This document provides details on a federal contract opportunity for energy savings performance contracts. The U.S. Army Engineering and Support Center, Huntsville intends to solicit proposals to award multiple indefinite delivery/indefinite quantity contracts totaling $1.5 billion to acquire energy savings projects at government installations throughout the continental United States, Alaska, Hawaii, and overseas locations. Common services to be provided by energy savings contractors under task order scopes include equipment and system design, installation, testing, and operations and maintenance for areas such as boiler and chiller plants, building automation systems, HVAC, lighting, building envelopes, distribution systems, motors and drives, distributed power generation, renewable energy, and energy-related process improvements. It is the intention to award 20 firm fixed-price contracts over a 10-year period, with at least three set aside for small businesses.
Section J Attachment 4
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J, ATTACHMENT 4
AREAS OF EXPERTISE SUBMITTAL
Complete the table below to indicate each area of expertise being offered and include an estimate of the percentage of the projects or business devoted to the technology category over the last 5 year period. Add any additional areas of expertise under the “Miscellaneous” row in the table. Ensure the sum of all percentages assigned to each technology category total 100%.
| Technology Category |
| % of Total |
| 1 |
| Boiler Improvements |
| 2 |
| Chiller Improvements |
| 3 |
| Utility Monitoring Control Systems |
| 4 |
| Heating, Ventilating, and |
Air-Conditioning (Not including Boilers, Chillers, and Utility Control Systems)
| 5 |
| Lighting Improvements |
| 6 |
| Building Envelope Modifications |
| 7 |
| Water and Steam Distribution Systems |
| 8 |
| Electric Motors and Drives |
| 9 |
| Distributed Generation |
| 10 |
| Renewable Energy Systems |
| 11 |
| Energy/Utility Distribution Systems |
| 12 |
| Water and Sewer Conservation Systems |
| 13 |
| Electrical Peak Shaving/Load Shifting |
| 14 |
| Commissioning |
| 15 |
| Requirements Ancillary to Energy Measures |
| 16 |
| Miscellaneous |
Section J, Attachment 4- Areas of Expertise.docx 1 of 1