VOL 3 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf
PDF 25 MB Posted
- Solicitation number
- W912DS26RA018
About this file
This document is Volume 3 of the corrected Revised Technical Approach (RTA) drawings for the Child Development Center at Fort Hamilton, New York (Project No. 75662). The drawing set comprises detailed plumbing, mechanical, and electrical plans and schedules for a new 16,632 square foot facility designed to serve children ages 6 weeks through 5 years.
The plumbing drawings (sheets P-001 through P-702) include general notes and legends, overall floor plans, domestic water piping plans, sanitary waste plans, venting plans, kitchen details, and plumbing schedules. Specifications require copper piping with soldered joints, individual fixture shut-off valves, domestic cold water velocity limited to 5 FPS and hot water to 4 FPS, trap primer lines of 1/2-inch Type K copper for all floor drains and floor sinks, and ABA-compliant pre-mixed single push control faucets in toilet areas. The mechanical drawings (sheets M-001 through M-813) encompass HVAC system layouts, equipment schedules, ductwork and piping plans, control schematics, and points schedules for systems including air handling units (AHU-1, MAU-1), variable air volume (VAV) boxes, chilled water systems with air-cooled chillers, exhaust fans, unit heaters, and humidification equipment. The electrical drawings (included in the document header) provide symbols, abbreviations, and general notes covering power distribution, lighting, receptacles, fire protection systems, and controls wiring. All work must comply with the National Electrical Code, NFPA standards (including NFPA 96 for kitchen exhaust), SMACNA duct construction standards, and Army Corps of Engineers specifications, with coordination required among all building trades to accommodate the limited overhead space and complex mechanical systems integration.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
A
SS
NG
A
HWS
HWR
CD
F
RS
RL
RD
VTR
FD
CO
WH
WCO
PRV
TPRV
PS
FS
HB
AV
AS
ZZ ZZ
NN NN
CHS
CHR
CWS
CWR
GENERAL ABBREVIATIONS
PIPING SYSTEMS
PIPING SYMBOLS
VALVES
GENERAL NOTES
BALL VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
CHECK VALVE
SOLENOID VALVE
BUTTERFLY VALVE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER
RETURN
SANITARY SEWER
VENT
NATURAL GAS
COMPRESSED AIR
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER
SUPPLY
CONDENSER WATER
RETURN
REFRIGERANT SUCTION
REFRIGERANT LIQUID
ROOF DRAIN
CONTINUATION
DROP IN PIPE
VALVE IN RISER
ELBOW
ELBOW UP
ELBOW DOWN
TEE
UNION
UNION, FLANGED
FLOOR DRAIN WITH TRAP
FLOOR DRAIN WITH
CLEANOUT
FLOOR SINK WITH
HALF GRATE
FLOOR SINK WITH
FULL GRATE
PIPE PITCH
VENT THRU ROOF
DIRECTION OF FLOW
FLOOR PENETRATION
WALL HYDRANT
WALL CLEANOUT
TOP CONNECTION
BOTTOM CONNECTION
CONCENTRIC REDUCER
ECCENTRIC REDUCER
WATER HAMMER
ARRESTOR/ACCESS
PRESSURE REDUCING
VALVE
PRESSURE RELIEF
TEMP & PRESS RELIEF
THERMOMETER
THERMOMETER WELL
PRESSURE GAUGE WITH
COCK
PRESSURE SWITCH
BALL JOINT
ANCHOR
SOLENOID TWO-WAY
MODULATING TWO-WAY
THREE-WAY
STRAINER W/BLOW-OFF
AND HOSE CONNECTION
HOSE BIB
CALIBRATED BALANCING
VALVE
AUTOMATIC BALANCING
VALVE
BOP - BOTTOM OF PIPE ELEV.
E
D
C
B
A
F
G
H
I
IE - INVERT ELEVATION
K
L
AFF - ABOVE FINISHED FLOOR
ALT - ALTERNATE
AP - ACCESS PANEL
CA - COMBUSTION AIR
CAV - CONSTANT AIR VOLUME
CFM - CUBIC FEET PER MINUTE
CL - CENTERLINE
CLG - CEILING
COND - CONDENSATE/CONDENSER
CONN - CONNECTION/CONNECT
COP - CENTER OF PIPE
DB - DRY BULB TEMPERATURE
DDC - DIRECT DIGITAL CONTROL
DTC - DATA TERMINAL CABINET
EL - ELEVATION
EMCS - ENERGY MONITORING
AND CONTROL SYSTEM
ESP - EXTERNAL STATIC PRESSURE
EWT - ENTERING WATER TEMP.
FA - FIELD ADJUSTABLE
FC - FAIL CLOSED
FD - FLOOR DRAIN
FID - FIELD INTERFACE DEVICE
FLA - FULL LOAD AMPS
FO - FAIL OPEN
GA - GAUGE
HD - HUB DRAIN
LWT - LEAVING WATER TEMP.
N
NA - NOT APPLICABLE
NC - NORMALLY CLOSED
NIC - NOT IN CONTRACT
NO - NORMALLY OPEN
NPS - NOMINAL PIPE SIZE
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
O
P
Pa - PASCALS PaA - PASCALS ABSOLUTE PaG - PASCALS GAUGE
PD - PRESSURE DROP
OC - ON CENTER
OED - OPEN END DUCT
OV - OUTLET VELOCITY
R
RA - RETURN AIR
RPM - REVOLUTIONS PER MINUTE
S
SAN - SANITARY
SOG - SLAB ON GRADE
SP - STATIC PRESSURE
SV - SUPPLY VALVE
T
TOP - TOP OF PIPE ELEVATION
TOS - TOP OF SLAB/
TOP OF STEEL
TSP - TOTAL STATIC PRESSURE
V
VP - VELOCITY PRESSURE
VTR - VENT THRU ROOF
W
W - WASTE
WB - WET BULB
WC - WATER COLUMN
WG - WATER GAUGE
FLOW SWITCH
EXPANSION LOOP
AIR VENT, AUTOMATIC
AIR VENT, MANUAL
GUIDE
EXPANSION JOINT
FLEXIBLE CONNECTOR
AIR SEPARATOR
FLOW METER, ORIFICE
PRESSURE/TEMPERATURE
TEST PORT)
PETE'S PLUG
DETAIL NO.
REF: DET.NN/MZZ
DETAIL LOCATION
REFERENCE SYMBOLOGY
DETAIL LOCATION
FIRE PROTECTION
A. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS OF CONSTRUCTION.
B. ALL FLOOR MOUNTED EQUIPMENT IN MECHANICAL ROOM SHALL BE MOUNTED ON 6" HIGH HOUSEKEEPING PADS. THESE PADS SHALL EXTEND 6" BEYOND THE FOOTPRINT OF THE EQUIPMENT IN ALL DIRECTIONS.
C. WHERE PIPE SIZES ARE NOT INDICATED, THEY SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE (LATEST EDITION). DOMESTIC COLD WATER PIPING SHALL BE LIMITED TO 5 FPS. DOMESTIC HOT WATER
PIPING SHALL BE LIMITED TO 4 FPS.
D. TRAP PRIMER LINES SHALL BE 1/2" TYPE K COPPER. TRAP PRIMER VALVES/DISTRIBUTORS SHALL BE PROVIDED FOR ALL FLOOR DRAINS AND FLOOR SINKS. TRAP PRIMER VALVE/DISTRIBUTORS SHALL BE LOCATED IN THE
NEAREST ACCESSIBLE LOCATION AND PROVIDED WITH ACCESS PANELS.
E. DRAWINGS ARE SCHEMATIC AND ARE TO SHOW DESIGN INTENT, AND IT ISTHE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE PLACEMENTS.
F. REFER TO MECHANICAL SHEETS FOR ADDITIONAL DETAILS.
kW - KILOWATTS
V
NON-FREEZING WALL
HYDRANT
NFWH
NPW
NON-POTABLE WATER
(PURPLE PIPE)
PIPES SHALL BE MARKED
WITH "NONPOTABLE WATER,
DO NOT DRINK"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-001
PL
U
M
BI
N G
G
EN
ER
AL
N O
TE
S
AN
D
L
EG
EN
D
S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
REMOTE CONDENSING UNIT CLEARANCE REQUIREMENTS
WALK-IN
COOLER
44 SF
WALK-IN
FREEZER
44 SFDRY FOOD &
PAPER STORAGE
118 SF
PREPARATION
ASSEMBLY
PO
T/
PA
N
W
AS
H
IN
GW
AR
E W
AS
H
IN
G
C O
O
KI
N G
CART STAGING
F.E.
