Shallow Land Disposal Area (SLDA) SOW
Section 31 11 00 Page 1
SECTION 31 11 00
CLEARING AND GRUBBING
08/08
PART 1 GENERAL
1.1 SUBMITTALS
Submittals shall be controlled in accordance with Section 8.0 of the SOW.
1.2 DELIVERY, STORAGE, AND HANDLING
Deliver materials to store at the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use.
PART 2 PRODUCTS
2.1 TREE WOUND PAINT
Submit samples in cans with manufacturer's label of bituminous based paint of standard manufacture specially formulated for tree wounds.
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
Keep roads and walks free of dirt and debris at all times.
3.1.2 Trees, Shrubs, and Existing Facilities
Trees and vegetation to be left standing shall be protected from damage incident to clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.
3.1.3 Utility Lines
Protect existing utility lines that are indicated to remain from damage. Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor is responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service.
Shallow Land Disposal Area (SLDA) SOW
Section 31 11 00 Page 2
3.2 CLEARING
Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing shall also include the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such trees and vegetation as may be indicated or directed to be left standing. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 1-1/2 inches or more in diameter and shall be trimmed of all branches the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches. Cuts more than 1-1/2 inches in diameter shall be painted with an approved tree-wound paint.
3.3 TREE REMOVAL
Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING. Trees shall be disposed of as specified in paragraph DISPOSAL OF MATERIALS.
3.4 PRUNING
Trim trees designated to be left standing within the cleared areas of dead branches 1-1/2 inches or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches. Paint cuts more than 1-1/4 inches in diameter with an approved tree wound paint.
3.5 GRUBBING
Grubbing shall consist of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. Material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, shall be removed to a depth of not less than 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the original adjacent surface of the ground.
3.6 DISPOSAL OF MATERIALS
Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations, shall be disposed of in the designated waste disposal area, except when otherwise directed in writing.
Such directive will state the conditions covering the disposal of such products and will also state the areas in which they may be placed.
-- End of Section --
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 TREE WOUND PAINT |
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Roads and Walks |
| 3.1.2 Trees, Shrubs, and Existing Facilities |
| 3.1.3 Utility Lines |
| 3.2 CLEARING |
| 3.3 TREE REMOVAL |
| 3.4 PRUNING |
| 3.5 GRUBBING |
| 3.6 DISPOSAL OF MATERIALS |
File details come from the government source that posted it. Updated .