W912DW24R0001 - Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement Project.
Solicitation number
W912DW24R0001
Issued by

About this file

This document is a solicitation for the Chief Joseph Dam (CJD) Excitation System Units 1-16 Replacement Project, Solicitation Number W912DW24R0001, issued by the U.S. Army Corps of Engineers Engineering District Seattle.

The solicitation covers the testing and reporting requirements for the Chief Joseph Units 1-16 hydrogenerators to meet current North American Electrical Reliability Corporation (NERC) and Western Electricity Coordinating Council (WECC) reliability standards. Key requirements include testing and modeling the generator, excitation system, power system stabilizer, governor, and turbine, and submitting model validation test procedures, personnel qualifications, test reports, raw test data, and dynamic data files. The contractor must also research and comply with any additional WECC requirements for generator owner testing and reporting. The solicitation provides details on the government's and contractor's responsibilities during the model validation field testing.

View the file

Other files

File Type Posted
Amendment 0007 Released (W912DW24R0001 (CJD Exciters)).pdf PDF
Amendment 0006_Released_W912DW24R0001 (CJD Exciters).pdf PDF
01 45 00.00 10 R0005.pdf PDF
Amendment 0005_Released_W912DW24R0001 (CJD Exciters).pdf PDF
01 35 26 R0005.pdf PDF
01 22 00 R0004.pdf PDF
48 19 26.00 26 R0004.pdf PDF
00 41 00 R0004.pdf PDF
W912DW24R0001 Amendment 0004.pdf PDF
01 33 00-A R0004.pdf PDF
Amendment 0003 (Released) W912DW24R0001 (CJD Exciters).pdf PDF
G-002 R0003.pdf PDF
E-801 R0003.pdf PDF
E-802 R0003.pdf PDF
26 05 00.00 26 R0003.pdf PDF
Chief Joseph Excitation System 100 pct Reference Drawings R0002.pdf PDF
26 05 13.00 26 R0002.pdf PDF
G-003 R0002.pdf PDF
00 72 00-A Drawing Index R0002.pdf PDF
26 05 19.00 26 R0002.pdf PDF
26 25 00.00 26 R0002.pdf PDF
Amendment 0002 W912DW24R0001 (CJD Exciters).pdf PDF
W912DW24R0001 Amendment 0001.pdf PDF
5_Attachment_D_Proposal_Data_Sheet.pdf PDF
8_Site_Visit_RSVP_Form_CJ_Exciters.pdf PDF
4_Attachment_C_Small_Business_Commitment_Document.pdf PDF
9_Chief_Joseph_Excitation_System_100Percent_Reference_Drawings.pdf PDF
2_Attachment_A_Past_Performance_Project_Relevancy_Form.pdf PDF
7_Statement_Of_Work_Chief_Joseph_Excitation_System_Units_1-16.pdf PDF
3_Attachment_B__NAVFAC_USACE_Past_Performance_Questionanaire.pdf PDF
6_Attachment_E_Sample_Small_Business_Subcontracting_Plan.pdf PDF
10_W912DW24R0001_Project_Plan_CJD_Exciter__Units 1_16.pdf PDF
1_W912DW24R0001__RFP_Chief_Joseph_Dam_Exciters_1_16_Replacement.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CJD Excitation Units 1 – 16 Replacement 21050 Bridgeport, WA W912DW24R0001

SECTION TABLE OF CONTENTS

DIVISION 48 - ELECTRICAL POWER GENERATION

SECTION 48 70 01.00 26

NERC COMPLIANCE FOR HYDROGENERATORS

PART 1 GENERAL

1.1 GENERAL

1.2 REFERENCES

1.3 SUBMITTALS

1.4 Unit Information

1.5 Applicable NERC standards

1.5.1 MOD-025-1

1.5.2 MOD-026-1

1.5.3 MOD-027-1

1.5.4 MOD-032-1

1.6 PRC-019-2

1.7 Applicable Regional Entity standards

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 Model Validation Procedures