DESK
2 43
19 20
17 23
19 19 19 20
4 4
23-T
12 23-T
RRD
AIR
OUT
AIR
IN
RRD
AIR
OUT
AIR
IN
18x304 TIER
18x304 TIER x
T
IE
R
A
IR
IN
24x604 TIER
24x604 TIER
C
C H x3
TI
E R x
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R
S S
E1
H
C
D D
D
DC
D
H
H
C
24x604 TIER
24x544 TIER 24x364 TIER
C W O
C W
IC
W O
C W I
P-4
P-3A
P-3B
1" ø
C W
2 1/2"ø
CW
2" ø
C W
2"ø
CW
2" ø
C W
2" ø
C W
2" ø
C W
1/
4" ø
H W
1"ø
HW
1/
2" ø
C W
2 1/2"ø
CW
2" ø
C W
1 1/2"ø
HW
2"ø
CW
1/
2" ø
H W
1/
2" ø
H W
1"ø
CW
2" ø
C W
2" ø
C W
1/
4" ø
H W
1/
4" ø
H W
1/
4" ø
H W
2"ø
HW
2 1/2"ø
CW
1"ø
CW
2" ø
C W
1"ø
CW
1/
2" ø
C W
2 1/2"ø
CW
1"ø
CW
2" ø
C W
1"ø
CW
1" ø
C W
1/
4" ø
H W
1"ø
HW
1/
4" ø
H W
3" ø
C W
1 2 3 4 4.4 5
B
C
D
6 7 8 9 10
C.1
A
D.1
INFANT/PRE-TODDLER
ACTIVITY RM 01
INFANT/PRE-TODDLER
ACTIVITY RM 02
PRESCHOOL/PRE-K
ACTIVITY RM 01
PRESCHOOL/PRE-K
ACTIVITY RM 02
INFANT/PRE-TODDLER
ACTIVITY RM 03
INFANT/PRE-TODDLER
ACTIVITY RM 04
105 TRAINING RM
STAFF LOUNGE
PRESCHOOL/PRE-K
ACTIVITY RM 03
OUTREACH/TRANSITIONAL
CARE ACTIVITY
RM
KITCHEN
MECHANICAL
ACTIVE
PLAYROOM
COMMUNICATIONS
ELECTRICAL
STORAGE
118B
RECYCLE RM
LAUNDRY
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-100
PL
U
M
BI
N G
O
VE
R
AL
L
FL
O O
R P
LA
N
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/32" = 1'-0"1 PLUMBING OVERALL PLAN 0' 4' 8' 16' 32' 64'
SCALE: 3/32"=1'-0" N
PRESCHOOL/PRE-K
ACTIVITY RM 02
COMMUNICATIONS
ASSISTANT
DIRECTORS
OFFICE
DIRECTORS
OFFICE
OPEN OFFICE
AREA
CORRIDOR
VESTIBULE
STAFF LOUNGE
TRAINING RM
PRESCHOOL/PRE-K
ACTIVITY RM 01
WAITING AREA
PUBLIC TOILET
002B
STORAGE
004A
ISO TOILET
005B
JANITOR CLOSET
106ISOLATION AREA
005A
INFANT/PRE-TODDLER
ACTIVITY RM 04
INFANT/PRE-TODDLER
ACTIVITY RM 02
INFANT/PRE-TODDLER
ACTIVITY RM 03
INFANT/PRE-TODDLER
ACTIVITY RM 01
CORRIDOR
EXT STORAGE
STORAGE
132B
CCTV EQUIPMENT
BUGGY STORAGE
003A
STORAGE
115B
STORAGE
111B
EXT STORAGE
NURSING
MOTHERS RM
STORAGE
105B
STORAGE
109B
EXT STORAGE
P-1B
P-1B
P-1B
P-1B
P-1D
P-1C
P-1D
P-1C
P-1B
P-1B
P-1B
P-1B
P-1A
P-8 P-8
P-8P-8
P-1A
TOILET 01
P-3A
P-1E
P-7
P-8A P-4
P-4 P-4
P-4 P-4 P-8A
P-3A
1/
2" ø
C W
1" ø
H W
1"ø
CW
1"ø
CW
1/
4" ø
H W
2" ø
C W
2"ø
CW
1 1/2"ø
HW
1/
4" ø
H W
2" ø
C W
1/
2" ø
C W
2 1/2"ø
CW
2"ø
HW
1"ø
HW
1"ø
CW
1"ø
HW
1"ø
CW
P-9
P-9
WH
WH
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-3B
P-3B
P-3B
P-12
P-3B
P-3B P-3C P-3C
P-3C
P-1E
P-3B P-3B
P-3B
P-3C
P-3C
2 1/2"ø
CW
2"ø
HW
P-6
WHA-C WHA-A
WHA-B
WHA-A
WHA-B
WHA-A
WHA-A
WHA-B
WHA-CWHA-B
3/4"ø
HWR
3/4"ø
HWR
3/4"ø
HWR
1" ø
H W
2" ø
C W
1/
4" ø
H W
BALANCING VALVE
BALANCING VALVE
MATCHLINE
A B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-101
D O
M
ES
TI
C
W
AT
ER
P
IP
IN
G P
LA
N
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16" = 1'-0"1 DOMESTIC WATER FLOOR PLAN A
NOTES:
1. ALL FLOOR PENETRATIONS SHALL BE PROVIDED WITH A PVC SLEEVE SCHEDULE 40.
2. ALL CW, HW AND HWR PIPES SHALL BE RUN ABOVE CEILING AND COME DOWN
IN THE CHASES PROVIDED BY THE ARCHITECT.
3. WATER HAMMER ARRESTOR ARE INDENTIFY AS WH-X. SEE WATER HAMMER ARRESTOR SCHEUDLE.
4. ALL DOMESTIC COLD WATER BRANCH CONNECTIONS MUST BE PROVIDED WITH A SHUT-OFF VALVE, 1/4 - TURN BALL VALVE
FULL PIPE BORE SIZE.
5. ALL FIXTURES SHALL BE PROVIDED WITH INDIVIDUAL 1/4 - TURN FIXTURE SHUT-OFF BALL VALVE.
6. ALL DOMESTIC PIPING SHALL BE COPPER, ALL JOINTS SHALL BE SOLDERED. CONTRACTOR MUST FOLLOW THE LATEST
FT HAMILTON STANDARDS.
7. TOILET AREA FAUCETS SHALL BE PRE-MIXED SINGLE PUSH CONTROL MEETING ABA REQUIRMENTS. WATER SHALL RUN
FOR AT LEAST 10-20 SECONDS.
8. PROVIDE A MAKE-UP WATER CONNECTION FOR THE CHILLED WATER SYSTEM IN THE MECHANICAL ROOM. SEE SHEET M-402
FOR CONNECTION DETAILS
N
8'4' 16'0
SCALE: 3/16" = 1'-0"
8'4' 16'0
SCALE: 3/16" = 1'-0"
COOLER
44 SF
WALK-IN
FREEZER
44 SFDRY FOOD &
PAPER STORAGE
118 SF
PREPARATION
ASSEMBLY
PO
T/
PA
N
W
AS
H
IN
GW
AR
E W
AS
H
IN
G
C O
O
KI
N G
CART STAGING
F.E.
DESK
2 43
19 20
17 23
19 19 19 20
4 4
23-T
12 23-T
RRDRRD
S S
E1
D D
D
D
D
3" ø
C W
MECHANICAL
KITCHEN
OUTREACH/TRANSITIONAL
CARE ACTIVITY
RM
PRESCHOOL/PRE-K
ACTIVITY RM 03
PRESCHOOL/PRE-K
ACTIVITY RM 02
ELECTRICAL
STORAGE
118B
CORRIDOR
CENTRAL
STORAGE
STORAGE
122B
EXT STORAGE
CORRIDOR
RECYCLE RM
LAUNDRY
ACTIVE
PLAYROOM
COMMUNICATIONS
ASSISTANT
DIRECTORS
OFFICE
DIRECTORS
OFFICE
OPEN OFFICE
AREA
PUBLIC TOILET
002B
STORAGE
004A
ISO TOILET
005B
JANITOR CLOSET
P-1D
P-1C
P-1D
P-1C
P-1D
P-1C
P-1D
P-1B
P-1A
P-1A
TOILET 02
P-3A
P-1E
P-7
P-4
P-8AP-8AP-8A
P-3A
P-4 P-4
1/
2" ø
C W
2 1/2"ø
CW
2"ø
HW
2" ø
C W
1/
4" ø
H W
1"ø CW1"ø
HW
1"ø
HW
1"ø
CW
1"ø
HW
1"ø
CW
1/
4" ø
H W
2" ø
C W
2 1/2"ø
CW
2"ø
HW
WH
WH
P-1C
P-8
P-10
P-11
3" REDUCED PRESSURE
BACKFLOW PREVENTER (RPBP)
AND ISOLATION VALVE FOR
DOMESTIC WATER ONLY
2" ø
H W
P-401
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-5
P-3C
P-3C
P-1E P-3C
P-3C
P-3C
P-3C
P-3C
WHA-CWHA-B
EXT STORAGE
STORAGE
126B
STORAGE
130B
WHA-C
WHA-A WHA-B WHA-A
P-14
P-14
3/4"ø
HWR
3/4"ø
HWR
3/4"ø
HWR
3/4"ø
HWR
3/ 4" ø H
W R
1 1/2"ø
HW
2"ø CW
3/4"ø
HWR
2 1/2"ø
CW
2"ø HW
1" ø
H W
BH-1
1/2"ø CW
2"ø HW 140 F
2"ø HW 140 F
COLD WATER FROM
UTILITY LINE SEE CIVIL
DWGS FOR CONTINUATION
TMV
BALANCING VALVE
WHA-A
WHA-A
MATCHLINE
¾” CW CONNECTION
TO HUMIDFIER
(HUM-01) WITH RPBP
AND ISOLATION
VALVE.
¾” CW CONNECTION FOR
MAKE-UP WATER FOR
CHILLED WATER SYSTEM
A B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-102
D O
M
ES
TI
C
W
AT
ER
P
IP
IN
G P
LA
N
II
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16" = 1'-0"1 DOMESTIC WATER FLOOR PLAN B
N
8'4' 16'0
SCALE: 3/16" = 1'-0"
8'4' 16'0
SCALE: 3/16" = 1'-0"
NOTES:
1. ALL FLOOR PENETRATIONS SHALL BE PROVIDED WITH A PVC SLEEVE SCHEDULE 40.
2. ALL CW, HW AND HWR PIPES SHALL BE RUN ABOVE CEILING AND COME DOWN
IN THE CHASES PROVIDED BY THE ARCHITECT.
3. WATER HAMMER ARRESTOR ARE INDENTIFY AS WH-X. SEE WATER HAMMER ARRESTOR SCHEUDLE.
4. ALL DOMESTIC COLD WATER BRANCH CONNECTIONS MUST BE PROVIDED WITH A SHUT-OFF VALVE, 1/4 - TURN BALL VALVE
FULL PIPE BORE SIZE.
