W912QR25R0016_CERT_Final_Specs-0005.pdf
PDF 2 MB Posted
- Solicitation number
- W912QR25R0016
About this file
This is an Amendment 0005 to a Federal contract solicitation for the Rough River Dam Safety Modification Phase II project located in Falls of Rough, Kentucky. The U.S. Army Corps of Engineers Louisville District is seeking a contractor to complete a comprehensive dam safety modification involving new outlet works and a concrete cutoff wall construction. The project requires full and open competition with a HUBZone 10% price evaluation, and all large businesses must submit a subcontracting plan.
Key technical specifications include constructing a continuous concrete cutoff wall between dam stations 9+00 to 25+40, with a minimum 24-inch width and various specified depths. The contractor will be responsible for complex excavation methods, concrete placement, verification drilling, permeability testing, and abandonment of the existing outlet works. The solicitation requires detailed technical submittals, including work plans, construction methods, and comprehensive documentation. Quotes are due on March 20, 2025, at 10:00 AM Eastern Standard Time, with the contract to be awarded as a firm-fixed price. All contractors must be registered in the System for Award Management (SAM) prior to submission, and the project is classified under NAICS code 237990.
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: ADYSON MEDLEY
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0016
X 9B. DATED (SEE ITEM 11)
20-Dec-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0005
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912QR
FACILITY CODECODE
EMAIL:TEL:
9-APR-2025
W912QR25R0016_CERT_Final_Specs-0005
W912QR25R0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005 CHANGES
Solicitation W912QR25R0016 for Rough River Dam Modification is hereby amended with the following changes:
1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
01 52 13.30 08 LABORATORY TESTING FACILITIES
03 00 00 GENERAL CONCRETE REQUIREMENTS
03 30 00 CAST IN PLACE CONCRETE OUTLET WORKS
31 56 10.00 06 CUTOFF WALL CONSTRUCTION
2. The following PLANS have been revised and replaced in their entirety:
OTW_BR S-101 SERVICE BRIDGE DECK AND SUPERSTRUCTURE PLAN
OTW_BR S-401 SERVICE BRIDGE FRAMING AND CONNECTIONS
OTW_BR S-601 SERVICE BRIDGE MISCELLANEOUS DETAILS
3. The following DOCUMENT has been added for requested information:
Environmental Assessment or Rough River Lake Dam Rehabilitation
(End of Summary of Changes)
SECTION 01 52 13.30 08 Page 1
AMENDMENT 0005
CERTIFIED FINAL
P2#: 145870 Rough River Falls of Rough, KY Dam Safety Mod Phase II
SECTION 01 52 13.30 08
PART 1 GENERAL
LABORATORY TESTING FACILITIES
08/24
1.1 GENERAL REQUIREMENTS
A mobile laboratory testing facility is required to be established by the Contractor for both the Contractor and the Government to perform Quality Control and Quality Assurance testing. The Contractor is required to provide two separate laboratories and core storage space for each mobile working lab. Core storage space may be in the same facility provided there are designated areas with proper signage. The Quality Control (QC) laboratory will be for the exclusive use of the Contractor to perform required testing. The Quality Assurance (QA) laboratory will be for the exclusive use of the Government. The Contractor shall provide all labor, equipment, calibrations, materials, fees, and coordination required for the complete set up of two fully functional mobile laboratories, to include provisions for necessary field testing. The USACE is responsible for the costs associated with ERDC validation of the QA Laboratory. Corrections of deficiencies found in the lab by the ERDC team are the responsibility of the Contractor. The testing facility shall be completed, validated, approved and ready for operations at least 30 calendar days prior to the start of work requiring on-site testing. Approval of the lab is subject to ERDC validation and the Contracting Officer. To the greatest extent possible, validation of the Government QA lab will be coordinated by the Contractor in tandem with the efforts for the QC lab. The laboratory shall be in compliance with ASTM C1077/C1077M and validated in accordance with ER 1110-1-261 for the specific grout and concrete tests required in Sections 03 00 00 GENERAL CONCRETE REQUIREMENTS, 03 30 00 CAST-IN PLACE
CONCRETE FOR OUTLET WORKS, 03 37 13 SHOTCRETE, 03 37 29 CONCRETE FOR
CUTOFF WALL, 03 70 00 MASS CONCRETE, 31 00 00.00 06 EARTHWORK,
31 32 23.00 06 SLURRY CONTROL DRILLING AND GROUTING , 31 56 10.00 08 CUTOFF
WALL CONSTRUCTION, 31 68 13 ROCK SLOPE REINFORCEMENT,31 71 16.00 06 ROCK
TUNNELING, 31 73 00 TUNNEL GROUTING, 32 11 10 AGGREGATE SUBBASE
CONSTRUCTION, 32 11 16.16 KYTC CRUSHED STONE BASE CONSTRUCTION, 35 73 13
EMBANKMENT FOR EARTH AND ROCKFILL DAMS,and 35 42 37.00 06 RIP RAP STONE PROTECTION. Evidence of successful Laboratory Validation shall be submitted to the Contracting Officer for approval. The Contractor shall compile and maintain all laboratory manuals in accordance with ASTM C1077/C1077M (Section 9) and USACE validation procedures for the on site laboratory. All documentation for the Government QA laboratory will be provided in draft form for final editing and submission to the USACE validation office by the Government. The Contractor shall permit/accommodate Government access to the Contractor's facility to observe Quality Control testing as requested.
The Contractor shall furnish all laboratory equipment and field testing equipment required for the specified testing. All testing laboratories must be validated by the USACE Material Testing Center (MTC) for the tests to be performed. Information on the USACE MTC with web-links to both a list of validated testing laboratories and for the laboratory inspection request for can be found at: https://mtc.erdc.dren.mil/. All testing performed either at the mobile laboratory or at an independent, contracted commercial, and/or off site laboratory must meet validation requirements
SECTION 01 52 13.30 08 Page 2 for each of the specific test required. This is not a blanket approval for all testing, only specific testing. All laboratories and testing must be in compliance with ASTM C1077/C1077M and validated for the specific tests to be performed in accordance with ER 1110-1-261. All laboratories must be approved by the Contracting Officer. A breakdown of field and laboratory testing is shown in Table 1. The table includes specific test references and testing requirements include tests related to that test standard.
Testing requirements include all tests and reports associated with the cited standards.
1.2 MEASUREMENT AND PAYMENT
1.2.1 Complete and Fully Functioning Mobile Laboratory
All incidental costs associated with the performance of work in this section are included in the contract price. The Contractor must provide all aspects for a complete, fully functioning mobile laboratory. All lab testing facilities and equipment are incidental to this item. The Government will make no additional separate payment for items included herein or by reference. Specific tests and testing frequencies are contained and paid for under the specifications and items that the tests apply to under the appropriate bid items pertinent to those activities. The location for the laboratory is indicated on the Volume 1 Plans.
1.2.1 Unit of Measure
Lump Sum: JOB
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 135 (2022) Standard Method of Test for
Wetting-and-Drying Test of Compacted Soil-Cement Mixtures
AASHTO T 136 (2022) Standard Method of Test for
Freezing-and-Thawing Tests of Compacted
AASHTO T 180 (2022) Moisture-Density Relations of Soils
Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop
AMERICAN PETROLEUM INSTITUTE (API)
API RP 13B-1 (2019; Errata 1: 2020; Errata 2: 2021;
Errata 3: 2023) Recommended Practice for Field Testing Water-Based Drilling Fluids
ASTM INTERNATIONAL (ASTM)
SECTION 01 52 13.30 08 Page 3
ASTM C1064/C1064M (2023) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C1077/C1077M (2024) Standard Practice for Agencies
Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1116/C1116M (2023) Standard Specification for
Fiber-Reinforced Concrete
ASTM C109/C109M (2023) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)
ASTM C117/C117M (2023) Standard Test Method for Materials
Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing
ASTM C123/C123M (2023) Standard Test Method for
Lightweight Particles in Aggregate
ASTM C1240/C1240M (2020) Standard Specification for Silica Fume Used in Cementitious Mixtures
ASTM C127/C127M (2024) Standard Test Method for Relative
Density (Specific Gravity), and Absorption of Coarse Aggregate
ASTM C128/C128M (2022) Standard Test Method for Relative of Fine Aggregate
ASTM C131/C131M (2020) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
ASTM C136/C136M (2019) Standard Test Method for Sieve
Analysis of Fine and Coarse Aggregates
ASTM C138/C138M (2023) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
ASTM C142/C142M (2017; R 2023) Standard Test Method for
Clay Lumps and Friable Particles in Aggregates
ASTM C143/C143M (2020) Standard Test Method for Slump of
ASTM C150/C150M (2022) Standard Specification for Portland Cement
SECTION 01 52 13.30 08 Page 4
ASTM C1567/C1567M (2023) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2022) Standard Specification for Mixing
Water Used in Production of Hydraulic Cement Concrete
ASTM C1611/C1611M (2021) Standard Test Method for Slump Flow of Self-Consolidating Concrete
ASTM C191/C191M (2021) Standard Test Method for Time of Setting of Hydraulic Cement by Vicat Needle
ASTM C192/C192M (2019) Standard Practice for Making and
Curing Concrete Test Specimens in the Laboratory
ASTM C231/C231M (2024) Standard Test Method for Air
Content of Freshly Mixed Concrete by the Pressure Method
ASTM C232/C232M (2021) Standard Test Method for Bleeding of Concrete
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C266/C266M (2021) Standard Test Method for Time of
Setting of Hydraulic-Cement Paste by Gilmore Needles
ASTM C295/C295M (2019) Standard Guide for Petrographic
Examination of Aggregates for Concrete
ASTM C25/C25M (2019) Standard Test Method for Chemical Analysis of Limestone, Quicklime, and Hydrated Lime
ASTM C29/C29M (2023) Standard Test Method for Bulk
Density ("Unit Weight") and Voids in Aggregate
ASTM C31/C31M (2024) Standard Practice for Making and
Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2023) Standard Specification for Concrete
ASTM C39/C39M (2023) Standard Test Method for
Compressive Strength of Cylindrical Concrete Specimens
ASTM C40/C40M (2020) Standard Test Method for Organic
Impurities in Fine Aggregates for Concrete
SECTION 01 52 13.30 08 Page 5
ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C50/C50M (2013; R 2019) Sampling, Sample
Preparation, Packaging, and Marking of Lime and Limestone Products
ASTM C78/C78M (2022) Standard Test Method for Flexural
Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C403/C403M (2023) Standard Test Method for Time of
Setting of Concrete Mixtures by Penetration Resistance
ASTM C494/C494M (2019; E 2022) Standard Specification for
Chemical Admixtures for Concrete
ASTM C511/C511M (2021) Standard Specification for Mixing Rooms, Moist Cabinets, Moist Rooms, and Water Storage Tanks Used in the Testing of Hydraulic Cements and Concretes
ASTM C535/C535M (2016) Standard Test Method for Resistance to Degradation of Large-Size Coarse
ASTM C566/C566M (2019) Standard Test Method for Total
Evaporable Moisture Content of Aggregate by Drying
ASTM C617/C617M (2023) Standard Practice for Capping
Cylindrical Concrete Specimens
ASTM C618/C618M (2023; E 2023) Standard Specification for Coal Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C666/C666M (2015) Standard Test Method for Resistance of Concrete to Rapid Freezing and Thawing
ASTM C70/C70M (2020) Standard Test Method for Surface Moisture in Fine Aggregate
ASTM C87/C87M (2023) Standard Test Method for Effect of
Organic Impurities in Fine Aggregate on Strength of Mortar
ASTM C88/C88M (2024) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
ASTM C94/C94M (2023) Standard Specification for
Ready-Mixed Concrete
SECTION 01 52 13.30 08 Page 6
ASTM C685/C685M (2017) Standard Specification for Concrete Made by Volumetric Batching and Continuous Mixing
ASTM C702/C702M (2018) Standard Practice for Reducing
Samples of Aggregate to Testing Size
ASTM C937/C937M (2023) Grout Fluidifier for Preplaced-Aggregate Concrete
ASTM C938/C938M (2019) Proportioning Grout Mixtures for
Preplaced-Aggregate Concrete
ASTM C939/C939M (2022) Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method)
ASTM C940 (2022) Standard Test Method for Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory
ASTM C977/C977M (2018) Quicklime and Hydrated Lime for
Soil Stabilization
ASTM C979/C979M (2016) Standard Specification for Pigments for Integrally Colored Concrete
ASTM C989/C989M (2024) Standard Specification for Slag
Cement for Use in Concrete and Mortars
ASTM C1141/C1141M (2015) Standard Specification for Admixtures for Shotcrete
ASTM C1385/C1385M (2010; R 2017) Standard Practice for
Sampling Materials for Shotcrete
ASTM C1436/C1436M (2013) Standard Specification for Materials for Shotcrete
ASTM C1140/C1140M (2011; R 2019) Standard Practice for
Preparing and Testing Specimens from Shotcrete Test Panels
ASTM C1260 (2023) Standard Test Method for Potential
Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C1583/C1583M (2020) Standard Test Method for Tensile
Strength of Concrete Surfaces and the Bond Strength or Tensile Strength of Concrete Repair and Overlay Materials by Direct Tension (Pull-off Method)
ASTM C1604/C1604M (2005; R 2019) Standard Test Method for
Obtaining and Testing Drilled Cores of Shotcrete
SECTION 01 52 13.30 08 Page 7
ASTM C1609/C1609M (2024) Standard Test Method for Flexural Performance of Fiber-Reinforced Concrete (Using Beam with Third-Point Landing)
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for
Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D1557/D1557M (2012; R 2021) Standard Test Methods for
Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D1632/D1632M (2017; E 2020) Making and Curing
Soil-Cement Compression and Flexure Test Specimens in the Laboratory
ASTM D2167/D2167M (2015) Density and Unit Weight of Soil in
Place by the Rubber Balloon Method
ASTM D2216/D2216M (2019) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
ASTM D2487/D2487M (2017; E 2020) Standard Practice for
Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D2937/D2937M (2017; E 2017; E 2018) Standard Test
Method for Density of Soil in Place by the Drive-Cylinder Method
ASTM D75/D75M (2019) Standard Practice for Sampling
ASTM D1140/D1140M (2011; R 2019) Standard Practice for Preparing and Testing Specimens from
SECTION 01 52 13.30 08 Page 8
Shotcrete Test Panels
ASTM D3551/D3551M (2017) Laboratory Preparation of Soil-Lime Mixtures Using a Mechanical Mixer
ASTM D3740/D3740M (2023) Minimum Requirements for Agencies
Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM D4318/D4318M (2017; E 2018) Standard Test Methods for
Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D4380/D4380M (2020) Standard Test Method for
Determining Density of Bentonitic Slurries
ASTM D4381/D4381M (2022) Standard Test Method for Sand Content by Volume of Bentonitic Slurries
ASTM D4253/D4253M (2016; E 2019) Standard Test Methods for
Maximum Index Density and Unit Weight of Soils Using a Vibratory Table
ASTM D4254/D4254M (2016) Standard Test Methods for Minimum
Index Density and Unit Weight of Soils and Calculation of Relative Density
ASTM D4643/D4643M (2017) Standard Test Method for
Determination of Water Content of Soil and Rock by Microwave Oven Heating
ASTM D4718/D4718M (2015; R 2023) Standard Practice for
Correction of Unit Weight and Water Content for Soils Containing Oversize Particles
ASTM D4791 (2019; R 2023) Standard Test Method for
Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse
ASTM D4802/D4802M (2016) Standard Specification for
Poly(Methyl Methacrylate) Acrylic Plastic Sheet
ASTM D4992/D4992M (2022)Standard Practice for Evaluation of
Rock to be Used for Erosion Control
ASTM D5084/D5084M (2016) Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter
ASTM D5102/D5102M (2024) Standard Test Method for Unconfined
Compressive Strength of Compacted Soil-Lime Mixtures
SECTION 01 52 13.30 08 Page 9
ASTM D5312/D5312M (2021) Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions
ASTM D5313/D5313M (2021) Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions
ASTM D5519/D5519M (2015) Particle Size Analysis of Natural and Man-Made Riprap Materials
ASTM D6473/D6473M (2024) Standard Test Method For Specific Gravity And Absorption of Rock For Erosion Control
ASTM D6910/D6910M (2019) Standard Test Method for Marsh
Funnel Viscosity of Construction Slurries
ASTM D6938/D6938M (2023) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D6913/D6913M (2017) Standard Test Methods for
Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis
ASTM D7928/D7928M (2017) Standard Test Method for
Particle-Size Distribution (Gradation) of Fine-Grained Soils Using the Sedimentation (Hydrometer) Analysis
ASTM D698/D698M (2021) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))
ASTM D559/D559M (2015) Wetting and Drying Compacted
ASTM D560/D560M (2016) Freezing and Thawing Compacted
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 104 (1980) Method of Calculation of the Fineness Modulus of Aggregate
COE CRD-C 112 (1969) Method of Test for Surface Moisture in Aggregate by Water Displacement
COE CRD-C 114 (1997) Test Method for Soundness of Aggregates by Freezing and Thawing of
SECTION 01 52 13.30 08 Page 10
COE CRD-C 120 (1994) Test Method for Flat and Elongated Particles in Fine Aggregate
COE CRD-C 143 (1962) Specification for Meters for Automatic Indication of Moisture in Fine Aggregate
COE CRD-C 61 (1989) Test Method for Determining the Resistance of Freshly Mixed Concrete to Washing Out in Water
COE CRD-C 661 (2006) Specification for Antiwashout Admixtures for Concrete
EM 385-1-1 (2024) Safety and Occupational (SOH) Health Requirements
ER 1110-1-261 (1999) Engineering and Design - Quality
Assurance of Laboratory Testing Procedures
1.4 LABORATORY CAPABILITIES
The laboratory shall meet testing requirements of the specifications, applicable standards, the Contractor's approved means and methods or any other applicable requirement for facilities required herein.
1.5 SUBMITTALS
Government approval/acceptance by the Resident Office (RO) is required for submittals with a "G" designation; submittals not having a "G" designation are for information only (FIO) or as otherwise designated. When used, a designation following the "G" designation identifies an additional office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Mobile Testing Facility; G,DO Laboratory Equipment; G, DO Manufacturer's descriptive data shall be submitted for the testing facilities building and all office, laboratory and computer equipment.
Field Testing Equipment; G, DO
SD-02 Shop Drawings
Mobile Testing Facility Plan; G, DO
SD-07 Certificates
Laboratory Validation; G Validations shall be submitted for the on-site laboratory and all off-site laboratories to be used during the course of work.
1.6 MOBILE TESTING FACILITY PLAN
The Contractor shall submit detail drawings showing the layout of the
SECTION 01 52 13.30 08 Page 11 mobile testing facility including location of testing equipment, sample storage, core storage and core layout areas for the mobile lab and storage areas. All mechanical and electrical equipment, and the location of all utility connections for electric and water service must be included. The plan shall be coordinated with and submitted as part of the STAGING AND AREA USE PLAN required under Section 01 35 00.00 08 SPECIAL PROCEDURES.
PART 2 PRODUCTS
2.1 MOBILE TESTING FACILITY
General Requirements:
The laboratory testing facilities are temporary. Testing equipment, curing tanks, and environmental conditions must be controlled within the mobile lab and support areas. Adequate heating and air conditioning shall be provided to control and maintain the required temperature for testing standards throughout the laboratory area. The Contractor must provide an aggregate surface parking area able to accommodate at least 10 vehicles at the mobile lab.
The following sections from SECTION 01 50 00 TEMPORARY CONSTRUCTION
FACILITIES AND CONTROLS are applicable to the Laboratory Facility:
a. The facility must comply with Paragraph BACKFLOW PREVENTERS.
b. The facility must comply with Paragraph CYBERSECURITY DURING
CONSTRUCTION.
c. The facility must comply with Paragraph TEMPORARY WIRING.
d. The facility must comply with Paragraph AVAILABILITY AND USE OF UTILITY
SERVICES.
e. The facility must comply with Paragraph TRAFFIC CONTROL.
f. The facility must comply with Paragraph PLANT COMMUNICATIONS.
g. The facility must comply with Paragraph DUMPSTERS.
Requirements for Laboratory Testing Areas:
The laboratory testing areas and mobile facilities must be large enough to accommodate laboratory testing equipment and testing preparation areas, sample storage, curing room/tanks, core storage and layout areas, sufficient counter/work bench space to accommodate up to six (6) QA/QC technicians working concurrently on separate tests. A minimum area of 400 square feet shall be provided for the testing equipment, testing preparation, and curing tanks/room for each respective QC and QA space.
Dedicated QA lab space shall be secured with a locking door with restricted access. This area shall only be accessible to Government and QA personnel.
At minimum, the Contractor shall provide and install the following equipment for the Laboratory Office Areas:
Laboratory Storage Area:
The contractor must provide, at minimum, 2,500 sf for QC/QA rock core and concrete core storage in a temporary facility. Aggregate floors are
SECTION 01 52 13.30 08 Page 12 acceptable provided the facility is graded to drain and the floor is maintained flat without rutting, potholes, or erosion rills. The storage space must have adequate room to fit a forklift to expedite unloading pallets. The pallets and contents shall be protected from damage at all times during storage, loading/unloading, and during transport. The Contractor shall be responsible for obtaining the use of a suitable forklift or pallet jack for transport and placement of the pallets at no cost to the Government. The area where core is stored shall be sized such that core boxes can be stacked on wooden pallets. At all times, core boxes shall be stacked such that all side labels are upright and visible from isles. Full pallets shall not be stacked over 2 pallets high with a maximum of 20 core boxes per pallet. A shared hand truck, or pallet jack, should be designated in the space for use by either QA/AC to transport, relocate, or assist in the laying out of core boxes. The Contractor shall store core sample boxes at the temporary facility for the duration of field work.
Additional areas may be provided in the immediate area. The Contractor is responsible for keeping the storage facility organized and safe.
2.2 UTILITIES
Utility service installation shall be coordinated with the owning utility company as specified in Section 00 80 00.00 06 SPECIAL PROVISIONS. The Contractor shall be responsible for providing all utility services and water necessary for the operation of the testing facility. All cost for such provisions shall be borne by the Contractor as long as the facility is in use. The Contractor shall procure and pay for all necessary permits that are required in conjunction with proposed utilities.
PART 3 EXECUTION
3.1 LABORATORY TESTING FACILITY CAPABILITIES
All testing laboratories must be validated by the USACE Material Testing Center (MTC) for the tests to be performed. Information for the USACE laboratory inspection request for can be found at:
https://mtc.erdc.dren.mil/. The Contractor shall perform all required maintenance and repairs for both the QA and QC laboratory equipment including providing required calibrations from the time of delivery and installation until contract completion or final acceptance of the contract work, whichever is later. Maintenance, repairs, and calibrations shall be performed to maintain the equipment in good working order and in accordance with the manufacturer's recommendations or the appropriate testing standard (i.e. ASTM, AASHTO, etc.), whichever is the most stringent. The equipment will remain the property of the Contractor until contract completion. Upon contract completion or final acceptance of the contract work, whichever is later, all Contractor-furnished lab equipment will be returned to the Contractor. The official transfer will be documented on DD Form 1354 and signed by both the Contractor and the Contracting Officer's Representative.
3.2 LABORATORY TESTING REQUIREMENTS
TABLE 1 - LABORATORY TESTING REQUIREMENTS
TESTING TO BE PERFORMED ON-SITE TESTING TO BE PERFORMED ON- OR
OFF-SITE
SECTION 01 52 13.30 08 Page 13
SECTION 03 00 00 GENERAL CONCRETE REQUIREMENTS
TESTING TO BE PERFORMED ON-SITE TESTING TO BE PERFORMED ON- OR
OFF-SITE
PRODUCTION TESTING:
ASTM C117/C117M, ASTM C136/C136M,
ASTM C566/C566M, ASTM D4791,
COE CRD-C 104, COE CRD-C 112,
COE CRD-C 143
MATERIAL APPROVAL AND QC TESTING:
ASTM C33/C33M, ASTM C40/C40M,
ASTM C70/C70M, ASTM C87/C87M,
ASTM C88/C88M, ASTM C117/C117M,
ASTM C123/C123M, ASTM C127/C127M,
ASTM C128/C128M, ASTM C131/C131M,
ASTM C136/C136M, ASTM C142/C142M,
ASTM C150/C150M, ASTM C260/C260M,
ASTM C295/C295M, ASTM C494/C494M,
ASTM C535/C535M, ASTM C566/C566M,
ASTM C618/C618M, ASTM C666/C666M,
ASTM C989/C989M, ASTM C1240/C1240M,
ASTM C1260, ASTM C1567/C1567M,
ASTM C1602/C1602M, ASTM D4791,
COE CRD-C 104, COE CRD-C 114,
COE CRD-C 61
MIXTURE PROPORTIONING:
ASTM C39/C39M, ASTM C138/C138M,
ASTM C143/C143M, ASTM C231/C231M,
ASTM C1064/C1064M, ASTM C666/C666M,
ASTM C1567/C1567M
Any other related testing
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
PRODUCTION TESTING:
ASTM C39/C39M, ASTM C42/C42M,
ASTM C231/C231M, ASTM C138/C138M,
ASTM C143/C143M,
ASTM C1064/C1064M
MATERIALS APPROVAL:
See 03 00 00 General Concrete Requirements
Requirements
SECTION 03 37 13 SHOTCRETE
SECTION 01 52 13.30 08 Page 14
OFF-SITE
PRODUCTION TESTING:
ASTM C78/C78M, ASTM C231/C231M,
ASTM C1064/C1064M,
ASTM C1140/C1140M,
ASTM C1385/C1385M,
ASTM C1583/C1583M,
ASTM C1604/C1604M,
ASTM C1609/C1609M
MATERIALS APPROVAL AND QC TESTING:
ASTM C33/C33M, ASTM C127/C127M,
ASTM C128/C128M, ASTM C266/C266M,
ASTM C494/C494M, ASTM C1141/C1141M,
ASTM C1436/C1436M, ASTM C1567/C1567M
ASTM C94/C94M, ASTM C231/C231M,
ASTM C685/C685M, ASTM C1116/C1116M
SECTION 03 37 29 CONCRETE FOR CUTOFF WALL
PRODUCTION TESTING:
ASTM C39/C39M, ASTM C117/C117M,
ASTM C136/C136M, ASTM C138/C138M,
ASTM C143/C143M, ASTM C231/C231M,
ASTM C232/C232M, ASTM C403/C403M,
ASTM C617/C617M,
ASTM C1064/C1064M,
ASTM C1611/C1611M
COE CRD-C 61, COE CRD-C 104
MATERIAL APPROVAL AND QC TESTING:
ASTM C33/C33M, ASTM C87/C87M,
ASTM C88/C88M, ASTM C117/C117M,
ASTM C123/C123M, ASTM C127/C127M,
ASTM C128/C128M, ASTM C131/C131M,
ASTM C136/C136M, ASTM C142/C142M,
ASTM C150/C150M, ASTM C260/C260M,
ASTM C295/C295M, ASTM C494/C494M,
ASTM C618/C618M, ASTM C979/C979M,
ASTM C989/C989M, ASTM C1240/C1240M,
ASTM C1602/C1602M, ASTM D4791,
COE CRD-C 104, COE CRD-C 61
ASTM C39/C39M, ASTM C138/C138M,
ASTM C143/C143M, ASTM C231/C231M,
ASTM C232/C232M, ASTM C403/C403M,
ASTM C1064/C1064M, ASTM C1567/C1567M,
ASTM C1611/C1611M
COE CRD-C 661
Any other related testing
SECTION 03 70 00 MASS CONCRETE
PRODUCTION TESTING:
ASTM C39/C39M, ASTM C231/C231M,
ASTM C143/C143M,
ASTM C1064/C1064M
MATERIALS APPROVAL:
SECTION 01 52 13.30 08 Page 15
SECTION 31 00 00.00 06 EARTHWORK
TESTING TO BE PERFORMED ON-SITE TESTING TO BE PERFORMED ON- OR
OFF-SITE
PRODUCTION TESTING:
ASTM D698/D698M, AASHTO T 180,
ASTM D1556/D1556M,
ASTM D1557/D1557M,
ASTM D2216/D2216M,
ASTM D6938/D6938M, ASTM C25/C25M,
ASTM C50/C50M, ASTM D2487/D2487M,
ASTM D3551/D3551M,
ASTM D5102/D5102M,
ASTM D4254/D4254M,
MATERIAL APPROVAL AND QC TESTING
ASTM C88/C88M, ASTM C535/C535M,
ASTM D7928/D7928M, ASTM D6913/D6913M,
ASTM D698/D698M, ASTM C977/C977M,
ASTM D4718/D4718M, ASTM D5519/D5519M,
ASTM D6938/D6938M
SECTION 31 32 23.00 06 SLURRY CONTROL DRILLING AND GROUTING
PRODUCTIONS TESTING:
API RP 13B-1
ASTM C39/C39M, ASTM C109/C109M,
ASTM C191/C191M, ASTM C938/C938M,
ASTM C939/C939M, ASTM C940,
ASTM D4380/D4380M,
ASTM D6910/D6910M,
COE CRD-C 61
MATERIAL APPROVAL AND QC
TESTING:<BRK/><BRK/>ASTM C87/C87M,
ASTM C117/C117M, ASTM C123/C123M,
ASTM C128/C128M, ASTM C136/C136M,
ASTM C142/C142M, ASTM C150/C150M,
ASTM C494/C494M, ASTM C618/C618M,
ASTM C937/C937M, ASTM C1240/C1240M,
ASTM C1602/C1602M<BRK/>COE CRD-C 120,
COE CRD-C 661
<BRK/><BRK/><BRK/>MIXTURE
PROPORTIONING:<BRK/><BRK/>
API RP 13B-1<BRK/>ASTM C39/C39M,
ASTM C109/C109M, ASTM C191/C191M,
ASTM C938/C938M, ASTM C939/C939M,
ASTM C940, ASTM D4380/D4380M,
ASTM D6910/D6910M<BRK/>COE CRD-C 61
SECTION 31 56 10.00 08 CUTOFF WALL CONSTRUCTION
PRODUCTION TESTING:
API RP 13B-1
ASTM C39/C39M, ASTM C109/C109M,
ASTM C403/C403M,
ASTM D4380/D4380M,
ASTM D4381/D4381M
MATERIAL APPROVAL AND QC TESTING:
ASTM C39/C39M, ASTM C109/C109M
SECTION 32 11 16.16 KYTC CRUSHED STONE BASE CONSTRUCTION
PRODUCTION TESTING:
ASTM D1556/D1556M,
ASTM D2167/D2167M,
ASTM D6938/D6938M
MATERIAL APPROVAL AND QC TESTING:
ASTM C117/C117M, ASTM C136/C136M,
ASTM D698/D698M, ASTM
D6938/D6938M
SECTION 35 42 37.00 06 RIP RAP STONE PROTECTION
SECTION 01 52 13.30 08 Page 16
OFF-SITE
PRODUCTION TESTING: MATERIAL APPROVAL AND QC TESTING:
ASTM D5519/D5519M ASTM C295/C295M, ASTM D4791,
ASTM D4992/D4992M, ASTM D5312/D5312M,
ASTM D5313/D5313M, ASTM D5519/D5519M,
ASTM D6473/D6473M
Amendment 0005*************************************************************************
3.3 REQUIRED LABORATORY TESTING EQUIPMENT
At minimum, the required equipment to be provided for each lab shall meet the laboratory and specific lab test validation requirements as well as the applicable testing standard. Additional equipment meeting the capabilities detailed in Table 1 are also required:
EQUIPMENT DESCRIPTION ASTM APPLICATION QUANTITY
Electronic (Floor) Scale, 30"x30" w/ramp 500lb capacity
ASTM
ASTM
D75/D75M, C702/C702M
Three-Cell Permeability Test System
ASTM D5084/D5084M 1
Electronic Scale, 2100g, d=10mg ASTM
ASTM
ASTM
D4318/D4318M, D1140/D1140M, C70/C70M
Electronic Scale, 32000g, d=.1g ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
C136/C136M, C117/C117M, C566/C566M, C702/C702M D1140/D1140M, D1557/D1557M D1556/D1556M, C70/C70M, COE CRD-C 61
Drying Oven (Air Circulating) ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
C142/C142M C136/C136M, C117/C117M, C566/C566M, C702/C702M D1140/D1140M, D1557/D1557M, D1556/D1556M
Drying Oven (Convection) ASTM
ASTM
ASTM
ASTM
ASTM
D6913/D6913M, D7928/D7928M, C70/C70M, C136/C136M, D4318/D4318M
SECTION 01 52 13.30 08 Page 17 w/ramp 500lb capacity
ASTM
ASTM
D75/D75M, C702/C702M
Sample Splitter, Lg. Capacity, Floor Model
ASTM
ASTM
D4802/D4802M, C136/C136M
Material Catch Pan for Lg.
Capacity Splitter
ASTM
ASTM
D4802/D4802M, C136/C136M
Sample Splitter, Table Model ASTM
ASTM
D4802/D4802M, C136/C136M
Testing Sieve Shaker ASTM C136/C136M 1
Dustpan Tray ASTM C136/C136M 1
Testing Sieve Shaker, RoTap ASTM C136/C136M 1
Compression Testing Machine
- Upper Bearing Block Assy, 6"
ASTM C39/C39M 1
Cylinder Capping Alignment Device ASTM C617/C617M 1
Cylinder Capping Plate ASTM C617/C617M 1
Cut-Off Saw, masonry (Mason-Mite
II)
ASTM C39/C39M 1
Grout Cube Mold Assy. ASTM C109/C109M 2
Grout Cube Mold Assy. w/Cover Plate
ASTM C109/C109M 2
Cube Mold Cover Plate (Sulfur Mortar Cubes)
ASTM C617/C617M 1
Cube Mold Tamper ASTM C109/C109M 1
Concrete Air Meter, Pressure Type B
ASTM C231/C231M 2
Curing Tank, 8ft length, 300gal ASTM
ASTM
C511/C511M, C192/C192M
Heater for curing tank, 110V ASTM
ASTM
C511/C511M, C192/C192M
Curing Tank Circulator Pump, 110V ASTM
ASTM
C511/C511M, C192/C192M
Curing Tank Data Logger ASTM
ASTM
C511/C511M, C192/C192M
Field Curing Chest, storage/Transport
ASTM C31/C31M 1
Unit Weight Container, 0.1 CF ASTM
ASTM
C29/C29M, C138/C138M
Unit Weight Container, 0.5 CF ASTM
ASTM
C29/C29M, C138/C138M
Unit Weight Container, 1.0 ASTM
ASTM
C29/C29M, C138/C138M
Liquid Limits Device ASTM D4318/D4318M 1
Grooving Tool (Liquid Limits), Plastic, ASTM D4318/D4318M 1
SECTION 01 52 13.30 08 Page 18
Electronic (Floor) Scale, 30"x30" ASTM D75/D75M, 1 w/ramp ASTM C702/C702M 500lb capacity
Plastic Limits Glass Plate ASTM D4318/D4318M 1
Comparator Rod ASTM D4318/D4318M 1
Wet Sieve, 2" (18" dia.) ASTM C231/C231M 2
Wet Sieve, 1-1/2" (18" dia.) ASTM C143/C143M 2
Hand Sieve, 3" (8" dia.) ASTM C136/C136M 2
Hand Sieve, 2" (8" dia.) ASTM C136/C136M 2
Hand Sieve, 1-1/2" (8" dia.) ASTM C136/C136M 2
Hand Sieve, 1" (8" dia.) ASTM C136/C136M 2
Hand Sieve, 3/4" (8" dia.) ASTM C136/C136M 2
Hand Sieve, 1/2" (8" dia.) ASTM C136/C136M 2
Hand Sieve, 3/8" (8" dia.) ASTM C136/C136M 2
Test Sieve, No. 4 ASTM C136/C136M 2
Test Sieve, No. 8 ASTM C136/C136M 2
Test Sieve, No. 10 ASTM C136/C136M 2
Test Sieve, No. 16 ASTM C136/C136M 2
Test Sieve, No. 20 ASTM C136/C136M 2
Test Sieve, No. 30 ASTM C136/C136M 2
Test Sieve, No. 40 ASTM C136/C136M 2
Test Sieve, No. 50 ASTM C136/C136M 2
Test Sieve, No. 60 ASTM C136/C136M 2
Test Sieve, No. 70 ASTM C136/C136M 2
Test Sieve, No. 80 ASTM C136/C136M 2
Test Sieve, No. 100 ASTM C136/C136M 2
Test Sieve, No. 200 ASTM C136/C136M 2
Test Sieve, No. 200 (Deep), ASTM D1140/D1140M, 2 reinforced ASTM C117/C117M screen
Test Sieve, Gilson, 3” ASTM C136/C136M 2
Test Sieve, Gilson, 2” ASTM C136/C136M 2
Test Sieve, Gilson, 1-1/2” ASTM C136/C136M 2
Test Sieve, Gilson, 1” ASTM C136/C136M 2
Test Sieve, Gilson, 3/4” ASTM C136/C136M 2
SECTION 01 52 13.30 08 Page 19 w/ramp 500lb capacity
ASTM D75/D75M,
ASTM C702/C702M
Test Sieve, Gilson, 1/2” ASTM C136/C136M 2
Test Sieve, Gilson, 3/8” ASTM C136/C136M 2
Test Sieve, Gilson, No. 4” ASTM C136/C136M 2
Test Sieve, Gilson, No. 8” ASTM C136/C136M 2
Proportional Caliper Device ASTM D4791 2
Organic Impurities Test Bottle w/ Lid (set)
ASTM C40/C40M 1
Flow Table, motorized w/ counter ASTM C87/C87M 1
Los Angles Abrasion Machine ASTM C535/C535M, ASTM C131/C131M, Gilmore Needle Apparatus ASTM C150/C150M 2
Freeze Thaw Cabinet ASTM C666/C666M, COE CRD-C 114
2 Gang Prism Mold, 2 X 2 X 10 inches
ASTM C1260 2
Length Comparator ASTM C1260 1
Water Bath ASTM D6913/D6913M, ASTM D7928/D7928M, ASTM C1260, ASTM C1567/C1567M, Washout Tube COE CRD-C 61 1
Receiving Container COE CRD-C 61 2
Concrete Vibrator -150 Hz minimum
ASTM C138/C138M 1
Slump Cone (steel) w/ base plate ASTM C1611/C1611M, ASTM C143/C143M, Penetrometer ASTM C403/C403M 1
Compound Melting Pot ASTM C617/C617M 1
Soil Density Mold Set, 4 inch AASHTO T 180, ASTM D698/D698M, ASTM D1557/D1557M, Soil Density Mold Set, 6 inch AASHTO T 180, ASTM D698/D698M, ASTM D1557/D1557M, Automatic Mechanical Compactor AASHTO T 180, ASTM D698/D698M, ASTM D1557/D1557M, SECTION 01 52 13.30 08 Page 20 w/ramp 500lb capacity
ASTM D75/D75M,
ASTM C702/C702M
Sample Ejector ASTM D1557/D1557M 1
Soil Dispersion Mixer ASTM D6913/D6913M, ASTM D7928/D7928M
Sterescopic Microscope COE CRD-C 120 1
Standard Vicat Apparatus ASTM C191/C191M 1
Grout Flow Cone Set ASTM C939/C939M 1
Marsh Funnel ASTM D6910/D6910M 2
Mud Balance ASTM D4380/D4380M 1
*************************************************************************Amendment 0005
3.4 REMOVAL OF LABORATORY TESTING EQUIPMENT
At the completion of the contract, the Contractor shall remove any laboratory testing equipment, storage areas, and mobile labs.
-- End of Section --
SECTION 03 00 00 Page 1
SECTION 03 00 00
GENERAL CONCRETE REQUIREMENTS
6/24
PART 1 GENERAL
This specification addresses general concrete and materials requirements that are applicable to multiple concrete specifications within the Contract. This includes but is not limited to references, submittals, quality control personnel, preconstruction testing and approvals, mixture proportioning, trial batching, batch plant requirements for set-up, testing, and operation, etc. Additional requirements for concrete mixes and various concrete placements are included in related sections as defined below. Where conflicts between specifications arise the requirements of this specification shall govern. Specifications listed below reference the requirements in this specification unless specifically indicated herein.
Related Sections
03 30 00 CAST-IN-PLACE CONCRETE FOR OUTLET WORKS
03 15 00 BRIDGE CONCRETE ACCESSORIES
03 37 13 SHOTCRETE
03 37 29 CONCRETE FOR CUTOFF WALL
03 70 00 MASS CONCRETE
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
31 60 00.00 06 FOUNDATION PREPARATION
31 68 13 ROCK SLOPE REINFORCEMENT AND PERMANENT ROCKFALL PROTECTION
Note that for specification 03 37 13 SHOTCRETE only the requirements for fine aggregate and ASR apply from this specification. All other requirements for shotcrete are specific to that specification.
Permanent concrete requires a dedicated batch plant. The Contractor shall not bring alternative materials to the batch plant for the purpose of producing temporary concrete simultaneous to permanent concrete production. All materials stored and permanent concrete produced at the on-site batch plant shall meet the material requirements contained herein. During periods where permanent concrete is not being produced, temporary concrete may be batched at the on-site batch plant but any temporary materials must be fully separated, contained, and fully removed prior to subsequent permanent concrete placements. The Contractor may elect to use ready-mix concrete for temporary concrete and shall be subject to the requirements of Paragraph
TEMPORARY CONCRETE.
Concrete for cutoff walls requirements for mixture proportioning, placement, and other special previsions are included in Specification
03 37 29 CONCRETE FOR CUTOFF WALL.
All other provisions of this specification apply unless otherwise noted.
1.1 SPECIAL COORDINATION
Careful coordination by the Contractor is required to ensure no blast occurs immediately after fresh concrete has been placed and that the concrete elements have set to be sufficiently considered "Green Concrete", SECTION 03 00 00 Page 2 minimum strength of at least 1,000 psi. The Contractor shall ensure that any scheduled blasting is adjusted sufficiently for the placement and curing schedule with the blasting design adjusted accordingly based on the strength and age of the concrete to prevent damage to the newly placed elements. The Contractor is responsible for any associated costs verifying concrete strength, adjusting blast designs, or executing test blasts to demonstrate a proposed blast will not damage green concrete. Requirements for blasting near green concrete are in the following specifications.
31 23 17.00 06 UNDERWATER BLASTING
31 23 18.00 06 SURFACE BLASTING
1.2 UNIT PRICES
1.2.1 MASS CONCRETE: MIX 1 (LOWER CONTROL TOWER)
This mix is designed for mass concrete placements required for the lower control tower construction. Mass Concrete shall be protected by monolithically placed facing concrete for each lift placed during production in all instances.
1.2.1.1 Payment
section are included in the contract price for mass concrete. Payment will be made to include all labor, equipment, materials and supplies for completing the mass concrete as shown on the contract drawings and as specified. The mass concrete shall meet the requirements of Section 03 00 00 GENERAL CONCRETE REQUIREMENTS as well as 03 70 00 MASS CONCRETE. These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, coal ash, ground granulated blast furnace slag (GGBFS), mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, miscellaneous metals, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No payment will be made for concrete wasted or not otherwise placed during production. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, will be made and these costs shall be incidental to concrete construction.
1.2.1.2 Measurement
Concrete will be measured for payment based upon the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the excavation or surface to be constructed. No measurement will be made of concrete placed outside the tolerances specified for the excavation unless otherwise approved by the Contracting Officer. No deductions shall be made for rounded or beveled edges, space occupied by metal work, electrical conduits or reinforcing steel, nor voids or embedded items that are either less than five (5) cubic feet in volume
SECTION 03 00 00 Page 3 or one (1) square foot in cross section.
1.2.1.3 Unit of Measure
Unit of measure: cubic meters yards.
1.2.2 FACING CONCRETE: MIX 2 (LOWER CONTROL TOWER)
This mix is designed to be both pumpable and resistant to abrasion and cavitation caused by fast flowing water. Facing Concrete for the Stilling Basin can be the same mix as for the Tunnel Liner if concrete in the stilling basin is placed via pump. For Measurement and Payment the tunnel liner and stilling basin facing concrete will be tracked separately.
1.2.2.1 Payment
section are included in the contract price for facing concrete in the lower control tower. Payment will be made to include all labor, equipment, materials and supplies for completing the tunnel liner and all incidentals as shown on the contract drawings and as specified. Payment will be made to include all labor, equipment, materials and supplies for completing facing concrete as shown on the contract drawings and as specified. The facing concrete shall meet the requirements of Section 03 00 00 GENERAL CONCRETE REQUIREMENTS as well as 03 30 00 CAST-IN-PLACE CONCRETE FOR OUTLET WORKS.
These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, coal ash, ground granulated blast furnace slag (GGBFS), silica fume, mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, will be made and these costs shall be incidental to concrete construction. No payment will be made for concrete wasted or not otherwise placed during production.
1.2.2.2 Measurement
Pay lines for tunnel liner are based on the neat lines of the structures as shown on the drawings. Concrete will be measured for payment based upon the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the excavation or surface to be constructed.
No measurement will be made of concrete placed outside the tolerances specified for the excavation unless otherwise approved by the Contracting Officer. No deductions shall be made for rounded or beveled edges, space occupied by metal work, electrical conduits or reinforcing steel, nor voids
1.2.2.3 Unit of Measure
SECTION 03 00 00 Page 4
1.2.3 FACING CONCRETE: MIX 2A (STILLING BASIN AND TUNNEL LINER)
This mix is designed to be resistant to abrasion and cavitation caused by fast flowing water and is required for the stilling basin and apron structures. Stilling basin facing concrete is not required to be placed via pumping. For Measurement and Payment the tunnel liner and stilling basin facing concrete will be tracked separately.
1.2.3.1 Payment
section are included in the contract price designated for facing concrete in the stilling basin and for the tunnel liner. Payment will be made to include all labor, equipment, materials and supplies for completing the stilling basin and apron as shown on the contract drawings and as specified. Payment will be made to include all labor, equipment, materials and supplies for completing the structural concrete, including incidental items, as shown on the contract drawings and as specified. The facing concrete shall meet the requirements of Section 03 00 00 GENERAL CONCRETE as well as 03 30 00 CAST-IN-PLACE CONCRETE FOR OUTLET WORKS. These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, coal ash, ground granulated blast furnace slag (GGBFS), silica fume, mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, will be made and these costs shall be incidental to concrete construction. No payment will be made for concrete wasted or not otherwise placed during production.
1.2.3.2 Measurement
Pay lines for stilling basin are based on the neat lines of the structures as shown on the drawings. Concrete will be measured for payment based upon the actual volume of concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the excavation or surface to be constructed.
No measurement will be made of concrete placed outside…
This is the start of the file's text. The full file is on GovTribe.