3.2 Personnel Qualifications

3.3 Model Validation Field Testing

3.4 Model Validation Reporting

-- End of Section Table of Contents --

SECTION 48 70 01.00 26 Page 1

R0007

SECTION 48 70 01.00 26

NERC COMPLIANCE FOR HYDROGENERATORS

PART 1 GENERAL

1.1 GENERAL

This section covers testing and reporting requirements for the Chief Joseph Units 1-16 hydrogenerators to meet current North American Electrical Reliability Corporation (NERC) and Western Electricity Coordinating Council (WECC) reliability requirements that must be met and reported by Generator Owners. Test and model the following systems using standard models available in GE PSLF Simulator simulation programs:

a. Generator

b. Excitation System

c. Power System Stabilizer

d. Governor

e. Turbine

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 421.5 (2016) IEEE Recommended Practices for Excitation System Models for Power System Stability Studies

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" are for information only. Designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with

SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-05 Design Data

Within 120 calendar days after date of receipt of written notice of award:

Model Validation Test Procedures; G, HDC

Personnel Qualifications for Model Validation Testing; G, HDC

SD-06 Test Reports

SECTION 48 70 01.00 26 Page 2

Test reports for all tests shall be submitted for approval within 60 calendar days of completing the testing.

Model Validation Test Report; G, HDC Electronic copies shall be Portable Document Format (PDF) with bookmarks matching the index. Include all information necessary for submission to NERC and the regional entity with enough detail to answer basic questions of methods and tests performed. Where applicable, submit separate appendices of fill-in compliance forms.

Raw Test Data; G, HDC Provide on a CD or DVD. Comma Separated Value (CSV) with column headings and necessary scaling factors applied or provided in a separate document to determine actual quantities.

Dynamic Data File; G, HDC Provide the text file necessary for incorporation into the simulation program used.

1.4 Unit Information

a. Generator: Generator Units 1-16 were manufactured by Westinghouse (rewound by Westinghouse in 1987). They are rated at 92,920 kVA at

0.95 power factor and 100 rpm.

b. Governor: The governor system installed is an American Governor digital governor.

c. Turbine: The turbine are manufactured by Alstom and they are Francis turbines. The rating of these turbine is 120,250 HP at nominal (rated) head of 165 ft. Turbine capacity at full gate opening, nominal rated head is 88 MW, minimum head is 84.3 MW, and maximum head is 99.1

MW.

d. Excitation System: These will be the new exciters that were just installed.

e. Power System Stabilizer: These will be the new PSS of the exciters that were just installed.

1.5 Applicable NERC standards

1.5.1 MOD-025-1

Verification of Generator Gross and Net Reactive Power Capability: Test for and report information necessary to meet required Generator owner compliance with this NERC standard.

1.5.2 MOD-026-1

Verification of Models and Data for Generator Excitation Control System or Plant Volt/VAR Control Functions: Test for and report information necessary to meet required Generator owner compliance with this NERC standard.

SECTION 48 70 01.00 26 Page 3

1.5.3 MOD-027-1

Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions: Test for and report information necessary to meet required Generator owner compliance with this NERC standard.

1.5.4 MOD-032-1

Data for Power System Modeling and analysis: Test for and report information necessary to meet required Generator owner compliance with this NERC draft standard. Until approved by FERC, it is acceptable to consider this requirement as compliance with MOD-010-0, MOD-011-0, MOD-012-0, MOD-013-1, MOD-014-0, and MOD-015-0.1 per the intended consolidation of MOD-032-1.

1.6 PRC-019-2

Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection: Test for and report information necessary to meet required Generator owner compliance with this NERC standard.

1.7 Applicable Regional Entity standards

The Contractor is responsible for researching all specific or additional applicable Generator Owner testing and reporting requirements for the components and WECC.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

3.1 Model Validation Procedures

Submit Model Validation Test Procedures. The Contractor shall prepare for approval detailed field test procedures for model validation testing for the generator , governor , exciter , and Power System Stabilizer (PSS) .

Provide a detailed step-by-step procedure of all required connections, test equipment, test sequence, operations, measurements and adjustments, and a list of the proposed dynamic simulation models. Testing and reporting shall be completed to satisfy the specific requirements of WECC in addition to the NERC requirements noted in "Applicable NERC standards." Approval of the test procedure does not release the contractor from the responsibility of testing and preparing a report that is acceptable to WECC. The contractor is responsible for researching all Generator Owner WECC requirements.

3.2 Personnel Qualifications

Submit Personnel Qualifications for Model Validation Testing. Test personnel shall have experience with the contractor's test equipment and test procedures and with the operating functionality and configuration of the type of governor and exciter (both manufacturer and model) to be tested. The test personnel must have experience performing model validation testing at a minimum of five (5) different generating plants in the past two (2) years. Contractor shall submit for approval a resume and experience list of the individual(s) who will perform the testing and the

SECTION 48 70 01.00 26 Page 4 individual(s) who will be the knowledgeable exciter technician or engineer. One qualified individual may perform both roles.

3.3 Model Validation Field Testing

a. Field Testing. Test the generator , governor , excitation system , and PSS in accordance with WECC and listed NERC requirements as necessary to demonstrate compliance.

b. Contractor Supplied Items. The contractor shall supply the following:

(1) All equipment, materials, personnel, and any and all services as required in connection with generator, governor, and excitation system model validation testing (this includes, but is not limited to, test equipment, laptops, and software);

(2) A knowledgeable exciter technician or engineer to provide onsite support during the described testing;

(3) All software as necessary for the knowledgeable exciter technician or engineer to program and operate the exciter during testing;

(4) Provide wiring termination strip to Government for connection to Government owned equipment and control systems, as described in the test procedure;

c. Government Support During Testing. The Government will provide the following support for testing:

(1) Powerhouse operators to operate government owned equipment and control systems as described in the approved written test procedures;

(2) Electricians to perform modifications to unit controls if needed for the tests as well as perform all wiring connections to Government owned equipment;

(3) Access to AC power outlets and/or extension cords in the area where the data recording equipment will be used;

(4) Previously prepared validation and modeling reports, if available;

(5) Equipment schematics or elementary drawings as requested by Contractor (if available).

(6) Equipment operation and maintenance manual as requested by Contractor (if available).

3.4 Model Validation Reporting

a. Computer Simulations. Perform computer simulations to ensure that the generator, governor, exciter, and PSS models, with parameters corresponding to as-left equipment settings, represent equipment dynamic performance with sufficient accuracy for power system stability studies. Models shall be standard models used in the simulation program or listed in IEEE 421.5 . Models shall be selected

SECTION 48 70 01.00 26 Page 5 to appropriately model the equipment. Custom models, if needed, shall be coordinated with WECC.

b. Model Validation Test Report. The Contractor shall submit a test report includes direct comparisons of actual dynamic performance with model predicted performance overlaid. The report shall includes a subjective evaluation of equipment performance as well as the models and the correct model parameters presented in a format suitable for transmittal to WECC. The report shall include a generator capability curve verified through testing. The Contractor shall be available to respond in writing to inquiries from WECC regarding test procedures and results. All deliverable products and working papers shall be the property of the U.S. Government. Procedures and reports shall be provided as Microsoft Word files.

c. Raw Test Data. Provide the raw test data in comma separated values (CSV) format on either a compact disc or digital video disc. Create the file names for the CSV files such that it is apparent which facility, unit, and test is being completed. Provide either as a header to columns or as a separate key file the contents and scaling factors for all columns.

d. Dynamic Data File. Provide the dynamic data file (.dyd) for the modeled data on either a compact disc or digital video disc. The file can be provided on the same disc with the raw test data in paragraph

3.3 (c).

-- End of Section --

SECTION 48 70 01.00 26 Page 6

File details come from the government source that posted it. Updated .