W912QR25R0016_CERT_Final_Specs-0005.pdf

PDF 2 MB Posted

Attached to
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
Solicitation number
W912QR25R0016
Issued by

About this file

This is an Amendment 0005 to a Federal contract solicitation for the Rough River Dam Safety Modification Phase II project located in Falls of Rough, Kentucky. The U.S. Army Corps of Engineers Louisville District is seeking a contractor to complete a comprehensive dam safety modification involving new outlet works and a concrete cutoff wall construction. The project requires full and open competition with a HUBZone 10% price evaluation, and all large businesses must submit a subcontracting plan.

Key technical specifications include constructing a continuous concrete cutoff wall between dam stations 9+00 to 25+40, with a minimum 24-inch width and various specified depths. The contractor will be responsible for complex excavation methods, concrete placement, verification drilling, permeability testing, and abandonment of the existing outlet works. The solicitation requires detailed technical submittals, including work plans, construction methods, and comprehensive documentation. Quotes are due on March 20, 2025, at 10:00 AM Eastern Standard Time, with the contract to be awarded as a firm-fixed price. All contractors must be registered in the System for Award Management (SAM) prior to submission, and the project is classified under NAICS code 237990.

View the file

Other files

File Type Posted
W912QR25R0016_CERT_Final__Plans-0009.pdf PDF
W912QR25R0016_CERT_Final_Specs-0009.pdf PDF
W912QR25R0016_CERT_Final_V1A_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_V1B_OTW_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0008.pdf PDF
W912QR25R0016_CERT_Final__V3_CTWSTR_Plans-0008.pdf PDF
W912QR25R0016_CERT_Final_Specs-0007.pdf PDF
W912QR25R0016-0006.pdf PDF
W912QR25R0016_CERT_Final_Plans-0005.pdf PDF
W912QR25R0016_CERT_Final_EnviroAssess-0005.pdf PDF
W912QR25R0016_CERT_Final_Plans-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0004.pdf PDF
W912QR25R0016_CERT_Final_Specs-0003.pdf PDF
W912QR25R0016_CERT_Final_Vol5_ MFR_ConcreteMatTest-0003.pdf PDF
W912QR25R0016_CERT_Final_Plans-0003.pdf PDF
Site Visit Sign In Sheet.docx DOCX document
W912QR25R0016_CERT_Final_Specs-0002.pdf PDF
Virtual Registration.pdf PDF
W912QR25R0016_CERT_Final_Specs-0001.pdf PDF
W912QR25R0016 0001.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_18of20_E2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_20of28_D1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_9of20_C2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_3of9_2B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_15of28_B1-0000.pdf PDF
W912QR25R0016_CERT_Final_V4c_Specs-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_13of16_F-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_14of16_G-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_7of16_B5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_1of20-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_10of20_C3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_16of16_I-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_1of16-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_3of28_A2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGBR_MainReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_10bof16_C2b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_19of20_E3-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1941_GeoReport-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillGroutCCR_8of9_4C-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_4of16_B2-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_ PH1B_DrillFMCR_2of20_A-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol6_1953_DesignMemo1-0000.pdf PDF
W912QR25R0016_CERT_Final_Vol5_TunnelGDR_1of28_MainReport-0000.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: ADYSON MEDLEY

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0016

X 9B. DATED (SEE ITEM 11)

20-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0005

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE DATE

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912QR

FACILITY CODECODE

EMAIL:TEL:

9-APR-2025

W912QR25R0016_CERT_Final_Specs-0005

W912QR25R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005 CHANGES

Solicitation W912QR25R0016 for Rough River Dam Modification is hereby amended with the following changes:

1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

01 52 13.30 08 LABORATORY TESTING FACILITIES

03 00 00 GENERAL CONCRETE REQUIREMENTS

03 30 00 CAST IN PLACE CONCRETE OUTLET WORKS

31 56 10.00 06 CUTOFF WALL CONSTRUCTION

2. The following PLANS have been revised and replaced in their entirety:

OTW_BR S-101 SERVICE BRIDGE DECK AND SUPERSTRUCTURE PLAN

OTW_BR S-401 SERVICE BRIDGE FRAMING AND CONNECTIONS

OTW_BR S-601 SERVICE BRIDGE MISCELLANEOUS DETAILS

3. The following DOCUMENT has been added for requested information:

Environmental Assessment or Rough River Lake Dam Rehabilitation

(End of Summary of Changes)

SECTION 01 52 13.30 08 Page 1

AMENDMENT 0005

CERTIFIED FINAL

P2#: 145870 Rough River Falls of Rough, KY Dam Safety Mod Phase II

SECTION 01 52 13.30 08

PART 1 GENERAL

LABORATORY TESTING FACILITIES

08/24

1.1 GENERAL REQUIREMENTS

A mobile laboratory testing facility is required to be established by the Contractor for both the Contractor and the Government to perform Quality Control and Quality Assurance testing. The Contractor is required to provide two separate laboratories and core storage space for each mobile working lab. Core storage space may be in the same facility provided there are designated areas with proper signage. The Quality Control (QC) laboratory will be for the exclusive use of the Contractor to perform required testing. The Quality Assurance (QA) laboratory will be for the exclusive use of the Government. The Contractor shall provide all labor, equipment, calibrations, materials, fees, and coordination required for the complete set up of two fully functional mobile laboratories, to include provisions for necessary field testing. The USACE is responsible for the costs associated with ERDC validation of the QA Laboratory. Corrections of deficiencies found in the lab by the ERDC team are the responsibility of the Contractor. The testing facility shall be completed, validated, approved and ready for operations at least 30 calendar days prior to the start of work requiring on-site testing. Approval of the lab is subject to ERDC validation and the Contracting Officer. To the greatest extent possible, validation of the Government QA lab will be coordinated by the Contractor in tandem with the efforts for the QC lab. The laboratory shall be in compliance with ASTM C1077/C1077M and validated in accordance with ER 1110-1-261 for the specific grout and concrete tests required in Sections 03 00 00 GENERAL CONCRETE REQUIREMENTS, 03 30 00 CAST-IN PLACE

