Contractor_Security_Policy_Letter.doc

DOC document 28 KB Posted

Attached to
Award to Chance Construction on 22 Aug 09
Solicitation number
W912L109R0038
Issued by

About this file

CONTRACTOR SECURITY POLICY LETTER

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS LA PORTE as of 21 JUL 09.doc DOC document
QUESTIONS AND ANSWERS LA PORTE AS OF 20 JUL 09.doc DOC document
QUESTIONS AND ANSWERS as of 8 Jul 09.doc DOC document
QUESTIONS AND ANSWERS as of 7 Jul 09.doc DOC document
QUESTIONS AND ANSWERS as of 6 JUL 09.doc DOC document
Addendum 2 Dimensioned Floor Plans 20090701.pdf PDF
QUESTIONS AND ANSWERS LA PORTE AS OF 29 JUN 09 —
9- Exhibit C 12-05.doc DOC document
Exhibit D-E-F Jan 08.doc DOC document
8 -Exhibit B 1205.doc DOC document
QUESTIONS AND ANSWERS as of 1 JUL 09.doc DOC document
08110-Steel Doors Frames.DOC DOC document
09651 - Resilient Tile Flooring and Accesories.DOC DOC document
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MEETING MINUTES - LA PORTE FACILITIES.doc DOC document
PHOTOS.doc DOC document
Hurricane IKE B 1359 Drawings 20090506.pdf PDF
09512-Accoustical Ceiling.doc DOC document
09680 - Carpet.DOC DOC document
07210-Building Insulation.DOC DOC document
01001-00-General_Requirements.doc DOC document
01731-00-Cutting_ _Patching.DOC DOC document
01019-00-Contract_Considerations.DOC DOC document
AF Form 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Form WH-347-Wage report Form-BlanK.xls XLS spreadsheet
07620-Sheet Metal Flashing and Trim.DOC DOC document
01420-00-Environmental_Protection.doc DOC document
01700-00-Contract_Closeout.DOC DOC document
01300-00-Submittals 20090302.doc DOC document
09900 - Painting.doc DOC document
07591-Preparation for Reroofing 20090227 .doc DOC document
Form 3065-Contract Progress Report.xls XLS spreadsheet
07550-Modified Bitumin Roofing 20090226.doc DOC document
Form 3064- Progress Schedule.xls XLS spreadsheet
09255-Gypsum Board Assemblies.DOC DOC document
07560-Cold Coal Tar Modified 20090227.doc DOC document
01105-00-Haz_Mat_Procedures.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Policy Letter: Contractor/Visitor Access Procedures

CONSTRUCTION OR MAINTENANCE CONTRACTORS:

General Contractor is required to email or fax a listing of individuals who are authorized to access Ellington Field to:

Major Gary Kerr (gary.kerr@txelli.ang.af.mil) Fax: 281-929-2762

AND

Jamie Tigner (Jamie.tigner@txelli.ang.af.mil) Fax: 281-929-2784

The list of authorized personnel must include the following information:

· General Contractor Name/Address/Phone Number

· Subcontractor Name (if applicable)

· Subcontractor Address

· Subcontractor Office Phone Number

· Individual’s Name

· Individual’s State or Federal Identification Number (this must be a photo I.D.)

· Individual’s Date of Birth

· Individual’s Social Security Number (if available)

· Individual’s Supervisor Name

· Individual’s Supervisor Mobile Phone Number

· Projected Expiration Date of Contract Work

Major Gary Kerr or Mr. Tigner will enter the information into the Security Forces contractor access database. A printout of the database will be kept at the front gate. Persons whose names do not appear on the database will not be allowed access on to the installation.

Upon arriving at the base, individuals must be escorted by their supervisor to the front office of Security Forces in Building 1193 to be photographed and issued a Contractor’s Security Badge. To obtain the badge, individuals must present current and valid Federal or State photograph identification cards.

The Ellington Field Contractor’s Security Badge will contain all of the above listed information and must be displayed on the individual’s person at all times while on base.

Persons not properly displaying photo identification badges will be escorted off of the installation.

Misuse or alteration of the Security Badge will result in permanent disbarment from the base.

DELIVERIES AND SINGLE-DAY WORKERS

General Contractor or Squadron Representatives must advise the Front Gate in writing when deliveries are expected or when individual workers or visitors will need access to the site for a single day.

The Front Gate will take down the following information and issue temporary numbered badges:

· Individual’s Name

· Company Name

· Company Phone Number

· License Plate Number

The temporary badge must be returned to the Front Gate upon departure from the base each day.

File details come from the government source that posted it. Updated .