Amendment 0003 (Released) W912DW24R0001 (CJD Exciters).pdf
PDF 182 KB Posted
- Attached to
- W912DW24R0001 - Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement Project.
- Solicitation number
- W912DW24R0001
About this file
This document is Amendment 0003 to Solicitation W912DW24R0001 for the Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement Project. The amendment revises several technical specifications and drawings related to the excitation system, including changes to Division 26 specifications, the Drawing Index, Cable and Conduit Schedules, and the Index of Drawings. The amendment provides instructions for bidders on acknowledging receipt of the changes. The overall solicitation, as described in the related federal contract opportunity, is for the replacement of the excitation system units 1-16 at the Chief Joseph Dam. The solicitation includes a Statement of Work and several attachments related to past performance, small business commitments, and proposal requirements. The solicitation is being issued by the US Army Corps of Engineers, Seattle District.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003
SEE CONTINUATION PAGES:
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW24R0001
X 9B. DATED (SEE ITEM 11)
16-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2024
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW24R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
Summary of Changes for Amendment 0003
1. Specifications CJD Excitation System Units 1-16:
• Division 26 05 00.00 26 Basic Electrical Materials and Methods, paragraphs 2.10 and 3.7 have been revised. Attached file 26 05 00.00 26 R0003
2. G-002 Drawing Index Sheet 1 of 2:
• Changes: revised drawing index. Attached file G-002 R0003
3. E-801 Cable and Conduit Schedule Sheet 1 – Install:
• Changes: general revision. Attached file E-801 R0003
4. E-802 Cable and Conduit Schedule Sheet 2 – Install:
• Changes: added a new drawing. Attached file E-802 R0003
5. The attached revise sections are to be replaced in their entirety. All portions of the revised sections shall apply whether or not changes have been indicated.
6. IMPORTANT NOTICE: Bidders must acknowledge receipt of this amendment by number and date on offer.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
INDEX OF DRAWINGS
CHIEF JOSEPH DAM EXCITATION
UNITS 1 -16 REPLACEMENT
DRAWING RECORD FILE NO. E-51-
4-73, DATED: "FINAL"
PAGE# SHEET# SHEET TITLE REVISION DATE
GENERAL
1 G-001 PROJECT LOCATION & VICINITY MAP
2 G-002 DRAWING INDEX SHEET 1 OF 2 6/24/2024
3 G-003 DRAWING INDEX SHEET 2 OF 2 2 5/20/2024
4 G-004 SITE LOCATION PHOTOGRAPHS
5 G-101 POWERHOUSE PLAN VIEW
ELECTRICAL
6 ED201 EXCITATION SYSTEM PLAN - REMOVAL
7 ED211A EXCITATION SYSTEM PLAN DETAILS - REMOVAL
8 ED211B EXCITATION SYSTEN PLAN DETAILS - REMOVAL
9 ED301 WITCHBOARD - REMOVAL
10 ED302 CONTROL ROOM INSTRUMENT BOARD - REMOVAL
11 ED601 ONE LINE DIAGRAM - REMOVAL
12 E-201 EXCITATION SYSTEM PLAN - INSTALL
13 E-211A EXCITATION SYSTEN PLAN DETAILS - INSTALL
14 E-211B EXCITATION SYSTEN PLAN DETAILS - INSTALL
15 E-301 SWITCHBOARD - INSTALL
16 E-302 CONTROL ROOM INSTRUMENT BOARD - INSTALL
17 E-601 ONE LINE DIAGRAM - INSTALL
18 E-602 THREE LINE DIAGRAM - INSTALL
19 E-660 EXCITER EXTERNAL CONNECTIONS - INSTALL
20 E-801 CABLE AND CONDUIT SCHEDULE SHEET 1 – INSTALL 6/24/2024
21 E-802 CABLE AND CONDUIT SCHEDULE SHEET 2– INSTALL 6/24/2024
(End of clause)
(End of Summary of Changes)