5. ALL FIXTURES SHALL BE PROVIDED WITH INDIVIDUAL 1/4 - TURN FIXTURE SHUT-OFF BALL VALVE.
6. ALL DOMESTIC PIPING SHALL BE COPPER, ALL JOINTS SHALL BE SOLDERED. CONTRACTOR MUST FOLLOW THE LATEST
FT HAMILTON STANDARDS.
7. TOILET AREA FAUCETS SHALL BE PRE-MIXED SINGLE PUSH CONTROL MEETING ABA REQUIRMENTS. WATER SHALL RUN
FOR AT LEAST 10-20 SECONDS.
8. PROVIDE A MAKE-UP WATER CONNECTION FOR THE CHILLED WATER SYSTEM IN THE MECHANICAL ROOM. SEE SHEET M-402
FOR CONNECTION DETAILS
COOLER
44 SF
WALK-IN
FREEZER
44 SFDRY FOOD &
PAPER STORAGE
118 SF
PREPARATION
ASSEMBLY
PO
T/
PA
N
W
AS
H
IN
GW
AR
E W
AS
H
IN
G
C O
O
KI
N G
CART STAGING
F.E.
DESK
2 43
19 20
17 23
19 19 19 20
4 4
23-T
12 23-T
RRD
AIR
OUT
AIR
IN
RRD
AIR
OUT
AIR
IN
18x304 TIER
18x304 TIER x
T
IE
R
A
IR
IN
24x604 TIER
24x604 TIER
C
C H x3
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R x
T
IE
R
S S
E1
H
C
D D
D
DC
D
H
H
C
24x604 TIER
24x544 TIER 24x364 TIER
C W O
C W
IC
W O
C W I
1 2 3 4 4.4 5
B
C
D
6 7 8 9 10
C.1
A
D.1
P-4
P-3A
P-3B
INFANT/PRE-TODDLER
ACTIVITY RM 01
INFANT/PRE-TODDLER
ACTIVITY RM 02
PRESCHOOL/PRE-K
ACTIVITY RM 01
PRESCHOOL/PRE-K
ACTIVITY RM 02
INFANT/PRE-TODDLER
ACTIVITY RM 03
INFANT/PRE-TODDLER
ACTIVITY RM 04
105 TRAINING RM
STAFF LOUNGE
PRESCHOOL/PRE-K
ACTIVITY RM 03
OUTREACH/TRANSITIONAL
CARE ACTIVITY
RM
KITCHEN
MECHANICAL
ACTIVE
PLAYROOM
COMMUNICATIONS
ELECTRICAL
STORAGE
118B
RECYCLE RM
LAUNDRY
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-103
SA
N
IT
AR
Y W
AS
TE
O
VE
R
AL
L
PL
AN
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/32" = 1'-0"1 SANITARY WASTE OVERALL PLAN
N
0' 4' 8' 16' 32' 64'
SCALE: 3/32"=1'-0"
PRESCHOOL/PRE-K
ACTIVITY RM 02
PRESCHOOL/PRE-K
ACTIVITY RM 01
COMMUNICATIONS
JANITOR CLOSET
ISO TOILET
005B
ISOLATION AREA
005A
RECEPTION
OPEN OFFICE
AREA
ASSISTANT
DIRECTORS
OFFICE
DIRECTORS
OFFICE
STORAGE
004A
PUBLIC TOILET
002B
WAITING AREA
VESTIBULE
STROLLER/ CAR
SEAT STORAGE
002C
STORAGE
101A
TRAINING RM
STAFF LOUNGE
INFANT/PRE-TODDLER
ACTIVITY RM 04
INFANT/PRE-TODDLER
ACTIVITY RM 03
STORAGE
105B
STORAGE
109B
EXT STORAGE
NURSING
MOTHERS RM
INFANT/PRE-TODDLER
ACTIVITY RM 01
EXT STORAGE
STORAGE
111B
STORAGE
115B
TOILET 01
INFANT/PRE-TODDLER
ACTIVITY RM 02
EXT STORAGE
STORAGE
132B
CCTV EQUIPMENT
BUGGY STORAGE
003A
P-1B
P-1B
P-1B
P-1B
P-1D
P-1C
P-1D
P-1C
P-1B
P-1B
P-1B
P-1B
P-1A
P-8 P-8
P-8P-8
P-1A
P-3A
P-1E
P-7
P-8AP-4
P-4 P-4
P-4 P-4
P-8A
P-3A
4"ø
SAN
4"ø
SAN
4"ø
SAN
3" ø
SA
N
3" ø
SA
N
3" ø
SA
N
3" ø
SA
N
3" ø
SA
N
FD-A
FD-A FD-A
FD-A FD-A
FD-A
P-3B
P-3B
P-5
P-5
P-3B
P-3B
P-5
P-5
P-3B
P-3B
P-5
P-5
P-3B
P-3B
P-5
P-5
P-12
P-5
P-5
P-5
P-5
P-3C
P-3C
P-3C
P-3C
P-9
P-9
P-4
FD-A
P-3C
0.25:1 0.25:1
FD-A
FD-A
3"ø SAN
FCO
FCO FCO
FD-A
MATCHLINE
FD-A
A B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-104
SA
N
IT
AR
Y W
AS
TE
P
LA
N A
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16" = 1'-0"1 SANITARY WASTE PLAN A
NOTES:
1. ALL SANITARY PIPING SHALL HAVE A ¼ INCH PER FOOT SLOPE.
2. ALL SANITARY TEE CONNECTIONS SHALL BE OF THE TYPE Y-TEE.
3. ALL FLOOR DRAINS VENT TO THE NEAREST VENT BRANCHSTACK.
4. COORDINATE ALL PIPING ENTRY/EXIT BUILDING WITH CIVIL
DISCIPLINE PRIOR TO EXCAVATION AND CONCRRETE WORK.
5. ALL SANITARY PIPING ARE BURIED BELOW FINISH FLOOR.
6. FLOOR SINKS LOCATED IN THE KITCHEN AREA SHALL BE VENT TO
THE NEAREST VENT STACK
N
8'4' 16'0
SCALE: 3/16" = 1'-0"
COOLER
44 SF
WALK-IN
FREEZER
44 SFDRY FOOD &
PAPER STORAGE
118 SF
PREPARATION
ASSEMBLY
PO
T/
PA
N
W
AS
H
IN
GW
AR
E W
AS
H
IN
G
C O
O
KI
N G
CART STAGING
F.E.
DESK
2 43
19 20
17 23
19 19 19 20
4 4
23-T
12 23-T
RRDRRD
S S
E1
D D
D
D
D
OUTREACH/TRANSITIONAL
CARE ACTIVITY
RM
KITCHEN
MECHANICAL
PRESCHOOL/PRE-K
ACTIVITY RM 03
PRESCHOOL/PRE-K
ACTIVITY RM 02
ACTIVE
PLAYROOM
ELECTRICAL
STORAGE
118B
CORRIDOR
RECYCLE RM
112 LAUNDRY
CORRIDOR
TOILET 02
STORAGE
130B
STORAGE
126B
EXT STORAGE
COMMUNICATIONS
JANITOR CLOSET
ISO TOILET
005B
OPEN OFFICE
AREA
ASSISTANT
DIRECTORS
OFFICE
DIRECTORS
OFFICE
STORAGE
004A
PUBLIC TOILET
002B
WAITING AREA
4 INCHES
SANITARY PIPE
INV 35.12.
SEE CIVIL DWGS FOR
CONTINUATION.
4 INCHES WASTE PIPE TO
GREASE INTERCEPTOR
SEE CIVIL DWGS FOR
CONTINUATION.
4"ø
SAN
3" ø
SA
N
3" ø
SA
N
3" ø
SA
N
4" ø
SA
N
FD-B
FD-B
FD-B
FD-B
P-8A
P-4
P-1D
P-1C
FD-A
P-1A
P-3A
P-8A
P-4
FD-A
P-1D
P-1B
P-8
FD-A
FD-A
FCO
FCO
P-13
P-13
P-13
P-13
P-14
P-14
FD-A
FCO FCO
P-3C
P-3C
0.25:1 0.25:1
FD-B FD-B
FCO
FCO
P-13
P-3C
P-3C
FCO
FCO
4"ø W
4"ø W0.
:1
0.
:1
P-11
P-10
3" ø
SA
N
3" ø
SA
N
3"ø SAN
4"ø SAN
4"ø SAN
4"ø SAN
4" ø
SA
N
4"ø SAN
4" ø
W
4"ø W
4"ø W
1 1/2"ø W
1/
2" ø
W
MATCHLINE
FD-A
P-3C
P-8A
P-4
P-3C
P-1C
P-1DP-1D
P-1C 3"ø SAN
3" ø
SA
N
4"ø SAN
FD-A
P-3A
P-1A
FD-B
A B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-105
SA
N
IT
AR
Y W
AS
TE
P
LA
N B
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16" = 1'-0"1 SANITARY WASTE PLAN B
NOTES:
1. ALL SANITARY PIPING SHALL HAVE A ¼ INCH PER FOOT SLOPE.
2. ALL SANITARY TEE CONNECTIONS SHALL BE OF THE TYPE Y-TEE.
3. ALL FLOOR DRAINS VENT TO THE NEAREST VENT BRANCHSTACK.
4. COORDINATE ALL PIPING ENTRY/EXIT BUILDING WITH CIVIL
DISCIPLINE PRIOR TO EXCAVATION AND CONCRRETE WORK.
5. ALL SANITARY PIPING ARE BURIED BELOW FINISH FLOOR.
6. FLOOR SINKS LOCATED IN THE KITCHEN AREA SHALL BE VENT TO
THE NEAREST VENT STACK
N
8'4' 16'0
SCALE: 3/16" = 1'-0"
1 2 3 4 4.4 5
B
C
D
C.1
A
D.1
PRESCHOOL/PRE-K
ACTIVITY RM 02
PRESCHOOL/PRE-K
ACTIVITY RM 01
COMMUNICATIONS
JANITOR CLOSET
ISO TOILET
005B
ISOLATION AREA
005A
RECEPTION
OPEN OFFICE
AREA
ASSISTANT
DIRECTORS
OFFICE
DIRECTORS
OFFICE
STORAGE
004A
PUBLIC TOILET
002B
WAITING AREA
VESTIBULE
STROLLER/ CAR
SEAT STORAGE
002C
STORAGE
101A
TRAINING RM
STAFF LOUNGE
INFANT/PRE-TODDLER
ACTIVITY RM 04
INFANT/PRE-TODDLER
ACTIVITY RM 03
STORAGE
105B
STORAGE
109B
EXT STORAGE
NURSING
MOTHERS RM
INFANT/PRE-TODDLER
ACTIVITY RM 01
EXT STORAGE
STORAGE
111B
STORAGE
115B
TOILET 01
INFANT/PRE-TODDLER
ACTIVITY RM 02
EXT STORAGE
STORAGE
132B
CCTV EQUIPMENT
BUGGY STORAGE
003A
P-1B
P-1B
P-1B
P-1B
P-1D
P-1C
P-1D
P-1C
P-1B
P-1B
P-1B
P-1B
P-1A
P-8 P-8
P-8P-8
P-1A
P-3A
P-1E P-7
P-8AP-4
P-4 P-4
P-4 P-4 P-8A
P-3A
FD-A FD-A
FD-A FD-A
FD-A FD-A
FD-A
P-3B
P-3B
P-5
P-5
P-3B
P-3B
P-5
P-5
P-3B
P-3B
P-5
P-5
P-3B
P-3B
P-5
P-5
P-12
P-5
P-5
P-5
P-5
P-3C P-3C P-3CP-3C
P-9
P-9
P-3C
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
2" ø
V
2" ø
V
2"ø
3" ø
V
3" ø
V
3" ø
V
3" ø
V 2" ø V
2" ø
V
2" ø
V
2" ø
2" ø
V
2"ø V
2" ø
V
2" ø
V
2" ø
V
3" ø
V
2" ø
V
1 1/2"ø V
FD-A
FD-A
P-6
MATCHLINE
FD-A
A B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-106
VE
N
TI
N
G P
LA
N
A
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16" = 1'-0"1 VENTING FLOOR PLAN A 8'4' 16'0
SCALE: 3/16" = 1'-0"
SCALE: 3/16" = 1'-0" N
COOLER
44 SF
WALK-IN
FREEZER
44 SFDRY FOOD &
PAPER STORAGE
118 SF
PREPARATION
ASSEMBLY
PO
T/
PA
N
W
AS
H
IN
GW
AR
E W
AS
H
IN
G
C O
O
KI
N G
CART STAGING
F.E.
DESK
2 43
19 20
17 23
19 19 19 20
4 4
23-T
12 23-T
RRD
AIR
OUT
AIR
IN
RRD
AIR
OUT
AIR
IN
A
IR
IN
S S
E1
D D
D
D
D
B
C
D
6 7 8 9 10
C.1
A
D.1
PRESCHOOL/PRE-K
ACTIVITY RM 03
OUTREACH/TRANSITIONAL
CARE ACTIVITY
RM
MECHANICAL
ACTIVE
PLAYROOM
STORAGE
118B
ELECTRICAL
CORRIDOR
KITCHEN
EXT STORAGE
STORAGE
122B
CENTRAL
STORAGE
124TOILET 02
STORAGE
130B
STORAGE
126B
EXT STORAGE
MECHANICAL
YARD
RECYCLE RM
LAUNDRY
4" VENT
THRU ROOF3"ø V
2" ø
V
2" ø
V
2"ø V
3"ø V
2" ø
V
2" ø
V
4" VENT
THRU ROOF
3" ø
V
3"ø V
P-5
P-5
P-1D
P-1C
FD-A
P-3C
P-3C
P-8A
P-4
P-3AP-1A
FD-A
P-5
P-5
P-3C
P-3C
P-8A
P-4
FD-A
P-1D
P-1B
P-3C
FD-A
P-8
P-1C
P-14
P-14
FD-A
P-11
P-10
FD-B
FD-B
FD-B
FD-B
P-13
P-13
P-13
P-13
P-13
3"ø V
2" ø
V
MATCHLINE
FD-A
P-1C
P-1D
P-3C
P-8A
P-3C
P-4
FD-A
P-7
P-1A
FD-AP-3A
A B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-107
VE
N
TI
N
G P
LA
N
B
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16" = 1'-0"1 VENTING FLOOR PLAN B
N
8'4' 16'0
SCALE: 3/16" = 1'-0"
COOLER
44 SF
WALK-IN
FREEZER
44 SFDRY FOOD &
PAPER STORAGE
118 SF
PREPARATION
ASSEMBLY
PO
T/
PA
N
W
AS
H
IN
GW
AR
E W
AS
H
IN
G
C O
O
KI
N G
CART STAGING
F.E.
DESK
2 43
19 20
17 23
19 19 19 20
4 4
23-T
12 23-T
RRDRRD
S S
E1
D D
D
D
D
B
C
9 10
C.1
P-13
P-13
P-13
P-13
P-13
4" ø
W
FCO
FCO
1/
2" ø
W
FD-B
FD-B
1" ø
H W
3/ 4" ø H
W R
2" ø
C W
1 1/2"ø
HW
3/4"ø
HWR
1/ 2" ø C
W
2"ø CW
2" ø
C W 1
1/ 2" ø H
W
2"ø HW 140 F
4"ø W
4" ø
W
4"ø W
3/4"ø
HWR
3"ø V
3" ø
V 3" ø V
3"ø V
1/2"ø HW 1/2"ø CW
1 1/2"ø
HW
1/
2" ø
H W
FD-B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-401
KI
TC
H
EN
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/8" = 1'-0"1 ENLARGE KITCHEN PLAN 0 2' 4' 8'
SCALE: 3/8" = 1'-0" N
NOTES:
1. SEE FOOD SERVICE EQUIPMENT DRAWINGS FOR MORE INFORMATION.
DRAIN TO BE
MAXIMUM 6" FROM
FLOOR
HOT WATER SUPPLY TO
MIXING VALVE
140 DEG F HOT WATER
TO KITCHEN
COLD WATER SUPPLY
VACUUM RELIEF
VALVE
GATE VALVE
(TYP)
DIP TUBE INSIDE
THE TANK
SEISMIC STRAP
HOSE BIB
4 INCHES
CONCRETE PADFLOOR
HEATING ELEMENT
(TYP)
AQUASTAT
(TYP)
COMBUSTION TEPERATURE
AND PRESSURE RELIEF
VALVE
EX-01
HOT WATER HEATER
COLD WATER SUPPLY
HEAT TRAP
ISOLATION VALVE
CHECK VALVE
THERMOMETER
BALL VALVE FOR
SET UP (OPYIONAL)
ISOLATION VALVE
CHECK VALVE
BALANCING
VALVE
AQUASTAT FOR P-1 TO BE
SET AT 100 DEG F
CIRCULATOR PUMP
THERMOSTATIC MIXING VALVE
RESET SET POINT TO 131 DEF F (ADJ)
HOT WATER RETURN
TO FIXTURES
TO FIXTURES
NOTE: A SEPARATE “POINT-OF-USE” MIXING VALVE TO BE PROVIDED AT EACH LAVATORY (NOT SHOWN HERE)
TO BUILDING
LINESIZE BACKFLOW PREVENTER
(RPZ REDUCE PRESSURE TYPE)WATER METER WITH VISUAL REAT OUT
AND PULSE INITIATOR FOR REMOTE READING
AND LOGGING. READ OUT TO INDEX IN GALLONS
COORDINATE WITH ARMY CENTRAL METERING
REQUIREMENTS FOR CONNECTION TO THE
ADVANCE METER INFRASTRUCTURE.
