Conf_Slides.pdf
PDF 2 MB Posted
- Solicitation number
- W912DY-12-R-0046
About this file
This pre-solicitation synopsis announces the U.S. Army Corps of Engineers' intent to issue a request for proposal for multiple indefinite delivery/indefinite quantity energy savings performance contracts with a total programmatic capacity of $1.5 billion. The objective is to acquire design, construction, and operation of energy savings projects to help meet mandated energy reduction goals. Common services to be provided include equipment and systems design, installation, testing, and operations and maintenance. Project scopes will include improvements in areas such as boiler and chiller plants, building automation systems, HVAC, lighting, building envelopes, distribution systems, motors and drives, renewable energy systems, and energy-related process improvements. The government intends to award twenty firm fixed-price contracts under this solicitation, with at least three set aside for small businesses. The ordering period will be five years base with a five-year option, and services will cover the continental U.S., Alaska, Hawaii, and overseas locations in Germany and Korea.
Not Listed
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
Energy Savings Performance
Contracting (ESPC)
Contractual Considerations
Tonju Butler
Procuring Contracting Officer
US Army Engineering & Support Center, Huntsville
18 April 2014
*The information contained in this briefing is for informational purposes only. All proposals must conform to the terms and conditions of the solicitation.*
Pre-Award Acquisition Team
Tonju L. Butler
Contracting Officer
Tonju.L.Butler@usace.army.mil
Sarah Schlapman
Contract Specialist
Sarah.M.Schlapman@usace.army.mil
Will Irby
Program Manager
Kay Sommerkamp
Office of Counsel
BUILDING STRONG® 3
Requirement Overview
This contract vehicle will be used to acquire the design, construction, and operation of energy savings projects from Energy Service Companies
(ESCOs).
The North American Industry Classification System (NAICS) code for this acquisition is 541330, Engineering Services. The small business size standard for this code is $35.5M (falls under the exception for contracts awarded under the National Energy Policy Act of 1992).
The geographic scope of the contracted services under this acquisition will cover the United States (CONUS), including Alaska, Hawaii, and all
U.S. Territories and possessions, and may include overseas locations of
Germany and Korea.
Acquisition Approach
Solicitation will result in the award of multiple-award indefinite delivery/ indefinite quantity (ID/IQ) contracts with a shared $1.5B total contract capacity over a 10-year ordering period (5-year base period and 5-year option period).
Task orders will be issued as firm fixed-price (FFP) and may include performance periods of up to 25 years.
A target of 20 contracts are planned to result from this acquisition, of which a target of at least three will be set aside for small businesses.
Task orders will either be set aside exclusively for small business competition or will be competed among all contractors (both large and small business) in accordance with detailed ordering procedures included in the solicitation.
Source Selection- Base Contracts
All proposals will be evaluated against the following factors (in descending order of importance, with Factors 3 and 4 equal in importance):
Factor 1: Corporate Technical Experience and Management Approach
Factor 2: Financial Capability
Factor 3: Past Performance
Factor 4: Small Business Participation
Factor 5: Technology Markups and Financing Markups
Basis of Award – Best Value
► Non-price related factors, when combined, are significantly more important than the price-related factor.
Small Business Participation Factor
All Offerors, both large and small, must submit a Small Business
Participation Plan to be evaluated by the SSEB.
A separate Small Business Subcontracting Plan will be submitted by large firms only and will be evaluated on a pass / fail basis prior to award. The
Subcontracting Plan should be consistent with the efforts proposed in the
Small Business Participation Plan.
Offerors will be required to propose their best effort for meeting the following small business participation percentages:
Small Business: 20%
Small Disadvantaged Business: 3%
Women-Owned Small Business: 3%
HUBZone Small Business: 2%
Veteran-Owned Small Business: 2%
Service-Disabled Veteran-Owned Small Business: 2%
Task Order Competition
Detailed ordering procedures are included in the solicitation and will be added to all resultant contracts to specify circumstances for setting-aside a task order for small businesses as follows:
7 Procurement Sensitive
Dollar Value Task Order Competition Caveats
$5 Million or Greater
Unrestricted Competition
Less than $5M The Contracting Officer will first consider reserving the Task Order for small businesses. The determination will examine the size of the project, complexity of the project and level of financing required.
