OTW CG720xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG719145870_OTW CG719xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG718145870_OTW CG718xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG717145870_OTW CG717xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG716145870_OTW CG716xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG715145870_OTW CG715xxx.dgn

TOWER ACCESS CROSS SECTIONSOTW CG714145870_OTW CG714xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG713145870_OTW CG713xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG712145870_OTW CG712xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG711145870_OTW CG711xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG710145870_OTW CG710xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG709145870_OTW CG709xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG708145870_OTW CG708xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG707145870_OTW CG707xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG706145870_OTW CG706xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG705145870_OTW CG705xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG704145870_OTW CG704xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG703145870_OTW CG703xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG702145870_OTW CG702xxx.dgn

APPROACH COFFERDAM CROSS SECTIONSOTW CG701145870_OTW CG701xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG700145870_OTW CG700xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG699145870_OTW CG699xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG698145870_OTW CG698xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG697145870_OTW CG697xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG696145870_OTW CG696xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG695145870_OTW CG695xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG694145870_OTW CG694xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG693145870_OTW CG693xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG692145870_OTW CG692xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG691145870_OTW CG691xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG690145870_OTW CG690xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG689145870_OTW CG689xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG688145870_OTW CG688xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG687145870_OTW CG687xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG686145870_OTW CG686xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG685145870_OTW CG685xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG684145870_OTW CG684xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG683145870_OTW CG683xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG682145870_OTW CG682xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG681145870_OTW CG681xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG680145870_OTW CG680xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG679145870_OTW CG679xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG678145870_OTW CG678xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG677145870_OTW CG677xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG676145870_OTW CG676xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG675145870_OTW CG675xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG674145870_OTW CG674xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG673145870_OTW CG673xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG672145870_OTW CG672xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG671145870_OTW CG671xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG670145870_OTW CG670xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG669145870_OTW CG669xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG668145870_OTW CG668xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG667145870_OTW CG667xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG666145870_OTW CG666xxx.dgn

OUTLET WORKS CROSS SECTIONSOTW CG665145870_OTW CG665xxx.dgn

FILE NAME

SHEET

REF DESCRIPTION

POOL, TAILWATER, STILLING BASIN, AND RAINFALL 2018 TO 2023RF909-

RESERVOIR AND TAILWATER ELEVATION 1960 TO PRESENTRF908145870_RF908xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 2020 TO 2030RF907145870_RF907xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 2010 TO 2020RF906145870_RF906xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 2000 TO 2010RF905145870_RF905xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 1990 TO 2000RF904145870_RF904xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 1980 TO 1990RF903145870_RF903xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 1970 TO 1980RF902145870_RF902xxx.dgn