CONCRETE FOR OUTLET WORKS, 03 37 13 SHOTCRETE, 03 37 29 CONCRETE FOR

CUTOFF WALL, 03 70 00 MASS CONCRETE, 31 00 00.00 06 EARTHWORK,

31 32 23.00 06 SLURRY CONTROL DRILLING AND GROUTING , 31 56 10.00 08 CUTOFF

WALL CONSTRUCTION, 31 68 13 ROCK SLOPE REINFORCEMENT,31 71 16.00 06 ROCK

TUNNELING, 31 73 00 TUNNEL GROUTING, 32 11 10 AGGREGATE SUBBASE

CONSTRUCTION, 32 11 16.16 KYTC CRUSHED STONE BASE CONSTRUCTION, 35 73 13

EMBANKMENT FOR EARTH AND ROCKFILL DAMS,and 35 42 37.00 06 RIP RAP STONE PROTECTION. Evidence of successful Laboratory Validation shall be submitted to the Contracting Officer for approval. The Contractor shall compile and maintain all laboratory manuals in accordance with ASTM C1077/C1077M (Section 9) and USACE validation procedures for the on site laboratory. All documentation for the Government QA laboratory will be provided in draft form for final editing and submission to the USACE validation office by the Government. The Contractor shall permit/accommodate Government access to the Contractor's facility to observe Quality Control testing as requested.

The Contractor shall furnish all laboratory equipment and field testing equipment required for the specified testing. All testing laboratories must be validated by the USACE Material Testing Center (MTC) for the tests to be performed. Information on the USACE MTC with web-links to both a list of validated testing laboratories and for the laboratory inspection request for can be found at: https://mtc.erdc.dren.mil/. All testing performed either at the mobile laboratory or at an independent, contracted commercial, and/or off site laboratory must meet validation requirements

SECTION 01 52 13.30 08 Page 2 for each of the specific test required. This is not a blanket approval for all testing, only specific testing. All laboratories and testing must be in compliance with ASTM C1077/C1077M and validated for the specific tests to be performed in accordance with ER 1110-1-261. All laboratories must be approved by the Contracting Officer. A breakdown of field and laboratory testing is shown in Table 1. The table includes specific test references and testing requirements include tests related to that test standard.

Testing requirements include all tests and reports associated with the cited standards.

1.2 MEASUREMENT AND PAYMENT

1.2.1 Complete and Fully Functioning Mobile Laboratory

All incidental costs associated with the performance of work in this section are included in the contract price. The Contractor must provide all aspects for a complete, fully functioning mobile laboratory. All lab testing facilities and equipment are incidental to this item. The Government will make no additional separate payment for items included herein or by reference. Specific tests and testing frequencies are contained and paid for under the specifications and items that the tests apply to under the appropriate bid items pertinent to those activities. The location for the laboratory is indicated on the Volume 1 Plans.

1.2.1 Unit of Measure

Lump Sum: JOB

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 135 (2022) Standard Method of Test for

Wetting-and-Drying Test of Compacted Soil-Cement Mixtures

AASHTO T 136 (2022) Standard Method of Test for

Freezing-and-Thawing Tests of Compacted

AASHTO T 180 (2022) Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop

AMERICAN PETROLEUM INSTITUTE (API)

API RP 13B-1 (2019; Errata 1: 2020; Errata 2: 2021;

Errata 3: 2023) Recommended Practice for Field Testing Water-Based Drilling Fluids

ASTM INTERNATIONAL (ASTM)

SECTION 01 52 13.30 08 Page 3

ASTM C1064/C1064M (2023) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete

ASTM C1077/C1077M (2024) Standard Practice for Agencies

Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C1116/C1116M (2023) Standard Specification for

Fiber-Reinforced Concrete

ASTM C109/C109M (2023) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)

ASTM C117/C117M (2023) Standard Test Method for Materials

Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing

ASTM C123/C123M (2023) Standard Test Method for

Lightweight Particles in Aggregate

ASTM C1240/C1240M (2020) Standard Specification for Silica Fume Used in Cementitious Mixtures

ASTM C127/C127M (2024) Standard Test Method for Relative

Density (Specific Gravity), and Absorption of Coarse Aggregate

ASTM C128/C128M (2022) Standard Test Method for Relative of Fine Aggregate

ASTM C131/C131M (2020) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM C136/C136M (2019) Standard Test Method for Sieve

Analysis of Fine and Coarse Aggregates

ASTM C138/C138M (2023) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete

ASTM C142/C142M (2017; R 2023) Standard Test Method for

Clay Lumps and Friable Particles in Aggregates

ASTM C143/C143M (2020) Standard Test Method for Slump of

ASTM C150/C150M (2022) Standard Specification for Portland Cement

SECTION 01 52 13.30 08 Page 4

ASTM C1567/C1567M (2023) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2022) Standard Specification for Mixing

Water Used in Production of Hydraulic Cement Concrete

ASTM C1611/C1611M (2021) Standard Test Method for Slump Flow of Self-Consolidating Concrete

ASTM C191/C191M (2021) Standard Test Method for Time of Setting of Hydraulic Cement by Vicat Needle

ASTM C192/C192M (2019) Standard Practice for Making and

Curing Concrete Test Specimens in the Laboratory

ASTM C231/C231M (2024) Standard Test Method for Air

Content of Freshly Mixed Concrete by the Pressure Method

ASTM C232/C232M (2021) Standard Test Method for Bleeding of Concrete

ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C266/C266M (2021) Standard Test Method for Time of

Setting of Hydraulic-Cement Paste by Gilmore Needles

ASTM C295/C295M (2019) Standard Guide for Petrographic

Examination of Aggregates for Concrete

ASTM C25/C25M (2019) Standard Test Method for Chemical Analysis of Limestone, Quicklime, and Hydrated Lime

ASTM C29/C29M (2023) Standard Test Method for Bulk

Density ("Unit Weight") and Voids in Aggregate

ASTM C31/C31M (2024) Standard Practice for Making and

Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2023) Standard Specification for Concrete

ASTM C39/C39M (2023) Standard Test Method for

Compressive Strength of Cylindrical Concrete Specimens

ASTM C40/C40M (2020) Standard Test Method for Organic

Impurities in Fine Aggregates for Concrete

SECTION 01 52 13.30 08 Page 5

ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C50/C50M (2013; R 2019) Sampling, Sample

Preparation, Packaging, and Marking of Lime and Limestone Products

ASTM C78/C78M (2022) Standard Test Method for Flexural

Strength of Concrete (Using Simple Beam with Third-Point Loading)

