This document is Amendment 0007 to Solicitation W912DW24R0001 for the Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement Project. The amendment modifies Section 48 70 01.00 26 NERC Compliance For Hydrogenerators by adding a new paragraph 1.6 and renumbering the subsequent paragraphs. The revised sections are to be replaced in their entirety, and all portions of the revised sections shall apply whether or not changes are indicated. Bidders must acknowledge receipt of this amendment by number and date on their offer. The solicitation is for the replacement of the excitation system units 1-16 at the Chief Joseph Dam, issued by the U.S. Army Corps of Engineers, Seattle District.

View the file

Other files

File Type Posted
48 70 01.00 26 R0007.pdf PDF
Amendment 0006_Released_W912DW24R0001 (CJD Exciters).pdf PDF
01 45 00.00 10 R0005.pdf PDF
Amendment 0005_Released_W912DW24R0001 (CJD Exciters).pdf PDF
01 35 26 R0005.pdf PDF
01 22 00 R0004.pdf PDF
48 19 26.00 26 R0004.pdf PDF
00 41 00 R0004.pdf PDF
W912DW24R0001 Amendment 0004.pdf PDF
01 33 00-A R0004.pdf PDF
Amendment 0003 (Released) W912DW24R0001 (CJD Exciters).pdf PDF
G-002 R0003.pdf PDF
E-801 R0003.pdf PDF
E-802 R0003.pdf PDF
26 05 00.00 26 R0003.pdf PDF
Chief Joseph Excitation System 100 pct Reference Drawings R0002.pdf PDF
26 05 13.00 26 R0002.pdf PDF
G-003 R0002.pdf PDF
00 72 00-A Drawing Index R0002.pdf PDF
26 05 19.00 26 R0002.pdf PDF
26 25 00.00 26 R0002.pdf PDF
Amendment 0002 W912DW24R0001 (CJD Exciters).pdf PDF
W912DW24R0001 Amendment 0001.pdf PDF
5_Attachment_D_Proposal_Data_Sheet.pdf PDF
8_Site_Visit_RSVP_Form_CJ_Exciters.pdf PDF
4_Attachment_C_Small_Business_Commitment_Document.pdf PDF
9_Chief_Joseph_Excitation_System_100Percent_Reference_Drawings.pdf PDF
2_Attachment_A_Past_Performance_Project_Relevancy_Form.pdf PDF
7_Statement_Of_Work_Chief_Joseph_Excitation_System_Units_1-16.pdf PDF
3_Attachment_B__NAVFAC_USACE_Past_Performance_Questionanaire.pdf PDF
6_Attachment_E_Sample_Small_Business_Subcontracting_Plan.pdf PDF
10_W912DW24R0001_Project_Plan_CJD_Exciter__Units 1_16.pdf PDF
1_W912DW24R0001__RFP_Chief_Joseph_Dam_Exciters_1_16_Replacement.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0007

Please See Continuation Pages:

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW24R0001

X 9B. DATED (SEE ITEM 11)

16-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2024

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW24R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

Summary Of Changes for Amendment 0007

1. 48 70 01.00 26 NERC Compliance For Hydrogenerators: paragraph 1.6 has been added in red and paragraph 1.7 has been re-numbered. Attached file 48 70 01.00 26 R0007.

2. The attached revised sections are to be replaced in their entirety. All portions of the revised sections shall apply whether or not changes have been indicated.

3. IMPORTANT NOTICE: Bidders must acknowledge receipt of this amendment by numbers and date on offer.

(End of Summary of Changes)