Section_J_Attachment_6.docx

DOCX document 76 KB Posted

Attached to
Pre-Solicitation Synopsis for Energy Savings Performance Contracts (ESPC) III
Solicitation number
W912DY-12-R-0046
Issued by

About this file

This document contains schedules for an energy savings performance contract task order. The schedules provide details on proposed guaranteed cost savings, contractor payments, implementation pricing by energy conservation measure, post-acceptance performance period cash flow, estimated first year cost savings by measure and category, and annual cancellation ceilings. Key information includes the requirement for the contractor to complete installation within a certain time period after task order award. The schedules also specify escalation rates, equipment capacities, measurement and verification expenses, and supporting documentation requirements.

This pre-solicitation synopsis announces the intent to solicit proposals for multiple indefinite delivery/indefinite quantity energy savings performance contracts with a total programmatic capacity of $1.5 billion. Services include equipment design, installation, testing, and operations/maintenance for projects involving building systems, distributed generation, and process improvements. The U.S. Army Corps of Engineers intends to award 20 firm fixed-price contracts over a 10-year ordering period, with at least three set aside for small businesses. The scope covers U.S. government facilities in the continental U.S., Alaska, Hawaii, and overseas locations in Germany and Korea.

Section J Attachment 6

View the file

Other files

File Type Posted
Amendment_0007.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_10.pdf PDF
Conformed_Solicitation.pdf PDF
Section_J_Attachment_22.docx DOCX document
Section_J_Attachment_21.docx DOCX document
Section_J_Attachment_19.docx DOCX document
Section_J_Attachment_8.docx DOCX document
Section_J_Attachment_14.docx DOCX document
Section_J_Attachment_4.docx DOCX document
Amendments_0001_thorugh_0008.pdf PDF
Section_J_Attachment_16.doc DOC document
Section_J_Attachment_15.doc DOC document
Section_J_Attachment_10.docx DOCX document
Conf_Slides.pdf PDF
Conformed_Solicitation.pdf PDF
Section_J_Attachment_7.docx DOCX document
Section_J_Attachment_17.xlsx XLSX spreadsheet
Section_J_Attachment_3.docx DOCX document
Section_J_Attachment_9.docx DOCX document
Section_J_Attachment_11.docx DOCX document
Section_J_Attachment_2.doc DOC document
Section_J_Attachment_18.docx DOCX document
Section_J_Attachment_13.docx DOCX document
Section_J_Attachment_12.docx DOCX document
Section_J_Attachment_20.docx DOCX document
Section_J_Attachment_1.docx DOCX document
Section_J_Attachment_5.pdf PDF
Amendment_0009.pdf PDF
Conf_Q&As.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J, ATTACHMENT 6 (J-6)

TASK ORDER (TO) SCHEDULES

TO-1 (PA) (Preliminary Assessment (PA)) Proposed Guaranteed Cost Savings and Contractor Payments

TO-1 (final) Guaranteed Cost Savings and Contractor Payments

TO-2 Implementation Price by Energy Conservation Measure

TO-3 Post-Acceptance Performance Period Cash Flow

TO-4 Task Order Performance Period First Year Estimated Annual Cost Savings, by Energy Conservation Measure and Technology Category

TO-5 Annual Cancellation Ceiling Schedule

ESPC

SCHEDULE TO-1 (Preliminary Assessment – PA)

PROPOSED GUARANTEED COST SAVINGS AND CONTRACTOR PAYMENTS

IMPORTANT INFORMATION

(1) This schedule is not to be altered or changed in any way. Please note any clarifications in the comments/explanations area below.

(2) [Reserved]

(3) The guaranteed annual cost savings are based on the site-specific M&V plan.

(4) The total of annual contractor payments represents the TO price and should be supported by information submitted.

(5) If applicable, prior to the post-acceptance performance period, implementation period allowable payments and energy savings are one-time amounts only.

(6) The proposed guaranteed cost savings during the implementation period and post-acceptance performance period must exceed the contractor payments.

(7) If applicable, submit escalation rates applied to initial estimated annual cost savings in column (a) as follows: a) energy rates: % per year (specify for each energy type); b) energy-related O&M savings (including water and sewer):____% per year.

(8) If selected, the contractor shall complete the installation of all proposed ECMs not later than ______ months after task award.

Task Order No.:
Contractor Name:
Project Site:

(a) Estimated Cost Savings ($) (b) Proposed Guaranteed Cost Savings ($) (c) Contractor Payments ($)

Implementation Period

Post-Acceptance Performance Period Year
(d)

Estimated Annual Cost Savings ($) (e) Proposed Guaranteed Annual Cost Savings ($) (f) Annual Contractor Payments ($)

One

Two

Three

Four

Five

Six

Seven

Eight

Nine

Ten

Eleven

Twelve

Fourteen

Fifteen

Sixteen

Seventeen

Eighteen

Nineteen

Twenty

Twenty-one

Twenty-two

Twenty-three

Twenty-four

Totals
$
$
$

Explanations/Comments:

RFP DE-RP36-06GO96031 10/11/2007

SCHEDULE TO-1 (final)

GUARANTEED COST SAVINGS AND CONTRACTOR PAYMENTS

IMPORTANT INFORMATION

(1) This schedule is not to be altered or changed in any way. Please note any clarifications in the comments/explanations area below.

(2) The first year post-acceptance performance period estimated annual cost savings reflect technical proposal and engineering estimates as presented in

TO-4.

(3) The guaranteed annual cost savings are based on the site-specific M&V plan.

(4) The total of contractor payments (columns c and f) represents the TO price and should be supported by information submitted in and provided with Schedules TO-2 and TO-3.

(5) If applicable, prior to post-acceptance performance period, implementation period allowable payments and energy savings are one-time amounts only.

(6) If applicable, provide a separate table showing proposed energy rates (i.e., $/kWh, $kW, $/MBtu) for each post-acceptance performance period year, derived using the National Institute of Standards and Technology Handbook 135 and Annual Supplement. Also, submit escalation rates applied to energy-related O&M savings (including water and sewer):____% per year.

(7) [Reserved]

(8) [Reserved]

(9) [Reserved]

(10) If selected, the contractor shall complete the installation of all proposed ECMs not later than ______ months after TO award.

Task Order No.:
Contractor Name:
Project Site:

(a) Estimated Cost Savings ($) (b) Guaranteed Cost Savings ($) (c) Contractor Payment ($)

Implementation Period

Post-Acceptance Performance Period Year (d) Estimated Annual Cost Savings ($) (e) Guaranteed Annual Cost Savings ($) (f) Annual Contractor Payments ($)

One

Two

Three

Four

Five

Six

Seven

Eight

Nine

Ten

Eleven

Twelve

Fourteen

Fifteen

Sixteen

Seventeen

Eighteen

Nineteen

Twenty

Twenty-one

Twenty-two

Twenty-three

Twenty-four

Totals

SCHEDULE TO-2

IMPLEMENTATION PRICE BY ENERGY CONSERVATION MEASURE

IMPORTANT INFORMATION:

1) This schedule is not to be altered or changed in any way. Please note any clarifications in the comments/explanations area below.

2) Implementation expense shall include only direct costs for each ECM and no post-acceptance performance period expenses. Indirect expenses and profit will be applied to the sum of direct expenses for all ECMs and project development to calculate total implementation price (d) for the project.

3) Contractor shall attach adequate supporting information detailing total implementation expenses.

4) Contractor shall propose bonded amount representing the basis of establishing performance and payment bonds per Section H of the contract, as required.

5) Attached supporting information shall be presented to identify portions of ECM or project expenses included in proposed bonded amount.

6) Proposed bonded amount is assumed to include indirect expenses and profit applied to implementation expenses above, unless otherwise specified by contractor.

7) For the following ECMs, enter the total installed capacity of new equipment in the units specified (e.g., chillers-150); chillers and packaged units in tons, VFDs in hp, boilers and furnaces in input Btu/hr, BAS/EMCS in number of points, transformers in kVA, generators in kW. For lighting ECMs, specify baseline kW treated.

8) M&V expense shall not include any performance-period expenses.

Project Site:

Task Order No.:

Contractor Name:

Tech Category

(TC)

ECM No.
Equipment Description — Title
ECM Size
M&V Expense
Implementation Expense
(c) Profit $

(d)

(a) Direct
(b) Indirect

Implementation Price:

Totals (a)+(b)+(c) = (d)

n/a
n/a
Project Development
n/a
$
$

TOTALS

$
$
$
$

Bonded Amount ($)

Explanations/Comments:

RFP DE-RP36-06GO96031 10/11/2007

SCHEDULE TO-3 — POST-ACCEPTANCE PERFORMANCE PERIOD CASH FLOW

Project Site:
Task Order No:
Contractor Name:

Project Capitalization

Applicable Financial Index:
Issue Date:

Total Implementation Price (from TO-2 Total)

Term (Years):
Source:

Plus Financing Procurement Price ($)

Index Rate:
Effective Through:

Less Implementation Period Payments (from TO-1 (final) (c))(If proposed, must be fully documented)

Added Premium (adjusted for tax incentives):

Total Amount Financed (Principal)

Project Interest Rate:

Term
1
2
3
4
5
6

Annual Cash Flow (Post-Acceptance Performance Period)

Debt Service

Principal Repayment ($)

Less incentives (i.e., REC, White Tag, etc.)

Net principal repayment before interest

Interest ($)

Total Debt Service (a)

Post-Acceptance Performance Period Expenses

Management/Administration

Operation

Maintenance

Repair and Replacement

Measurement and Verification

Permits and Licenses

Insurance

Property Taxes

Other – Describe and Explain

Other – Describe and Explain

SUBTOTAL Before Application of Indirect Rates

Indirect Cost Rate (%)

Indirect Cost Applied ($)

SUBTOTAL Post-Acceptance Performance Period Exp

Post-Acceptance Performance Period Profit (%)

Post-Acceptance Performance Period Profit ($)

Total Post-Acceptance Performance Period Expenses (b)

TOTAL - ANNUAL CONTRACTOR PAYMENTS (a)+(b)

Term
7
8
9
10
11
12

Annual Cash Flow (Post-Acceptance Performance Period)

Debt Service

Principal Repayment ($)

Less incentives (i.e., REC, White Tag, etc.)

Net principal repayment before interest

Interest ($)

Total Debt Service (a)

Post-Acceptance Performance Period Expenses

Management/Administration

Operation

Maintenance

Repair and Replacement

Measurement and Verification

Permits and Licenses

Insurance

Property Taxes

Other – Describe and Explain

Other – Describe and Explain

SUBTOTAL Before Application of Indirect Rates

Indirect Cost Rate (%)

Indirect Cost Applied ($)

SUBTOTAL Post-Acceptance Performance Period Exp

Post-Acceptance Performance Period Profit (%)

Post-Acceptance Performance Period Profit ($)

Total Post-Acceptance Performance Period Expenses (b)

TOTAL - ANNUAL CONTRACTOR PAYMENTS (a)+(b)

Term
13
14
15
16
17
18

Annual Cash Flow (Post-Acceptance Performance Period)

Debt Service

Principal Repayment ($)

Less incentives (i.e., REC, White Tag, etc.)

Net principal repayment before interest

Interest ($)

Total Debt Service (a)

Post-Acceptance Performance Period Expenses

Management/Administration

Operation

Maintenance

Repair and Replacement

Measurement and Verification

Permits and Licenses

Insurance

Property Taxes

Other – Describe and Explain

Other – Describe and Explain

SUBTOTAL Before Application of Indirect Rates

Indirect Cost Rate (%)

Indirect Cost Applied ($)

SUBTOTAL Post-Acceptance Performance Period Exp

Post-Acceptance Performance Period Profit (%)

Post-Acceptance Performance Period Profit ($)

Total Post-Acceptance Performance Period Expenses (b)

TOTAL - ANNUAL CONTRACTOR PAYMENTS (a)+(b)

Term
19
20
21
22
23
24

Annual Cash Flow (Post-Acceptance Performance Period)

Debt Service

Principal Repayment ($)

Less incentives (i.e., REC, White Tag, etc.)

Net principal repayment before interest

Interest ($)

Total Debt Service (a)

Post-Acceptance Performance Period Expenses

Management/Administration

Operation

Maintenance

Repair and Replacement

Measurement and Verification

Permits and Licenses

Insurance

Property Taxes

Other – Describe and Explain

Other – Describe and Explain

SUBTOTAL Before Application of Indirect Rates

Indirect Cost Rate (%)

Indirect Cost Applied ($)

SUBTOTAL Post-Acceptance Performance Period Exp

Post-Acceptance Performance Period Profit (%)

Post-Acceptance Performance Period Profit ($)

Total Post-Acceptance Performance Period Expenses (b)

TOTAL - ANNUAL CONTRACTOR PAYMENTS (a)+(b)

SCHEDULE TO-4

Task Order Performance Period First Year Estimated Annual Cost Savings, by Energy Conservation Measure and Technology Category

IMPORTANT INFORMATION:

1) Project Square Footage (in 1000 SF) - Include only building square footage affected by installed ECMs in project.

2) For column (a) insert estimated energy baseline by ECM and total project in MBtu based on IGA, and proposal data.

3) For column (c1), annual electric demand savings (kW/yr) is the sum of the monthly demand savings

4) Energy conversion factors for MBtu: MBtu=106 Btu; Electricity — 0.003413 MBtu/kWh; Natural Gas — 0.1 MBtu/therm ; #2 Oil — 0.128 MBtu/gal.

5) Specify "Other" energy savings in (e)(1) and (e)(2) as applicable. Include energy type ____; energy units ______; and MBtu conversion factor _____ MBtu/ _____ (unit)

6) This schedule is not to be altered or adapted in any way. Please note any clarifications in the comments/explanations area below.

Project Site:
Task Order#:
Contractor Name:
Project Square Footage (KSF):

TC

No.

Att 2

ECM

No.

a.

ECM energy baseline (MBtu/yr) b1.

Electric energy savings (kWh/yr) b2.

Electric energy savings ($/yr) c1.

Electric demand savings (kW/yr) c2.

Electric demand savings ($/yr) d1.

Natural gas savings (MBtu/yr) d2.

Natural gas savings ($/yr) e1.

Other savings (MBtu/yr) e2.

Other savings ($/yr) f.

b1+d1+e1 Total energy savings (MBtu/yr) g.=b2+c2+d2 +e2 Total energy cost savings ($/yr) h.

Other energy-related and O&M cost savings ($/yr) i.

Water savings (1000 gal/yr) j.

Water savings ($/yr) k=g+h+-j Estimated annual cost savings ($yr) l.

Implementation price m=l/k Simple Payback (yrs.)

TOTALS

Explanations/Comments:

SCHEDULE TO-5

ANNUAL CANCELLATION CEILING SCHEDULE

IMPORTANT INFORMATION:

(1) Cancellation Ceilings for each time period specified below establish the maximum termination liability for that time period, and includes the remaining unamortized principal on total amount financed for each time period specified above plus any prepayment charges. Actual total termination costs will be negotiated.

(2) The contractor may attach a monthly Financing Termination Liability Schedule.

(3) In the event of TO cancellation or termination for convenience, FAR 52.217-2 or 52.249.2 will apply.

Project Site:
Task Order No:
Contractor Name:
Time Period
Cancellation Ceiling

Installation Acceptance

End of Year One

End of Year Two

End of Year Three

End of Year Four

End of Year Five

End of Year Six

End of Year Seven

End of Year Eight

End of Year Nine

End of Year Ten

End of Year Eleven

End of Year Twelve

End of Year Thirteen

End of Year Fourteen

End of Year Fifteen

End of Year Sixteen

End of Year Seventeen

End of Year Eighteen

End of Year Nineteen

End of Year Twenty

End of Year Twenty-one

End of Year Twenty-two

End of Year Twenty-three

End of Year Twenty-four

End of Year Twenty-five

File details come from the government source that posted it. Updated .