Section_J_Attachment_18.docx

DOCX document 28 KB Posted

Attached to
Pre-Solicitation Synopsis for Energy Savings Performance Contracts (ESPC) III
Solicitation number
W912DY-12-R-0046
Issued by

About this file

This pre-solicitation synopsis and attachment describe requirements for energy savings performance contracts to be awarded by the U.S. Army Corps of Engineers. The Corps intends to solicit proposals and award multiple indefinite delivery/indefinite quantity contracts with a total programmatic capacity of $1.5 billion. Common services to be provided by energy services contractors include equipment and system design, installation, testing, and operations and maintenance. Energy savings project task order scopes may include improvements to boiler and chiller plants, building automation systems, HVAC equipment, lighting, building envelopes, distribution systems, motors, refrigeration, distributed power generation, and renewable energy. The geographic scope covers the continental U.S., Alaska, Hawaii, and overseas locations in Germany and Korea. The Corps plans to award 20 firm fixed-price, performance-based contracts for ordering periods of 5-year base and option terms, setting aside at least three for small businesses. Proposed markups for implementation, performance periods, and interest rates must be provided in the specified attachment spreadsheet.

Section J Attachment 18

View the file

Other files

File Type Posted
Amendment_0007.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_10.pdf PDF
Conformed_Solicitation.pdf PDF
Section_J_Attachment_22.docx DOCX document
Section_J_Attachment_21.docx DOCX document
Section_J_Attachment_19.docx DOCX document
Section_J_Attachment_8.docx DOCX document
Section_J_Attachment_14.docx DOCX document
Section_J_Attachment_4.docx DOCX document
Amendments_0001_thorugh_0008.pdf PDF
Section_J_Attachment_16.doc DOC document
Section_J_Attachment_15.doc DOC document
Section_J_Attachment_10.docx DOCX document
Conf_Slides.pdf PDF
Conformed_Solicitation.pdf PDF
Section_J_Attachment_7.docx DOCX document
Section_J_Attachment_17.xlsx XLSX spreadsheet
Section_J_Attachment_3.docx DOCX document
Section_J_Attachment_9.docx DOCX document
Section_J_Attachment_11.docx DOCX document
Section_J_Attachment_6.docx DOCX document
Section_J_Attachment_2.doc DOC document
Section_J_Attachment_13.docx DOCX document
Section_J_Attachment_12.docx DOCX document
Section_J_Attachment_20.docx DOCX document
Section_J_Attachment_1.docx DOCX document
Section_J_Attachment_5.pdf PDF
Amendment_0009.pdf PDF
Conf_Q&As.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J, ATTACHMENT 18

MARKUPS FOR PROPOSAL SUBMISSION

The purpose of the markup submittal spreadsheet at Section J, Attachment 17 is to establish the maximum mark-up percentages that may be applied to the appropriate Task Order category, listed below, over the term of the contract.

Maximum Implementation Mark-up The Prime Contractor shall propose a maximum mark-up to be applied as identified in section C of the RFP for the implementation costs of the project. Mark-up rate if for all technologies and is not requested as technology specific. Rate shall be entered in the spreadsheet contained in Section J, Attachment 17, provided as part of the Price Factor for evaluation, and a working electronic copy of the Excel spreadsheet shall also be provided with the submission of the Prime Contractor’s proposal.

Maximum Performance Period Mark-up The Prime Contractor shall propose a maximum mark-up to be applied as identified in section C of the RFP for the Performance Period costs of the project. Rate shall be entered in the spreadsheet contained in Section J, Attachment 17, provided as part of the Price Factor evaluation, and a working electronic copy of the Excel spreadsheet shall also be provided with the submission of the Prime Contractor’s proposal.

Maximum Interest Rate Mark-up This mark-up is the maximum, fixed, annual percentage rate that, when added to the treasury bill/ treasury constant maturity 10 year interest rate, will be the total percentage finance charge (not including finance processing fees) that the contractor will charge the Government as a total finance charge for all ECMs (sometimes referred to as the interest rate spread). The treasury rate in effect at the time of an ECM task order award will be used and the rate shall be for the time period of ECM amortization. The maximum interest rate mark-up shall be notated in the spreadsheet in Section J, Attachment 17, and a working copy of the Excel spreadsheet shall also be provided with the submission of the Prime Contractor’s proposal. This interest rate mark-up or spread shall only be the amount added to the treasury rate and not the addition of the mark-up and the treasury rate.

File details come from the government source that posted it. Updated .