RESERVOIR POOL AND T/W HYDROGRAPHS 1960 TO 1970RF901145870_RF901xxx.dgn

ELECTRICAL DETAILSOTW ES501145870_OTW ES501xxx.dgn

SITE ELECTRICAL LEGEND AND NOTESOTW ES001145870_OTW ES001xxx.dgn

UTILITY DETAILSOTW CU505145870_OTW CU505xxx.dgn

UTILITY DETAILSOTW CU504145870_OTW CU504xxx.dgn

UTILITY DETAILSOTW CU503145870_OTW CU503xxx.dgn

UTILITY DETAILSOTW CU502145870_OTW CU502xxx.dgn

UTILITY DETAILSOTW CU501145870_OTW CU501xxx.dgn

PROFILE - SANITARY SEWER - RELOCATEDOTW CU201145870_OTW CU201xxx.dgn

UTILITY PLAN 15 OF 15OTW CU116145870_OTW CU116xxx.dgn

UTILITY PLAN 14 OF 15OTW CU115145870_OTW CU115xxx.dgn

UTILITY PLAN 13 OF 15OTW CU114145870_OTW CU114xxx.dgn

UTILITY PLAN 12 OF 15OTW CU113145870_OTW CU113xxx.dgn

UTILITY PLAN 11 OF 15OTW CU112145870_OTW CU112xxx.dgn

UTILITY PLAN 10 OF 15OTW CU111145870_OTW CU111xxx.dgn

UTILITY PLAN 9 OF 15OTW CU110145870_OTW CU110xxx.dgn

UTILITY PLAN 8 OF 15OTW CU109145870_OTW CU109xxx.dgn

UTILITY PLAN 7 OF 15OTW CU108145870_OTW CU108xxx.dgn

UTILITY PLAN 6 OF 15OTW CU107145870_OTW CU107xxx.dgn

UTILITY PLAN 5 OF 15OTW CU106145870_OTW CU106xxx.dgn

UTILITY PLAN 4 OF 15OTW CU105145870_OTW CU105xxx.dgn

UTILITY PLAN 3 OF 15OTW CU104145870_OTW CU104xxx.dgn

UTILITY PLAN 2 OF 15OTW CU103145870_OTW CU103xxx.dgn

UTILITY PLAN 1 OF 15OTW CU102145870_OTW CU102xxx.dgn

OVERALL UTILITY PLANOTW CU101145870_OTW-CU101xxx.dgn

UTILITIES

FILE NAME

SHEET

REF DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S S

H

IF

F L

E T

T

N O

V E

M B

E R

E X

O F

D R

A W

IN

G

S

V O

L U

M

R T

IF

IE

D F

IN

GI002A

A

L L

S O

F R

O U

G H

K

E N

T U

C K

Y

R O

U G

H R

IV

E

R D

A M

D A

M S

A F

E T

Y M

O D

IF

IC

A T

IO

N

P H

A S

E I

I

P

B D

O R

S C

H

B S

A Y

L O

R

R H

A R

R

IS

A N

S

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

INDEX OF DRAWINGS - VOLUME 1

R E

V

IS

IO

N

I N

A C

C O

R D

A N

C E

W

IT

H A

M T

D

A1

W

2Q R

R

_C

ER

T_ Fi na l_

V1 A_

O

TW

_P la ns -0

REFERENCE DRAWING KNOWN OBSTRUCTIONSRF132145870_CTW-RF132xxx.dgn

REFERENCE DRAWING STILLING BASIN DETAILSRF131145870_CTW-RF131xxx.dgn

REFERENCE DRAWING STILLING BASIN DETAILSRF130145870_CTW-RF130xxx.dgn

REFERENCE DRAWING STILLING BASINRF129145870_CTW-RF129xxx.dgn

REFERENCE DRAWING CONDUIT PROFILE AND DETAILSRF128145870_CTW-RF128xxx.dgn

REFERENCE DRAWING DOWNSTREAM HANEY PROFILERF127145870_CTW-RF127xxx.dgn

REFERENCE DRAWING UPSTREAM HANEY PROFILERF126145870_CTW-RF126xxx.dgn

REFERENCE DRAWING DOWNSTREAM OVERBURDEN PROFILERF125145870_CTW-RF125xxx.dgn

REFERENCE DRAWING UPSTREAM OVERBURDEN PROFILERF124145870_CTW-RF124xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF123145870_CTW-RF123xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF122145870_CTW-RF122xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF121145870_CTW-RF121xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF120145870_CTW-RF120xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF119145870_CTW-RF119xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF118145870_CTW-RF118xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF117145870_CTW-RF117xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF116145870_CTW-RF116xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF115145870_CTW-RF115xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF114145870_CTW-RF114xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF113145870_CTW-RF113xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF112145870_CTW-RF112xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF111145870_CTW-RF111xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF110145870_CTW-RF110xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF109145870_CTW-RF109xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF108145870_CTW-RF108xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFILERF107145870_CTW-RF107xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B WATER TEST PROFILERF106145870_CTW-RF106xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PROFIILERF105145870_CTW-RF105xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PLANRF104145870_CTW-RF104xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PLANRF103145870_CTW-RF103xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PLANRF102145870_CTW-RF102xxx.dgn