PRESSURE GAUGE
DRAIN VALVE
PLUG
FINISHED FLOOR
PLASTIC SLEEVE
FINISHED GRADE
PIPE SLEEVE
WATER SERVICE LINE
SEE CIVIL DRAWINGS FOR
LOCATION AND SIZE
60"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-501
PL
U
M
BI
N G
D
ET
AI
LS
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
NTS4 INLINE PUMP DETAIL
NTS1 ELECTRIC WATER HEATER DETAIL
NTS2 MIXING VALVE DETAIL
NTS3
COLD WATER SERVICE ENTARNCE DETAIL
(TYP)
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-502
PL
U
M
BI
N G
D
ET
AI
LS
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
NTS1 CONDENSATE DRAIN DETAIL
NTS2 FLOOR CLEANOUT DETAIL
NTS3 PIPE PENETRATION DETAIL
NTS4 PIPE SUPPORT DETAIL
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-503
PL
U
M
BI
N G
D
ET
AI
LS
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
NTS1 TRAP PRIMER DETAIL
NTS2 VENT THRU ROOF DETAIL
NTS3 WATER HAMMER ARRESTOR DETAIL
NTS4 WALL CLEANOUT DETAIL
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-601
PL
U
M
BI
N G
S C
H
ED
U
LE
S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-602
PL
U
M
BI
N G
S C
H
ED
U
LE
S
II
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
2"ø CW
2"ø HW
2 1/2"øCW
1 1/2"øHW
2"ø CWDCW
3/4"øHWR
WH
P-5
P-5
P-12
P-5
P-5
P-3B
P-1B
P-1B
P-3B
P-4
P-8
P-3B
P-1B
P-1B
P-6
P-4 P-3B
P-3B P-1B
P-1B
WH
P-5 P-5
P-8
P-3B
P-4
P-5 P-5
P-8
P-3A
P-1A
P-1B
P-3B
P-4 P-3B
P-1B
2"ø HW
3/4"øHWR
2 1/2"øCW
WH
P-1C P-3C
WH
P-5
P-5
P-1B
P-1D
P-3C
P-3C
P-4
P-8A
P-5P-5
P-3C
P-4 P-1A P-3A
P-1C
P-1D
P-8
P-5
P-5
P-5
P-5 P-8A
P-1C
P-1C
P-1D
P-1D
P-1E
P-7
P-3C
P-1A
P-3A
P-9 P-9
2"ø CW1"ø CW1 1/4"ø
HW
P-8
2"ø CW
1 1/4"ø
HW
3/4"øHWR
1"ø CW
2"ø CW
1"ø HW
1"ø CW
1 1/2"ø
CW
1"ø HW
3/4"ø
HWR
2"ø CW
1 1/4"ø
HW
1"ø HW
1"ø CW
3"ø CW
1/ 2" ø C
W
2"ø CW
1 1/2"øHW
1 1/4"ø
HW
2"ø CW
3/4"øHWR
3"ø CW
P-11 P-10
BH-1
BACKFLOW PREVENTER
HAND SINK
2 SINKS & POT/PAN
ICE MAKER
HAND SINK
HOSE REEL
3-COMP. SINK
P-3C
P-8A
P-3C
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-701
D O
M
ES
TI
C
W
AT
ER
R
IS
ER
D
IA
G R
AM
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
NTS1 DOMESTIC WATER ISOMETRIC
P-12
P-5 P-5
P-3B
P-3B
P-1B
P-1B
FD-A
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
3"ø V
3"ø V
4" ø
4" ø
4" ø
4" ø
FCO
FCO
FD-A
P-1A P-3A
P-3C
P-5 P-5
P-5
P-5
P-5
P-5
P-5 P-5
P-3C
P-1D P-1B
P-4
P-8A
P-13
P-13FD-B
FCO
FCO
P-13
FCO
FCO
FD-B
P-11
P-10
P-13
FD-B
FD-B
FD-B
P-14
P-14
4" VENT
THRU ROOF
4" VENT
THRU ROOF
4" VENT
THRU ROOF
P-8
P-1C P-3C
4"ø SAN
4"ø SAN
4"ø SAN1 1/2"ø
SAN
3"ø SAN
3"ø SAN
3"ø SAN
3"ø SAN
FCO
FD-A
4"ø SAN
P-6
2"ø V
2"ø V
2"ø V
2"ø V
4"ø W
4"ø W
2"ø V
2"ø V 1 1/2"ø V
3"ø V
P-1A
P-3A
P-9
P-9
P-7
P-1E
P-3C P-3C
P-4
P-8AP-1C
P-1C
P-1D
P-1D
P-8A P-3C
P-4
P-3C
FD-A
FD-A
FD-A
FD-A
FD-A
FD-A
P-1B
P-1B P-3B
P-5 P-5
FD-A
P-1D P-1C
FD-A
P-4
P-8A
P-3C
FCO
FCO
FD-B P-13
FD-A
FD-A2"ø V
2"ø V
3"ø V
2"ø V
FCO
2"ø V
2"ø
P-5 P-5
P-3B
P-1A
P-8
P-4 P-3B
P-4 P-3A
P-1B P-1B
P-4
P-3B
P-1B P-1B
P-3B P-5
P-5
P-8
P-3B
P-8 P-4
P-3C
3"ø SAN
2"ø V
3"ø
3"ø V
2"ø V
3"ø V
3"ø V
4"ø SAN
4"ø SAN 4"ø SAN
4"ø SAN
4"ø W
1 1/2"ø
W 4"ø W
4"ø W
2"ø SAN 3"ø V
2"ø V
4" VENT
THRU ROOF
3"ø V
3"ø V
HAND SINK
HAND SINK
3"ø SAN
FCO
FD-B
SEE CIVIL DWGS FOR CONTINUATION
TO GREASE INTERCEPTOR
SEE CIVIL DWGS FOR CONNECTION
FD-A
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P-702
SA
N
IT
AR
Y W
AS
TE
D R
AI
N
AG
E
R
IS
ER
D
IA
G
R
AM
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
FW
B
FW
B
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
NTS1 SANITARY WASTE ISOMETRIC
Ø
GENERAL ABBREVIATIONS
A ---------------------
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
AL ACOUSTIC LINING
AP ACCESS PANEL
ATC AUTOMATIC TEMPERATURE
CONTROL
B ---------------------
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BTU BRITISH THERMAL UNITS
BTUH BTU'S PER HOUR
C ---------------------
CC COOLING COIL
CD CEILING DIFFUSER
CDR CEILING DIFFUSER, ROUND
CFM CUBIC FEET PER MINUTE
COND CONDENSATE
COR CONTRACTING OFFICER'S REP
CV CONVECTOR
D ---------------------
DB DRY BULB
DIA DIAMETER
DN DOWN
DPT DIFFERENTIAL PRESSURE
TRANSMITTER
DV DRAIN VALVE
E ---------------------
EA EXHAUST AIR
EAC EXHAUST AIR CONTROLLER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EL ELEVATION
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
F ---------------------
°F DEGREE FAHRENHEIT
F.D. FLOOR DRAIN
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&T FLOAT & THERMOSTATIC TRAP
FPM FEET PER MINUTE
FTR FINNED TUBE RADIATION
FPB FAN-POWERED BOX
G ---------------------
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
H ---------------------
HC HEATING COIL
HP HORSEPOWER
HX HEAT EXCHANGER
I ---------------------
INF INFILTRATION
AIR OR STEAM VENT
DIAMETER
DIRECTION OF FLOW
FLEXIBLE CONNECTION
DIFFERENTIAL PRESSURE
TRANSMITTER
PITCH OF PIPE, DOWN
PRESSURE GAUGE AND VALVE
PRESSURE / TEMPERATURE
PLUG
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC
STRAIGHT CROWN
REDUCER, ECCENTRIC
STRAIGHT INVERT
RISER OR ELBOW DOWN
RISER UP AND DOWN
ELBOW UP
STEAM TRAP
STRAINER
STRAINER W/GATE VALVE
W/NIPPLE & CAP
THERMOMETER
THERMOMETER WELL
THERMOSTAT
UNION OR FLANGED
CONNECTION
VALVE, AUTOMATIC
FLOW CONTROL
VALVE, BALANCING
VALVE, CHECK
VALVE, DRAIN W/NIPPLE & CAP
VALVE, SHUT-OFF
VALVE, SOLENOID
VALVE, TWO-WAY CONTROL
DPT
P/T
T
S
CHWR
CHWS
D
HWR
HWS
LPC
LPS
V
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DRAIN LINEBOILER BLOW DOWN
HEATING WATER RETURN
HEATING WATER SUPPLY
LOW PRESSURE CONDENSATE
LOW PRESSURE STEAM
VENT, ATMOSPHERIC
L ---------------------
LAT LEAVING AIR TEMPERATURE
LB POUND
LBD LINEAR BAR DIFFUSER
LBG LINEAR BAR GRILLE
LF LINEAR FEET
M ---------------------
MBH THOUSAND BTU'S PER HOUR
N ---------------------
(N) NEW
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
O ---------------------
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OBD OPPOSED BLADE DAMPER
P ---------------------
PHC PREHEAT COIL
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
R ---------------------
RA RETURN AIR
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
S ---------------------
SA SUPPLY AIR
SAT SOUND ATTENUATOR
SF SMOKE FIRE DAMPER
SG SUPPLY GRILLE
SP STATIC PRESSURE
T ---------------------
TOD TOP OF DUCT
TOP TOP OF PIPE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
V ---------------------
V VENT
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VRF VARIABLE REFRIGERANT FLOW
W ---------------------
WB WET BULB
PIPING SYMBOLS
PIPING NOMENCLATURE
AIR DISTRIBUTION, GENERAL SYMBOLS & NOMENCLATURE
Ø
U
D
R
D D
H
CO2
AFMS
TRANSFER DUCT, SEE DETAIL
TRANSFER DUCT, SEE DETAIL
W/RETURN/TRANSFER GRILLE
TRANSFER DUCT, SEE DETAIL
W/RETURN/TRANSFER GRILLE
AIR CUSHION, 12" LONG MIN.
AIR CUSHION, 12" LONG MIN.
VOLUME DAMPER
DAMPER
(TYPE AS INDICATED; BD, BDD,
MOD, FD, SD/FD, VD, ETC.)
DIAMETER
DOOR LOUVER
(FREE AREA IN SQ. FEET)
DOOR UNDERCUT
DUCT DROP (SLOPING)
DUCT DROP (90°)
DUCT RISE (SLOPING)
DUCT RISE (90°)
(RISE AND DROP IN
DIRECTION OF AIR FLOW)
TRANSFER AIR
DUCT MOUNTED SMOKE DETECTOR
FLEXIBLE CONNECTION
FLEXIBLE DUCTWORK
FLEXIBLE DUCTWORK
HUMIDIFIER (DUCT MOUNTED)
HUMIDITY SENSOR
CARBON DIOXIDE SENSOR
DUCT TRASITION (RECTANGULAR
TO RECTANGULAR)
DUCT TRASITION (RECTANGULAR
TO ROUND)
AIR FLOW MEASURING STATION
T/H
AV
22 x 10
22 x 10
12" Ø
22x10 B
14x10 T
22x10 T
14x10 B
8X14
LFD-1
14X10
( ) 8X8 CD-1 (3-3/4)
250 - 2W
RECTANGULAR DUCT (FIRST
NUMBER INDICATES PLAN
DIMENSION, SECOND NUMBER
INDICATES DEPTH)
FLAT OVAL DUCT
ROUND DUCT (12" Ø DIAMETER)
RADIUS ELBOW
(NO TURNING VANES)
HARD ELBOW
(WITH TURNING VANES)
DUCT TRANSITION
(RECTANGULAR TO RECTANGULAR)
DUCT TRANSITION
(RECTANGULAR TO ROUND)
RECTANGULAR SUPPLY
DUCT UP
RECTANGULAR SUPPLY
DUCT DOWN
DUCT INDICATION FOR STACKING
T= TOP; B= BOTTOM
DUCT INDICATION FOR STACKING
T= TOP; B= BOTTOM
VOLUME DAMPER
DAMPER (TYPE AS INDICATED;
BD, BDD, MOD, FD, SD/FD, ETC.)
SPLITTER DAMPER
AUDIO VISUAL ALARM
TEMP / HUMID SENSOR
(DUCT MOUNTED)
AIR DEVICE DESIGNATION
QUANTITY (IF MORE
THAN ONE)
CONNECTION SIZE, SINGLE
DIMENSION INDICATES
ROUND CONNECTION. FOR
RECTANGULAR NECK, FIRST
DIMENSION IS THE PLAN
HORIZONTAL DIMENSION.
TYPE IDENTIFICATION
(SEE SCHEDULE)
NO. & SIZE OF SLOTS
(TYPE LPD ONLY)
BLOW DIRECTION WHERE
APPLICABLE (TYPE CD 4-WAY
UNLESS NOTED OTHERWISE);
(TYPE LPD 2-WAY UNLESS
NOTED OTHERWISE)
AIR QUANTITY - CFM
FLEXIBLE BRANCH DUCT
CONNECTION TO DIFFUSER.
CONICAL BELL MOUTH OR
SQUARE/ROUND BOOT FITTING
WITH VOLUME DAMPER.
ROUND INLET CONNECTION TO
LAMINAR FLOW DIFFUSER
(CFM INDICATED)
BRANCH DUCT CONNECTION TO
DIFFUSER WITH VOLUME DAMPER.
SQUARE INLET CONNECTION
TO DIFFUSER
RETURN GRILLE
SUPPLY DIFFUSER
DUCTWORK WITH INSULATION
GENERAL NOTES
EXHAUST GRILLE
1. THE PLANS SHOW PIPING AND DUCTWORK DIAGRAMATICALLY AND DO NOT SHOW ALL OFFSETS, DROPS AND RISERS OF RUNS. THE CONTRACTOR SHALL ALLOW FOR ROUTING PIPING AND DUCTWORK
TO AVOID OBSTRUCTIONS.
2. COORDINATE MECHANICAL REQUIREMENTS WITH STRUCTURAL, ARCHITECTURAL, ELECTRICAL, PLUMBING, FIRE PROTECTION AND OTHER TRADES IN ORDER TO FIT MECHANICAL ITEMS WITHIN THE AVAILABLE SPACE. THIS SHOULD BE COMPLETED BEFORE ANY TYPE OF EQUIPMENT INSTALLATION
BEGINS.
3. THE MECHANICAL LEGEND ON THIS DRAWING TAKES PRECEDENCE OVER THE LEGEND PROVIDED ON
THE TITLE SHEET.
4. FOR MECHANICAL EQUIPMENT SUPPORTED BY TRUSSES, SUPPORT SHALL BE LOCATED AT TRUSS
PANEL POINTS.
5. ALL EQUIPMENT PADS SHALL EXTEND 6 INCHES AROUND THE PERIMETER OF EQUIPMENT. SEE
STRUCTURAL AND CIVIL DRAWINGS FOR ALL OTHER PAD REQUIREMENTS.
6. UNLESS OTHERWISE NOTED, ALL DUCTWORK SHOWN ON M- SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH SPECIFICATION SECTION 23 30 00 AND SHALL MEET ALL REQUIREMENTS OF SMACNA SEAL CLASS A. SEE SPECIFICATION SECTION 23 30 00 FOR ALLOWABLE DUCT LEAKAGE RATE
BASED ON LEAKAGE CLASS CL6.
7. DUCT DIMENSIONS NOTED ARE SIZED AS CLEAR INTERIOR DUCT DIMENSIONS AND DO NOT TAKE INTO
ACCOUNT SOUND LINING AND EXTERIOR INSULATION REQUIREMENTS.
8. COORDINATE THERMOSTAT LOCATIONS WITH EQUIPMENT AND FURNITURE LAYOUT.
9. REFER TO ARCHITECTURAL DRAWINGS FOR LOUVER DIMENSIONS. SEE STRUCTURAL DRAWINGS FOR
LINTEL DETAILS AND NOTES.
10. PROVIDE ACCESS TO ALL VOLUME DAMPERS, FIRE DAMPERS, AND VALVES.
11. REFER TO THE MECHANICAL EQUIPMENT SCHEDULES FOR ALL EQUIPMENT SIZES AND CAPACITIES.
12. THE CONTRACTOR SHALL VERIFY ALL MECHANICAL EQUIPMENT LOCATIONS AND BE RESPONSIBLE FOR ALL RELATED CLEARANCES IN THE FIELD. PROVIDE ADEQUATE MAINTENANCE CLEARANCE AROUND ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS PER NATIONAL ELECTRIC CODE REQUIREMENTS. COORDINATE EXACT LOCATION
OF ALL OUTDOOR EQUIPMENT IN THE FIELD WITH CONTRACTING OFFICER.
13. RUN PIPING, DUCTS AND INSTALL EQUIPMENT PARALLEL WITH OR AT RIGHT ANGLES TO THE WALLS
OF THE BUILDING UNLESS SHOWN OTHERWISE ON THE DRAWINGS. PARALLELED RUNS SHALL BE
STRAIGHT AND TRUE WITH OFFSETS UNIFORM AND SYMMETRICAL.
14. PRIOR TO INSULATING, PRESSURE TEST ALL PIPING AND DUCTWORK.
15. SEE STRUCTURAL DWGS FOR ATFP BRACING FOR OVERHEAD EQUIPMENT.
16. OVERALL PLANS DO NOT SHOW ALL DUCTWORK SIZING. REFER TO PART PLANS.
17. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS FOR ALL CONCEALED EQUIPMENT INSTALLED.
SIZE ACCESS PANELS AS REQUIRED TO ALLOW WORKING CLEARANCE.
MOTORIZED DAMPER
LV LOUVER
T TEMPERATURE SENSOR
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
TG TRANSFER GRILLE
S
S
S
M
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-001
M
EC
H
AN
IC
AL
G
EN
ER
AL
N O
TE
S
AN
D
L
EG
EN
D
S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
MM
M
MM
M
MM
MM MM
M
1 2 3 4 4.4 5
B
C
D
6 7 8 9 10
C.1
A
D.1
M-301
3/32" = 1'-0"1 FLOOR PLAN - DUCTWORK - OVERALL
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-101
FL
O
O R
P
LA
N
O
VE
R
AL
L
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
0' 4' 8' 16' 32' 64'
SCALE: 3/32"=1'-0"
PLAN NORTH
1 2 3 4 4.4 5
B
C C.1
A
40"x24" SA30"x20" SA
18"ø RA
DIRECTORS
OFFICE
ASSISTANT
DIRECTORS
OFFICE
COMMUNICATIONS
OPEN OFFICE
AREA
WAITING AREA
CCTV EQUIPMENT
BUGGY STORAGE
003A
INFANT/PRE-TODDLER
ACTIVITY RM 02
EXT STORAGE
INFANT/PRE-TODDLER
ACTIVITY RM 01
STORAGE
111B
STORAGE
115B
TOILET 01
EXT STORAGE
STORAGE
132B
PRESCHOOL/PRE-K
ACTIVITY RM 01
INFANT/PRE-TODDLER
ACTIVITY RM 03
STORAGE
105B
STORAGE
109B
NURSING
MOTHERS RM
INFANT/PRE-TODDLER
ACTIVITY RM 04
105 TRAINING RM
STAFF LOUNGE
VESTIBULE
STROLLER/ CAR
SEAT STORAGE
002C
RECEPTION
ISOLATION AREA
005A
JANITOR CLOSET
CORRIDOR
EXT STORAGE
PUBLIC TOILET
002B
VAV-6
VAV-8
VAV-7
VAV-5
VAV-11
VAV-9
VAV-15
VAV-3
VAV-14
VAV-4
AC-1
AC-3
CUH-1
16"x14" EA
12"x10" EA
12"x10" EA
14"x12" EA
CD-1
250 CFM
CD-1
250 CFM
18"ø RA14"ø RA
"x
" S
A
"x
" S
A
CD-1
250 CFM
CD-1
125 CFM
CD-1
125 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
225 CFM
CD-1
225 CFM
CD-1
250 CFM
CD-1
240 CFM
CD-1
235 CFM
CD-1
235 CFM
CD-1
180 CFM CD-1
180 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
170 CFM
RG-1
400 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
RG-1
400 CFM
RG-1
380 CFM
RG-1
380 CFM
RG-1
325 CFM
RG-1
325 CFM
RG-1
375 CFM
RG-1
375 CFM
RG-1
450 CFM
RG-1
450 CFM
EXH-1
150 CFM
EXH-1
150 CFM
CD-1
175 CFM
CD-3
50 CFM
CD-3
50 CFM
CD-3
50 CFM
CD-3
50 CFM
CD-3
50 CFM
CD-1
175 CFM
EXH-1
150 CFM
CD-1
60 CFM
CD-1
130 CFM
CD-1
160 CFM
RG-1
160 CFM
RG-1
150 CFM
CD-1
100 CFM
CD-1
130 CFM
EXH-1
150 CFM
RG-1
100 CFM
VAV-2
RG-1
130 CFM
RG-1
200 CFM
CD-1
200 CFM
CD-2
50 CFM
RG-2
50 CFM
26"ø RA
26"ø RA18"ø RA
STORAGE
101A
12"x10" EA
T H CO2
S S S
T H CO2
S S S
T
H
CO2
S
S
S
T
H
CO2
S
S
S
T
H
CO2
S
S
S
T S
T S
T S
T S
T S
T
H
CO2
S
S
S
S
S
S
S
S
RG-1
350 CFM
RG-1
360 CFM
T
EXH-1
150 CFM
6" ø
EA
"x
" S
A
12"ø RA
"x
" S
A
"x
" S A
4"ø SA
"ø
R A
6" ø
R A
6" ø
SA
4"ø SA
"x
" S
A
"ø
R A
4"ø SA
30"ø RA
4"ø SA
"x
" S
A
"x
" S A
"x
" S
A
"x
" S A
14"x12" EA
12"ø RA
"ø
R A
"ø
R A 12
"ø R
A
12"x10" SA
CU-1
CD-2
20 CFM
øSA10" øSA10"
S H øSA6" øSA10" øSA10" øSA10"
4"ø SA øSA10" øSA10"øSA10" øSA10" øSA8" øSA8" øEA6" øEA6" øSA10" øSA10" øSA10" øEA6" øEA6" øSA8" øSA8" øSA8"
"ø
R A
"x
" S
A
12"x8" SA
"x
" S
A
8"ø SA
8" ø
SA
øSA6" øSA6"
8" ø
R A
"ø
R A øSA8" øRA12"
8" ø
R A øSA8" øSA8" øSA6" øSA8"
6" x6
" E A øEA6" øEA6"
6" ø
8" x8
"x
" S A øEA6" øEA6" øEA6" øEA6" øEA6"øEA6" øRA12"øRA12"
10"x8"
8" ø
R A
8" ø
R A
"x
" E
A
14"x12" EA
8" ø
TG
150 CFM
TG
150 CFM
8"x8" SA
12"x10" SA10"x6" SA
6"x6"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-102
FL
O
O R
P
LA
N
AR
EA
A
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16"=1'-0"SCALE:
2' 4' 8' 12'
PLAN NORTH
3/16" = 1'-0"1 FLOOR PLAN - DUCTWORK - AREA A
GENERAL SHEET NOTES
1. LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL
DROPS, RISES, OR OFFSETS REQUIRED FOR A
COMPLETE INSTALLATION. COORDINATE EXACT ROUTING
OF WORK WITH ALL OTHER DISCIPLINES AND
OBSTRUCTIONS. COORDINATE EXACT LOCATIONS OF
CEILING MOUNTED DEVICES WITH LIGHTS, CEILING GRID,
AND OTHER OBSTRUCTIONS.