Before making the determination on a particular project, the Contracting Officer will request a letter of interest from all SB firms. If fewer than two responses are received, the Task Order will open for Unrestricted Competition.
Benefits of using a single MATOC suite with task order set-asides:
Small businesses that graduate and recertify as a large business will be able to compete on unrestricted task orders.
Small businesses that gain capacity during the course of contract performance will be able to compete for larger projects whether those projects are set aside or solicited on an unrestricted basis.
Capacity will be shared between small and large businesses, providing maximum flexibility for mission accomplishment.
Small firms that are bought out by a large business must immediately recertify, and are no longer eligible for set-aside task orders.
Task Order Competition (cont)
Procurement Sensitive
BUILDING STRONG® 9
On-Ramps & Off-Ramps
Not later than 18 months prior to exercise of the option period the
Contracting Officer will determine if it is in the Government’s best interest to employ “on-ramp” or “off ramp” procedures.
On-Ramp Government will accept & evaluate new proposals with intention of adding additional contracts
Purpose is to increase competition and provide the Government with better buying power
New proposals will be subject to substantially the same proposal instructions and evaluation criteria contained in original solicitation
Off-Ramp Contracting Officer may elect to remove firms with poor performance records or firms that have not submitted any acceptable proposals for projects in which they are qualified
Overview of Solicitation
Section A: Executive Summary
Section B: Contract Line Items
Section C: Performance Work Statement
Section E: Inspection and Acceptance
Section F: Period of Performance
Section G: Contract Administration
Section H: Special Contract Requirements
Section I: Contract Clauses
Section J: RFP Attachments
Section K: Reps, Certs and Other Statements
Section L: Instructions to Offerors
Section M: Evaluation Factors for Award
Section L
Proposal shall be prepared clearly and concisely to demonstrate the Offeror has a complete understanding of requirements.
Proposal Format
Proposal Content
Page Limitations
Submission Requirements
Communications: All questions shall be submitted via Bidder Inquiry in
ProjNet in accordance with the instructions provided in Section A, Executive
Summary, of the solicitation.
Submission Requirements
NUMBER SUBMITTAL FORMAT
Complete Proposal
One hard copy/ One CD copy
PDF format and Word format, all pages to be word searchable; workable MS-Excel spreadsheets saved separately
Volumes 1, 2, 3 & 4
Four hard copies Volume 1
Three hard copies of Volumes 2, 3, and 4
One CD copy of each volume
All hard copies should be bound separately
CD copies should include a PDF format and Word format, all pages to be word searchable
Volume 5- Technology Markups and Financing Markups
One hard copy/ two CD copies
PDF format of entire volume, word format of entire volume, workable MS-Excel spreadsheets saved separately. All pages to be word searchable
All proposals shall be shipped to: US Army Engineering and Support Center- Huntsville, 4820 University
Square, Huntsville, AL 35816-1822. The package exterior should contain the solicitation number and the
POCs: Sarah M. Schlapman and Tonju L. Butler. Hand carried proposals must be delivered to the Mail Room
(rear of building, hours 0800-1630 central time) at 4820 University Square, Huntsville, AL 35816-1822 and time-stamped prior to the closing time and date. Electronic submissions will NOT be accepted.
Evaluation Factors
FACTOR 1: CORPORATE TECHNICAL EXPERIENCE AND
MANAGEMENT APPROACH OF ESPC PROJECTS
Element A: Performance Contracting Based Energy Experience and Expertise
Element B: Management Approach to Support Contract Performance
Element C: Understanding of the Army ESPC Process
Element D: Energy Baseline and Savings Calculation Capability
Element E: Ability to Develop a Measurement and Verification Plan
*Factor 1 will be discussed in greater detail in the Technical Overview presentation.
FACTOR 2: TECHNICAL AND MANAGEMENT APPROACH
Element A: Financial Strength and Stability
Element B: Ability to Obtain Required Financing at Competitive Rates
Element C: Ability to Shoulder Monetary Risk and Withstand Long Term Payback Periods
*Factor 2 will be discussed in greater detail in the Technical Overview
FACTOR 3: PAST PERFORMANCE
Element A: Past Performance Project Narratives
Element B: Past Performance Questionnaires
NOTES:
Past performance should be provided for each project submitted in Volume I.
Completed questionnaires should be submitted with proposal; however, client may send the forms directly to the Government POC identified in RFP.
Please verify customer POC contact info before submitting proposal.
Government may review other sources in addition to questionnaires.
FACTOR 4: SMALL BUSINESS PARTICIPATION
Element A: Small Business Participation Plan (all offerors)
Element B: Small Business Subcontracting Plan (other than small businesses)
*Factor 4 will be discussed in greater detail in the Small Business
FACTOR 5: TECHNOLOGY MARKUPS AND FINANCING MARKUPS
Submission Requirements:
-Standard Form 33
-Representations, Certifications, and Other Statements
-Joint Venture/ Mentor Protégé Agreements & Approvals
-Bankruptcy Statement
-Markups Rate Spreadsheets
NOTE:
The markup rates in RFP Section J, Attachment 17- Markup Submittal Spreadsheet shall be completed and submitted by the Offeror in Volume V, Tab E. The instructions for completing these schedules are found in RFP Section J, Attachment 18- Markup Submittal Instructions.
Questions All questions must be submitted via the ProjNet website at www.projnet.org
► Bidder Inquiry Key: PQAZT9-2CTWD9
► Deadline for questions is April 23, 2014
► You will first have to register if you have never done so before
► Instructions can found in paragraph A.9 of the solicitation
Answers will be posted to www.fbo.gov and may result in amendments to the solicitation.
** No questions will be accepted via email or by phone. Individual meetings with firms will not be scheduled.
**All official information related to this acquisition will be posted to www.fbo.gov.
http://www.projnet.org/ http://www.fbo.gov/ http://www.fbo.gov/
Energy Savings Performance
Contracting (ESPC)
Program Overview
Will Irby
ESPC Program Manager
US Army Engineering & Support Center, Huntsville
18 April 2014
ESPC Program Purpose
ESPCs utilize private capital to make infrastructure improvements on military installations
Allows Energy Services Companies (ESCOs) to provide Federal customers:
► energy and water efficiency improvement projects
► renewable energy projects
► demand reduction services
Implementation and development costs are financed for up to 25 years at competitive interest rates
Payment is derived from the savings generated by the improvements – Savings must occur or contractor does not get paid
How Does ESPC Help the Army?
• ESCO fronts the capital costs
• Financed projects paid from consumption savings
• Savings ensured by mandatory measurement and verification (M&V)
• ESCO performs O&M on major systems
• ESPC saves energy & water to meet goal
O&M and
Utility
Bill
O&M and
Utility
Bill
O&M and
Utility
Bill
Capital Cost
Financing &
Debt Service
Govt. Share
O&M and
Energy
Savings
Before ESPC
Contract
During ESPC
Contract
After ESPC
Contract
Army doesn’t have sufficient funds for capital investment
Limited DPW maintenance resources
ESPC Overview
► In the 1QFY14, Huntsville Center (CEHNC) awarded four ESPC Task Orders with a total value of $72M. These projects contributed to the Army exceeding its commitment to the President’s Performance Contracting Challenge (PPCC). The
Army exceeded its goal of $384M by $114M, or 29.7% for a total of $498M, with
CEHNC contributing $422M over the Dec 2012 – Dec 2013 period.
► President’s Performance Contracting Challenge (PPCC) – the PPCC has been extended through Dec 2016. Federal Agencies, to include Army, will be expected to set aggressive goals for 3rd party financed projects.
► HNC currently supports 35 different customers with ESPC projects in development and/or construction and an additional 40 projects in performance period administration.
► HNC has approximately 8-10 projects in the “pre-solicitation” pipeline at any given time.
ESPC Program Statistics
$208M
$85M
$25M
$189M
200,000
400,000
600,000
800,000 696K
315K
75K
HNC Awards 3rd Party Capital Investment
Annual MBTU Savings
FY10 FY11 FY12
FY12 FY11 FY10
FY13
FY10
FY13
400K
FY13 FY12 FY11
FY14
$220M
FY14
Projected
430K
FY14
ESPC Programmatic Goals
Continue to meet and exceed the Army’s PPCC execution goals
Provide innovative solutions to reduce customer’s energy consumption
Partner with other DoD and Federal agencies to leverage USACE’s proven, streamlined approach to developing and awarding ESPC projects
Streamline our development approach further to achieve savings quicker
ESPC Programmatic Goals (cont’d)
Improved energy infrastructure at Army Garrisons
Reduced energy consumption (Btu)
Reduced O&M needs
Lower maintenance costs
Meeting Army energy reduction goals
Increased reliability of systems, equipment, and components
A PARTNERSHIP
Contractor
Installation
Contracting
Agency
All parties must enter contract in good faith.
Long term relationship.
Current Customers
Rock Island Arsenal JMTC
Rock Island Arsenal
White Sands Missile Range
FT Carson
McAlester AAP
Daegu Korea
Yongsan Korea
Ft McCoy
SPAWAR Pacific (Navy)
SPAWAR Atlantic (Navy)
Fleet Readiness Center SW (Navy)
Mobile District (USACE)
Ft Buchanan
Ft Bragg
Camp Humphries (Korea)
Aberdeen Proving Grounds
Letterkenny Army Depot
Michigan National Guard
Puerto Rico National Guard
Ft Bliss
Corpus Christi Army Depot
Hohenfels (Germany)
Wiesbaden (Germany)
Ft Lee
Adelphi Laboratory Center
Ft Leavenworth
FT Irwin
Soldier System Center Natick
West Point
Ft Greely
HNC ESPC MATOC Features
Pre-qualified pool of ESPC contractors compete for new requirements
Streamlined Task Order Acquisition Process
Performance Based Contract – contractor must deliver guaranteed savings or no payments made
Helps meet energy reduction goals
Leverages funds already being paid to the utility for critical infrastructure upgrades
BUILDING STRONG® 11
Typical ESPC Energy Conservation
Measures (ECMs) Boiler Improvements
Chiller Improvements
Air Handling Equipment
Controls
Motors and Drives
Upgrade of HVAC Systems
Lighting Retrofits
Renewable Energy Systems
Building Envelope
Water & Steam Distributions
Electrical Peak Sharing
Solar, Photovoltaic
Ground Source Heat Pumps
Generators
Variable Frequency Drives
Upgrade of Central Power Plants
Metering & Energy Information Systems
Gas-fired Infrared Heaters
Primary/Secondary Pumping Systems
Decentralization of Domestic Hot Water Systems
Decentralization of Central Power Plants
Wind
BUILDING STRONG® 12
Measurement & Verification
Critically important to ESPC Program success
Must follow Army guidance
Must conform to FEMP M&V protocols
No stipulated savings
ESCOs must see M&V as a way to promote what ESPC has provided:
► Use M&V to show benefit
► Schedule M&V briefings with the customer
► Use M&V to identify issues and alert the customer to any field problems they may not be aware of
Final Notes… What we want from ESPC
Be creative…
Be innovative…
Be responsive…
Customer focused, technical solutions to real problems…
Focus on building an ESPC program, not just executing an ESPC project…
Questions?
Energy Savings Performance Contract
Technical Overview
Bruce Forsberg
Mechanical Engineer
US Army Engineering & Support Center, Huntsville, AL
Agenda
Performance Work Statement (PWS)
Technical Highlights of ESPC
Technical – Factor 1
Technical – Factor 2
BUILDING STRONG® 3
Performance Work Statement
Performance Work Statement is a statement of work that describes the required results, rather than how it is done.
Establishes the technical requirements of the work and the products and services that can be awarded.
The contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, subcontractors, and other items and services necessary to effectively and efficiently perform all design, installation, operation, maintenance, repair, and replacement of the projects identified in the Task Order RFP and resulting proposal. All activities shall be performed in accordance with applicable codes, standards, laws, and regulations.