REFERENCE DRAWING AS-BUILT PHASE 1B GROUTING PLANRF101145870_CTW-RF101xxx.dgn

CONDUIT ABANDONMENT-EMERGENCY GATE NDT REQUIREMENTSCTW CG510145870_CTW-S-CG510.RVT

CONDUIT ABANDONMENT-EXISTING EMERGENCY GATE REFERENCE PHOTOSCTW CG509145870_CTW-S-CG509.RVT

CRITICAL AREA A: SPECIAL PANEL/ELEMENT (BID OPTION 3)CTW CG508145870_CTW-CG508xxx.dgn

CRITICAL AREA A: CONDUIT DEMOLITION - BID OPTION 3 (CONT.) CTW CG507145870_CTW-CG507xxx.dgn

CRITICAL AREA A: CONDUIT DEMOLITION (BID OPTION 3)CTW CG506145870_CTW-CG506xxx.dgn

CONCRETE ABANDONMENT CONCRETE PLACEMENTS (BID OPTION 3)CTW CG505145870_CTW-CG505xxx.dgn

OUTLET WORKS CONCRETE PLACEMENT (BID OPTION 3)CTW CG504145870_CTW-CG504xxx.dgn

CONDUIT ABANDONMENT PREPARATION (BID OPTION 3)CTW CG503145870_CTW-CG503xxx.dgn

CRITICAL AREA A SEQUENCE OF WORK (BID OPTION 3)CTW CG502145870_CTW-CG502xxx.DGN

WORK PLATFORM DETAILS (BID OPTION 2)CTW CG501145870_CTW-CG501xxx.DGN

CUTOFF WALL CROSS SECTIONS (BID OPTION 3)CTW CG301145870_CTW-CG301xxx.DGN

PHASE II FOUNDATION GROUTING - DOWNSTREAM (BID OPTION 2)CTW CG205145870_CTW-CG205xxx.DGN

PHASE II FOUNDATION GROUTING - UPSTREAM (BID OPTION 2)CTW CG204145870_CTW-CG204xxx.DGN

CUTOFF WALL PROFILE (BID OPTION 3)CTW CG203145870_CTW-CG203xxx.DGN

CUTOFF WALL PROFILE (BID OPTION 3)CTW CG202145870_CTW-CG202xxx.DGN

CUTOFF WALL PROFILE (BID OPTION 3)CTW CG201145870_CTW-CG201xxx.DGN

OVERALL CUTOFF WALL PROFILE (BID OPTION 3)CTW CG200145870_CTW-CG200xxx.DGN

SITE DETAILS - CUTOFF WALLCTW CS501145870_CTW-CS501xxx.dgn

CUTOFF WALL SITE PLANCTW CS107145870_CTW-CS107xxx.dgn

CUTOFF WALL SITE PLANCTW CS106145870_CTW-CS106xxx.dgn

CUTOFF WALL SITE PLANCTW CS105145870_CTW-CS105xxx.dgn

CUTOFF WALL SITE PLANCTW CS104145870_CTW-CS104xxx.dgn

CUTOFF WALL OVERALL SITE PLANCTW CS101145870_CTW-CS101xxx.dgn

GENERAL SITE NOTES - CUTOFF WALLCTW CS001145870_CTW-CS001xxx.dgn

INSTRUMENTATION DETAILSCTW CI504145870_CTW-CI504xxx.dgn

INSTRUMENTATION DETAILSCTW CI503145870_CTW-CI503xxx.DIN

INSTRUMENTATION DETAILSCTW CI502145870_CTW-CI502xxx.DIN

INSTRUMENTATION DETAILSCTW CI501145870_CTW-CI501xxx.DIN

INSTRUMENTATION PLAN (BID OPTION 2)CTW CI107145870_CTW-CI107xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 2)CTW CI106145870_CTW-CI106xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 2)CTW CI105145870_CTW-CI105xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 2)CTW CI104145870_CTW-CI104xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 2)CTW CI103145870_CTW-CI103xxx.dgn

OVERALL INSTRUMENTATION PLAN BID OPTION 2CTW CI101145870_CTW-CI101xxx.dgn

EXISTING INSTRUMENTATION PLANCTW CI100145870_CTW-CI100xxx.dgn

CUTOFF WALL DEMOLITION PLAN (BID OPTION 2)CTW CD107145870_CTW-CD107xxx.dgn

CUTOFF WALL DEMOLITION PLAN (BID OPTION 2)CTW CD106145870_CTW-CD106xxx.dgn

CUTOFF WALL DEMOLITION PLAN (BID OPTION 2)CTW CD105145870_CTW-CD105xxx.dgn

CUTOFF WALL DEMOLITION PLAN (BID OPTION 2)CTW CD104145870_CTW-CD104xxx.dgn

CUTOFF WALL DEMOLITION PLAN (BID OPTION 2)CTW CD103145870_CTW-CD103xxx.dgn

CUTOFF WALL OVERALL DEMOLITION PLAN BID OPTION 2CTW CD101145870_CTW-CD101xxx.dgn

CUTOFF WALL EROSION CONTROL DETAILSCTW GC502145870_CTW-GC502xxx.dgn

CUTOFF WALL EROSION CONTROL DETAILSCTW GC501145870_CTW-GC501xxx.dgn

CUTOFF WALL EROSION CONTROL PLAN SHEET 4 OF 4 (BID OPTION 2)CTW GC107145870_CTW-GC107xxx.dgn

CUTOFF WALL EROSION CONTROL PLAN SHEET 3 OF 4 (BID OPTION 2)CTW GC106145870_CTW-GC106xxx.dgn

CUTOFF WALL EROSION CONTROL PLAN SHEET 2 OF 4 (BID OPTION 2)CTW GC105145870_CTW-GC105xxx.dgn

CUTOFF WALL EROSION CONTROL PLAN SHEET 1 OF 4 (BID OPTION 2)CTW GC104145870_CTW-GC104xxx.dgn

CUTOFF WALL OVERALL EROSION CONTROL PLAN BID OPTION 2CTW GC101145870_CTW-GC101xxx.dgn

CUT-OFF WALL (CTW)