2. FIELD VERIFY ALL MEASUREMENTS AND
DIMENSIONS OF PROPOSED EQUIPMENT TO ENSURE
THAT THE EQUIPMENT WILL FIT IN THE
DESIGNATED SPACE.
3. COORDINATE WITH STRUCTURAL TO ROUTE RETURN
DUCTWORK THROUGH METAL TRUSS SPACE.
4. VAV BOXES SHALL BE MOUNTED NO MORE THAN 24”
ABOVE FINISHED CEILING.
SHEET KEYNOTES
1. TEMPERATURE AND AIR QUAILITY MONITORING DEVICE.
DEVICE SHALL MONITOR SPACE TEMPERATURE, SPACE
HUMIDITY, AND SPACE CARBON DIOXIDE LEVELS. MOUNT
DEVICE AT 48" AFF. DEVICE SHALL BE TAMPER PROOF.
2. INSTALL SECOND SPACE TEMPERATURE SENSOR 12" AFF.
SENSOR SHALL BE FLUSH WITH WALL.
3.. PROVIDE MANUAL EMERGENCY HVAC SYSTEM
SHUT-OFF BUTTON WITH A NON-LOCKING PROTECTIVE
COVER ON THE WALL BEHIND THE RECEPTION DESK.
M
MM
M
MM
MM MM
M
B
C
6 7 8 9 10
C.1
A
30"ø RA
"ø
R A
PRESCHOOL/PRE-K
ACTIVITY RM 02
EXT STORAGE
STORAGE
126B
STORAGE
130B
TOILET 02
PRESCHOOL/PRE-K
ACTIVITY RM 03
ACTIVE
PLAYROOM
EXT STORAGE
STORAGE
122B
CENTRAL
STORAGE
OUTREACH/TRANSITIONAL
CARE ACTIVITY
RM
MECHANICAL
KITCHEN
ELECTRICAL
STORAGE
118B
VAV-12
VAV-13
VAV-10
VAV-1
AC-2
EF-3
EF-4
AHU-1
MAU-1
14"x12" SA 14"x12" EA
"x
" E
A
8"x8" EA
CD-1
185 CFM
CD-1
185 CFM
CD-1
190 CFM
CD-1
190 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
230 CFM
CD-1
230 CFM
CD-1
230 CFM
CD-1
230 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
200 CFM
CD-1
150 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
170 CFM
CD-1
230 CFM
CD-1
300 CFMCD-1
435 CFM
CD-1
435 CFM
CD-1
300 CFM
EXH-2
300 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
EXH-1
150 CFM
RG-1
600 CFM
RG-1
600 CFM
RG-1
500 CFM
RG-1
500 CFM
30"ø RA
CD-3
50 CFM
RG-1
450 CFM
RG-1
450 CFM
CD-3
50 CFM
CD-3
50 CFM
RG-1
600 CFM
12"x10" SA
18"x12" SA
"x
" S
A
M-301
CD-3
50 CFM
RG-1
1470 CFM
M-301
LAUNDRY
4"ø EA
4"ø EA
UH-1
"x
" S
A
12"x10" SA
4"ø SA
12"ø RA
"x
" S
A
4"ø SA
"x
" S
A
"x
" S A
12"x10" SA 12"x10" SA 12"x10" SA
"x
" S
A
12"x12" SA
"ø
R A
"x
" S
A
"x
" S
A
T
H
CO2
S
S
S
T
H
CO2
S
S
S
T
H
CO2
S
S
S
CD-2
50 CFM
4" ø
SA
DH-1
AFMS
26"ø RA26"ø RA 40"x30" RA
40"x24" SA
16"x14" EA 16"x14" EA 20"x18" EA
8" x6
" E A
8" x6
" E A
4"ø SA
TYP.
EXH-1
150 CFM
8" x6
" E A
4"ø SA
24"x20" EA
"x
" E
A
"x
" E
A
8" x1
0" S
A
CD-3
50 CFM
12"x10" SA
6" ø
EA
8" x6
" E A
8" x6
" E A
"x
" S
A
12"ø RA
RC-1
M-302
EXH-2
800 CFM
EF-6
LV-3
800 CFM
LV-2
1470 CFM
LV-1
4200 CFM
LV-4
300 CFM
S S
S
RC-2
HUM-1
DH-2
EF-5
TG
450 CFM
TG
450 CFMEXH-3
50 CFM
10"x10" EA øSA8"øSA8" øSA8"
12"ø RA
26"ø RA øSA8" øSA8"
RG-1
600 CFM
øSA10"
"x
TG
400 CFM
TG
400 CFM
"x øSA8" øSA8" øSA8"
12"x10" øSA8" øSA8" øSA8"
T S
12"x10" SA
"x
" S
A øSA10" øSA10" øSA10" øSA8"
20"x14" RA
20"x14" OA øRA12"
"ø
R A
12"ø RA 12"ø RA
T S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-103
FL
O
O R
P
LA
N
AR
EA
B
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/16"=1'-0"SCALE:
2' 4' 8' 12'
PLAN NORTH
3/16" = 1'-0"1 FLOOR PLAN - DUCTWORK - AREA B
GENERAL SHEET NOTES
1. LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL
DROPS, RISES, OR OFFSETS REQUIRED FOR A COMPLETE
INSTALLATION. COORDINATE EXACT ROUTING OF WORK
WITH ALL OTHER DISCIPLINES AND OBSTRUCTIONS.
COORDINATE EXACT LOCATIONS OF CEILING MOUNTED
DEVICES WITH LIGHTS, CEILING GRID, AND OTHER
OBSTRUCTIONS.
2. FIELD VERIFY ALL MEASUREMENTS AND DIMENSIONS OF
PROPOSED EQUIPMENT TO ENSURE THAT THE
EQUIPMENT WILL FIT IN THE DESIGNATED SPACE.
3. COORDINATE WITH STRUCTURAL TO ROUTE RETURN
DUCTWORK THROUGH METAL TRUSS SPACE.
4. VAV BOXES SHALL BE MOUNTED NO MORE THAN 24”
ABOVE FINISHED CEILING.
5. INSTALL INTAKE LOUVERS MINIMUM 10 FEET ABOVE
FINISHED GRADE.
SHEET KEYNOTES
1. TEMPERATURE AND AIR QUAILITY MONITORING DEVICES.
DEVICE SHALL MONITOR SPACE TEMPERATURE, SPACE
HUMIDITY, AND SPACE CARBON DIOXIDE LEVELS. MOUNT
DEVICE AT 48" AFF. DEVICE SHALL BE TAMPER PROOF.
2. INSTALL SECOND SPACE TEMPERATURE SENSOR 12" AFF.
SENSOR SHALL BE FLUSH WITH WALL.
3. 10"x10" EXHAUST DUCT SERVING DISHWASHER HOOD.
ROUTE DUCT UP THROUGH ROOF TO EF-1.
4. 12"x10" EXHAUST DUCT SERVING KITCHEN HOOD. PROVIDE
GREASE RESERVOIR AT BOTTOM OF CONNECTION TO
HOOD. ROUTE DUCT UP THROUGH ROOF TO EF-2 IN
ACCORDANCE WITH NFPA 96 REQUIREMENTS AND
MANUFACTURERS RECOMMENDATIONS.
5. ROUTE DUCT SECTION ABOVE SHEAR WALL THROUGH
METAL TRUSS. COORDINATE WITH OTHER DISCIPLINES
AND OBSTRUCTIONS.
6. 8” x 8” EXHAUST DUCT UP TO GV-2. PROVIDE MOTORIZED
DAMPER.
