W912P4-15-R-0001_(22_Dec_2015).doc
DOC document 1 MB Posted
- Attached to
- SLDA FUSRAP Remediation
- Solicitation number
- W912P4-15-R-0001
About this file
Solicitation
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
Based Period, FUSRAP SLDA SATOC
FFP
Develop Remediation work plans as ordered under individual task order Statements of Work. The maximum ordering amount under the contract (for all CLINS) is $350,000,000. This includes the base work and option work
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
Based Period, FUSRAP SLDA SATOC
FFP
Perform fixed price tasks such as Infrastructure, Operations and Maintenance as ordered under individual task order Statements of Work. The maximum ordering amount under the contract (for all CLINS) is $350,000,000. This includes the base work and option work
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
Based Period, FUSRAP SLDA SATOC
CPFF
Remediation of Soils will be accomplished using Cost Plus Fixed Fee task orders. The maximum ordering amount under the contract (for all CLINS) is $350,000,000. This includes the base work and option work
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Option Period, FUSRAP SLDA SATOC |
FFP
Develop Remediation work plans as ordered under individual task order Statements of Work. The maximum ordering amount under the contract (for all CLINS) is $350,000,000. This includes the base work and option work
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Option Period, FUSRAP SLDA SATOC |
FFP
Perform fixed price tasks such as Infrastructure, Operations and Maintenance as ordered under individual task order Statements of Work. The maximum ordering amount under the contract (for all CLINS) is $350,000,000. This includes the base work and option work
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Job
| OPTION |
| Option Period, FUSRAP SLDA SATOC |
CPFF
Remediation of Soils will be accomplished using Cost Plus Fixed Fee task orders. The maximum ordering amount under the contract (for all CLINS) is $350,000,000. This includes the base work and option work
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
SATOC OVERVIEW
The Maximum Ordering amount under this SATOC is $350,000,000.00. There is a base ordering period of 5 years (17 Jan 2017 – 16 Jan 2022) and an optional ordering period for an additional 5 years (17 Jan 2022 – 16 Jan 2027). Task orders will be issued either as Firm Fixed Price (FFP) or Cost Plus Fixed Fee (CPFF) depending on the nature of work. The majority of the task orders are anticipated to be CPFF. The Guaranteed minimum for this contract is $10,000.00. Offerors are not required to add any information to these CLINs. These CLINs are for administrative/ordering purposes only. The only prices required are for the task orders as outlined in Section L.
Section C - Descriptions and Specifications
SCOPE OF WORK
Section C - Descriptions / Specifications / Work Statement
Table of Contents
5Section C - Descriptions / Specifications / Work Statement
12ACRONYMS AND ABBREVIATIONS
161.0 GENERAL
161.1 Contract Award
161.2 Issuance of Task Orders
161.3 Scope of Work
182.0 BACKGROUND INFORMATION
182.1 Site Location and Description
182.2 Site History
182.3 ROCs and Soil Cleanup Goals
192.4 Regulatory Background
202.5 Applicable or Relevant and Appropriate Requirements
202.6 Roles and Responsibilities
202.7 USACE Mega-Project Requirements
202.8 Existing Site Conditions and Information
243.0 UNIVERSAL REQUIREMENTS
243.1 Safety and Health
243.2 Physical and Information Security
273.3 Environmental Requirements
273.4 Radiological Materials and Equipment
273.5 Laboratory Support Services
283.5.1 Field Testing Capability
283.5.2 On-site or Subcontracted Laboratory
283.5.3 Capabilities
283.5.4 Analytical Methods
283.6 Analytical Data and Other Data – Required Format
293.7 Geospatial Data Format
293.8 Typical Reports – Required Format and Frequency
304.0 REQUIREMENTS FOR COST REIMBURSEMENT TASK ORDERS
304.1 Contract Management Procedures
304.2 Cost Control
304.3 Accounting System Capabilities
304.4 Management Organization, Responsibilities, and Authorities
304.5 Mobilization
304.6 Management Information System
314.7 Work Allocation Document
324.8 Procurement and Subcontracting
324.9 Subcontractor Changes and Claims
324.10 Closeout Procedures
335.0 REMEDIATION ACTIVITIES AND REQUIREMENTS
345.1 Mobilization and Preparatory Work – 331XX01
345.1.1 Mobilization of Construction Equipment and Facilities – 331XX0101
345.1.2 Submittals / Implementation Plans – 331XX0103
355.1.2.1 Project Schedule
355.1.2.2 Site Operations Plan (SOP)
365.1.2.3 Accident Prevention Plan (APP) / Site Safety and Health Plan (SSHP) / Chronic Beryllium Disease Prevention Program (CBDPP)