INDEX OF DRAWINGS VOL. 3GI004145870_GI004XXX.dgn

INDEX OF DRAWINGS VOL. 2GI003145870_2022_S_USC SITE

INDEX OF DRAWINGS VOL. 1 ContinuedGI002A145870_GI002AXX.dwg

INDEX OF DRAWINGS VOL. 1GI002145870_GI002XXX.dgn

COVER SHEET (VOLUME 3)GI001C145870_GI001aXX.dgn

GENERAL

PARAPET WALL CLOSURE CONCRETE DETAILSSTR CG507145870_STR-CG507xxx.RVT

DRAINAGE STRUCTURE DETAILS - DROP BOX INLET TYPE 14 AND 15STR CG506145870_STR-CG506xxx.DGN

DRAINAGE STRUCTURE DETAILS - SLOPED BOX OUTLET TYPE 1STR CG505145870_STR-CG505xxx.DGN

ARTICULATING CONCRETE BLOCK (ACB) MAT DETAILLSSTR CG504145870_STR-CG504xxx.DGN

PARAPET WALL DETAILSSTR CG503145870_STR-CG503xxx.DGN

DRAINAGE STRUCTURE DETAILS - DBI TYPE 10 AND PERF. PIPE HEADWALLSTR CG502145870_STR-CG502xxx.DGN

MISCELLANEOUS DRAINAGE DETAILSSTR CG501145870_STR-CG501xxx.DGN

VISITORS CENTER AREA TYPICAL SECTIONS (BID OPTION 3)STR CG403145870_STR-CG403xxx.dgn

MAINTENANCE ROAD TYPICAL SECTIONS (BID OPTION 3)STR CG402145870_STR-CG402xxx.dgn

HIGHWAY 79 TYPICAL SECTIONS (BID OPTION 3)STR CG401145870_STR-CG401xxx.dgn

MAINTENANCE ROAD CROSS SECTIONS (BID OPTION 3)STR CG307145870_STR-CG307xxx.dgn

SIDEWALK CROSS SECTIONS (BID OPTION 3)STR CG306145870_STR-CG306xxx.dgn

HIGHWAY 79 CROSS SECTIONS (BID OPTION 3)STR CG305145870_STR-CG305xxx.dgn

HIGHWAY 79 CROSS SECTIONS (BID OPTION 3)STR CG304145870_STR-CG304xxx.dgn

HIGHWAY 79 CROSS SECTIONS (BID OPTION 3)STR CG303145870_STR-CG303xxx.dgn

HIGHWAY 79 CROSS SECTIONS (BID OPTION 3)STR CG302145870_STR-CG302xxx.dgn

HIGHWAY 79 CROSS SECTIONS (BID OPTION 3)STR CG301145870_STR-CG301xxx.dgn

MAINTENANCE ROAD AND SIDE WALK PROFILES (BID OPTION 3)STR CG206145870_STR-CG206xxx.dgn

PARAPET WALL PROFILES (BID OPTION 3)STR CG205145870_STR-CG205xxx.dgn

STATE ROAD RELOCATION STORM LINE PROFILES (BID OPTION 3)STR CG204145870_STR-CG204xxx.dgn

SUPERELEVATION DIAGRAM (BID OPTION 3)STR CG203145870_STR-CG203xxx.dgn

HIGHWAY 79 PROFILE CONTINUED (BID OPTION 3)STR CG202145870_STR-CG202xxx.dgn

HIGHWAY 79 PROFILE (BID OPTION 3)STR CG201145870_STR-CG201xxx.dgn

STATE ROAD RELOCATION GRADING PLAN (BID OPTION 3)STR CG107145870_STR-CG107xxx.dgn

STATE ROAD RELOCATION GRADING PLAN (BID OPTION 3)STR CG106145870_STR-CG106xxx.dgn

STATE ROAD RELOCATION GRADING PLAN (BID OPTION 3)STR CG105145870_STR-CG105xxx.dgn

STATE ROAD RELOCATION GRADING PLAN (BID OPTION 3)STR CG104145870_STR-CG104xxx.dgn

STATE ROAD RELOCATION GRADING PLAN (BID OPTION 3)STR CG103145870_STR-CG103xxx.dgn

STATE ROAD RELOCATION GRADING PLAN (BID OPTION 3)STR CG102145870_STR-CG102xxx.dgn

STATE ROAD RELOCATION OVERALL GRADING PLAN BID OPTION 3STR CG101145870_STR-CG101xxx.dgn

GUARDRAIL END TREATMENT DETAILS 2 OF 2STR CS517145870_STR-CS517xxx.DGN

GUARDRAIL END TREATMENT DETAILS 1 OF 2STR CS516145870_STR-CS516xxx.DGN

GUARDRAIL TERMINAL SECTION DETAILSSTR CS515145870_STR-CS515xxx.DGN

GUARDRAIL CONNECTOR TYPE A DETAILS 3 OF 3STR CS514145870_STR-CS514xxx.DGN

GUARDRAIL CONNECTOR TYPE A DETAILS 2 OF 3STR CS513145870_STR-CS513xxx.DGN

GUARDRAIL CONNECTOR TYPE A DETAILS 1 OF 3STR CS512145870_STR-CS512xxx.DGN

CRACH CUSHION TYPE VI DETAILSSTR CS511145870_STR-CS511xxx.DGN

W BEAM GUARDRAIL DETAILS 5 OF 5STR CS510145870_STR-CS510xxx.DGN

