Section_J_Attachment_2.doc
DOC document 100 KB Posted
- Solicitation number
- W912DY-12-R-0046
About this file
This pre-solicitation synopsis announces the Department of the Army Corps of Engineers Engineering Support Center Huntsville's intent to solicit proposals for multiple indefinite delivery/indefinite quantity energy savings performance contracts totaling $1.5 billion to design, construct, and operate energy savings projects for government installations throughout the continental United States, Alaska, Hawaii, and overseas locations in Germany and Korea. The objective is to help meet energy savings goals established in the Energy Policy Act of 1992. Common services provided by energy service contractors include equipment and system design, installation, testing, and operations, maintenance, and repair. Project scopes will include improvements to boiler and chiller plants, building automation and energy management control systems, HVAC equipment, lighting, building envelopes, distribution systems, electric motors and drives, refrigeration, distributed power generation, renewable energy systems, energy distribution, water and sewer systems, and energy-related process improvements. The acquisition will award approximately 20 firm fixed-price, performance-based contracts for a 5-year base and 5-year option, of which at least three will be set aside for small businesses.
Section J Attachment 2
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J, ATTACHMENT 2
ENERGY SAVINGS PERFORMANCE CONTRACT TECHNOLOGY CATEGORIES AND ASSOCIATED ENERGY CONSERVATION MEASURES This attachment lists the technology categories (TCs) authorized under this master indefinite delivery/indefinite quantity (IDIQ) contract, and provides energy conservation measure (ECM) examples for each TC. This list is not intended to be inclusive of all potential ECMs authorized under each TC.
1. Boiler Improvements - ECMs such as, but not limited to:
· Boiler control, including new controls and retrofits to existing controls
· Replacement of existing boilers with high efficiency boilers
· Boiler decentralization
2. Chiller Improvements - ECMs such as, but not limited to:
· Chiller retrofits or replacements
· Chiller plant pumping, piping, and controls retrofits and replacements
· Replacement of ice/refrigeration equipment with high efficiency units
3. Utility Monitoring Control Systems - ECMs such as, but not limited to:
· Metering systems
· Digital control systems
· Monitoring systems
4. Heating, Ventilating, and Air-Conditioning (HVAC) (Not including Boilers, Chillers, and Utility Control Systems) - ECMs such as, but not limited to:
· Packaged air conditioning unit replacements
· HVAC damper and controller repair or replacement
· Window air conditioning replacement with high efficiency units
· Cooling tower retrofits or replacements
· Economizer installation
· Fans and pump replacement or impeller trimming
· Thermal energy storage
· Variable air volume retrofit
5. Lighting Improvements - ECMs such as, but not limited to:
· Interior and exterior lighting retrofits and replacements
· Intelligent lighting controls
· Occupancy sensors
6. Building Envelope Modifications - ECMs such as, but not limited to:
· Insulation installation
· Weatherization
· Window replacement
· Reflective solar window tinting
7. Water and Steam Distribution Systems - ECMs such as, but not limited to:
· Piping insulation installation
· Hot water heater repair and replacement
· Steam trap repair and replacement
· Repair or replacement of existing condensate return systems and installation of new condensate return systems
8. Electric Motors and Drives - ECMs such as, but not limited to:
· Motor replacement with high efficiency motors
· Variable speed motors or drives
9. Distributed Generation - ECMs such as, but not limited to:
· Cogeneration systems installation
· Microturbines installation
· Fuel cells installation
10. Renewable Energy Systems - ECMs such as, but not limited to:
· Photovoltaic system installation
· Solar hot water system installation
· Solar ventilation preheating system installation
· Wind energy system installation
· Passive solar heating installation
· Landfill gas, waster water treatment plant digester gas, and coalbed methane power plant installation
· Wood waste and other organic waste stream heating or power plant installation
· Replacement of air conditioning and heating units with ground coupled heat pump systems
11. Energy/Utility Distribution Systems - ECMs such as, but not limited to:
· Transformers installation
· Power quality upgrades
· Power factor correction
· Gas distribution systems installation
12. Water and Sewer Conservation Systems - ECMs such as, but not limited to:
· Low-flow faucets and showerheads
· Low-flow plumbing equipment
· Water efficient irrigation
· On-sight sewer treatment systems
13. Electrical Peak Shaving/Load Shifting - ECMs such as, but not limited to:
· Thermal energy storage
· Gas cooling
14. Commissioning - ECMs such as, but not limited to:
· Retro-commissioning services
· Continuous commissioning services
15. Requirements Ancillary to Energy Measure - Work efforts such as, but not limited to:
· Envelope modification or improvements
· Interior modifications or improvements
· Electrical modification or improvements
· Plumbing modifications or improvements
· Protective housings for ECMs
16. Miscellaneous - ECMs such as, but not limited to:
· Production and/or manufacturing improvements
· Recycling and other waste stream reductions
· Industrial process improvement
· Replace air-cooled ice/refrigeration equipment
· Replace refrigerators
· Delamp vending machines
· Plug timers
· Energy Star® products
· Project Development Costs if separated
ATTACHMENT J-3 Technology Categories and ECM examples.doc
File details come from the government source that posted it. Updated .