395.1.2.4 Radiation Protection Program (RPP)
395.1.2.5 Nuclear Criticality Safety (NCS) Program
405.1.2.6 Material Control and Accounting (MC&A) Program
405.1.2.7 Emergency Plan
415.1.2.8 Physical Security Plan
415.1.2.9 Communications Plan
415.1.2.10 Contractor Quality Control (CQC) Plan
425.1.2.11 Regulatory Compliance Plan
425.1.2.12 Perimeter Air Monitoring Plan (PAMP)
425.1.2.13 Sampling and Analysis Plan (SAP)
435.1.2.14 Wastewater Management Plan (WMP)
435.1.2.15 Storm Water Pollution Prevention Plan (SWPPP)
435.1.2.16 Waste Management, Transportation, and Disposal Plan
455.1.2.17 Waste Management Transportation and Disposal Facilities Report Package
455.1.2.18 Transportation Security Plan / Transporter Certification
455.1.2.19 Final Status Survey Plan (FSSP)
455.1.2.20 Backfill and Restoration Plan
455.1.3 Meetings
455.1.3.1 Facilitated Partnering
465.1.3.2 Coordination Meeting
465.1.3.3 Preconstruction Conference
465.1.3.4 Pre-Construction Survey
465.1.3.5 Mega Design-Construction Evaluations
475.1.4 Setup / Construct Temporary Facilities – 331XX0103
475.2 Monitoring, Sampling, Testing, and Analysis – 331XX02
475.2.1 Meteorological Monitoring – 331XX0201
485.2.2 Radiation Monitoring – 331XX0202
485.2.3 Air Monitoring and Sampling – 331XX0203
485.2.4 Sampling Surface Water / Groundwater / Liquid Waste – 331XX0205
485.2.5 Sampling Soil and Sediment – 331XX0206
495.2.6 Sampling Radioactive Contaminated Media – 331XX0208
495.2.7 Laboratory Chemical Analysis – 331XX0209
495.2.8 Radioactive Waste Analysis – 331XX0210
495.2.9 Geotechnical Testing – 331XX0211
495.2.10 On-Site Laboratory Facilities – 331XX0213
495.2.11 Beryllium Monitoring, Sampling, Testing, and Analysis – 331XX0290
505.3 Surface Water Collection and Control – 331XX05
505.4 Air Pollution / Gas Collection and Control – 331XX07
505.5 Solids Collection and Containment – 331XX08
505.6 Liquids / Sediments / Sludges Collection and Containment – 331XX09
505.7 Physical Treatment – 331XX13
505.8 Disposal (Commercial) – 331XX19
515.8.1 Transportation, Storage, Treatment and/or Disposal of Hazardous Materials
515.8.1.1 Transportation
515.8.1.2 Identification of the Disposal Facility
515.8.1.3 Shipment Tracking
525.8.1.4 Tracking of Hazardous, Radioactive, and/or Solid Wastes
525.8.1.5 Certification
525.8.2 Complete Manifest Package
525.8.2.1 Preparation
525.8.2.2 Submittal
525.8.2.3 Approval
525.8.2.4 Designation of Generator
535.8.2.5 Transportation of Waste
535.8.2.6 Generator Status
535.8.3 Transportation and Disposal Reporting Requirements
535.8.3.1 Hazardous Waste Manifest Annual and/or Biennial Reporting Requirements
535.8.3.2 Tabulated Waste Handling Information
535.8.3.3 State Reporting Requirements
535.8.3.4 Transportation and Disposal Tracking Form
535.8.3.5 Discrepancy Reports
545.8.3.6 Exception Reports
545.8.3.7 On-Site Personnel
545.8.4 Contractor Responsibilities
545.8.5 Government Responsibilities
545.8.6 Regulator Notices of Non-Compliance
545.8.7 Subcontractor Coordination
545.9 Site Restoration – 331XX20
555.10 Demobilization – 331XX21
555.10.1 Removal of Temporary Facilities – 331XX2101
555.10.2 Final Decontamination – 331XX2103
565.10.3 Demobilization of Construction Equipment and Facilities – 331XX2104
565.10.4 Submittals – 331XX2106
565.10.4.1 Project Completion Report
575.10.4.2 Lessons Learned Reports
575.10.4.3 Lessons Learned Meetings
575.11 General Requirements – 331XX22
575.11.1 Supervision and Management – 331XX2201
575.11.1.1 Project Meetings
585.11.1.2 Conference Calls / Progress Meetings
585.11.2 Administration Job Office – 331XX2202
585.11.3 Engineering, Surveying, and Quality Control – 331XX2204
585.11.4 First Aid, Fire Protection, and Traffic Control – 331XX2206
595.11.5 Health and Safety – 331XX2207
595.11.5 Temporary Construction Facilities – Ownership – 331XX2208
595.11.6 Temporary Construction Facilities – Operation – 331XX2209
595.11.7 Project Utilities – 331XX2210
606.0 CONTRACTOR PROJECT STAFF ORGANIZATION, QUALIFICATIONS AND RESPONSIBILITIES
606.1 List of Key Job Functions, Qualifications and Responsibilities
606.1.1 Program Manager
616.1.2 Project Manager
616.1.3 Site Superintendent
626.1.4 Safety and Health Manager
636.1.5 Site Safety and Health Officer (SSHO)
636.1.6 Radiation Safety Officer
646.1.7 Assistant Radiation Safety Officer
656.1.8 Certified Health Physicist (CHP)
656.1.9 Construction Quality Control System Manager
666.1.10 Nuclear Material Accountability Officer
676.1.11 Nuclear Criticality Safety Manager
686.1.12 Senior NCS Engineer
686.1.13 Data Acquisition Manager
696.1.14 Project Chemist / Lab Manager
706.1.15 Training Coordinator
716.1.16 Facility Security Officer
716.1.17 Emergency Manager
726.1.18 Waste Manager
736.1.19 Project Scheduler
736.2 Other On-Site Personnel
746.3 Corporate Support Staff
746.3.1 Civil Engineer
746.3.2 Hydro-Geologist
746.3.3 Regulatory Specialist
756.3.4 Cost Scheduler
756.3.5 Contracts Manager
756.3.6 Other Personnel
767.0 RESIDENT MANAGEMENT SYSTEM
778.0 DELIVERABLES AND SUBMITTALS.
778.1 General Submittal Requirements
778.2 Independent Technical Review
788.3 CONTRACTOR Submittal Procedures
788.3.1 Control of Submittals
788.3.2 For Information Only (FIO) Submittals
788.3.3 Approved Submittals
788.3.4 Disapproved Submittals
788.3.5 Withholding of Payment
788.3.6 Approval of Submittals
788.3.7 Deviations
798.3.8 Information Only Submittals
798.3.9 As-Built Drawings
809.0 GREEN AND SUSTAINABLE REMEDIATION AND INNOVATIVE TECHNOLOGIES
8210.0 GOVERNMENT FURNISHED PROPERTY
8311.0 PUBLIC AFFAIRS
