EC_Plan_SLDA_-_Issued_for_Construction.pdf

PDF 9 MB Posted

Attached to
SLDA FUSRAP Remediation
Solicitation number
W912P4-15-R-0001
Issued by

About this file

Design Drawings

View the file

Other files

File Type Posted
Amendment_6.pdf PDF
Amendment_5-Revised.pdf PDF
SCA_rev_WD_15-4235_29_DEC_2015-12FEB2016.pdf PDF
Att_7.3_Sample_Project__1_PWS_rev01.pdf PDF
Att_7.1_Task_Order_001_PWS_rev01.pdf PDF
Amendment-5.pdf PDF
Att_7.4_Bid_Schedule_Worksheet_rev01.xlsx XLSX spreadsheet
Att_8.1_SLDA_Air_Handling_SOP.pdf PDF
Att_8.2_MPB_Air_Handlers_O M.PDF PDF
Att_11.9_UFGS_02_61_13_rev01.pdf PDF
Remediation_DD_254_DRAFT.pdf PDF
FOUO_DD_FORM_254_ATTACHMENT.docx DOCX document
Att_11.10_UFGS_31_11_00.pdf PDF
Amendment_4.pdf PDF
SLDA_Final_Visit_Roster_and_Contact_Info.pdf PDF
Final_Amendment_3.pdf PDF
Att_7.3_Sample_Project__1_PWS_28Jan2016.pdf PDF
Amendment_2.pdf PDF
Final_Amendment_1.pdf PDF
Att_7.4_Bid_Schedule_Worksheet_26Aug15.xlsx XLSX spreadsheet
Att_15_GSP_Interim_Guidance.pdf PDF
Att_4.02_Basic_SCA_Wage_Determination-2.pdf PDF
Att_14_WWTP_Effluent_Summary_Table.xlsx XLSX spreadsheet
Att_11.5_UFGS_01_32_01.00_10.pdf PDF
Att_11.9_UFGS_02_61_13.pdf PDF
Att_7.2_Task_Order_001_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
W912P4-15-R-0001_(22_Dec_2015).doc DOC document
SOW_Att_18.1_-_Eng_Form_4025-R.pdf PDF
Att_9.9_SLDA_CBDPP_SOW_Outlines.docx DOCX document
Att_9.4_ENG_Form_3394_w_Instructions.pdf PDF
Small_Business_Participation_Proposal.docx DOCX document
Att_13.2_ENG_Form_93.pdf PDF
Att_11.4_UFGS_01_35_29.13.pdf PDF
Att_7.3_Sample_Project__1_PWS_15Sep15.docx DOCX document
Att_1_Site_Layout.pdf PDF
Att_9.5_CELRB_Crane_Certificate_of_Compliance.doc DOC document
Att_5_NAVFAC_USACE_PPQ.docx DOCX document
Att_11.7_UFGS_01_45_00.00_10.pdf PDF
Att_11.3_UFGS_01_35_26.pdf PDF
Att_11.8_UFGS_01_50_00.pdf PDF
Att_8_SLDA_GFP_Inventory.pdf PDF
Att_11.1_SLDA_Be_Variance_LRP_20_Mar_2015_Rev_2.pdf PDF
Att_9.8_UFGS_01_35_26.doc DOC document
Att_6_ERPIMS_Data_Format_Dictionary.pdf PDF
Att_9.2_AHA_Template_385_1 1 _Apr08.pdf PDF
Att_9.1_APPSSHP_Checklist_SLDA_Remediation_RFP_upd_28Apr2015.docx DOCX document
Att_13.1_Prog_Payment_Checklist.doc DOC document
Att_11.6_UFGS_01_32_16.00_20.pdf PDF
Att_10_-_HTRW_WBS_ _Data_Dictionary.pdf PDF
Att_9.6_SLDA_Be_Variance_LRP_20_Mar_2015_Rev_2.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHALLOW LAND DISPOSAL AREA - SEDIMENTATION & EROSION CONTROL PLAN

STATE ROUTE 66 AT KISKIMERE ROAD

ARMSTRONG COUNTY, PENNSYLVANIA

APRIL 14, 2010

MARK W. GLYNN, P.E.

PA. LICENSE #051219-E

OVERALL EXISTING CONDITIONS

SLDA - SEDIMENTATION &

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E

B E1

PROJECT LOCATION MAP

A E1

EXISTING CONDITIONS - PLAN

C E1

USDA NRCS - SOIL SURVEY D

E1

EXISTING WATERSHED AND BASIN BOUNDARIES

OVERALL PROPOSED CONDITIONS

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E

A E2

OVERALL PROPOSED CONDITIONS - PLAN

NOTES: INSTALLATION SEQUENCE OF NON BMP SITE FEATURES :

B E2

EXISTING & MAXIMUM DURING CONSTRUCTION BASINS

INSTALLATION AND REMOVAL SEQUENCE OF BMP SITE FEATURES :

BMP LOWER SITE - PLAN

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E

A E3

BMP LOWER SITE - PLAN

BMP MIDDLE SITE - PLAN

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E

A E4

BMP MIDDLE SITE - PLAN

BMP UPPER SITE - PLAN

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E

A E5

BMP UPPER SITE - PLAN

BEST MANAGEMENT PRACTICES -

DETAILS

SLDA - SEDIMENTATION &

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E

CHANNEL CROSS-SECTION

CHANNEL

NO. STATIONS

BOTTOM

WIDTH

B

(FT)

DEPTH

D

(FT)

Z1

(FT)

Z2

(FT)

SIZE

(R-_)

STANDARD CONSTRUCTION DETAIL #2

Riprap Channels

RIPRAP

THICK.

t

(IN)

STANDARD CONSTRUCTION DETAIL #8

Sediment Basin Emergency Spillways

Dimension PI should be 5' minimum.

BASIN

NO.

Z3

(FT)

Z4

(FT)

TOP

ELEV

WTE

(FT)

CREST

ELEV

WCE

(FT)

WIDTH

Ww

(FT)

RIPRAP

SIZE

(R-_)

RIPRAP

THICK.

LRt

(IN)

Z5

(FT)

DEPTH

Cd

(FT)

WIDTH

Dw

(FT)

RIPRAP

SIZE

(R-_)

RIPRAP

THICK.

DRt

(IN)

LENGTH

DI

(FT)

WEIR LINING CHANNEL DISSIPATER

RIPRAP OUTLET DISSIPATER

PLAN VIEW

WEIR

SECTION Z-Z

EMBANKMENT SECTION ALONG EMERGENCY SPILLWAY

STANDARD CONSTRUCTION DETAIL #11

Embankment Sediment Traps

TRAP

NO.

Z1

(FT)

H

(FT)

h

(FT)

Z2

(FT)

EMBANK.

TOP

ELEV.

ETE

(FT)

OUTLET

CREST

ELEV.

OCE

(FT)

CLEAN

OUT

ELEV.

COE

(FT)

BOTTOM

ELEV.

BE

(FT)

OUTLET

WIDTH

OW

(FT)

* Embankment outlet composed entirely of rock; main body R-3 or larger, inside face ASSHTO #57 stone or smaller.

Clean out stake shall be placed near center of each trap. Accumulated sediment shall be removed when it reaches the clean out elveation marked on the stake.

SECTION THROUGH SPILLWAY*

INSIDE FACE

STANDARD CONSTRUCTION DETAIL #33

Riprap Aprons at Pipe Outlets with Flared End Sections

OUTLET

NO.

PIPE

DIA

Pd

(IN)

SIZE

(R-_)

THICK.

Rt

(IN)

LENGTH

AI

(FT)

INITIAL

WIDTH

Aiw

(FT)

TERMINAL

WIDTH

Atw

(FT)

RIPRAP APRON

PLAN VIEW

SECTION Y-Y

SECTION Z-Z

EMBANKMENT SECTION ALONG PRINCIPAL SPILLWAY*

BASIN

NO.

Z2

(FT)

SKIMMER

INFO

DIA

Bd

(IN)

INLET

ELEV

BIE

(FT)

OUTLET

ELEV

BOE

(FT)

STANDARD CONSTRUCTION DETAIL #3

Sediment Basins

TOP

ELEV

ETE

(FT)

Z1

(FT)

FAIRCLOTH SKIMMER BARREL

CREST

ELEV

TRCE

(FT) MAT'L

LENGTH

BI

(FT)

EMBANKMENT

TOP

WIDTH

ETw

(FT)

CLEAN

OUT

ELEV

COE

(FT)

BOTTOM

ELEV

BE

(FT)

* Also refer to Sediment Basin Temporary Riser, Emergency Spillway, Energy Dissipater, Trash Rack & Anti-vortex Device, and Sediment Storage Dewatering Facility Details.

A clean out stake shall be placed near the center of each basin. Accumulated sediment shall be removed when it has reached the clean out elevation on the stake.

STANDARD CONSTRUCTION DETAIL #19

Standard Filter Fabric Fence (18" High)

* Stakes spaced @ 8' maximum. Use 2" x 2" wood or equivalent steel stakes.

Filter Fabric Fence must be placed at level existing grade. Both ends of the barrier must be extended at least 8 feet up slope at 45 degrees to the main barrier alignment.

Sediment must be removed when accumulations reach 1/2 the above ground height of the fence.

Any section of Filter Fabric Fence which has been undermined or topped must be immediately replaced with a Rock Filter Outlet. See Standard Construction Detial #18.

JOINING FENCE SECTIONS

STANDARD CONSTRUCTION DETAIL #20

Reinforced Filter Fabric Fence (30" High)

Filter Fabric Fence must be installed at existing level grade. Both ends of each fence section must be extended at least 8 feet upslope at 45 degrees to the main fence alignment.

Sediment must be removed where accumulations reach 1/2 the above ground height of the fence.

Any fence section which has been undermined or topped must be immediately replaced with a Rock Filter Outlet. See Standard Construction Detial #18.

JOINING FENCE SECTIONS CUTAWAY VIEW

NOTE: SHOW ALL DETAILS AND CONSTRUCTION

DIMENSIONS ON PLAN DRAWINGS.

STANDARD CONSTRUCTION DETAIL #21

Filter Fabric Fence Reinforced by Staked Straw Bales

Filter Fabric Fence must be installed at existing level grade. Both ends of each fence section must be extended at least 8 feet upslope at 45 degrees to the main fence alignment.

Sediment must be removed where accumulations reach 1/2 the above ground height of the fence.

Any fence section which has been undermined or topped must be immediately replaced with a Rock Filter Outlet. See Standard Construction Detial #18.

MATERIAL SPECIFICATIONS

EROSION CONTROL PLAN

MARK W. GLYNN, P.E., PA LICENSE #051219-E