CSC-20099 Resurface Playgrounds at Child Development Center

Closed Solicitation Posted

Solicitation number
SP4702-20-R-0023
Agency
Defense Logistics Agency Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238990 All Other Specialty Trade Contractors
PSC
Z1PZ Maintenance Of Other Non-Building Facilities
Place of performance
Columbus OH 43218 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to resurface playgrounds at a Child Development Center for the Defense Logistics Agency. The scope of work involves demolishing the existing playground surface, adding pour-in-place surfacing as needed, and installing a new pour-in-place surface to replace damaged areas, while keeping existing play equipment safe. Offerors must furnish all labor, equipment, materials, tools, delivery, disposal, and supervision to complete the project in accordance with the specifications and contract drawings. Questions were due by August 10, 2020, with proposals due by August 25, 2020. Evaluation will be based on technical acceptability, past performance, and price.

The opportunity is set aside for total small business. The NAICS code is 237910 and PSC code R499. The place of performance is Columbus, Ohio. The total square footage of the playground area to be resurfaced is provided in the contract drawings. Two amendments extended proposal due dates and added provisions related to COVID-19 safety requirements and provision 52.204-24 for representation regarding prohibited telecommunications equipment.

Notice text

3 versions

Update #3 · Latest ·

The purpose of Amendment 02 is as follows: To provide Auto Cad Drawings file for project CSC-20099, Solicitation SP4702-20-R-0023(if you need the AutoCad files I will have to email them. You must request them by email to william.hurley@dla.mil by 17th of August.) Also, To add FAR provision 52.204-24 (AUG 2020), and To add Attachment 07 Additional Requirements Due to COVID-19. To provide the questions & answers for project: CSC-20099, Solicitation SP4702-20-R-0023. Responses to this amendment must be submitted electronically to William Hurley at William.Hurley@dla.mil.

Responses must be received by August 25th, 2020 at 1:00pm EST. Upon the response time shown above; discussions for this procurement shall be closed, and no further changes to vendor proposals will be accepted.

Amendment 01 Posted 27 July, 2020.

The purpose amendment 01 is as follows: To provide revised Drawings for project CSC-20099, Solicitation SP4702-20-R-0023. Also, to extend Question Due date until 10 August, 2020 at 1:00 pm EST. Extending Request for Proposal Due date until 25 August, 2020 at 1:00pm EST. Responses to this amendment must be submitted electronically to William Hurley at William.Hurley@dla.mil. Responses must be received by August 25th, 2020 at 1:00pm EST.

 The scope of work includes: Demo the existing playground surface. Adding pour-in-place surfacing as needed. Add a new surface of PIP to replace the damaged surface. Keep the existing play equipment safe with no damage. The contractor shall furnish all plant, labor, equipment, material, supplies, equipment, tools, delivery, disposal and supervision required in performing all operations in conjunction with this project complete, in strict accordance with these specifications and Contract Drawing No. 3-1698 subject to the terms and provisions of this contract.  This section of the specifications is applicable to all other sections herein. The contract drawings indicate the extent and general arrangement of the existing facilities, new work, materials and equipment installations and are provided for reference only, the Contractor shall field verify all existing conditions.  If any departures from the contract drawings, other than minor adjustments, are deemed necessary by the Contractor, details of such departures and the reasons therefore shall be submitted to the Contracting Officer or their authorized representatives as soon as practicable for approval.  No such departures shall be made without the written approval of the Contracting Officer.

Update #2 ·

The purpose of Amendment 02 is as follows: To provide Auto Cad Drawings file for project CSC-20099, Solicitation SP4702-20-R-0023(if you need the AutoCad files I will have to email them. You must request them by email to william.hurley@dla.mil by 17th of August.) Also, To add FAR provision 52.204-24 (AUG 2020), and To add Attachment 07 Additional Requirements Due to COVID-19. Responses to this amendment must be submitted electronically to William Hurley at William.Hurley@dla.mil.

Responses must be received by August 25th, 2020 at 1:00pm EST. Upon the response time shown above; discussions for this procurement shall be closed, and no further changes to vendor proposals will be accepted.

Amendment 01 Posted 27 July, 2020.

The purpose amendment 01 is as follows: To provide revised Drawings for project CSC-20099, Solicitation SP4702-20-R-0023. Also, to extend Question Due date until 10 August, 2020 at 1:00 pm EST. Extending Request for Proposal Due date until 25 August, 2020 at 1:00pm EST. Responses to this amendment must be submitted electronically to William Hurley at William.Hurley@dla.mil. Responses must be received by August 25th, 2020 at 1:00pm EST.

 The scope of work includes: Demo the existing playground surface. Adding pour-in-place surfacing as needed. Add a new surface of PIP to replace the damaged surface. Keep the existing play equipment safe with no damage. The contractor shall furnish all plant, labor, equipment, material, supplies, equipment, tools, delivery, disposal and supervision required in performing all operations in conjunction with this project complete, in strict accordance with these specifications and Contract Drawing No. 3-1698 subject to the terms and provisions of this contract.  This section of the specifications is applicable to all other sections herein. The contract drawings indicate the extent and general arrangement of the existing facilities, new work, materials and equipment installations and are provided for reference only, the Contractor shall field verify all existing conditions.  If any departures from the contract drawings, other than minor adjustments, are deemed necessary by the Contractor, details of such departures and the reasons therefore shall be submitted to the Contracting Officer or their authorized representatives as soon as practicable for approval.  No such departures shall be made without the written approval of the Contracting Officer.

Update #1 ·

 The scope of work includes: Demo the existing playground surface. Adding pour-in-place surfacing as needed. Add a new surface of PIP to replace the damaged surface. Keep the existing play equipment safe with no damage. The contractor shall furnish all plant, labor, equipment, material, supplies, equipment, tools, delivery, disposal and supervision required in performing all operations in conjunction with this project complete, in strict accordance with these specifications and Contract Drawing No. 3-1698 subject to the terms and provisions of this contract.  This section of the specifications is applicable to all other sections herein. The contract drawings indicate the extent and general arrangement of the existing facilities, new work, materials and equipment installations and are provided for reference only, the Contractor shall field verify all existing conditions.  If any departures from the contract drawings, other than minor adjustments, are deemed necessary by the Contractor, details of such departures and the reasons therefore shall be submitted to the Contracting Officer or their authorized representatives as soon as practicable for approval.  No such departures shall be made without the written approval of the Contracting Officer.