8412.0 REAL ESTATE RIGHTS
8513.0 INVOICES
8714.0 REFERENCES
ACRONYMS AND ABBREVIATIONS
AEC
United States Atomic Energy Commission
AFARS
Army Federal Acquisition Regulation Supplement
AHA
Activity Hazard Analysis
AIHA
American Industrial Health Association
ALARA
As Low As Reasonably Achievable
Am-241 Americium-241
ANS
American Nuclear Society
ANSI
American National Standards Institute
APP
Accident Prevention Plan
AR
Army Regulation
ARAR
Applicable or Relevant and Appropriate Requirement
ARCO
Atlantic Richfield Company
ARSO
Assistant Radiation Safety Officer
ATCTS
Army Training Certification Tracking System
ATP
Authority to Proceed
B&W Babcock & Wilcox Company
Be Beryllium
BMP
Best Management Practices
BWXT
BWX Technologies, Inc.
CAAS
Criticality Accident Alarm System
CADD
Computer Aided Design and Drafting
CBDPP
Chronic Beryllium Disease Prevention Program
CDC
Centers for Disease Control and Prevention
CDQMP
Chemical Data Quality Management Plan
CERCLA
Comprehensive Environmental Response, Compensation, and Liability Act
CFR
Code of Federal Regulations
CHP
Certified Health Physicist
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number
CONTRACTOR
Remediation Contractor
COR
Contracting Officer’s Representative
CPFF
Cost-Plus-Fixed-Fee
CPIF
Cost-Plus-Incentive-Fee
CPM
Critical Path Method
CPR
Cardiopulmonary Resuscitation
CQC
Contractor Quality Control
CQCSM
Contractor Quality Control System Manager
CSP
Certified Safety Professional
D&D Decontamination and Decommissioning
DA
Department of the Army
DCAA
Defense Contract Audit Agency
DCGL
Derived Concentration Guideline Level
DCP
Double Contingency Principle
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
United States Department of Defense
DOE
United States Department of Energy
DOT
United States Department of Transportation
DU
Depleted Uranium
ECB
Engineering Construction Bulletin
ELAP
Environmental Laboratory Accreditation Program
EM
Engineer Manual
ER
Engineer Regulation
ERPIMS
Environmental Restoration Program Information Management System
EVMS
Earned Value Management System
FAR
Federal Acquisition Regulation
FFP
Firm-Fixed-Price
FID
Flame Ionization Detectors
FS
Feasibility Study
FSO
Facility Security Officer
FSP
Field Sampling Plan
FSSP
Final Status Survey Plan
FUSRAP
Formerly Utilized Sites Remedial Action Program
GFE
Government Furnished Equipment
GFP
Government Furnished Property
GIS
Geographic Information System
GSR
Green and Sustainable Remediation
HP
Health Physics
HQUSACE
Headquarters, United States Army Corps of Engineers
HSPD
Homeland Security Presidential Directive
HTRW
Hazardous, Toxic and Radiological Waste
IA/IT
Information Assurance / Information Technology
ICPMS
Inductively Coupled Plasma Mass Spectroscopy
ICS
Incident Command System
IDIQ
Indefinite Delivery Indefinite Quantity
IH
Industrial Hygiene
IROFS
Items Relied On For Safety
IT
Innovative Technologies
ITR
Independent Technical Review
KO
Contracting Officer
LLRW
Low-level Radioactive Waste
LQMP
Laboratory Quality Management Plan
MARLAP
Multi-Agency Radiological Laboratory Analytical Protocols
MARSAME
Multi-Agency Radiation Survey and Assessment of Materials and Equipment
MARSSIM
Multi-Agency Radiation Survey and Site Investigation Manual
MC&A
Material Control and Accountability/Accounting
MED
Manhattan Engineer District
MIS
Management Information System
MOU
Memorandum of Understanding
MPB
Material Processing Building mrem Millirem
MSDS
Material Safety Data Sheet
NAS
Network Analysis System
NCP
National Oil and Hazardous Substances Pollution Contingency Plan
NCS
Nuclear Criticality Safety
NDA
Non-Destructive Assay
NIOSH
National Institute for Occupational Safety and Health
NMAO
Nuclear Material Accountability Officer
NMMSS
Nuclear Materials Management and Safeguards System
NNSA
National Nuclear Security Administration
NOV
Notice of Violation
NRC
United States Nuclear Regulatory Commission
NRRPT
National Registry of Radiation Protection Technologists
NUMEC
Nuclear Materials and Equipment Corporation
OACSIM
Office of the Assistant Secretary for Installation Management
O&M Operation and Maintenance
OSH
Occupational Safety and Health
OSHA
Occupational Safety and Health Administration
OSWER
Office of Solid Waste and Emergency Response
PADEP
Pennsylvania Department of Environmental Protection
PAT
Proficiency Analytical Testing
PID
Photo Ionization Detectors
PMP
Project Management Professional
PPE
Personal Protective Equipment
Pu-238 Plutonium-238
Pu-239 Plutonium-239
Pu-241 Plutonium-241
PWS
Performance Work Statement
QA
Quality Assurance
QAPP
Quality Assurance Project Plan
QC
Quality Control
Ra-226 Radium-226
Ra-228 Radium-228
RCRA
Resource Conservation and Recovery Act
RFP
Request for Proposal
RMS
Resident Management System
ROC
Radionuclides of Concern
ROD
Record of Decision
RPP
Radiation Protection Program
RSO
Radiation Safety Officer
SAMS
Safeguards Management Software
SAP
Sampling and Analysis Plan
SATOC
Single Award Task Order Contract
SHM
Safety and Health Manager
SLDA
Shallow Land Disposal Area
SNM
Special Nuclear Material
SOR
Sum of Ratios
SOW
Scope of Work
SSHO
Site Safety and Health Officer
SSHP
Site Safety and Health Plan
SVOC
Semi-Volatile Organic Compound
SWPPP
Storm Water Pollution Protection Plan
T&D Transportation and Disposal
TBD
To Be Determined
TEDE
Total Effective Dose Equivalent
Th-232 Thorium-232
TRU
Transuranic
TSDF
Treatment, Storage or Disposal Facility
TSP
Transportation Security Plan
U-232 Uranium-232
U-233 Uranium-233
U-234 Uranium-234
U-235 Uranium-235
U-238 Uranium-238
UFGS
Unified Facilities Guide Specifications
UFP
Uniform Federal Policy
USACE
United States Army Corps of Engineers
USEPA
United States Environmental Protection Agency
VOC
Volatile Organic Compounds
VTR
Vault Type Room
WAC
Waste Acceptance Criteria
WAD
Work Allocation Document
WBS
Work Breakdown Structure
WVN
Work Variation Notice
Y-12 Y-12 National Security Complex
1.0 GENERAL
1.1 Contract Award
The U.S. Army Corps of Engineers (USACE) intends to award an indefinite delivery/indefinite quantity (IDIQ) single award task order contract (SATOC) under Solicitation No. W912P4-15-R-0001 for remediation services. This ten (10) year IDIQ SATOC will include a five (5) year base period and a five (5) year option period in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 217.204, and will be procured using full and open competition procedures. Under this IDIQ SATOC, USACE intends to issue fixed-price and/or cost-reimbursable task orders. Cost-reimbursable task orders may include fixed-fee or incentive-fee.
1.2 Issuance of Task Orders
(a) For each task order to be awarded under this IDIQ SATOC, the Contracting Officer (KO) will provide the Remediation Contractor (CONTRACTOR) with a Performance Work Statement (PWS) describing all work and services required. The CONTRACTOR must provide the Government with a proposal within the period specified in the. Each task order will either be a firm-fixed-price (FFP), cost-plus-fixed-fee, or cost-plus-incentive-fee. The CONTRACTOR's proposal must be supported by necessary documentation such as drawings, calculations, catalog cuts, specifications, and architectural renderings, to indicate that adequate engineering and planning to accomplish the requirement has been done. The Government will review the proposal for completeness and negotiate, if necessary, with the CONTRACTOR.
(b) Task orders will then be issued by the KO. The CONTRACTOR will not be reimbursed for cost proposal preparation unless specifically stated in the PWS. The KO may consider paying a set proposal fee for difficult requirements such as those related to remediation of material. The CONTRACTOR will make every effort to maximize the use of local personnel to minimize travel costs.
1.3 Scope of Work
(a) This IDIQ SATOC is for remediation services required at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Shallow Land Disposal Area (SLDA) site in Parks Township, Armstrong County, Pennsylvania.
(b) This IDIQ SATOC requires the CONTRACTOR to furnish all labor, material, equipment, and supervision to perform all work necessary to complete simultaneous task orders at the SLDA site. The remedial activities required under this scope of work may include, but are not limited to: development of work plans, emergency response preparedness, environmental monitoring, excavation, waste characterization and segregation, waste evaluation, waste packaging, and transport and disposal of radiologically contaminated materials. The radioactively contaminated soils, sediments, and debris will be removed from the disposal trenches, subjected to on-site management, and transported off site for disposal in a facility permitted to receive such materials. Final status surveys of completed excavations must be performed to verify any soil remaining is below derived concentration guideline levels (DCGLs) specified in the Record of Decision (ROD) (DA, 2007). Excavated non-radioactive materials (below DCGLs) may be used for backfilling of the excavations if below the Pennsylvania Act 2 Clean Fill Policy Criteria. Excavated chemical-only wastes will be transferred by the CONTRACTOR to the site owner for disposition. On-site processes may include temporary storage, physical separation, size reduction, and radiological sorting.
(c) The waste types anticipated at the SLDA include, but are not limited to liquids, solids and demolition debris that may contain, among other constituents:
special nuclear material (SNM) as defined in 10 CFR 70.4 radioactive waste including, but not limited to, low-level radioactive waste (LLRW), and transuranic (TRU) waste mixed waste (i.e., waste that contains both source, SNM, or by-product material defined by the Atomic Energy Act of 1954, as amended, and hazardous waste as defined by RCRA) beryllium (Be) contaminated waste non-radioactive waste (below DCGLs) as defined by RCRA (characteristic waste) non-radioactive waste (below DCGLs) not defined by RCRA
(d) The CONTRACTOR will be responsible for year round operation of the site. If any periods of inactivity are encountered, the CONTRACTOR will be responsible for operations and maintenance activities required to maintain the site in a secure, limited activity condition. The USACE recognizes that periods of inactivity may impact retention of personnel and encourages optimization of annual operations to avoid these challenges.
(e) Additional activities may include, but are not limited to: environmental investigation, design, construction and/or modification of site infrastructure, preparation of appropriate documents and work plans, site maintenance, environmental monitoring, site restoration, interaction with local, State and Federal agencies including USACE, U.S. Department of Energy (DOE), U.S. Nuclear Regulatory Commission (NRC), NNSA, U.S. Environmental Protection Agency, Pennsylvania Department of Environmental Protection (PADEP) and emergency response agencies, assisting with preparation for and participation at public meetings, and any other actions necessary to remediate the SLDA.
2.0 BACKGROUND INFORMATION
2.1 Site Location and Description
(a) The SLDA site is located in Armstrong County, Pennsylvania, about 23 miles (38 km) east-northeast of Pittsburgh, Pennsylvania. The SLDA site is adjacent to the community of Kiskimere in Parks Township, Armstrong County, Pennsylvania. The SLDA site is bordered by Kiskimere Road to the southwest and State Route 66 and the Kiskiminetas River to the northwest. A seasonal stream called Dry Run meanders along the northeast side of the site.
(b) The SLDA site occupies approximately 44 acres (17.8 hectares) and is bounded by the community of Kiskimere to the southwest and vacant undeveloped land to the southeast and northeast. The former Parks Nuclear Fabrication facility site is located adjacent to and northwest of the SLDA site. Currently, the Parks site is vacant land owned by BWX Technologies, Inc. (BWXT). Land use within the vicinity of the SLDA site is mixed, consisting of small residential communities, individual rural residences, small farms with croplands and pastures, idle farmland, forested areas, and light industrial properties.
2.2 Site History
(a) In 1957, the Apollo Nuclear Fabrication Facility began operations in Apollo, Pennsylvania, under U.S. Atomic Energy Commission (AEC) license No. SNM-145. Between 1961 and 1970, Nuclear Materials and Equipment Corporation (NUMEC), who owned both the Apollo Facility and the Parks Facility including the SLDA, buried process and other wastes from the Apollo plant at the SLDA site. According to historical documents, these wastes were buried in accordance with AEC regulation 10 CFR 20.304, Disposal by Burial in Soil, which was subsequently rescinded in 1981. In 1967, NUMEC stock was bought by Atlantic Richfield Company (ARCO) and the use of the SLDA for radioactive waste disposal was discontinued after 1970. Anecdotal information suggests that not all materials buried at SLDA were recorded or documented, and burials may have continued beyond 1970. In 1971, the Babcock & Wilcox Company (B&W) acquired NUMEC. In 1997, BWXT assumed ownership of the SLDA and is the current owner.
(b) Based on reports prepared by ARCO/B&W, and discussions with individuals familiar with disposal operations at SLDA, the waste materials were placed into a series of pits that were constructed adjacent to one another. From geophysical surveys performed at the site, these pits appear as linear trenches and are depicted on site drawings as trenches. These geophysical anomalies were labeled as “trenches” 1 through 10; this numbering scheme was based partially on the sequential construction and use of each trench (1 being the oldest trench and 9 being the most recently constructed trench in the upper trench area). Trench 10 is located in another part of the site and was used for disposal purposes throughout the 1960s and during 1970.
(c) In 1965, the contents of trenches 2, 4 and 5 were excavated simultaneously and placed on the ground in the area between those trenches. After sorting through the material, packaging and disposing of some waste off-site, the remainder of the material, then mixed, was placed back in the three originating open trenches. As a result, the contents of the three trenches were mixed prior to (and during) replacement of the material back into the trenches. In addition, some contaminated soil and debris became mixed with the trench cover soils, and is located closer to the surface than originally reported.
2.3 ROCs and Soil Cleanup Goals
The scope of this response action addresses the eight specific ROCs identified at the SLDA site: americium-241 (Am-241), plutonium-239 (Pu-239), plutonium-241 (Pu-241), radium-228 (Ra-228), thorium- 232 (Th-232), uranium-234 (U-234), uranium-235 (U-235), and uranium-238 (U-238). Radionuclide-specific soil clean-up goals, referred to as Derived Concentration Guideline Levelss (DCGLs), for the SLDA site are as follows:
Radionuclide
DCGL (pCi/g)
Am-241
Pu-239
Pu-241
Ra-228
1.7
Th-232
1.4
U-234
U-235
U-238
If a mixture of radionuclides is present at a given location, then the Sum of Ratios (SOR) applies per the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). For example, using the DCGLw values for soil, the following equation is obtained:
Ra-228 Am-241 Pu-241 Pu-239 Th-232 U-234 U-235 U-238
SOR =
--------- + ---------- + --------- + ----------+ ---------- + -------- + -------- + --------- ≤ 1
1.7 28 890 33 1.4 96 35 120
If nuclides other than the ROCs listed above are discovered during remediation in significant quantities, the Corps may evaluate and establish soil-based cleanup goals in addition to the DCGLs listed above.
2.4 Regulatory Background
(a) In 1997, Congress designated the USACE as the lead federal agency for implementing the FUSRAP. As the lead federal agency for FUSRAP, USACE has authority to address the following:
· Radioactive contamination (hazardous substance) from Manhattan Engineer District (MED)/Atomic Energy Commission (AEC) activities, or
· Other hazardous substances (i.e., Be), pollutants, or contamination resulting from MED/AEC activities, or
· Hazardous substances, pollutants or contamination unrelated to MED/AEC activities, but which are commingled with MED/AEC waste.
(b) The authority for this response action is found in Section 8143 of the Fiscal Year 2002 Defense Appropriations Act, Public Law 107-117, which, subject to subsections (b) through (e) of section 611 of Public Law 106-60 (113 Stat. 502; 10 U.S.C. 2701 note), directs the Secretary of the Army, acting through the Chief of Engineers, to clean up radioactive waste at the SLDA site under the FUSRAP. The cleanup is subject to Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and its implementing regulations found in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), 40 CFR 300. This law also directs the USACE to clean up radioactive waste at the SLDA site, consistent with the July 5, 2001 Memorandum of Understanding (MOU) between the NRC and USACE for the coordination of cleanup and decommissioning of FUSRAP sites with NRC-licensed facilities. A site-specific MOU between USACE, NRC, DOE-Office of Environmental Management, and NNSA, was approved in 2014 for the purpose of articulating the cooperation of the agencies relating to the remediation at SLDA and details the respective roles and responsibilities of each agency. Any chemical contamination that is not co-mingled with radioactive waste cannot be addressed by the USACE under FUSRAP by the authority provided in Section 8143 of Public Law 107-117.
