Amendment 0002 W912DW24R0001 (CJD Exciters).pdf
PDF 340 KB Posted
- Attached to
- W912DW24R0001 - Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement Project.
- Solicitation number
- W912DW24R0001
About this file
This document is an Amendment to Solicitation W912DW24R0001 for the Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement project. The amendment revises the following: the drawing index, several specification sections, the list of reference drawings, and the applicable wage determination. Key details include:
The amendment revises Sections 26 05 13.00 26, 26 05 19.00 26, and 26 25 00.00 26 of the specifications. It also updates the list of reference drawings, deleting pages 199-291. The attached revised sections are to replace the previous versions in their entirety. Additionally, the applicable Davis-Bacon wage determination has been updated. Bidders must acknowledge receipt of this amendment. The solicitation remains open, with a proposal due date of 16-May-2024.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002
SEE CONTINUATION PAGES:
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW24R0001
X 9B. DATED (SEE ITEM 11)
16-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jun-2024
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW24R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
AMENDMENT 0002
1. Drawing Index has been revised for G-003. Attached file G-003 R0002
2. Specifications CJD Excitation System Units 1-16:
• Division 26 05 13.00 26 Medium Voltage Cable, paragraphs 2.2.4.2 & 2.2.5.1 & 3.1.10 have been revised. Attached file 26 05 13.00 26 R0002
• Division 26 05 19.00 26 Insulated Wire and Cable, paragraph 2.3.3 has been revised.
Attached file 26 05 19.00 26 R0002
• Division 26 25 00.00 26 Bus Structures, paragraph 2.1.1 has been revised. Attached file 26 25 00.00 26 R0002
3. G-003 DRAWING INDEX SHEET 2 OF 2:
• Changes: Updated the list of Reference Drawings. They were missed from the original issue.
4. Chief Joseph Excitation System - 100% Reference Drawings:
• Changes: Deleted pages 199 – 291. No new drawing was added and no change in drawing contents. Attached file Chief Joseph Excitation System – 100% Reference Drawings R0002
5. The attached revise sections are to be replaced in their entirety. All portions of the revised sections shall apply whether or not changes have been indicated.
6. Wage Determination has been updated.
7. IMPORTANT NOTICE: Bidders must acknowledge receipt of this amendment by number and date on offer.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
INDEX OF DRAWINGS
CHIEF JOSEPH DAM EXCITATION
UNITS 1 -16 REPLACEMENT
DRAWING RECORD FILE NO. E-51-
4-73, DATED: "FINAL"
PAGE# SHEET# SHEET TITLE REVISION DATE
GENERAL
1 G-001 PROJECT LOCATION & VICINITY MAP
2 G-002 DRAWING INDEX SHEET 1 OF 2
3 G-003 DRAWING INDEX SHEET 2 OF 2 2 5/20/2024
4 G-004 SITE LOCATION PHOTOGRAPHS
5 G-101 POWERHOUSE PLAN VIEW
ELECTRICAL
6 ED201 EXCITATION SYSTEM PLAN - REMOVAL
7 ED211A EXCITATION SYSTEM PLAN DETAILS - REMOVAL
8 ED211B EXCITATION SYSTEN PLAN DETAILS - REMOVAL
9 ED301 WITCHBOARD - REMOVAL
10 ED302 CONTROL ROOM INSTRUMENT BOARD - REMOVAL
11 ED601 ONE LINE DIAGRAM - REMOVAL
12 E-201 EXCITATION SYSTEM PLAN - INSTALL
13 E-211A EXCITATION SYSTEN PLAN DETAILS - INSTALL
14 E-211B EXCITATION SYSTEN PLAN DETAILS - INSTALL
15 E-301 SWITCHBOARD - INSTALL
16 E-302 CONTROL ROOM INSTRUMENT BOARD - INSTALL
17 E-601 ONE LINE DIAGRAM - INSTALL
18 E-602 THREE LINE DIAGRAM - INSTALL
19 E-660 EXCITER EXTERNAL CONNECTIONS - INSTALL
20 E-801 CABLE AND CONDUIT SCHEDULE - INSTALL
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION
DAVIS-BACON Act WD # WA20240124
"General Decision Number: WA20240124 05/24/2024
State: Washington
Construction Type: Heavy
County: Douglas County in Washington.
HEAVY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |· Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |· The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the |
| | contract in 2024. | |If the contract was awarded on|· Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |· The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 05/24/2024
CARP0206-005 06/01/2023
Rates Fringes
CARPENTER........................$ 59.92 15.04
ELEC0077-002 02/01/2024
Rates Fringes
Line Construction:
LINE PERSON.................$ 64.17 23.58+1.5%
ELEC0077-003 02/01/2023
Rates Fringes
TREE TRIMMER: Ground Person......$ 22.60 16.37
TREE TRIMMER.....................$ 42.57 17.97
ELEC0077-005 02/01/2024
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR..........$ 55.19 20.11+1.5%
ELEC0077-006 02/01/2023
Rates Fringes
Line Construction:
GROUND PERSON...............$ 37.53 17.74
ELEC0191-002 01/01/2024
Rates Fringes
ELECTRICIAN......................$ 53.20 29.15
ENGI0302-069 06/01/2023
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe 15 to 30 metric tons........$ 55.09 25.57 Over 30 metric tons and up to 50 metric tons...........$ 55.80 25.57
ENGI0302-072 06/01/2023
Rates Fringes
OPERATOR: Bulldozer D9 & under..................$ 54.47 25.57
ENGI0302-075 06/01/2023
Rates Fringes
OPERATOR: Drill Drilling Machine............$ 56.64 25.57 Horizontal/directional drill locator...............$ 54.47 25.57 Horizontal/directional drill operator..............$ 55.09 25.57
ENGI0302-083 06/01/2023
Rates Fringes
OPERATOR: Oiler Drill Oilers: auger type, truck or crane mount........$ 54.47 25.57 Truck Crane Oiler/Driver:
100 tons and over...........$ 55.09 25.57
ENGI0302-087 06/01/2023
Rates Fringes
OPERATOR: Scraper Self propelled under 45 yards.......................$ 53.42 25.57
ENGI0302-090 06/01/2023
Rates Fringes
OPERATOR: Crane 100 tons through 199 tons, or 150? of boom (including jib with attachments).......$ 54.93 25.57
ENGI0701-046 01/01/2024
Rates Fringes
OPERATOR: Concrete Pump.........$ 49.03 16.90
IRON0086-005 07/03/2023
Rates Fringes
IRONWORKER.......................$ 52.40 33.07
LABO0242-009 06/01/2023
Rates Fringes
LABORER: Mason Tender - Cement/Concrete..................$ 44.53 14.40
LABO0242-010 06/01/2023
Rates Fringes
LABORER: Nozzle Person...........$ 47.95 14.40
LABO0292-009 06/01/2023
Rates Fringes
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 47.95 14.40
LABO0348-011 06/01/2023
Rates Fringes
TRAFFIC CONTROL: Flagger.......$ 30.88 15.70
PAIN0300-002 07/01/2023
Rates Fringes
PAINTER..........................$ 37.80 13.63
PLAS0528-008 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 52.10 20.27
TEAM0313-001 06/01/2023
Rates Fringes
TRUCK DRIVER: Asphalt Mix.......$ 50.63 24.32
SUWA2018-024 03/01/2024
Rates Fringes
GRADE CHECKER....................$ 34.79 13.87
LABORER: Common or General......$ 28.34 3.04
LABORER: Concrete Saw Chain.....$ 36.24 10.89
LABORER: Hod Carrier............$ 35.06 10.94
LABORER: Pipelayer..............$ 40.85 10.89
LABORER: Fence Erector...........$ 30.21 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 43.60 0.00
OPERATOR: Forklift..............$ 45.93 19.20
OPERATOR: Grader/Blade..........$ 40.28 16.17
OPERATOR: Loader................$ 37.92 12.05
OPERATOR: Mechanic..............$ 34.39 14.95
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 32.35 13.44
OPERATOR: Roller................$ 45.11 11.08
TRAFFIC CONTROL:
Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper.............$ 30.61 10.89
TRUCK DRIVER: Dump Truck........$ 26.27 8.56
TRUCK DRIVER: Water Truck.......$ 31.62 16.84
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"