ASTM C403/C403M (2023) Standard Test Method for Time of

Setting of Concrete Mixtures by Penetration Resistance

ASTM C494/C494M (2019; E 2022) Standard Specification for

Chemical Admixtures for Concrete

ASTM C511/C511M (2021) Standard Specification for Mixing Rooms, Moist Cabinets, Moist Rooms, and Water Storage Tanks Used in the Testing of Hydraulic Cements and Concretes

ASTM C535/C535M (2016) Standard Test Method for Resistance to Degradation of Large-Size Coarse

ASTM C566/C566M (2019) Standard Test Method for Total

Evaporable Moisture Content of Aggregate by Drying

ASTM C617/C617M (2023) Standard Practice for Capping

Cylindrical Concrete Specimens

ASTM C618/C618M (2023; E 2023) Standard Specification for Coal Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C666/C666M (2015) Standard Test Method for Resistance of Concrete to Rapid Freezing and Thawing

ASTM C70/C70M (2020) Standard Test Method for Surface Moisture in Fine Aggregate

ASTM C87/C87M (2023) Standard Test Method for Effect of

Organic Impurities in Fine Aggregate on Strength of Mortar

ASTM C88/C88M (2024) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate

ASTM C94/C94M (2023) Standard Specification for

Ready-Mixed Concrete

SECTION 01 52 13.30 08 Page 6

ASTM C685/C685M (2017) Standard Specification for Concrete Made by Volumetric Batching and Continuous Mixing

ASTM C702/C702M (2018) Standard Practice for Reducing

Samples of Aggregate to Testing Size

ASTM C937/C937M (2023) Grout Fluidifier for Preplaced-Aggregate Concrete

ASTM C938/C938M (2019) Proportioning Grout Mixtures for

Preplaced-Aggregate Concrete

ASTM C939/C939M (2022) Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method)

ASTM C940 (2022) Standard Test Method for Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory

ASTM C977/C977M (2018) Quicklime and Hydrated Lime for

Soil Stabilization

ASTM C979/C979M (2016) Standard Specification for Pigments for Integrally Colored Concrete

ASTM C989/C989M (2024) Standard Specification for Slag

Cement for Use in Concrete and Mortars

ASTM C1141/C1141M (2015) Standard Specification for Admixtures for Shotcrete

ASTM C1385/C1385M (2010; R 2017) Standard Practice for

Sampling Materials for Shotcrete

ASTM C1436/C1436M (2013) Standard Specification for Materials for Shotcrete

ASTM C1140/C1140M (2011; R 2019) Standard Practice for

Preparing and Testing Specimens from Shotcrete Test Panels

ASTM C1260 (2023) Standard Test Method for Potential

Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C1583/C1583M (2020) Standard Test Method for Tensile

Strength of Concrete Surfaces and the Bond Strength or Tensile Strength of Concrete Repair and Overlay Materials by Direct Tension (Pull-off Method)

ASTM C1604/C1604M (2005; R 2019) Standard Test Method for

Obtaining and Testing Drilled Cores of Shotcrete

SECTION 01 52 13.30 08 Page 7

ASTM C1609/C1609M (2024) Standard Test Method for Flexural Performance of Fiber-Reinforced Concrete (Using Beam with Third-Point Landing)

ASTM D1556/D1556M (2015; E 2016) Standard Test Method for

Density and Unit Weight of Soil in Place by the Sand-Cone Method

ASTM D1557/D1557M (2012; R 2021) Standard Test Methods for

Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D1632/D1632M (2017; E 2020) Making and Curing

Soil-Cement Compression and Flexure Test Specimens in the Laboratory

ASTM D2167/D2167M (2015) Density and Unit Weight of Soil in

Place by the Rubber Balloon Method

ASTM D2216/D2216M (2019) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass

ASTM D2487/D2487M (2017; E 2020) Standard Practice for

Classification of Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D2937/D2937M (2017; E 2017; E 2018) Standard Test

Method for Density of Soil in Place by the Drive-Cylinder Method

ASTM D75/D75M (2019) Standard Practice for Sampling

ASTM D1140/D1140M (2011; R 2019) Standard Practice for Preparing and Testing Specimens from

SECTION 01 52 13.30 08 Page 8

Shotcrete Test Panels

ASTM D3551/D3551M (2017) Laboratory Preparation of Soil-Lime Mixtures Using a Mechanical Mixer

ASTM D3740/D3740M (2023) Minimum Requirements for Agencies

Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM D4318/D4318M (2017; E 2018) Standard Test Methods for

Liquid Limit, Plastic Limit, and Plasticity Index of Soils

ASTM D4380/D4380M (2020) Standard Test Method for

Determining Density of Bentonitic Slurries

ASTM D4381/D4381M (2022) Standard Test Method for Sand Content by Volume of Bentonitic Slurries

ASTM D4253/D4253M (2016; E 2019) Standard Test Methods for

Maximum Index Density and Unit Weight of Soils Using a Vibratory Table

ASTM D4254/D4254M (2016) Standard Test Methods for Minimum

Index Density and Unit Weight of Soils and Calculation of Relative Density

ASTM D4643/D4643M (2017) Standard Test Method for

Determination of Water Content of Soil and Rock by Microwave Oven Heating

ASTM D4718/D4718M (2015; R 2023) Standard Practice for

Correction of Unit Weight and Water Content for Soils Containing Oversize Particles

ASTM D4791 (2019; R 2023) Standard Test Method for

Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse

ASTM D4802/D4802M (2016) Standard Specification for

Poly(Methyl Methacrylate) Acrylic Plastic Sheet

ASTM D4992/D4992M (2022)Standard Practice for Evaluation of

Rock to be Used for Erosion Control

ASTM D5084/D5084M (2016) Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter

ASTM D5102/D5102M (2024) Standard Test Method for Unconfined

Compressive Strength of Compacted Soil-Lime Mixtures

SECTION 01 52 13.30 08 Page 9

ASTM D5312/D5312M (2021) Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions

ASTM D5313/D5313M (2021) Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

ASTM D5519/D5519M (2015) Particle Size Analysis of Natural and Man-Made Riprap Materials

ASTM D6473/D6473M (2024) Standard Test Method For Specific Gravity And Absorption of Rock For Erosion Control

ASTM D6910/D6910M (2019) Standard Test Method for Marsh

Funnel Viscosity of Construction Slurries

ASTM D6938/D6938M (2023) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

ASTM D6913/D6913M (2017) Standard Test Methods for

Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis

ASTM D7928/D7928M (2017) Standard Test Method for

Particle-Size Distribution (Gradation) of Fine-Grained Soils Using the Sedimentation (Hydrometer) Analysis

ASTM D698/D698M (2021) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

ASTM D559/D559M (2015) Wetting and Drying Compacted

ASTM D560/D560M (2016) Freezing and Thawing Compacted

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 104 (1980) Method of Calculation of the Fineness Modulus of Aggregate

COE CRD-C 112 (1969) Method of Test for Surface Moisture in Aggregate by Water Displacement

COE CRD-C 114 (1997) Test Method for Soundness of Aggregates by Freezing and Thawing of

SECTION 01 52 13.30 08 Page 10

COE CRD-C 120 (1994) Test Method for Flat and Elongated Particles in Fine Aggregate

COE CRD-C 143 (1962) Specification for Meters for Automatic Indication of Moisture in Fine Aggregate

COE CRD-C 61 (1989) Test Method for Determining the Resistance of Freshly Mixed Concrete to Washing Out in Water

COE CRD-C 661 (2006) Specification for Antiwashout Admixtures for Concrete

EM 385-1-1 (2024) Safety and Occupational (SOH) Health Requirements

ER 1110-1-261 (1999) Engineering and Design - Quality

Assurance of Laboratory Testing Procedures

1.4 LABORATORY CAPABILITIES

The laboratory shall meet testing requirements of the specifications, applicable standards, the Contractor's approved means and methods or any other applicable requirement for facilities required herein.

1.5 SUBMITTALS

Government approval/acceptance by the Resident Office (RO) is required for submittals with a "G" designation; submittals not having a "G" designation are for information only (FIO) or as otherwise designated. When used, a designation following the "G" designation identifies an additional office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Mobile Testing Facility; G,DO Laboratory Equipment; G, DO Manufacturer's descriptive data shall be submitted for the testing facilities building and all office, laboratory and computer equipment.

Field Testing Equipment; G, DO

SD-02 Shop Drawings

Mobile Testing Facility Plan; G, DO

SD-07 Certificates

Laboratory Validation; G Validations shall be submitted for the on-site laboratory and all off-site laboratories to be used during the course of work.

1.6 MOBILE TESTING FACILITY PLAN

The Contractor shall submit detail drawings showing the layout of the

SECTION 01 52 13.30 08 Page 11 mobile testing facility including location of testing equipment, sample storage, core storage and core layout areas for the mobile lab and storage areas. All mechanical and electrical equipment, and the location of all utility connections for electric and water service must be included. The plan shall be coordinated with and submitted as part of the STAGING AND AREA USE PLAN required under Section 01 35 00.00 08 SPECIAL PROCEDURES.

PART 2 PRODUCTS

2.1 MOBILE TESTING FACILITY

General Requirements:

The laboratory testing facilities are temporary. Testing equipment, curing tanks, and environmental conditions must be controlled within the mobile lab and support areas. Adequate heating and air conditioning shall be provided to control and maintain the required temperature for testing standards throughout the laboratory area. The Contractor must provide an aggregate surface parking area able to accommodate at least 10 vehicles at the mobile lab.

The following sections from SECTION 01 50 00 TEMPORARY CONSTRUCTION

FACILITIES AND CONTROLS are applicable to the Laboratory Facility:

a. The facility must comply with Paragraph BACKFLOW PREVENTERS.

b. The facility must comply with Paragraph CYBERSECURITY DURING

CONSTRUCTION.

c. The facility must comply with Paragraph TEMPORARY WIRING.

d. The facility must comply with Paragraph AVAILABILITY AND USE OF UTILITY

SERVICES.

e. The facility must comply with Paragraph TRAFFIC CONTROL.

f. The facility must comply with Paragraph PLANT COMMUNICATIONS.

g. The facility must comply with Paragraph DUMPSTERS.

Requirements for Laboratory Testing Areas:

The laboratory testing areas and mobile facilities must be large enough to accommodate laboratory testing equipment and testing preparation areas, sample storage, curing room/tanks, core storage and layout areas, sufficient counter/work bench space to accommodate up to six (6) QA/QC technicians working concurrently on separate tests. A minimum area of 400 square feet shall be provided for the testing equipment, testing preparation, and curing tanks/room for each respective QC and QA space.

Dedicated QA lab space shall be secured with a locking door with restricted access. This area shall only be accessible to Government and QA personnel.

At minimum, the Contractor shall provide and install the following equipment for the Laboratory Office Areas:

Laboratory Storage Area:

The contractor must provide, at minimum, 2,500 sf for QC/QA rock core and concrete core storage in a temporary facility. Aggregate floors are

SECTION 01 52 13.30 08 Page 12 acceptable provided the facility is graded to drain and the floor is maintained flat without rutting, potholes, or erosion rills. The storage space must have adequate room to fit a forklift to expedite unloading pallets. The pallets and contents shall be protected from damage at all times during storage, loading/unloading, and during transport. The Contractor shall be responsible for obtaining the use of a suitable forklift or pallet jack for transport and placement of the pallets at no cost to the Government. The area where core is stored shall be sized such that core boxes can be stacked on wooden pallets. At all times, core boxes shall be stacked such that all side labels are upright and visible from isles. Full pallets shall not be stacked over 2 pallets high with a maximum of 20 core boxes per pallet. A shared hand truck, or pallet jack, should be designated in the space for use by either QA/AC to transport, relocate, or assist in the laying out of core boxes. The Contractor shall store core sample boxes at the temporary facility for the duration of field work.

Additional areas may be provided in the immediate area. The Contractor is responsible for keeping the storage facility organized and safe.

2.2 UTILITIES

Utility service installation shall be coordinated with the owning utility company as specified in Section 00 80 00.00 06 SPECIAL PROVISIONS. The Contractor shall be responsible for providing all utility services and water necessary for the operation of the testing facility. All cost for such provisions shall be borne by the Contractor as long as the facility is in use. The Contractor shall procure and pay for all necessary permits that are required in conjunction with proposed utilities.

PART 3 EXECUTION

3.1 LABORATORY TESTING FACILITY CAPABILITIES

All testing laboratories must be validated by the USACE Material Testing Center (MTC) for the tests to be performed. Information for the USACE laboratory inspection request for can be found at:

https://mtc.erdc.dren.mil/. The Contractor shall perform all required maintenance and repairs for both the QA and QC laboratory equipment including providing required calibrations from the time of delivery and installation until contract completion or final acceptance of the contract work, whichever is later. Maintenance, repairs, and calibrations shall be performed to maintain the equipment in good working order and in accordance with the manufacturer's recommendations or the appropriate testing standard (i.e. ASTM, AASHTO, etc.), whichever is the most stringent. The equipment will remain the property of the Contractor until contract completion. Upon contract completion or final acceptance of the contract work, whichever is later, all Contractor-furnished lab equipment will be returned to the Contractor. The official transfer will be documented on DD Form 1354 and signed by both the Contractor and the Contracting Officer's Representative.

3.2 LABORATORY TESTING REQUIREMENTS

TABLE 1 - LABORATORY TESTING REQUIREMENTS

TESTING TO BE PERFORMED ON-SITE TESTING TO BE PERFORMED ON- OR

OFF-SITE

SECTION 01 52 13.30 08 Page 13

SECTION 03 00 00 GENERAL CONCRETE REQUIREMENTS

TESTING TO BE PERFORMED ON-SITE TESTING TO BE PERFORMED ON- OR

OFF-SITE

PRODUCTION TESTING:

ASTM C117/C117M, ASTM C136/C136M,

ASTM C566/C566M, ASTM D4791,

COE CRD-C 104, COE CRD-C 112,

COE CRD-C 143

MATERIAL APPROVAL AND QC TESTING:

ASTM C33/C33M, ASTM C40/C40M,

ASTM C70/C70M, ASTM C87/C87M,

ASTM C88/C88M, ASTM C117/C117M,

ASTM C123/C123M, ASTM C127/C127M,

ASTM C128/C128M, ASTM C131/C131M,

ASTM C136/C136M, ASTM C142/C142M,

ASTM C150/C150M, ASTM C260/C260M,

ASTM C295/C295M, ASTM C494/C494M,

ASTM C535/C535M, ASTM C566/C566M,

ASTM C618/C618M, ASTM C666/C666M,

ASTM C989/C989M, ASTM C1240/C1240M,

ASTM C1260, ASTM C1567/C1567M,

ASTM C1602/C1602M, ASTM D4791,

COE CRD-C 104, COE CRD-C 114,

COE CRD-C 61

MIXTURE PROPORTIONING:

ASTM C39/C39M, ASTM C138/C138M,

ASTM C143/C143M, ASTM C231/C231M,

ASTM C1064/C1064M, ASTM C666/C666M,

ASTM C1567/C1567M

Any other related testing

SECTION 03 30 00 CAST-IN-PLACE CONCRETE

PRODUCTION TESTING:

ASTM C39/C39M, ASTM C42/C42M,

ASTM C231/C231M, ASTM C138/C138M,

ASTM C143/C143M,

ASTM C1064/C1064M

MATERIALS APPROVAL:

See 03 00 00 General Concrete Requirements

Requirements

SECTION 03 37 13 SHOTCRETE

SECTION 01 52 13.30 08 Page 14

OFF-SITE

PRODUCTION TESTING:

ASTM C78/C78M, ASTM C231/C231M,

ASTM C1064/C1064M,

ASTM C1140/C1140M,

ASTM C1385/C1385M,

ASTM C1583/C1583M,

ASTM C1604/C1604M,

ASTM C1609/C1609M

MATERIALS APPROVAL AND QC TESTING:

ASTM C33/C33M, ASTM C127/C127M,

ASTM C128/C128M, ASTM C266/C266M,

ASTM C494/C494M, ASTM C1141/C1141M,

ASTM C1436/C1436M, ASTM C1567/C1567M

ASTM C94/C94M, ASTM C231/C231M,

ASTM C685/C685M, ASTM C1116/C1116M

SECTION 03 37 29 CONCRETE FOR CUTOFF WALL

PRODUCTION TESTING:

ASTM C39/C39M, ASTM C117/C117M,

ASTM C136/C136M, ASTM C138/C138M,

ASTM C143/C143M, ASTM C231/C231M,

ASTM C232/C232M, ASTM C403/C403M,

ASTM C617/C617M,

ASTM C1064/C1064M,

ASTM C1611/C1611M

COE CRD-C 61, COE CRD-C 104

MATERIAL APPROVAL AND QC TESTING:

ASTM C33/C33M, ASTM C87/C87M,

ASTM C88/C88M, ASTM C117/C117M,

ASTM C123/C123M, ASTM C127/C127M,

ASTM C128/C128M, ASTM C131/C131M,

ASTM C136/C136M, ASTM C142/C142M,

ASTM C150/C150M, ASTM C260/C260M,

ASTM C295/C295M, ASTM C494/C494M,

ASTM C618/C618M, ASTM C979/C979M,

ASTM C989/C989M, ASTM C1240/C1240M,

ASTM C1602/C1602M, ASTM D4791,

COE CRD-C 104, COE CRD-C 61

ASTM C39/C39M, ASTM C138/C138M,

ASTM C143/C143M, ASTM C231/C231M,

ASTM C232/C232M, ASTM C403/C403M,

ASTM C1064/C1064M, ASTM C1567/C1567M,

ASTM C1611/C1611M

COE CRD-C 661

Any other related testing

SECTION 03 70 00 MASS CONCRETE

PRODUCTION TESTING:

ASTM C39/C39M, ASTM C231/C231M,

ASTM C143/C143M,

ASTM C1064/C1064M

MATERIALS APPROVAL:

SECTION 01 52 13.30 08 Page 15

SECTION 31 00 00.00 06 EARTHWORK

TESTING TO BE PERFORMED ON-SITE TESTING TO BE PERFORMED ON- OR

OFF-SITE

PRODUCTION TESTING:

ASTM D698/D698M, AASHTO T 180,

ASTM D1556/D1556M,

ASTM D1557/D1557M,

ASTM D2216/D2216M,

ASTM D6938/D6938M, ASTM C25/C25M,

ASTM C50/C50M, ASTM D2487/D2487M,

ASTM D3551/D3551M,

ASTM D5102/D5102M,

ASTM D4254/D4254M,

MATERIAL APPROVAL AND QC TESTING

ASTM C88/C88M, ASTM C535/C535M,

ASTM D7928/D7928M, ASTM D6913/D6913M,

ASTM D698/D698M, ASTM C977/C977M,

ASTM D4718/D4718M, ASTM D5519/D5519M,

ASTM D6938/D6938M

SECTION 31 32 23.00 06 SLURRY CONTROL DRILLING AND GROUTING

PRODUCTIONS TESTING:

API RP 13B-1

ASTM C39/C39M, ASTM C109/C109M,

ASTM C191/C191M, ASTM C938/C938M,

ASTM C939/C939M, ASTM C940,

ASTM D4380/D4380M,

ASTM D6910/D6910M,

COE CRD-C 61

MATERIAL APPROVAL AND QC

TESTING:<BRK/><BRK/>ASTM C87/C87M,

ASTM C117/C117M, ASTM C123/C123M,

ASTM C128/C128M, ASTM C136/C136M,

ASTM C142/C142M, ASTM C150/C150M,

ASTM C494/C494M, ASTM C618/C618M,

ASTM C937/C937M, ASTM C1240/C1240M,

ASTM C1602/C1602M<BRK/>COE CRD-C 120,

COE CRD-C 661

<BRK/><BRK/><BRK/>MIXTURE

PROPORTIONING:<BRK/><BRK/>

API RP 13B-1<BRK/>ASTM C39/C39M,

ASTM C109/C109M, ASTM C191/C191M,

ASTM C938/C938M, ASTM C939/C939M,

ASTM C940, ASTM D4380/D4380M,

ASTM D6910/D6910M<BRK/>COE CRD-C 61

SECTION 31 56 10.00 08 CUTOFF WALL CONSTRUCTION

PRODUCTION TESTING:

API RP 13B-1

ASTM C39/C39M, ASTM C109/C109M,

ASTM C403/C403M,

ASTM D4380/D4380M,

ASTM D4381/D4381M

MATERIAL APPROVAL AND QC TESTING:

ASTM C39/C39M, ASTM C109/C109M

SECTION 32 11 16.16 KYTC CRUSHED STONE BASE CONSTRUCTION

PRODUCTION TESTING:

ASTM D1556/D1556M,

ASTM D2167/D2167M,

ASTM D6938/D6938M

MATERIAL APPROVAL AND QC TESTING:

ASTM C117/C117M, ASTM C136/C136M,

ASTM D698/D698M, ASTM

D6938/D6938M

SECTION 35 42 37.00 06 RIP RAP STONE PROTECTION

SECTION 01 52 13.30 08 Page 16

OFF-SITE

PRODUCTION TESTING: MATERIAL APPROVAL AND QC TESTING:

ASTM D5519/D5519M ASTM C295/C295M, ASTM D4791,

ASTM D4992/D4992M, ASTM D5312/D5312M,

ASTM D5313/D5313M, ASTM D5519/D5519M,

ASTM D6473/D6473M

Amendment 0005*************************************************************************

3.3 REQUIRED LABORATORY TESTING EQUIPMENT

At minimum, the required equipment to be provided for each lab shall meet the laboratory and specific lab test validation requirements as well as the applicable testing standard. Additional equipment meeting the capabilities detailed in Table 1 are also required:

EQUIPMENT DESCRIPTION ASTM APPLICATION QUANTITY

Electronic (Floor) Scale, 30"x30" w/ramp 500lb capacity

ASTM

ASTM

D75/D75M, C702/C702M

Three-Cell Permeability Test System

ASTM D5084/D5084M 1

Electronic Scale, 2100g, d=10mg ASTM

ASTM

ASTM

D4318/D4318M, D1140/D1140M, C70/C70M

Electronic Scale, 32000g, d=.1g ASTM

ASTM

ASTM

ASTM

ASTM

ASTM

ASTM

ASTM

C136/C136M, C117/C117M, C566/C566M, C702/C702M D1140/D1140M, D1557/D1557M D1556/D1556M, C70/C70M, COE CRD-C 61

Drying Oven (Air Circulating) ASTM

ASTM

ASTM

ASTM

ASTM

ASTM

ASTM

ASTM

C142/C142M C136/C136M, C117/C117M, C566/C566M, C702/C702M D1140/D1140M, D1557/D1557M, D1556/D1556M

Drying Oven (Convection) ASTM

ASTM

ASTM

ASTM

ASTM

D6913/D6913M, D7928/D7928M, C70/C70M, C136/C136M, D4318/D4318M

SECTION 01 52 13.30 08 Page 17 w/ramp 500lb capacity

ASTM

ASTM

D75/D75M, C702/C702M

Sample Splitter, Lg. Capacity, Floor Model

ASTM

ASTM

D4802/D4802M, C136/C136M

Material Catch Pan for Lg.

Capacity Splitter

ASTM

ASTM

D4802/D4802M, C136/C136M

Sample Splitter, Table Model ASTM

ASTM

D4802/D4802M, C136/C136M

Testing Sieve Shaker ASTM C136/C136M 1

Dustpan Tray ASTM C136/C136M 1

Testing Sieve Shaker, RoTap ASTM C136/C136M 1

Compression Testing Machine

- Upper Bearing Block Assy, 6"

ASTM C39/C39M 1

Cylinder Capping Alignment Device ASTM C617/C617M 1

Cylinder Capping Plate ASTM C617/C617M 1

Cut-Off Saw, masonry (Mason-Mite

II)

ASTM C39/C39M 1

Grout Cube Mold Assy. ASTM C109/C109M 2

Grout Cube Mold Assy. w/Cover Plate

ASTM C109/C109M 2

Cube Mold Cover Plate (Sulfur Mortar Cubes)

ASTM C617/C617M 1

Cube Mold Tamper ASTM C109/C109M 1

Concrete Air Meter, Pressure Type B

ASTM C231/C231M 2

Curing Tank, 8ft length, 300gal ASTM

ASTM

C511/C511M, C192/C192M

Heater for curing tank, 110V ASTM

ASTM

C511/C511M, C192/C192M

Curing Tank Circulator Pump, 110V ASTM

ASTM

C511/C511M, C192/C192M

Curing Tank Data Logger ASTM

ASTM

C511/C511M, C192/C192M

Field Curing Chest, storage/Transport

ASTM C31/C31M 1

Unit Weight Container, 0.1 CF ASTM

ASTM

C29/C29M, C138/C138M

Unit Weight Container, 0.5 CF ASTM

ASTM

C29/C29M, C138/C138M

Unit Weight Container, 1.0 ASTM

ASTM

C29/C29M, C138/C138M

Liquid Limits Device ASTM D4318/D4318M 1

Grooving Tool (Liquid Limits), Plastic, ASTM D4318/D4318M 1

SECTION 01 52 13.30 08 Page 18

Electronic (Floor) Scale, 30"x30" ASTM D75/D75M, 1 w/ramp ASTM C702/C702M 500lb capacity

Plastic Limits Glass Plate ASTM D4318/D4318M 1

Comparator Rod ASTM D4318/D4318M 1

Wet Sieve, 2" (18" dia.) ASTM C231/C231M 2

Wet Sieve, 1-1/2" (18" dia.) ASTM C143/C143M 2

Hand Sieve, 3" (8" dia.) ASTM C136/C136M 2

Hand Sieve, 2" (8" dia.) ASTM C136/C136M 2

Hand Sieve, 1-1/2" (8" dia.) ASTM C136/C136M 2

Hand Sieve, 1" (8" dia.) ASTM C136/C136M 2

Hand Sieve, 3/4" (8" dia.) ASTM C136/C136M 2

Hand Sieve, 1/2" (8" dia.) ASTM C136/C136M 2

Hand Sieve, 3/8" (8" dia.) ASTM C136/C136M 2

Test Sieve, No. 4 ASTM C136/C136M 2

Test Sieve, No. 8 ASTM C136/C136M 2

Test Sieve, No. 10 ASTM C136/C136M 2

Test Sieve, No. 16 ASTM C136/C136M 2

Test Sieve, No. 20 ASTM C136/C136M 2

Test Sieve, No. 30 ASTM C136/C136M 2

Test Sieve, No. 40 ASTM C136/C136M 2

Test Sieve, No. 50 ASTM C136/C136M 2

Test Sieve, No. 60 ASTM C136/C136M 2

Test Sieve, No. 70 ASTM C136/C136M 2

Test Sieve, No. 80 ASTM C136/C136M 2

Test Sieve, No. 100 ASTM C136/C136M 2

Test Sieve, No. 200 ASTM C136/C136M 2

Test Sieve, No. 200 (Deep), ASTM D1140/D1140M, 2 reinforced ASTM C117/C117M screen

Test Sieve, Gilson, 3” ASTM C136/C136M 2

Test Sieve, Gilson, 2” ASTM C136/C136M 2

Test Sieve, Gilson, 1-1/2” ASTM C136/C136M 2

Test Sieve, Gilson, 1” ASTM C136/C136M 2

Test Sieve, Gilson, 3/4” ASTM C136/C136M 2

SECTION 01 52 13.30 08 Page 19 w/ramp 500lb capacity

ASTM D75/D75M,

ASTM C702/C702M

Test Sieve, Gilson, 1/2” ASTM C136/C136M 2

Test Sieve, Gilson, 3/8” ASTM C136/C136M 2

Test Sieve, Gilson, No. 4” ASTM C136/C136M 2

Test Sieve, Gilson, No. 8” ASTM C136/C136M 2

Proportional Caliper Device ASTM D4791 2

Organic Impurities Test Bottle w/ Lid (set)

ASTM C40/C40M 1

Flow Table, motorized w/ counter ASTM C87/C87M 1

Los Angles Abrasion Machine ASTM C535/C535M, ASTM C131/C131M, Gilmore Needle Apparatus ASTM C150/C150M 2

Freeze Thaw Cabinet ASTM C666/C666M, COE CRD-C 114

2 Gang Prism Mold, 2 X 2 X 10 inches

ASTM C1260 2

Length Comparator ASTM C1260 1

Water Bath ASTM D6913/D6913M, ASTM D7928/D7928M, ASTM C1260, ASTM C1567/C1567M, Washout Tube COE CRD-C 61 1

Receiving Container COE CRD-C 61 2

Concrete Vibrator -150 Hz minimum

ASTM C138/C138M 1

Slump Cone (steel) w/ base plate ASTM C1611/C1611M, ASTM C143/C143M, Penetrometer ASTM C403/C403M 1

Compound Melting Pot ASTM C617/C617M 1

Soil Density Mold Set, 4 inch AASHTO T 180, ASTM D698/D698M, ASTM D1557/D1557M, Soil Density Mold Set, 6 inch AASHTO T 180, ASTM D698/D698M, ASTM D1557/D1557M, Automatic Mechanical Compactor AASHTO T 180, ASTM D698/D698M, ASTM D1557/D1557M, SECTION 01 52 13.30 08 Page 20 w/ramp 500lb capacity

ASTM D75/D75M,

ASTM C702/C702M

Sample Ejector ASTM D1557/D1557M 1

Soil Dispersion Mixer ASTM D6913/D6913M, ASTM D7928/D7928M

Sterescopic Microscope COE CRD-C 120 1

Standard Vicat Apparatus ASTM C191/C191M 1

Grout Flow Cone Set ASTM C939/C939M 1

Marsh Funnel ASTM D6910/D6910M 2

Mud Balance ASTM D4380/D4380M 1

*************************************************************************Amendment 0005

3.4 REMOVAL OF LABORATORY TESTING EQUIPMENT

At the completion of the contract, the Contractor shall remove any laboratory testing equipment, storage areas, and mobile labs.

-- End of Section --

SECTION 03 00 00 Page 1

SECTION 03 00 00

GENERAL CONCRETE REQUIREMENTS

6/24

PART 1 GENERAL

This specification addresses general concrete and materials requirements that are applicable to multiple concrete specifications within the Contract. This includes but is not limited to references, submittals, quality control personnel, preconstruction testing and approvals, mixture proportioning, trial batching, batch plant requirements for set-up, testing, and operation, etc. Additional requirements for concrete mixes and various concrete placements are included in related sections as defined below. Where conflicts between specifications arise the requirements of this specification shall govern. Specifications listed below reference the requirements in this specification unless specifically indicated herein.

Related Sections

03 30 00 CAST-IN-PLACE CONCRETE FOR OUTLET WORKS

03 15 00 BRIDGE CONCRETE ACCESSORIES

03 37 13 SHOTCRETE

03 37 29 CONCRETE FOR CUTOFF WALL

03 70 00 MASS CONCRETE

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

31 60 00.00 06 FOUNDATION PREPARATION

31 68 13 ROCK SLOPE REINFORCEMENT AND PERMANENT ROCKFALL PROTECTION

Note that for specification 03 37 13 SHOTCRETE only the requirements for fine aggregate and ASR apply from this specification. All other requirements for shotcrete are specific to that specification.

Permanent concrete requires a dedicated batch plant. The Contractor shall not bring alternative materials to the batch plant for the purpose of producing temporary concrete simultaneous to permanent concrete production. All materials stored and permanent concrete produced at the on-site batch plant shall meet the material requirements contained herein. During periods where permanent concrete is not being produced, temporary concrete may be batched at the on-site batch plant but any temporary materials must be fully separated, contained, and fully removed prior to subsequent permanent concrete placements. The Contractor may elect to use ready-mix concrete for temporary concrete and shall be subject to the requirements of Paragraph

TEMPORARY CONCRETE.

Concrete for cutoff walls requirements for mixture proportioning, placement, and other special previsions are included in Specification

03 37 29 CONCRETE FOR CUTOFF WALL.

All other provisions of this specification apply unless otherwise noted.

1.1 SPECIAL COORDINATION

Careful coordination by the Contractor is required to ensure no blast occurs immediately after fresh concrete has been placed and that the concrete elements have set to be sufficiently considered "Green Concrete", SECTION 03 00 00 Page 2 minimum strength of at least 1,000 psi. The Contractor shall ensure that any scheduled blasting is adjusted sufficiently for the placement and curing schedule with the blasting design adjusted accordingly based on the strength and age of the concrete to prevent damage to the newly placed elements. The Contractor is responsible for any associated costs verifying concrete strength, adjusting blast designs, or executing test blasts to demonstrate a proposed blast will not damage green concrete. Requirements for blasting near green concrete are in the following specifications.

31 23 17.00 06 UNDERWATER BLASTING

31 23 18.00 06 SURFACE BLASTING

1.2 UNIT PRICES

1.2.1 MASS CONCRETE: MIX 1 (LOWER CONTROL TOWER)

This mix is designed for mass concrete placements required for the lower control tower construction. Mass Concrete shall be protected by monolithically placed facing concrete for each lift placed during production in all instances.

1.2.1.1 Payment

section are included in the contract price for mass concrete. Payment will be made to include all labor, equipment, materials and supplies for completing the mass concrete as shown on the contract drawings and as specified. The mass concrete shall meet the requirements of Section 03 00 00 GENERAL CONCRETE REQUIREMENTS as well as 03 70 00 MASS CONCRETE. These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, coal ash, ground granulated blast furnace slag (GGBFS), mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, miscellaneous metals, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No payment will be made for concrete wasted or not otherwise placed during production. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, will be made and these costs shall be incidental to concrete construction.

1.2.1.2 Measurement

Concrete will be measured for payment based upon the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the excavation or surface to be constructed. No measurement will be made of concrete placed outside the tolerances specified for the excavation unless otherwise approved by the Contracting Officer. No deductions shall be made for rounded or beveled edges, space occupied by metal work, electrical conduits or reinforcing steel, nor voids or embedded items that are either less than five (5) cubic feet in volume

SECTION 03 00 00 Page 3 or one (1) square foot in cross section.

1.2.1.3 Unit of Measure

Unit of measure: cubic meters yards.

1.2.2 FACING CONCRETE: MIX 2 (LOWER CONTROL TOWER)

This mix is designed to be both pumpable and resistant to abrasion and cavitation caused by fast flowing water. Facing Concrete for the Stilling Basin can be the same mix as for the Tunnel Liner if concrete in the stilling basin is placed via pump. For Measurement and Payment the tunnel liner and stilling basin facing concrete will be tracked separately.

1.2.2.1 Payment

section are included in the contract price for facing concrete in the lower control tower. Payment will be made to include all labor, equipment, materials and supplies for completing the tunnel liner and all incidentals as shown on the contract drawings and as specified. Payment will be made to include all labor, equipment, materials and supplies for completing facing concrete as shown on the contract drawings and as specified. The facing concrete shall meet the requirements of Section 03 00 00 GENERAL CONCRETE REQUIREMENTS as well as 03 30 00 CAST-IN-PLACE CONCRETE FOR OUTLET WORKS.

These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, coal ash, ground granulated blast furnace slag (GGBFS), silica fume, mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, will be made and these costs shall be incidental to concrete construction. No payment will be made for concrete wasted or not otherwise placed during production.

1.2.2.2 Measurement

Pay lines for tunnel liner are based on the neat lines of the structures as shown on the drawings. Concrete will be measured for payment based upon the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the excavation or surface to be constructed.

No measurement will be made of concrete placed outside the tolerances specified for the excavation unless otherwise approved by the Contracting Officer. No deductions shall be made for rounded or beveled edges, space occupied by metal work, electrical conduits or reinforcing steel, nor voids

1.2.2.3 Unit of Measure

SECTION 03 00 00 Page 4

1.2.3 FACING CONCRETE: MIX 2A (STILLING BASIN AND TUNNEL LINER)

This mix is designed to be resistant to abrasion and cavitation caused by fast flowing water and is required for the stilling basin and apron structures. Stilling basin facing concrete is not required to be placed via pumping. For Measurement and Payment the tunnel liner and stilling basin facing concrete will be tracked separately.

1.2.3.1 Payment

section are included in the contract price designated for facing concrete in the stilling basin and for the tunnel liner. Payment will be made to include all labor, equipment, materials and supplies for completing the stilling basin and apron as shown on the contract drawings and as specified. Payment will be made to include all labor, equipment, materials and supplies for completing the structural concrete, including incidental items, as shown on the contract drawings and as specified. The facing concrete shall meet the requirements of Section 03 00 00 GENERAL CONCRETE as well as 03 30 00 CAST-IN-PLACE CONCRETE FOR OUTLET WORKS. These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, coal ash, ground granulated blast furnace slag (GGBFS), silica fume, mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, will be made and these costs shall be incidental to concrete construction. No payment will be made for concrete wasted or not otherwise placed during production.

1.2.3.2 Measurement

Pay lines for stilling basin are based on the neat lines of the structures as shown on the drawings. Concrete will be measured for payment based upon the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the excavation or surface to be constructed.

No measurement will be made of concrete placed outside…