(c) The Administrative Record file for the SLDA site is located at the following locations:
U.S. Army Corps of Engineers, Pittsburgh District
Apollo Memorial Library
100 Liberty Avenue
219 North Pennsylvania Avenue
Pittsburgh, Pennsylvania 15222
Apollo, Pennsylvania 15613
(d) Within the CERCLA process, the Preliminary Assessment (USACE, 2002), Remedial Investigation (DA, 2005), Feasibility Study (DA, 2006a), Proposed Plan (DA, 2006b), ROD (DA, 2007), Feasibility Study Addendum (DA, 2014a), Proposed ROD Amendment (DA, 2014b), and a ROD Amendment (DA, 2015) have all been completed. The ROD and ROD Amendment formally provide the clean up alternative to be used at the site. The selected remedy in the ROD is to excavate radiologically contaminated material to unrestricted levels (subsistence farmer) and transport the material out of state to an approved disposal facility. For additional background information, please refer to the SLDA Project Website: https://tiny.army.mil/r/Loj2/
(e) The SLDA site is currently owned by BWXT and is maintained under NRC License SNM-2001. The NRC has placed the license in abeyance to enable the USACE to conduct remedial action activities in accordance with the MOU. During this period of license abeyance, USACE has control of the site for the purposes of protecting public health and safety, and radiation control.
2.5 Applicable or Relevant and Appropriate Requirements
The applicable or relevant and appropriate requirement (ARAR) for the SLDA site is 10 CFR Section 20.1402, Radiological Criteria for Unrestricted Use. 10 CFR 20.1402 considers a site to be acceptable for unrestricted use if residual radioactivity exceeding background results in a total effective dose equivalent (TEDE) that does not exceed 25 millirem (mrem) per year to the average member of the critical group, including that from groundwater sources of drinking water, and that the residual radioactivity has been reduced to levels that are as low as reasonably achievable (ALARA). The critical group was determined to be Subsistence Farmer.
2.6 Roles and Responsibilities
(a) The USACE is the lead agency for this remedial action and has overall responsibility for execution of the project. The DOE and NNSA will assist USACE in the characterization and disposition of potentially recoverable SNM and non-recoverable SNM that is precluded from disposal at commercial disposal facilities (Y-12 will supply all packaging and transportation for these materials). The NRC has the potential to observe and advise USACE under the Site Specific MOU (June 2014).
(b) The USACE Pittsburgh District has been assigned project management responsibility for remediation of the SLDA. The USACE Buffalo District is the Hazardous, Toxic and Radiological Waste (HTRW) Design Center assigned as the technical lead for the investigation and remediation work for this site. The combined USACE team is working closely with the PADEP, NRC, DOE, Parks Township, the stakeholders, and BWXT.
2.7 USACE Mega-Project Requirements
(a) The SLDA project has been designated by Headquarters, USACE (HQUSACE) as a “Mega-Project” as defined in Engineering and Construction Bulletin, No. 2014-14 (ECB 2014-14). The mega-project designation requires additional project management controls and efforts as detailed in ECB 2014-14. The CONTRACTOR must comply with all applicable mega-project tenets listed in ECB 2014-14, which are also summarized in this PWS.
(b) A three-tiered governance structure will be established for mega-projects in order to achieve needed accountability, visibility, understanding, and timely decision-making in order to assure effective communication and issue resolution at appropriate levels. The three levels will be established as follows:
1. Senior Executive Board – The senior level is composed of senior leaders from USACE and the CONTRACTOR’s corporate senior vice president or equivalent. Senior leaders from HQUSACE will serve in an advisory role to the mega-project’s Senior Project Executive, who is the Director of Programs for the Great Lakes and Ohio River Division, USACE.
2. Executive Leadership Team – The mid-level is composed of USACE program managers and supervisors, and the CONTRACTOR’s vice president level staff. This team is responsible for day-to-day operations at the project site, and for making decisions and applying resources to solve problems that rise above typical project management responsibilities.
3. Project Leadership Team – The working-level consists of the CONTRACTOR personnel assigned to accomplish the work tasks and develop the submittals specified in this PWS, and the USACE personnel assigned to provide direct oversight and management of the project.
2.8 Existing Site Conditions and Information
(a) NRC License SNM-2001 is suspended and will remain suspended for the duration of SLDA remediation under the USACE authority. The conditions specified in the NRC issued Confirmatory Order that suspended the license remain valid.
(b) A CONTRACTOR NRC license is not required to perform SLDA remediation. However, the CONTRACTOR should assume that on-site laboratories will require an NRC license to receive licensable calibration sources from a distributor. All radioactive sources and/or radiation generating devices to be used on the SLDA site must be approved by the USACE prior to delivery.
(c) The CONTRACTOR assumes responsibility for radioactive and mixed waste until it is received and accepted at an approved off-site disposal facility or possession is transferred to a federal agency partner. CONTRACTOR must demonstrate all waste packaged and prepared for shipment is acceptable for disposal (meets the recipient disposal facility WAC) and is prepared in accordance with applicable federal regulations and CONTRACTOR’s work plans. CONTRACTOR must prepare a declaration stating this and present this declaration with shipping papers for review by the USACE (and signature).
(d) USACE is not responsible for disposal of waste containing non-radiological contaminants only (below DCGLs). This type of waste remains the responsibility of BWXT, the site owner. The CONTRACTOR is responsible for identifying this waste, determining the hazards or hazardous characteristics, and safe storage of the material pending BWXT disposal. A separate “Chemical-Only Pad” remains on-site.
(e) There are no possession limitations for radioactive material, including SNM, removed from the trenches and in-process of removal from the SLDA site. However, the requirements specified in the CONTRACTOR’s Radiation Protection Program (RPP), Accident Prevention Plan (APP), NCS and MC&A Plans/Programs, as well as the SLDA site Physical Security Plan (established, maintained and controlled by the USACE) must be followed. NOTE: “In-process” includes everything up to final removal of material from the SLDA site by the appropriate transport method, including material required to be disposed by others, i.e. USACE federal agency partners.
(f) Uranium (U) is present as natural U, depleted U, low enriched U and high enriched U. U may be distributed in soil/waste, contained within intact or partially intact containers, as well as solid objects, and in any form (chemical and physical, including ceramic or other product types).
(g) Non-radiological contaminants include any potential chemical and solid wastes associated with nuclear fuel processing, research and development (R&D), as well as laboratory waste (including discarded bottles/containers of unused reagent grade laboratory chemicals). Beryllium is present. Additionally, other non-radiological contaminants may include those typical of disposed building materials (asbestos, etc.) or components (PCB, etc.).
(h) Waste is known to be within 10 trenches. Although NUMEC/ARCO was authorized to dispose of waste on-site in accordance with 10 CFR 20.304 (rescinded), it should not be assumed the requirements of the regulation or AEC license were followed. Although waste originating from the NUMEC/ARCO Parks Township facility or facilities external to NUMEC/ARCO were excluded from the on-site disposal authorization, it should not be assumed those wastes are not present in the trenches. Other areas of soil contaminated with radioactive material exist within the SLDA site.
(i) Excavated soil with no waste present, but containing low concentrations of radionuclides demonstrated to meet the DCGLs and demonstrated to meet the Pennsylvania Department of Environmental Protection (PADEP) requirements for management of fill may be used as backfill.
(j) Waste records that estimate the volume of waste in the SLDA trenches, as well as the radiological and chemical contaminants and SNM mass, are not considered to be accurate and the actual contents of the trenches is unknown. While a summary of this information is provided in the SLDA Remedial Investigation Report (and other documents), it should be stressed that this is based on best available information and should not, in any way, be assumed complete or fully representative of all waste within the trenches.
(k) An active account for the SLDA site exists in the Nuclear Materials Management and Safeguards System (NMMSS) database. The Reporting Identification Symbol (RIS) is VBL. However, the only information in the NMMSS database for the SLDA site is transaction data from the 2011 and 2012 remediation efforts (prior to the start of those efforts the VBL account contained no data). Therefore, to remove material from the VBL account it must first be added to the database.
(l) Existing Trench Conditions:
1. There is no covering (other than soil) or other protection of the trench areas from the elements, thus retained water exists within many of the trenches and as a result of years of snow, rain and retained water all waste is assumed wet.
2. Partially excavated Trench 3 is covered with two layers of geo-fabric and two layers of place back soil that must be removed prior to waste excavation.
3. Lighting in the trench areas does not exist.
(m) A complete list of government owned equipment can be found in Attachment 8 of Section J. Existing SLDA infrastructure includes:
1. The SLDA site is within an existing perimeter fence. At many locations around the site this fence separates the site from privately owned land, accessible by the public, and a public roadway. Residential areas are in the near vicinity. A security contractor with a separate contract directly with the USACE is responsible for administration and implementation of the SLDA physical security requirements. It is the responsibility of the CONTRACTOR to comply with those requirements and coordinate with the site security contractor.
2. A paved roadway exists from the primary SLDA site access on State Route 66 and traverses the site ending at the temporary structure known as the Material Processing Building (MPB).
3. A trailer complex remains on-site, south of the upper trench area (and south of the paved roadway). These trailers were used previously for office areas, as well as other project support services. Telephone and utility services (electric and water) remain. All water service to the trailer complex and other locations on-site has been drained up to the backflow preventer/meter and will remain in that condition until remediation activities resume. There is no sanitary sewer service on-site. Sewage is collected in tanks and pumped periodically by a local sewage disposal service. This is a CONTRACTOR supplied service.
4. The MPB constructed in 2009 remains on-site and is a radiologically controlled area. This is a steel frame fabric structure 150 feet wide, 400 feet long and 65 feet high at the peak, on concrete foundation. The floor is primarily asphalt with some concrete slab areas. There are roll-up and personnel access doors on the east and west ends of the MPB. A building ventilation system remains. This consists of four (4) independent 50,000 cubic feet per minute (cfm) units. Each unit consists of HEPA filtration on the inlet side prior to the vent fan which exhausts to a granular activated carbon vessel. All 4 units are on the exterior of the north side of the MPB, with the HEPA filter intakes along the inside north wall of the structure. Air is exhausted from each activated carbon vessel directly to atmosphere external to the MPB. The HEPA filters and activated carbon within the vessels remain. There are no effluent monitoring systems on the exhaust stacks. Make up air into the MPB is through louvers primarily on the south side of the MPB, with some on the east and west sides. Opening and closing of all inlet louvers is manual. There are no ventilation system interlocks (doors or louvers). There are no audible or visual alarm systems tied to ventilation system operations. A water collection/drain system is in place to divert water to a collection sump system in the building which was pumped to the wastewater treatment plant (WWTP). Utility services (electric and water) are provided to the MPB. A suitably sized emergency back-up generator will be required to be installed by the CONTRACTOR prior to start-up of the MPB. A separate structure (trailer) is in the southwest corner of the MPB building which served previously as a “clean” access/egress area, as well as “clean” work areas for support of MPB activities.
5. An asphalt area (Final Status Survey Pad) north of the MPB and ventilation systems, approximately 2 acres in size remains on site. An asphalt berm is provided around the majority of the perimeter of this area. Water collection/drain systems remain.
6. A WWTP previously on-site has been dismantled and removed. Infrastructure water collection points, as well as the transfer piping and temporary basins remain. Previous design relied on gravity water flow from the point of collection to the WWTP (sump pumps were utilized within open excavations for water removal which was piped to the WWTP). There are no intermediate pumps or lift stations.
7. A “drive on” type truck scale remains on-site. The total length of the scale deck is 60 feet. The gross weight capacity is 120,000 pounds.
8. There are no other structures, components, equipment or materials remaining on- site.
9. There is no direct rail access at the SLDA site.
(n) CONTRACTOR must supply all plans, programs, procedures, equipment, tools, materials, personnel (corporate, management, professional/technical and field) necessary to safely and completely execute tasks. CONTRACTOR retains responsibility for all CONTRACTOR owned and supplied equipment, tools and materials, including disposition of potentially contaminated equipment, tools and materials upon completion of assigned tasks.
(o) All activities conducted by the CONTRACTOR are subject to audits and/or inspections by the USACE. The USACE or separate contractor to the USACE will perform periodic independent and/or QA sampling, including, but not limited to, split or duplicate sampling with the CONTRACTOR, and/or surveys of areas and material in-process. Additionally, the USACE or separate contractor to the USACE may perform confirmatory sampling / measurements of candidate back-fill soil (soil removed from area at the SLDA site and proposed for reuse, as well as final trench limits of excavation). Use of back-fill soil or back fill of a remediation area can only be performed after authorization is received from the USACE.
(p) The USACE retains responsibility for public communications and coordination with off- site response organizations (local, state and Federal). This will not impede/delay necessary emergency assistance for personnel injuries (or personnel in need of immediate medical attention) or minimizing major property damage. If that is necessary, the USACE must be immediately notified after summoning this assistance.
3.0 UNIVERSAL REQUIREMENTS
3.1 Safety and Health
Personnel safety, public safety and protection of the environment are of paramount importance to the USACE. The CONTRACTOR management team must fully embrace safety as a tenant of this project by example, with clear, unambiguous statements of safety expectations for all project personnel. Zero accidents is an attainable goal. To achieve this goal, the CONTRACTOR must demonstrate that personnel have been provided with the necessary knowledge, equipment and tools to perform their jobs safely and without incident. Additionally, the CONTRACTOR must implement a process to identify issues (including precursors to events), perform causal analyses commensurate with the significance of the issue, document issue resolution through a corrective action tracking and resolution system, communicate issues identified and share lessons learned within the CONTRACTOR organization and the USACE. As part of this system, the CONTRACTOR must solicit feedback from project personnel utilizing an employee concerns or similar program. The CONTRACTOR management team must clearly communicate to all project personnel that adverse actions, direct or indirect, against project personnel for raising concerns will not be tolerated.
3.2 Physical and Information Security
(a) CONTRACTOR must comply with the general security requirements of the solicitation and approved physical security plans. Physical security of the site is the responsibility of USACE and its contracted security force. It is anticipated that classified technical data and documentation, up to the level of “Secret”, per U.S. Department of Defense (DOD) and NRC classification, will be available and utilized by the CONTRACTOR during performance of some task orders. The CONTRACTOR and all subcontractors will be required to have personnel with the appropriate security clearances, and will be required to protect classified information pursuant to relevant policies. Security requirements will be administered in accordance with 10 CFR Part 73, DOD Manual 5220.22M, National Industrial Security Program Operating Manual, DOD Regulation 5200.01R, DOD Information Security Program, and Army Regulation (AR) 190-13, The Army Physical Security Program. The CONTRACTOR will also be required to meet threat information reporting standards.
(b) The USACE and its security contractor will be responsible for issuing an identification badge/card to each employee working on site. Identification must consist of name tags with the name of the CONTRACTOR, the employee's name, picture, and access level. Additionally, a valid state driver's license or other government-issued photo identification card is required for positive identification.
(c) All CONTRACTOR and subcontractor employees performing work under this contract must have a DOD “Secret” (or DOE/NRC equivalent clearance) at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the DD Form 254. Background investigations are defined in two parts as described below:
1. Prior to any CONTRACTOR employees accessing the work site, an initial background check must be completed. To accomplish this, the CONTRACTOR must submit a complete list of employees who will be working on Government property (CONTRACTOR employees and any subcontractor employees) employees on the list will need to be fingerprinted by the Pittsburgh District Security Office and results approved prior to access being granted. The process of receiving fingerprint results can take up to ten (10) business days. This fingerprint requirement can be waived for any individual with a current, valid security clearance. The Pittsburgh Office of Security & Law Enforcement will verify that all security clearances are valid. If no issues are found, approval to begin work will be provided in writing by the KO or the COR to the CONTRACTOR upon receipt of the results from the Pittsburgh Office of Security & Law Enforcement. At that time, CONTRACTOR employees receiving a favorable background check will be permitted access to the work site."
2. In addition to the requirements of subparagraph 1 above, if the CONTRACTOR is awarded task orders that are sensitive or require access to a USACE computer network, the CONTRACTOR must also submit evidence of a sufficient clearance for each CONTRACTOR and subcontractor employee requiring such access. Security requirements are subject to change in accordance with Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors (HSPD-12), Office of Personnel Management, US Army Force Protection Measures, regulation or policy changes. Changes to any security requirements will be added to the contract by modification.
(d) The CONTRACTOR will be required to comply with AR 525-13, Antiterrorism that will be administered by the Pittsburgh District. AR 525-13 requirements are as follows:
1.
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
2.
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .