QUESTIONS AND ANSWERS LA PORTE as of 21 JUL 09.doc

DOC document 24 KB Posted

Attached to
Award to Chance Construction on 22 Aug 09
Solicitation number
W912L109R0038
Issued by

About this file

Q A as of 21 Jul 09

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS LA PORTE AS OF 20 JUL 09.doc DOC document
QUESTIONS AND ANSWERS as of 8 Jul 09.doc DOC document
QUESTIONS AND ANSWERS as of 7 Jul 09.doc DOC document
QUESTIONS AND ANSWERS as of 6 JUL 09.doc DOC document
Addendum 2 Dimensioned Floor Plans 20090701.pdf PDF
QUESTIONS AND ANSWERS LA PORTE AS OF 29 JUN 09 —
9- Exhibit C 12-05.doc DOC document
Exhibit D-E-F Jan 08.doc DOC document
8 -Exhibit B 1205.doc DOC document
QUESTIONS AND ANSWERS as of 1 JUL 09.doc DOC document
08110-Steel Doors Frames.DOC DOC document
09651 - Resilient Tile Flooring and Accesories.DOC DOC document
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MEETING MINUTES - LA PORTE FACILITIES.doc DOC document
PHOTOS.doc DOC document
Hurricane IKE B 1359 Drawings 20090506.pdf PDF
09512-Accoustical Ceiling.doc DOC document
09680 - Carpet.DOC DOC document
07210-Building Insulation.DOC DOC document
01001-00-General_Requirements.doc DOC document
01731-00-Cutting_ _Patching.DOC DOC document
01019-00-Contract_Considerations.DOC DOC document
AF Form 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Form WH-347-Wage report Form-BlanK.xls XLS spreadsheet
07620-Sheet Metal Flashing and Trim.DOC DOC document
01420-00-Environmental_Protection.doc DOC document
01700-00-Contract_Closeout.DOC DOC document
01300-00-Submittals 20090302.doc DOC document
09900 - Painting.doc DOC document
07591-Preparation for Reroofing 20090227 .doc DOC document
Contractor_Security_Policy_Letter.doc DOC document
Form 3065-Contract Progress Report.xls XLS spreadsheet
07550-Modified Bitumin Roofing 20090226.doc DOC document
Form 3064- Progress Schedule.xls XLS spreadsheet
09255-Gypsum Board Assemblies.DOC DOC document
07560-Cold Coal Tar Modified 20090227.doc DOC document
01105-00-Haz_Mat_Procedures.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

W912L-09-R-0038

HURRICANE IKE REPAIRS – LA PORTE ANG FACILITIES

As of 21 Jul 09

1. I believe I heard you mention 1.5" ISO at the walkthrough but the specifications call for R=19 ISO (which is 3.1"). Can you clear up what thickness of ISO is to be used? (Possibly R=19 refers to the entire roof system including the existing lightweight concrete deck?)

Answer: SOW calls for 1 1/2" rigid insulation.

2. Are we looking for a complete reroof of the entire building 1 (including lower roofs at north east and north west of bldg #1)? Are we reroofing the side ledges of the building also? Or are you only looking for repairs at certain areas?

Answer: SOW calls for a complete reroof with tire back to existing concrete deck, removal and replacement of all edge flashing, gutters and downspouts for the 2nd story roof and the 1st story north western roof. Mechanical wing roof not included. In a previous question I stated that the roof to masonry wall flashing can be bent back and reused provided the final installation is watertight.

3. Has anyone done a core sample of the existing roof? Can anyone verify what the existing roof consists of? Is it definitely a lightweight concrete deck? What is the thickness of insulation over the lightweight? etc -- this is important so I can identify whether nailer heights around the perimeter of the roof should be raised and if the through-wall flashing along the brick wall can be re-used or cut and replaced should the field of roof raise significantly.

Answer: No core samples taken. Per existing drawings, consider built-up roof over 2" insulation.

4. Please help me to at least understand the correct scope of the roofing work as all I have are the specifications and roof sketch, and these are incomplete. If there was information that was passed out in the original walkthrough that went over the scope of work, could you please either fax it to me or email it?

Answer: No additional information was provided at the walkthrough. All information is posted at www.fbo.gov searching on this solicitation #.