QUESTIONS AND ANSWERS LA PORTE AS OF 29 JUN 09
Optional Form Jun 2009 26 KB Posted
- Attached to
- Award to Chance Construction on 22 Aug 09
- Solicitation number
- W912L109R0038
About this file
Q A as of 1 Jul 09
Text of this file
QUESTIONS AND ANSWERS
W912L1-09-R-0038
HURRICANE IKE REPAIRS AT LA PORTE ANG FACILITIES
As of 1 Jul 09
1. It was mentioned that there would be an addendum issued for the changes to the scope of work that were discussed at the pre- bid (i.e. metal roofing, replacing more windows etc...).
A. Addendum 1, 25 Jun 2009 has been issued and addresses the changes and additions to the Statement of Work. Attached.
1. Has the roof been cored to verify the underlayment, insulation etc?
A. No. Existing insulation is 2” thick +/-.
2. Can I schedule another site visit to measure the quantities of carpet and cove base that will be replaced? I can't seem to find them on the drawing.
A: No additional site visits are scheduled.
3. At the meeting, it was discussed that only "various" ceiling tiles would be replace. Do you have an accurate count for how many will need to be replaced?
A. Addendum 1 has set a percentage to be replaced.
Other versions and copies of OF 29
| File | Revision | Posted | Attached to |
|---|---|---|---|
| FA-S0501-1 ALT 2 SHEET 09C OF 29 AFT.PDF | Revision not stated | DRYDOCK REPAIR FOR NOAA SHIP FAIRWEATHER | |
| FA-S0501-1 ALT 2 SHEET 09B OF 29 MID.PDF | Revision not stated | DRYDOCK REPAIR FOR NOAA SHIP FAIRWEATHER | |
| FA-S0501-1 ALT 2 SHEET 09A OF 29 BOW.PDF | Revision not stated | DRYDOCK REPAIR FOR NOAA SHIP FAIRWEATHER |
Who attaches OF 29
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .