09680 - Carpet.DOC

DOC document 46 KB Posted

Attached to
Award to Chance Construction on 22 Aug 09
Solicitation number
W912L109R0038
Issued by

About this file

CARPET

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS LA PORTE as of 21 JUL 09.doc DOC document
QUESTIONS AND ANSWERS LA PORTE AS OF 20 JUL 09.doc DOC document
QUESTIONS AND ANSWERS as of 8 Jul 09.doc DOC document
QUESTIONS AND ANSWERS as of 7 Jul 09.doc DOC document
QUESTIONS AND ANSWERS as of 6 JUL 09.doc DOC document
Addendum 2 Dimensioned Floor Plans 20090701.pdf PDF
QUESTIONS AND ANSWERS LA PORTE AS OF 29 JUN 09 —
9- Exhibit C 12-05.doc DOC document
Exhibit D-E-F Jan 08.doc DOC document
8 -Exhibit B 1205.doc DOC document
QUESTIONS AND ANSWERS as of 1 JUL 09.doc DOC document
08110-Steel Doors Frames.DOC DOC document
09651 - Resilient Tile Flooring and Accesories.DOC DOC document
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MEETING MINUTES - LA PORTE FACILITIES.doc DOC document
PHOTOS.doc DOC document
Hurricane IKE B 1359 Drawings 20090506.pdf PDF
09512-Accoustical Ceiling.doc DOC document
07210-Building Insulation.DOC DOC document
01001-00-General_Requirements.doc DOC document
01731-00-Cutting_ _Patching.DOC DOC document
01019-00-Contract_Considerations.DOC DOC document
AF Form 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Form WH-347-Wage report Form-BlanK.xls XLS spreadsheet
07620-Sheet Metal Flashing and Trim.DOC DOC document
01420-00-Environmental_Protection.doc DOC document
01700-00-Contract_Closeout.DOC DOC document
01300-00-Submittals 20090302.doc DOC document
09900 - Painting.doc DOC document
07591-Preparation for Reroofing 20090227 .doc DOC document
Contractor_Security_Policy_Letter.doc DOC document
Form 3065-Contract Progress Report.xls XLS spreadsheet
07550-Modified Bitumin Roofing 20090226.doc DOC document
Form 3064- Progress Schedule.xls XLS spreadsheet
09255-Gypsum Board Assemblies.DOC DOC document
07560-Cold Coal Tar Modified 20090227.doc DOC document
01105-00-Haz_Mat_Procedures.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ellington Field ANGB

Houston, Texas

Copyright 1998, The American Institute of Architects (AIA)

SECTION 09680

CARPET

This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes carpet, installation accessories, and installation.

Revise subparagraph below if fusion-bonded or needle-punched carpet is required.

B. Related Sections include the following:

List below only products that the reader might expect to find in this Section but are specified elsewhere.

1. Division 3 Sections for curing compounds and other concrete treatments compatibility with carpet and carpet cushion.

2. Division 9 Section "Resilient Floor Tiles, Wall Base and Accessories" for resilient wall base and accessories installed with carpet.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated. Include manufacturer's written data on physical characteristics, durability, and fade resistance. Include installation recommendations for each type of substrate required.

B. Shop Drawings: Show the following:

Retain, revise, or delete subparagraphs below to suit Project.

1. Doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required in carpet.

2. Carpet type, color, and dye lot.

Retain subparagraph below only for large installations where multiple dye lots are unavoidable.

3. Locations where dye lot changes occur.

4. Seam locations, types, and methods.

5. Pattern type, repeat size, location, direction, and starting point.

6. Pile direction.

7. Type, color, and location of insets and borders.

8. Type, color, and location of edge, transition, and other accessory strips.

9. Transition details to other flooring materials.

Delete subparagraph below if not applicable.

C. Samples: For each of the following products and for each color and texture required. Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.

Delete subparagraphs below if not applicable.

1. Carpet: 12-inch- (300-mm-) square Sample.

2. Exposed Edge Stripping and Accessory: 12-inch- (300-mm-) long Samples.

3. Carpet Seam: 6-inch (150-mm) Sample.

4. Mitered Carpet Border Seam: 12-inch- (300-mm-) square Sample. Show carpet pattern alignment.

D. Product Schedule: Use same room and product designations indicated on Drawings and in schedules.

E. Maintenance Data: For carpet to include in maintenance manuals specified in Division 1. Include the following:

1. Methods for maintaining carpet, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.

2. Precautions for cleaning materials and methods that could be detrimental to carpet.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: An experienced installer who is certified by the Floor Covering Installation Board or who can demonstrate compliance with its certification program requirements.

B. Manufacturer Qualifications: Engage a firm whose carpet materials comply with U.S. Department of Housing and Urban Development (HUD) “Use of Materials Building UM-YYD” and are currently listed in HUD’s “Certified Products Directory” and so identified by imprint on back of carpet.

Delete paragraph below if none of the products listed in Part 2 are required to have a critical radiant flux classification. Revise if authorities having jurisdiction require other fire tests.

C. Fire-Test-Response Characteristics: Provide products with the critical radiant flux classification indicated in Part 2, as determined by testing identical products per ASTM E 648 by an independent testing and inspecting agency acceptable to authorities having jurisdiction.

Retain paragraph below if products and manufacturers are named in Part 2 solely to serve as the basis for selecting comparable products. See "Specifying Methods" Article in the Evaluations.

Delete paragraph below if not required. If retaining, indicate location, size, and other details of mockups on Drawings or by inserts. Revise wording if only one mockup is required.

D. Single Source Responsibility: Obtain each type of carpet from one source and by a single manufacturer.

1.5 DELIVERY, STORAGE, AND HANDLING

A. General: Comply with CRI 104, Section 5, "Storage and Handling."

1.6 PROJECT CONDITIONS

A. General: Comply with CRI 104, Section 6.1, "Site Conditions; Temperature and Humidity."

B. Environmental Limitations: Do not install carpet until wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.

Delete paragraph below if products are not adhesively applied to concrete substrates. Revise to suit Project.

C. Do not install carpet over concrete slabs until slabs have cured and are sufficiently dry to bond with adhesive and concrete slabs have pH range recommended by carpet manufacturer.

D. Where demountable partitions or other items are indicated for installation on top of carpet, install carpet before installing these items.

1.7 WARRANTY

When warranties are required, verify with Owner's counsel that special warranties stated in this Article are not less than remedies available to Owner under prevailing local laws. Coordinate with Division 1 Section "Warranties."

A. General Warranty: Special warranty specified in this Article shall not deprive Government of other rights Government may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents.

B. Special Carpet Warranty: Written warranty, signed by carpet manufacturer agreeing to replace carpet that does not comply with requirements or that fails within specified warranty period. Warranty does not include deterioration or failure of carpet due to unusual traffic, failure of substrate, vandalism, or abuse. Failures include, but are not limited to, more than 10 percent loss of face fiber, edge raveling, snags, runs, and delamination.

Verify available warranty in subparagraph below and retain or insert number.

1. Warranty Period: Minimum five (5) years from date of Substantial Completion.

1.8 EXTRA MATERIALS

Extra materials may not be allowed for publicly funded projects.

A. Furnish extra materials described below, before installation begins, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

Revise below to suit Project. Replace percentage with a specific number of square yards (square meters).

1. Carpet: Full-width rolls equal to five percent (5%) of amount installed for each type indicated, but not less than 10 sq. yd. (8.3 sq. m).

PART 2 - PRODUCTS

Before editing Part 2, see "Specifying Methods" Article and sample of completed Part 2 in the Evaluations. See Editing Instruction No. 1 in the Evaluations for an explanation of the insert notes in article titles below.

2.1 CARPET

A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified in the Carpet Schedule at the end of this Section.

Retain above for nonproprietary or below for semiproprietary Specification. Refer to Division 1 Section "Materials and Equipment."

Delete remaining paragraphs if products are limited to those listed above.

Insert other performance characteristics, such as static resistance, to suit Project.

Delete remaining paragraphs if products are limited to those listed above.

Insert other performance characteristics, such as static resistance, to suit Project.

Retain paragraph below for fiber carpet cushion.

Retain paragraph and subparagraphs below for polyurethane-foam carpet cushion.

2.2 INSTALLATION ACCESSORIES

Revise paragraph below to suit Project.

A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided by or recommended by the carpet manufacturer.

B. Adhesives: Water-resistant, mildew-resistant, nonstaining type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet and that is recommended by the carpet manufacturer.

Retain paragraph below for stretch-in installations.

C. Trowelable Underlayments and Patching Compounds: As recommended by the carpet manufacturer.

D. Tackless Carpet Stripping: Water-resistant plywood in strips as required to match cushion thickness and that comply with CRI 104, Section 11.3.

E. Seaming Cement: Hot-melt adhesive tape or similar product recommended by carpet manufacturer for taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams.

Delete below if resilient edge strips are specified in another Division 9 Section. If retaining, revise finish or description to suit Project and show width requirements on Drawings.

F. Metal Edge Strips: Extruded aluminum with mill finish of width shown, of height required to protect exposed edge of carpet, and of maximum lengths to minimize running joints.

PART 3 - EXECUTION

3.1 EXAMINATION

A. General: Examine substrates, areas, and conditions for compliance with requirements for maximum moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet performance. Verify that substrates and conditions are satisfactory for carpet installation and comply with requirements specified.

Retain paragraph and subparagraphs below if products are adhesively attached to concrete subfloors.

B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following:

Revise subparagraph below to suit Project.

1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing bond and moisture tests recommended by the carpet manufacturer.

2. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits.

Delete paragraph and subparagraphs below if no wood subfloors. Carpet manufacturers recommend underlayment over wood subfloors; below assumes underlayment is specified. Correlate with Division 6 Section "Rough Carpentry" to ensure underlayment material and installation method specified are acceptable to carpet or carpet cushion manufacturers selected.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. General: Comply with CRI 104, Section 6.2, "Site Conditions; Floor Preparation," and carpet manufacturer's written installation instructions for preparing substrates indicated to receive carpet installation.

B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, and depressions in substrates.

Retain paragraph below if products are adhesively attached to concrete substrates.

C. Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by the carpet manufacturer.

D. Broom and vacuum clean substrates to be covered immediately before installing carpet. After cleaning, examine substrates for moisture, alkaline salts, carbonation, or dust. Proceed with installation only after unsatisfactory conditions have been corrected.

3.3 INSTALLATION

A. Direct-Glue-Down Installation: Comply with CRI 104, Section 8, "Direct Glue-Down Installation."

B. Comply with carpet manufacturer's written recommendations for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under the door in closed position.

Retain one of two subparagraphs below for seamed border installation.

1. Bevel adjoining border edges at seams with hand shears.

2. Level adjoining border edges.

C. Do not bridge building expansion joints with carpet.

D. Cut and fit carpet to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet manufacturer.

E. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.

F. Install pattern parallel to walls and borders.

Retain below for stretch-in installations.

3.4 CLEANING AND PROTECTION

A. Perform the following operations immediately after installing carpet:

1. Remove excess adhesive, seam sealer, and other surface blemishes using cleaner recommended by carpet manufacturer.

2. Remove yarns that protrude from carpet surface.

3. Vacuum carpet using commercial machine with face-beater element.

B. Protect installed carpet to comply with CRI 104, Section 15, "Protection of Indoor Installations."

C. Protect carpet against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet manufacturer.

3.5 CARPET SELECTION SCHEDULE

A. As indicated on the Drawings.

END OF SECTION 09680

Carpet

09680-1