Technical Highlights Section C and Task Order
Measurement & Verification – Critical Over
Term of Contract
Preliminary Assessments - Short, Quick, to the Point
Feasibility Study/Proposal – Detailed, Thorough, Focused
Safety, Security, and Quality
Technical Highlights (Continued)
UMCS – Accreditation, M&V, Site Integrate
Maintenance – Responsible over Term, Replacement Equipment, Non-Replacement Equipment, Ownership
Follow FEMP Formats – Standardize –
DIDs Support Information
Follow Army ESPC Policy Guidance
Save Energy – Save Cost
BUILDING STRONG® 7
Avoid Crash and Burn in ESPC Projects Solid Baseline – Documented, M&V
Solid List of Assumptions
Accurate Complete Description of
Projects, Requirements, & Responsibilities
Partnership of Major Stakeholders
Factors for Award
Factor 1: Corporate Technical Experience and Management Approach for ESPC
Projects
Factor 2: Financial Capability
Factor 3: Past Performance
Factor 4: Small Business Participation
Factor 5: Technology Markups and Financing
Markups
Factor 1: Corporate Technical Experience and
Management Approach for ESPC Projects
Element A: Performance Contracting Based Energy
Experience and Expertise
Element B: Management Approach to Support Contract
Performance
Element C: Understanding of Army ESPC Process
Element D: Energy Baseline and Savings Calculation
Capability
Element E: Ability to Develop a Measurement and
Verification Plan
Factor 1 Evaluation
Project Information – Breadth and Depth
Capability of Management Approach
Understanding of Army ESPC Process
Capability for Energy Baseline & Savings
Calculations
Ability to Develop M&V Plans
Factor 2: Financial Capability
Element A: Financial Strength and Stability
Element B: Ability to Obtain Required
Financing at Competitive Rates
Element C:Ability to Shoulder Monetary
Risk and Withstand Long Term Payback
Periods
Factor 2 Evaluation
Assessment of the Overall Financial Capability of the Prime Contractor
► Demonstrated Financial Strength and Stability
► Ability to Competitively Obtain Required Financing
► Risk Understanding and Ability to Shoulder that Risk
Prime Contractors Statements Evaluated against
Various Financial Ratios
BUILDING STRONG® 14
Helpful Hints
Follow Section L Format
Present what you have done w/r/t what is requested and how it will be evaluated
Do not miss a “SHALL” requirement
A “SHOULD” requirement should be included
Be accurate, clear, and concise
Parting Comments
Do not make 2 sound like 2,000,000,000
Presenting information that “studies have shown” to be accurate should be avoided
Don’t Crash and Burn because of poor performance
There is going to be 87 other Proposors, so Good Luck!
Questions
Energy Savings Performance
Contracting (ESPC)
Small Business Participation vs
Subcontracting
Rebecca Vucinaj
Chief, Small Business Office
US Army Engineering & Support Center, Huntsville
NAICS Code
NAICS for this RFP is 541330, Engineering Services (Awarded
Under the National Energy Policy Act of 1992)
► Small Business Size Standard – $35.5M
Selected through Market Research
U.S. Small Business Administration
► Concurred
► Will adjudicate concerns regarding applicability of NAICS
► Will adjudicate matters regarding size determination of Offerors
Source Selection- Factor 4
The evaluation factors are in descending order of importance (with
Factors 3 and 4 equal in importance):
Factor 1: Operation & Maintenance Experience
Factor 2: Technical and Management Approach
Factor 3: Past Performance
Factor 4: Small Business Participation
Factor 5: Price
3 Procurement Sensitive
Subcontracting Plan vs
Small Business Participation Plan
Subcontracting Plan
Other than Small Business
Evaluated IAW FAR 52.219-9 &
DFARS 252.219-7003
Total Subcontracted Dollars
Acceptable plan submitted to be eligible for award
Consistent with the Small
Business Participation Plan
Small Business Participation Plan
Large and Small Business
Evaluated IAW Section M of RFP during Source Selection
Total Contract Value
Submitted with Proposal IAW
Section L of RFP
SB Participation Factor for Large vs Small Business Offerors RFP is structured to allow small businesses to submit their own participation as a prime under the FAR Part 15 Evaluation Factor.