W BEAM GUARDRAIL DETAILS 4 OF 5STR CS509145870_STR-CS509xxx.DGN

W BEAM GUARDRAIL DETAILS 3 OF 5STR CS508145870_STR-CS508xxx.DGN

W BEAM GUARDRAIL DETAILS 2 OF 5STR CS507145870_STR-CS507xxx.DGN

W BEAM GUARDRAIL DETAILS 1 OF 5STR CS506145870_STR-CS506xxx.DGN

MAINTENANCE ROAD ACCESS GATE DETAILSSTR CS505145870_STR-CS505xxx.DGN

PIPE GATE DETAILSSTR CS504145870_STR-CS504xxx.DGN

NOT USEDSTR CS503145870_STR-CS503xxx.DGN

MISCELLANOUS SITE DETAILSSTR CS502145870_STR-CS502xxx.DGN

ROADSIDE SIGN DETAILSSTR CS501145870_STR-CS501xxx.DGN

STATE ROAD RELOCATION SITE PLAN (BID OPTION 3)STR CS107145870_STR-CS107xxx.dgn

STATE ROAD RELOCATION SITE PLAN (BID OPTION 3)STR CS106145870_STR-CS106xxx.dgn

STATE ROAD RELOCATION SITE PLAN (BID OPTION 3)STR CS105145870_STR-CS105xxx.dgn

STATE ROAD RELOCATION SITE PLAN (BID OPTION 3)STR CS104145870_STR-CS104xxx.dgn

STATE ROAD RELOCATION SITE PLAN (BID OPTION 3)STR CS103145870_STR-CS103xxx.dgn

STATE ROAD RELOCATION SITE PLAN (BID OPTION 3)STR CS102145870_STR-CS102xxx.dgn

STATE ROAD RELOCATION OVERALL SITE PLAN BID OPTION 3STR CS101145870_STR-CS101xxx.dgn

INSTRUMENTATION DETAILSSTR CI503145870_STR-CI503xxx.dgn

INSTRUMENTATION DETAILSSTR CI502145870_STR-CI502xxx.dgn

INSTRUMENTATION DETAILSSTR CI501145870_STR-CI501xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 3)STR CI107145870_STR-CI107xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 3)STR CI106145870_STR-CI106xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 3)STR CI105145870_STR-CI105xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 3)STR CI104145870_STR-CI104xxx.dgn

INSTRUMENTATION PLAN (BID OPTION 3)STR CI103145870_STR-CI103xxx.dgn

OVERALL INSTRUMENTATION PLAN BID OPTION 3STR CI101145870_STR-CI101xxx.dgn

STATE ROAD RELOCATION DEMOLITION PLAN (BID OPTION 3)STR CD107145870_STR-CD107xxx.dgn

STATE ROAD RELOCATION DEMOLITION PLAN (BID OPTION 3)STR CD106145870_STR-CD106xxx.dgn

STATE ROAD RELOCATION DEMOLITION PLAN (BID OPTION 3)STR CD105145870_STR-CD105xxx.dgn

STATE ROAD RELOCATION DEMOLITION PLAN (BID OPTION 3)STR CD104145870_STR-CD104xxx.dgn

STATE ROAD RELOCATION DEMOLITION PLAN (BID OPTION 3)STR CD103145870_STR-CD103xxx.dgn

STATE ROAD RELOCATION OVERALL DEMOLITION PLAN BID OPTION 3STR CD101145870_STR-CD101xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL DETAILSSTR GC502145870_STR-GC502xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL DETAILSSTR GC501145870_STR-GC501xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL PLAN (BID OPTION 3)STR GC107145870_STR-GC107xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL PLAN (BID OPTION 3)STR GC106145870_STR-GC106xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL PLAN (BID OPTION 3)STR GC105145870_STR-GC105xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL PLAN (BID OPTION 3)STR GC104145870_STR-GC104xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL PLAN (BID OPTION 3)STR GC103145870_STR-GC103xxx.dgn

STATE ROAD RELOCATION EROSION CONTROL PLAN (BID OPTION 3)STR GC102145870_STR-GC102xxx.dgn

OVERALL STATE ROAD RELOCATION EROSION CONTROL PLAN BID OPTION 3STR GC101145870_STR-GC101xxx.dgn

STATE ROAD RELOCATION (STR)

REFERENCE DRAWING EMERGENCY BULKHEADRF140145870_CTW-RF140xxx.dgn

REFERENCE DRAWING DEMOLISHED WATER TOWERRF139145870_CTW-RF139xxx.dgn

REFERENCE DRAWING HISTORIC GROUTING POST CONSTRUCTIONRF138145870_CTW-RF138xxx.dgn

REFERENCE DRAWING HISTORIC GROUTING POST CONSTRUCTIONRF137145870_CTW-RF137xxx.dgn

REFERENCE DRAWING HISTORIC GROUTING DURING CONSTRUCTIONRF136145870_CTW-RF136xxx.dgn

REFERENCE DRAWING HISTORIC GROUTING DURING CONSTRUCTIONRF135145870_CTW-RF135xxx.dgn

REFERENCE DRAWING RIGHT ABUTMENT SPECIAL TREATMENT ZONERF134145870_CTW-RF134xxx.dgn

REFERENCE DRAWING RIGHT ABUTMENT SPECIAL TREATMENT ZONERF133145870_CTW-RF133xxx.dgn

SCHEDULES AND DIAGRAMSSTR ET E-601145870_STR-ET E-601xxx.RVT

ELECTRICAL DETAILSSTR ET E-501145870_STR-ET E-501xxx.RVT

EXISTING TOWER LIGHTING AND POWER PLANSSTR ET E-102145870_STR-ET E-102xxx.RVT

EXISTING TOWER ELECTRICAL DEMO PLANSSTR ET E-101145870_STR-ET E-101xxx.RVT

STATE ROAD RELOCATION PAVEMENT MARKING DETAILSSTR CM502145870_STR-CM502xxx.DGN

STATE ROAD RELOCATION PAVEMENT MARKING DETAILSSTR CM501145870_STR-CM501xxx.DGN

STATE ROAD RELOCATION PAVEMENT MARKING PLAN (BID OPTION 3)STR CM107145870_STR-CM107xxx.dgn

STATE ROAD RELOCATION PAVEMENT MARKING PLAN (BID OPTION 3)STR CM106145870_STR-CM106xxx.dgn

STATE ROAD RELOCATION PAVEMENT MARKING PLAN (BID OPTION 3)STR CM105145870_STR-CM105xxx.dgn

STATE ROAD RELOCATION PAVEMENT MARKING PLAN (BID OPTION 3)STR CM104145870_STR-CM104xxx.dgn

STATE ROAD RELOCATION PAVEMENT MARKING PLAN (BID OPTION 3)STR CM103145870_STR-CM103xxx.dgn

STATE ROAD RELOCATION PAVEMENT MARKING PLAN (BID OPTION 3)STR CM102145870_STR-CM102xxx.dgn

STATE ROAD RELOCATION OVERALL PAVEMENT MARKING PLAN BID OPTION 3STR CM101145870_STR-CM101xxx.dgn

STATE ROAD RELOCATION PAVEMENT DETAILSSTR CP501145870_STR-CP501xxx.DGN

STATE ROAD RELOCATION PAVEMENT PLAN (BID OPTION 3)STR CP107145870_STR-CP107xxx.dgn

STATE ROAD RELOCATION PAVEMENT PLAN (BID OPTION 3)STR CP106145870_STR-CP106xxx.dgn

STATE ROAD RELOCATION PAVEMENT PLAN (BID OPTION 3)STR CP105145870_STR-CP105xxx.dgn

STATE ROAD RELOCATION PAVEMENT PLAN (BID OPTION 3)STR CP104145870_STR-CP104xxx.dgn

STATE ROAD RELOCATION PAVEMENT PLAN (BID OPTION 3)STR CP103145870_STR-CP103xxx.dgn

STATE ROAD RELOCATION OVERALL PAVEMENT PLAN BID OPTION 3STR CP101145870_STR-CP101xxx.dgn

PARAPET WALL CLOSURE STOP LOG DETAILSSTR CG508145870_STR-CG508xxx.RVT

FILE NAME

SHEET

REF DESCRIPTION FILE NAME

SHEET

REF DESCRIPTION FILE NAME

SHEET

REF DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S S

H

IF

F L

E T

T

N O

V E

M B

E R

E X

O F

D R

A W

IN

G

S

V O

L U

M

R T

IF

IE

D F

IN

GI004

A

L L

S O

F R

O U

G H

K

E N

T U

C K

Y

R O

U G

H R

IV

E

R D

A M

D A

M S

A F

E T

Y M

O D

IF

IC

A T

IO

N

P H

A S

E I

I

P

B D

O R

S C

H

B S

A Y

L O

R

R H

A R

R

IS

A N

S

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

INDEX OF DRAWINGS - VOLUME 3

R E

V

IS

E D

S H

E E

T T

IT

L

E S

T O

C L

A R

IF

Y

B

ID

O P

T

IO

N S

A1

W

2Q R

R

_C

ER

T_ Fi na l_

V1 A_

O

TW

_P la ns -0

P

G

AT

E

G

AT

EGAT

E

O A K

6' CHAIN LINK

6' CHAIN LIN

K

4' CHAIN LINK

4' CHAIN LINK

C

H A

IN

L

K

T

E P

E D

IS

T R

IA

N

GATE

MANUAL

GATE

MANUAL

6' CHAIN LINK

6' CHAIN LIN

K

4' CHAIN LINK

4' CHAIN LINK

C

H A

IN

L

K

T

E P

E D

IS

T R

IA

N

GATE

MANUAL

GATE

MANUAL

C H

A

IN

L

IN

K

WW

W

C B

C B

C B

C B

TE

NNIS

COURTS

TE

NNIS

COURTS

" C

M P

18" CMP

E

LE

V .4

E

.7

N

.5

U S G S

445 445

0 4

455 455

5 455

460 460

460 460

460 4

465 465

470 470

480 480

485 485

490 490

0 490

495 495

495 4

500 50

500 500

5 5

510 510

510 510

515 515

520 520

525 525

530 530

535 535

540 540 54

545 545

545 54

550 550

555 555

570 570

WW

W

C B

C B

C B

C B

TE

NNIS

COURTS

TE

NNIS

COURTS

" C

M P

18" CMP

445 445

0 4

5 455

460 460

460 460

460 4

465 465

470 470

480 480

485 485

490 490

0 490

495 495

495 4

500 50

5 5

510 510

510 510

515 515

520 520

525 525

530 530

535 535

540 540 54

545 545

545 54

555 555

570 570

COFFERDAM

TOWER EXCAVATION

H

IG

H W

A Y

ROUGH RIVER

RESERVOIR

D A

M

D A

M

H

IG

H W

A Y

ROUGH RIVER

RESERVOIR

GENERAL SHEET NOTES

LEGEND

CONTRACTOR WORK LIMITS

WINTER POOL ELEV. = 470

RESTRICTED SUMMER POOL ELEV. = 490

NORMAL SUMMER POOL ELEV. = 495

7. ROUGH RIVER RESERVOIR -

OTW CG502 THRU CG508.

REFER TO EXCAVATION PLAN SHEETS

6. FOR ADDITIONAL PHASING OF EXCAVATIONS,

SHEETS CS101, AND CS104 THRU CS107.

5. FOR WORK PLATFORM (BID OPTION 2), SEE CTW

PROTECTION.

EXISTING CHANNEL, AND LINED WITH SLOPE

CHANNEL SHALL BE EXCAVATED, CONNECTED TO

TUNNEL, NEW STILLING BASIN) THE NEW RETREAT

TO TESTING NEW OUTLET WORKS (NEW TOWER,

STILLING BASIN ARE BEING CONSTRUCTED. PRIOR

THE EXISTING CHANNEL WHILE THE TUNNEL AND

PHASED BY THE CONTRACTOR TO FIRST MAINTAIN

4. THE RETREAT CHANNEL EXCAVATION SHALL BE

AND THE EXISTING RETREAT CHANNEL FILLED.

BEFORE THE EXISTING CONDUIT CAN BE ABANDONED,

CHANNEL MUST BE APPROVED AS OPERATIONAL

3. THE NEW TOWER, TUNNEL, AND NEW RETREAT

01 11 00 SUMMARY OF WORK.

CONSTRUCTION SEQUENCING, SEE SPECIFICATION

2. FOR ADDITIONAL REQUIREMENTS REGARDING

ARE CONCEPTUAL.

SEQUENCING, ETC. SHOWN ON SHEET GI009

AND PROJECT SCHEDULE. THE EXCAVATION PLANS,

SEQUENCING, EXCAVATION AND SPOIL PLANNING,

1. CONTRACTOR IS RESPONSIBLE FOR PROJECT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S S

H

IF

F L

E T

T

N O

V E

M B

E R

X

C A

V A

T

IO

N S

E Q

U E

N C

R T

IF

IE

D F

IN

A

L

OTW

GI009

F A

L L

S O

F R

O U

G H

K

E N

T U

C K

Y

R O

U G

H R

IV

E

R D

A M

D A

M S

A F

E T

Y M

O D

IF

IC

A T

IO

N

P H

A S

E I

I

P

B D

O R

S C

H

B S

A Y

L O

R

R H

A R

R

IS

A N

S

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

C1 1"=200'

C5 1"=200' 400'0 200'400'0 200'

4 4

W O

R K

P L

A T

F O

R M

W O

R K

P L

A T

F O

R M

CONCEPTUAL UPLAND SPOIL PLANNING (SEE CONCEPTUAL SPOIL PLAN OTW GS104 THRU GS106

INITIAL OUTLET WORKS CONSTRUCTION FURTHERING OUTLET WORKS CONSTRUCTION

2 3

ABUTMENT SEPARATE FROM SPOILS AND OTHER TOPSOIL TO BE REUSED ON SITE.

TOPSOIL MAY BE STOCKPILED IN THE STAGING AREAS OR ON THE DOWNSTREAM DAM SOUTH

MUST BE RETURNED TO THE DAM SURFACE ONCE THE WORK PLATFORM IS REMOVED. DAM

4. TOPSOIL STRIPPED FROM THE DOWNSTREAM DAM FACE FOR WORK PLATFORM CONSTRUCTION

FOR FINISHED GRADING AROUND TOWER AND SPOIL AREA CAPPING.

3. TOPSOIL FROM TOWER AND ENTRANCE CHANNEL EXCAVATION MAY BE STOCKPILED

SPOIL STOCKPILES.

2. TOPSOIL SHALL REMAIN SEPARATED FROM SPOIL MATERIAL IN STOCKPILES DISTANT FROM

FOR DISPOSAL AREA REQUIREMENTS.

ACCEPTANCE IN ACCORDANCE WITH SPECIFICATION 31 23 05.00 06 MASS EXCAVATION

1. THE CONTRACTOR SHALL SUBMIT A MASS EXCAVATION ANS SPOILS PLAN FOR USACE 5. TOPSOIL FROM EXIT CHANNEL EXCAVATION MAY BE STOCKPILED FOR FINISHED

GRADING AROUND STILLING BASIN AND SPOIL AREA CAPPING.

6. PROCESSED SANDSTONE AND LIMESTONE FROM THE STILLING BASIN AND CONTROL TOWER

EXCAVATION MAY BE UTILIZED FOR WORK PLATFORM (BID OPTION 2), TOWER BRIDGE APPROACH, ETC.

7. EXCESS SPOIL TO BE DIVERTED TO THE "UPLAND SPOIL AREA".

8. TUNNEL EXCAVATION SPOIL AND RETREAT CHANNEL SPOIL MAY BE PLACED IN

"OLD CAMPGROUND SPOIL AREA" AND "UPLAND SPOIL AREA".

9. WORK PLATFORM REMOVAL SPOIL MAY BE PLACED IN THE "EXISTING CHANNEL

FILL SPOIL AREA" AND "UPLAND SPOIL AREA".

10. THE "UPLAND SPOIL AREA" SHALL HAVE 3 FEET OF SOIL IN ADDITION TO THE TOPSOIL

STRIPPED ACROSS THE ENTIRE AREA TO BE STORED FOR SOIL COVER ATOP THE

"UPLAND DISPOSAL AREA" ONCE SPOIL OPERATIONS ARE COMPLETE.

INTERSECTION SHALL BE INSTALLED PRIOR TO NEW OUTLET WORK RELEASES.

4. RETREAT CHANNEL LINING WITH EXCEPTION OF AREA AT EXISTING CHANNEL

ELEVATION IS BELOW ELEVATION 490.0.

3. UNDERWATER BLASTING (BID OPTION 1) CAN ONLY OCCUR WHEN THE RESERVOIR POOL

2. DREDGING FOR THE APPROACH CHANNEL CAN OCCUR AT ANY TIME.

TIMES FOR LAKE OPERATIONS.

NOTES: 1. ACCESS TO EXISTING STILLING BASIN SHALL BE MAINTAINED AT ALL

COFFERDAM REMOVAL.

RETREAT CHANNEL; SEE SHEETS OTW CG507 AND CG508.

CONSTRUCT ENTRANCE CHANNEL, STILLING BASIN,

AND CG509 THRU OTW CG511.

CONSTRUCT TUNNEL, SEE SHEETS OTW CG505, CG506,

CONSTRUCTION - SEE C1 THIS SHEET.

CONTINUE TOWER EXCAVATION (BASE BID) AND WORK PLATFORM (BID OPTION 2),

EXCAVATION CAN CROSS THE DAM CENTERLINE.

2. THE EMERGENCY BULKHEADS MUST BE INSTALLED BEFORE THE TUNNEL

BUT SHALL BE IN PLACE AND TEMPORARILY SECURED.

TOWER GATES HAVE BEEN INSTALLED. GATES MAY NOT BE OPERATIONAL,

NEW TOWER IS CONSTRUCTED ABOVE ELEVATION 525 AND THE NEW

NOTES: 1. THE UPSTREAM COFFERDAM SHALL NOT BE REMOVED UNTIL THE

CONSTRUCT WORK PLATFORM (BID OPTION 2), SEE CTW PLANS.

TUNNEL ACCESS RAMP PLANS.

INITIAL EXCAVATION FOR TUNNEL ACCESS, SEE SHEET OTW GS119 FOR

WALL, AND TOWER EXCAVATION GROUT CURTAIN.

CONSTRUCT UPSTREAM COFFERDAM, DOWNSTREAM SHEETPILE

INITIAL EXCAVATION FOR TOWER CONSTUCTION, SEE SHEET OTW GS101.

NORTH

PLAN

NORTH

PLAN

R E

V

IS

IO

N

S I

N A

C C

O R

D A

N C

E W

IT

H

A M

D T

W

2Q R

R

_C

ER

T_ Fi na l_

V1 A_

O

TW

_P la ns -0

SIGNAGE

SIGNS DURING CONSTRUCTION.

3. ALL EXISTING SPEED LIMIT SIGNS SHALL BE CHANGED TO 25 MPH POSTED

LOCATION, SO AS TO MAINTAIN 25 MPH SPEED LIMIT.

IF NECESSARY, THE 25 MPH SIGNS MAY BE MOVED TO A COMPARABLE, VISIBLE

IN PLACE AND VISIBLE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .