Attachment 13.2 - ENG Form 93

View the file

Other files

File Type Posted
Amendment_6.pdf PDF
Amendment_5-Revised.pdf PDF
SCA_rev_WD_15-4235_29_DEC_2015-12FEB2016.pdf PDF
Att_7.3_Sample_Project__1_PWS_rev01.pdf PDF
Att_7.1_Task_Order_001_PWS_rev01.pdf PDF
Amendment-5.pdf PDF
Att_7.4_Bid_Schedule_Worksheet_rev01.xlsx XLSX spreadsheet
Att_8.1_SLDA_Air_Handling_SOP.pdf PDF
Att_8.2_MPB_Air_Handlers_O M.PDF PDF
Att_11.9_UFGS_02_61_13_rev01.pdf PDF
Remediation_DD_254_DRAFT.pdf PDF
FOUO_DD_FORM_254_ATTACHMENT.docx DOCX document
Att_11.10_UFGS_31_11_00.pdf PDF
Amendment_4.pdf PDF
SLDA_Final_Visit_Roster_and_Contact_Info.pdf PDF
Final_Amendment_3.pdf PDF
Att_7.3_Sample_Project__1_PWS_28Jan2016.pdf PDF
EC_Plan_SLDA_-_Issued_for_Construction.pdf PDF
Amendment_2.pdf PDF
Final_Amendment_1.pdf PDF
Att_7.4_Bid_Schedule_Worksheet_26Aug15.xlsx XLSX spreadsheet
Att_15_GSP_Interim_Guidance.pdf PDF
Att_4.02_Basic_SCA_Wage_Determination-2.pdf PDF
Att_14_WWTP_Effluent_Summary_Table.xlsx XLSX spreadsheet
Att_11.5_UFGS_01_32_01.00_10.pdf PDF
Att_11.9_UFGS_02_61_13.pdf PDF
Att_7.2_Task_Order_001_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
W912P4-15-R-0001_(22_Dec_2015).doc DOC document
SOW_Att_18.1_-_Eng_Form_4025-R.pdf PDF
Att_9.9_SLDA_CBDPP_SOW_Outlines.docx DOCX document
Att_9.4_ENG_Form_3394_w_Instructions.pdf PDF
Small_Business_Participation_Proposal.docx DOCX document
Att_11.4_UFGS_01_35_29.13.pdf PDF
Att_7.3_Sample_Project__1_PWS_15Sep15.docx DOCX document
Att_1_Site_Layout.pdf PDF
Att_9.5_CELRB_Crane_Certificate_of_Compliance.doc DOC document
Att_5_NAVFAC_USACE_PPQ.docx DOCX document
Att_11.7_UFGS_01_45_00.00_10.pdf PDF
Att_11.3_UFGS_01_35_26.pdf PDF
Att_11.8_UFGS_01_50_00.pdf PDF
Att_8_SLDA_GFP_Inventory.pdf PDF
Att_11.1_SLDA_Be_Variance_LRP_20_Mar_2015_Rev_2.pdf PDF
Att_9.8_UFGS_01_35_26.doc DOC document
Att_6_ERPIMS_Data_Format_Dictionary.pdf PDF
Att_9.2_AHA_Template_385_1 1 _Apr08.pdf PDF
Att_9.1_APPSSHP_Checklist_SLDA_Remediation_RFP_upd_28Apr2015.docx DOCX document
Att_13.1_Prog_Payment_Checklist.doc DOC document
Att_11.6_UFGS_01_32_16.00_20.pdf PDF
Att_10_-_HTRW_WBS_ _Data_Dictionary.pdf PDF
Att_9.6_SLDA_Be_Variance_LRP_20_Mar_2015_Rev_2.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAYMENT ESTIMATE - CONTRACT PERFORMANCE

For use of this form, see ER 37-2-10 and 37-345-10; the proponent agency is CERM-FC.

ENG FORM 93, 1 MAR 1978 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

b. CONTRACTING OFFICER APPROVAL SIGNATURE

9. PERIOD COVERED BY THIS ESTIMATE (YYYYMMDD)

2. CONTRACTOR AND ADDRESS

1. DATE (YYYYMMDD)

SHEET of

3. CONTRACT NUMBER 4. DISTRICT

5. DESCRIPTION OF WORK 6. APPROPRIATION AND PROJECT 7. REQUIRED COMPLETION DATE (YYYYMMDD)

8. LOCATION 10. JOB ORDER NUMBER 11. ESTIMATE NUMBER

FROM THRU

12.

ITEM

NUMBER

a.

DESCRIPTION

b.

CONTRACT

(1)

QUANTITY AND UNIT

(2)

UNIT PRICE

(3)

AMOUNT

c.

TOTAL TO DATE

(1)

QUANTITY AND UNIT

(2)

AMOUNT

d. INCLUDES MODIFICATION THRU (YYYYMMDD): e. TOTAL CONTRACT > f. TOTAL EARNINGS

TO DATE >

13. PRESENTED FOR PAYMENT

a. PAYEE b. PER

c. DATE (YYYYMMDD) d. TITLE

14. APPROVED FOR PAYMENT

I CERTIFY THAT I HAVE CHECKED THE QUANTITIES COVERED BY THIS BILL OR ESTIMATE;

THAT THE WORK WAS ACTUALLY PERFORMED; AND THE QUANTITIES ARE CORRECT AND

CONSISTENT WITH ALL PREVIOUS COMPUTATIONS AS ACTUALLY CHECKED; THAT THE

QUANTITIES AND AMOUNTS ARE WHOLLY CONSISTENT WITH THE REQUIREMENTS OF THE

CONTRACT OR OTHER INSTRUMENT INVOLVED.

a. TITLE b. DATE (YYYYMMDD)

15a. DATE (YYYYMMDD)

c. SIGNATURE

16a. PREVIOUS DEDUCTIONS OTHER THAN RETAINED PERCENTAGE** (**Page 2)

b. PREVIOUS RETAINED PERCENTAGE

c. PREVIOUS PAYMENTS

d. PREVIOUS EARNINGS (a+b+c)

e. EARNINGS THIS PERIOD (Total Earnings to date minus d)

f. LESS RETAINED PERCENTAGE

h. TOTAL DEDUCTIONS FOR THIS PERIOD (f+g)

g. LESS DEDUCTIONS OTHER THAN

RETAINED PERCENTAGE FOR

i. RETAINAGE REFUNDED

j. OTHER REFUNDS

k. TOTAL REFUNDS THIS PERIOD (i+j)

ENG FORM 93, 1 MAR 1978 Page 2 of 2

SECTION 16 (Continuation)

18. **DETAILED EXPLANATION AND OR REMARKS (Page 1 Item 16a.)

l. AMOUNT DUE CONTRACTOR (e-h+k)

17. RECAPITULATION:

a. TOTAL RETAINED PCTG. (b+f-i)

b. TOTAL PAID (c+l)

SHEET of

PAYMENT ESTIMATE - CONTRACT PERFORMANCE

For use of this form, see ER 37-2-10 and 37-345-10; the proponent agency is CERM-FC.

ENG FORM 93, 1 MAR 1978 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

9. PERIOD COVERED BY THIS ESTIMATE (YYYYMMDD)

SHEET of

FROM

THRU

12.

ITEM

NUMBER

a.

DESCRIPTION

b.

CONTRACT

(1)

QUANTITY AND UNIT

(2)

UNIT PRICE

(3)

AMOUNT

c.

TOTAL TO DATE

(1)

QUANTITY AND UNIT

(2)

AMOUNT

d. INCLUDES MODIFICATION THRU (YYYYMMDD):

e. TOTAL CONTRACT >

f. TOTAL EARNINGS

TO DATE >

13. PRESENTED FOR PAYMENT

14. APPROVED FOR PAYMENT

I CERTIFY THAT I HAVE CHECKED THE QUANTITIES COVERED BY THIS BILL OR ESTIMATE; THAT THE WORK WAS ACTUALLY PERFORMED; AND THE QUANTITIES ARE CORRECT AND CONSISTENT WITH ALL PREVIOUS COMPUTATIONS AS ACTUALLY CHECKED; THAT THE QUANTITIES AND AMOUNTS ARE WHOLLY CONSISTENT WITH THE REQUIREMENTS OF THE CONTRACT OR OTHER INSTRUMENT INVOLVED.

16a. PREVIOUS DEDUCTIONS OTHER THAN RETAINED PERCENTAGE** (**Page 2)

b. PREVIOUS RETAINED PERCENTAGE

c. PREVIOUS PAYMENTS

d. PREVIOUS EARNINGS (a+b+c)

e. EARNINGS THIS PERIOD (Total Earnings to date minus d)

f. LESS RETAINED PERCENTAGE

h. TOTAL DEDUCTIONS FOR THIS PERIOD (f+g)

g. LESS DEDUCTIONS OTHER THAN

RETAINED PERCENTAGE FOR

i. RETAINAGE REFUNDED

j. OTHER REFUNDS

k. TOTAL REFUNDS THIS PERIOD (i+j) ENG FORM 93, 1 MAR 1978 Page 2 of 2 SECTION 16 (Continuation)

l. AMOUNT DUE CONTRACTOR (e-h+k)

17. RECAPITULATION:

a. TOTAL RETAINED PCTG. (b+f-i)

b. TOTAL PAID (c+l)

SHEET of 1.1 mark.a.cooper@usace.army.mil 20110815 Form Design Team CEIT-PMO-I ENG FORM 93 Payment Estimate Contract Performance 1 MAR 1978 Mark Cooper ENG FORM 93 Payment Estimate Contract Performance 1 MAR 1978 20110815

PrintForm:
Button1:
CONTRACTSIGN:
CAPTIONS:
YYYYMMDD:
Cell4:
NUM1:
NUM2:
NUM3:
NUM5:
NUM4:
NUM10:
NUM9:
NUM8:
NUM7:
NUM6:
NUM15:
NUM14:
NUM13:
NUM12:
NUM11:
NUM20:
NUM19:
NUM18:
NUM17:
NUM16:
NUM25:
NUM24:
NUM23:
NUM22:
NUM21:
NUM30:
NUM29:
NUM28:
NUM27:
NUM26:
NUM31:
NUM32:
NUM33:
DATECONTRACT:
SIGNATURE:
NUM34:
NUM35:
NUM36:
NUM37:
NUM38:
NUM39:
NUM40:
NUM41:
NUM42:
NUM43:
NUM44:
NUM45:
NUM46:

File details come from the government source that posted it. Updated .