A common mistake in procurements is asking both small and large businesses to submit SUBCONTRACTING goals, because this requires small businesses to SUBCONTRACT to attain the goal.
Instead SBs should be allowed to submit their own PARTICIPATION as a PRIME. Therefore, under the SB Participation Factor, you should see “SB Participation Goals”…meaning…
► Large businesses achieve the goals through subcontracting;
► Small businesses can achieve goals through their own performance/participation as a prime or with small business subcontractors.
All Offerors (both large and small businesses) will be evaluated on the level of small business commitment demonstrated for the proposed acquisition and the use of small businesses demonstrated in the performance of prior contracts relevant to the PWS. The following shall evidence small business participation:
The extent to which small business firms are specifically identified in the proposal;
The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);
The identification of the complexity and variety of the work small businesses are to perform;
Past performance of the Offeror in complying with the requirements of the clauses at FAR
52.219-8, Utilization of Small Business Concerns; and for all large business Offerors, FAR
52.219-9, Small Business Subcontracting Plan; and
The extent to which the Offeror meets or exceeds the small business participation goals.
SB Participation Evaluation Factor
Small Business Participation Plan
Minimum—20% of the total contract value commitment to small business participation
Sub-categories:
► Small Disadvantaged Business 3%
► Woman-Owned Small Business 3%
► HUBZone Small Business 2%
► Veteran-Owned Small Business 2%
► Service-Disabled Veteran-Owned 2%
Examples For a $1.5B contract with a SB Participation Goal of 20%, LB offerors must propose to offer $300M to small firms through 1st tier subcontracting; because
$300M is 20% of $1.5B total contract dollars.
LBs will determine their own subcontracting plan percentage and it’s dependant on how much the LB prime plans to subcontract .
If LB says $500M total will be subcontracted (then $300M SB/$500M = 60% of the subcontracted dollars go to SBs.
If LB says $700M will be subcontracted (then $300M SB/$700M = 43% of subcontracted dollars go to SBs).
The subcontracting % is irrelevant, as long as the total dollars subcontracted to small firms matches what is proposed in the SB Participation plan. Contractors determine their SB subcontracting plan percentages through this equation {total dollars subcontracted to SBs/total dollars subcontracted}
Questions???
Joint Ventures in Energy Savings
Performance Contracts (ESPC) III
Gary Heard
SBA PCR
Huntsville Engineering and Support
Center
Agenda
Size
Affiliates
Joint Venture
Teaming Agreement
Evaluation – SB Participation
Subcontracting
Limitation on Subcontracting
NAICS and Size Standard NAICS 541330, Engineering Services under
National Energy Policy Act of 1992
Size standard associated with NAICS 541330 is $ 35.5 Million
This means that a company, including its affiliates, would be considered a "small business" if its average annual gross receipts does not exceed $35.5 Million for the past three years. If a company has not been in business for three years, the average weekly revenue for the number of weeks the company has been in business is multiplied by 52 to determine the average annual receipts.
Who are your “affiliates?” Why do you care?
Affiliation
13 CFR § 121.103
• Concerns and entities are affiliates when one controls or has the power to control the other or a third party controls or has the power to control both. Power does not have to be exercised; it just has to exist.
• Factors considered include ownership, management, previous relationships or ties to another concern, and contractual relationships.
• Control can be positive or negative; direct or indirect.
• Determination based on totality of the circumstances.
Examples of Affiliation
• Stock ownership
• Stock options/Agreements to Merge
• Common Management
• Identify of Interest
• Newly organized Concern
• “Ostensible subcontractor”
• Joint Ventures
13 CFR § 121.103
BUILDING STRONG® 6 Procurement Sensitive
Joint Venture Defined in 13 CFR 121.103(h)
An association of individuals and/or concerns with interests in any degree or proportion consorting to engage in and carry out no more than 3 specific or limited-purpose business ventures for joint profit over a 2-year period, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis. Otherwise, it will be determined to have a general affiliation.
No more than 3 contracts over a 2-year period, starting from the date of the submission of the 1st offer.
Must be in writing
Must do business in its own name
May be in the form a legal entity and have its own employees, but it is not required.
JV and SB Size Standard
A Joint Venture is a small business (SB) concern when the combined revenue of all joint venture partners does not exceed the
SB Size Standard
JV size exemption for a “Large” Procurement
► Procurement is bundled; or
► It is a “large” procurement (i.e. dollar value of acquisition is exceeds ½ of the size standard)
► Then JV is Small if EACH joint venture partner is small.
Limitation on Subcontracting applies to the aggregate JV work
BUILDING STRONG® 8 Procurement Sensitive
8(a) Joint Venture 8(a) JV must be approved by the SBA (Applies only to 8(a) Acquisition)
In an unpopulated JV (one without its own employees, 8(a) JV must perform 40% of the work done by the JV and must not be simply administrative functions. [Source: 13 CFR 124.513(d)]
8(a) mentor-protégé JVs are considered small as long as the 8(a) protégé is small for the procurement.
SDVOSB
• SDVOSB can JV with 1 or more SBs
• SDVOSB JVs are considered affiliated unless they are offering on a “large” procurement
• Limitation on contracting applies to the aggregate JV work.
• An individual SDVOSB can fulfill the Limitations on subcontracting by using other SDVOSB subcontractors
BUILDING STRONG® 9 Procurement Sensitive
HUBZone A HUBZone may only JV with another HUBZone concern to be considered a HUBZone concern
However, the JV itself need not be certfied as a HUBZone
HUBZone JVs offering on a “large” procurement can qualify as small as long as each HUBZone partner is small for the acquisition.
Limitation on Subcontracting applies to aggregate effort of JV
HUBZone mentor and protégé will not be found affiliated when the mentor-protégé relationship is Federally approved.
HUBZone mentor can subcontract to its protege
BUILDING STRONG® 10 Procurement Sensitive
ED/WOSB
• WOSB/EDWOSB JVs are affiliated unless offering on a “large” procurement
• The WOSB/EDWOSB participant in the JV must be designated in CCR and ORCA as WOSB/EDWOSB
• JV must provide a written JV agreement to the Contracting Officer (KO) containing the elements of 13
CFR 127.506
• Limitation on Subcontracting applies to the aggregate JV work
Teaming
Both small and large businesses might benefit from teaming arrangements.
Section M: “‘Offeror’ refers to the proposed prime contractor and all proposed contractor team members/major subcontractors. “Contractor team arrangement” is an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program (see FAR 9.6).”
Note the requirement for letters of commitment for key subcontractors.
Joint Venture or Teaming with Subcontractors?
SBA affiliation rules & exceptions
52.219-14, Limitation on Subcontracting
►Services
►At least 50% of the cost of contract performance incurred for personnel shall be expended for employees of the firm.
BUILDING STRONG® 13 Procurement Sensitive
Evaluation of Proposals
Small Business (SB) Participation is a secondary evaluation factor …
BUT
Large Businesses (LBs) may be evaluated for their past performance in achieving their subcontracting goals in the “Past Performance” evaluation factor
► All firms (both LBs and SBs) will submit a SB Participation
Proposal
• SBs can include their contract performance in the %s to be completed by SB in their SB Participation Proposal
Where Can I Find the CFR
Federal Regulations (CFR) on-line:
http://ecfr.gpoaccess.gov
Size regulations -- 13 CFR Part 121
8(a) & SDB regulations -- 13 CFR Part 124
Government Contracting Programs – 13 CFR Part 125
HUBZone Program – 13 CFR Part 126
Service Disabled Veteran Program – 13 CFR 125.8-28
Women-Owned Small Business Program-13 CFR 127 http://ecfr.gpoaccess.gov/
| Slides_Contracting |
| Slides_Program |
| Slides_Technical |
| Slides_SBPP |
| Slides_SBA |
File details come from the government source that posted it. Updated .