7. PROVIDE 0.02" W.G. BAROMETRIC DAMPER.
8. PROVIDE AIR FLOW MEASURING STATION IN THE VERTICAL
OF DUCT.
1 2 3 4 4.4 5
C
D
6 7 8 9 10
C.1
A
D.1
M-302
AC-1
AC-3
RS
RL
RS
RL
RS
RL
C H
W R
R S
R L
C H
W R C
H W
S
CHWRCHWS
R S
R L
CU-1
AC-2
AHU-1
MAU-1
BT-1
ET-1
AS-1
CHWP-2
CHWP-1
CH-1
INFANT/PRE-TODDLER
ACTIVITY RM 01
INFANT/PRE-TODDLER
ACTIVITY RM 02
115 PRESCHOOL/PRE-K
ACTIVITY RM 01
INFANT/PRE-TODDLER
ACTIVITY RM 03
INFANT/PRE-TODDLER
ACTIVITY RM 04
STAFF LOUNGE
TRAINING RM
VESTIBULE
WAITING AREA
002 DIRECTORS
OFFICE
OPEN OFFICE
AREA
COMMUNICATIONS
ASSISTANT
DIRECTORS
OFFICE
104 ACTIVE
PLAYROOM
MECHANICAL
YARD
KITCHEN
MECHANICAL
C H
W S
COND
C O
N D
COND
C O
N D
CU-2
CU-3
COND
RC-1
RC-2
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-104
FL
O
O R
P
LA
N
M
EH
C
AN
IC
AL
P
IP
IN
G
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
0' 4' 8' 16' 32' 64'
SCALE: 3/32"=1'-0"
PLAN NORTH
3/32" = 1'-0"1 FLOOR PLAN - MECHANICAL PIPING
1. LAYOUTS ARE SCHEMATIC. PROVIDE ANY
ADDITIONAL DROPS, RISES, OR OFFSETS REQUIRED
FOR A COMPLETE INSTALLATION. COORDINATE
EXACT ROUTING OF WORK WITH ALL OTHER
DISCIPLINES AND OBSTRUCTIONS.
2. FIELD VERIFY ALL MEASUREMENTS AND
DIMENSIONS OF PROPOSED EQUIPMENT TO
ENSURE THAT THE EQUIPMENT WILL FIT IN THE
DESIGNATED SPACE.
3. REFRIGERATION PIPING SHOWN FOR BEST
ROUTING APPROXIMATION. CONTRACTOR SHALL
DETERMINE THE BEST ROUTING AND SHORTEST
PIPING LENGTHS AND SIZE PIPES IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS.
4. PROVIDE INSULATION FOR ALL PIPING.
5. SEE CIVIL DRAWINGS FOR DETAILS ON THE
MECHANICAL YARD.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. PROVIDE CH-1 WITH 6” THICK CONCRETE PAD
(SIZED 6” LARGER THAN EQUIPMENT IN ALL
SIDES).
2. EXTERIOR CHILLED WATER PIPING SHALL BE
PROVIDED WITH PEDESTAL SUPPORT.
3. ROUTE CONDENSATE PIPING TO JANITOR’S
CLOSET SINK TO CONNECT TO SANITARY WITH
INDIRECT CONNECTION.
4. ROUTE CONDENSATE PIPING TO NEAREST
FLOOR DRAIN IN MECHANICAL ROOM.
CONNECT TO SANITARY WITH INDIRECT
CONNECTION.
M
GV-3
GV-1
GV-2
4"
GOOSENECK
4"
GOOSENECK
EF-2EF-1
A
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-105
M
EC
H
AN
IC
AL
R O
O F
PL
AN
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
PLAN NORTH
0' 4' 8' 16' 32' 64'
SCALE: 3/32"=1'-0"
3/32" = 1'-0"1 ROOF PLAN
GENERAL SHEET NOTES
1. REFER TO SHEET A-405 FOR DETAILS ON THE SERVICE
PLATFORM.
2. INSTALL EXHAUST FAN IN ACCORDANCE WITH NFPA 96
REQUIREMENTS.
S U
BM
I S
SI
O
N
/1 5/
S U
BM
I S
SI
O
N
/0 3/
SERVICE PLATFORM
FIRST FLOOR
0' - 0"
T.O. STEEL
14' - 8"
T.O. ROOF RIDGE
28' - 7"
CC.1
AHU-1
24"x40" SA
"x
" S
A
30"x60" RA4'
7/
30"x30" OA
"x
" O
A
"x
" E
A
"x
" R
A
AFMS 1
CC.1
FIRST FLOOR
0' - 0"
T.O. STEEL
14' - 8"
C
MAU-1
"x
" S
A
EF-4EF-3
GV-1
EXH-2
800 CFM
"x
" O
A
36"x36" OA
C
T.O. WALL
14' - 8"
T.O. ROOF DECK @
RIDGE
27' - 10 3/64"
T.O. DECK @ CANOPY
11' - 5 1/2"
B ACC.1
40"x24" SA
30"ø RA
16"x14" EA
12"ø RA
VAV-1
14"x16" SA
14"x12" EA
"ø
R A øSA8" ø
SA
8"
12"x10" SA
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-301
M
EC
H
AN
IC
AL
S
EC
TI
O
N S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
0 2' 4' 8'
1/4"=1'-0SCALE:
1/4" = 1'-0"2
MECHANICAL ROOM DUCTWORK
SECTION I
1/4" = 1'-0"1
MECHANICAL ROOM DUCTWORK
SECTION II
SHEET KEYNOTES
1. PROVIDE TWO 30”x30" SIDE BY SIDE INDEPENDENTLY
CONTROLLED MODULATING DAMPERS IN VERTICAL OF
DUCT.
1/4" = 1'-0"3 MECHANICAL SECTION
FIRST FLOOR
0' - 0"
T.O. STEEL
14' - 8"
T.O. ROOF RIDGE
28' - 7"
ET-1
CHWP-1BT-1
AS-1
CHWRCHWR
C H
W R
CHWS
CHWR
C H
W R
C H
W R C
H W
R
CHWR
FIRST FLOOR
0' - 0"
T.O. STEEL
14' - 8"
T.O. ROOF RIDGE
28' - 7"
GV-1
EF-4
MAU-1
DH-2
12"x14" SA
"x
" S
A
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-302
M
EC
H
AN
IC
AL
S
EC
TI
O
N S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
0 2' 4' 8'
1/4"=1'-0SCALE:
1/4" = 1'-0"2 MECHANICAL ROOM PIPING SECTION
1/4" = 1'-0"1
MECHANICAL ROOM DUCTWORK
SECTION III
M
MM
M
MM
MM
M
B
C
C.1
UH-1
AHU-1
EF-4
EF-3
MAU-1
"x
" S
A
24"x20" EA
14"x12" SA
DH-1
AFMS
EF-6
RC-1
OA Intake Lvr OA Intake Lvr
OA Intake Lvr
"x
" E
A
HUM-1
RC-2
DH-2
20"x14" RA
20"x14" OA
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-401
EN
LA
R G
ED
P
LA
N
S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
1/2" = 1'-0"1
ENLARGED PLAN - MECHANICAL ROOM
DUCTWORK
PLAN NORTH
0 1' 2' 4'
1/2"=1'-0SCALE:
GENERAL SHEET NOTES
SHEET KEYNOTES
1. LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL DROPS,
RISES, OR OFFSETS REQUIRED FOR A COMPLETE
INSTALLATION. COORDINATE EXACT ROUTING OF WORK WITH
ALL OTHER DISCIPLINES AND OBSTRUCTIONS. COORDINATE
EXACT LOCATIONS OF CEILING MOUNTED DEVICES WITH
LIGHTS, CEILING GRID, AND OTHER OBSTRUCTIONS.
2. FIELD VERIFY ALL MEASUREMENTS AND DIMENSIONS OF
PROPOSED EQUIPMENT TO ENSURE THAT THE EQUIPMENT
WILL FIT IN THE DESIGNATED SPACE.
3. PROVIDE 6" THICK EQUIPMENT PADS. THESE PADS SHALL
EXTEND 6" BEYOND THE FOOTPRINT OF THE EQUIPMENT IN
ALL DIRECTIONS. FINAL EQUIPMENT PAD SIZE TO BE BASED ON
EQUIPMENT MANUFACTURER REQUIREMENTS.
1. PROVIDE BALANCING DAMPER IN THE VERTICAL OF RETURN
DUCT BRANCH.
2. PROVIDE AIR FLOW MEASURING STATION IN THE VERTICAL OF
DUCT.
3. 24”x20” EXHAUST DUCT UP TO GV-1.
4. 16”x16” EXHAUST DUCT UP TO GV-3.
5. PROVIDE RUN AROUND COIL WITH REMOVABLE FILTER
UPSTREAM OF COIL. PROVIDE ACCESS DOORS UPSTREAM
AND DOWNSTREAM TO PERMIT CLEANING.
MAU-1
AHU-1
BT-1
ET-1
C H
W S
CHWS
C H
W R
C H
W S
CHWS
CHWR
C H
W R
C H
W
SMECHANICAL
AS-1
R S
R L
COND
R L
R
S RC-2
RC-1
HUM-1
CHWP-2
CHWP-1
3" ø
3" ø
3"ø
HRP-1
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-402
EN
LA
R G
ED
P
LA
N
S
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
3/8"=1'-0"SCALE:
1' 2' 4' 6'
PLAN NORTH
3/8" = 1'-0"1
ENLARGED PLAN - MECHANICAL ROOM
PIPING
GENERAL SHEET NOTES
1. LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL
DROPS, RISES, OR OFFSETS REQUIRED FOR A COMPLETE
INSTALLATION. COORDINATE EXACT ROUTING OF WORK
WITH ALL OTHER DISCIPLINES AND OBSTRUCTIONS.
COORDINATE EXACT LOCATIONS OF CEILING MOUNTED
DEVICES WITH LIGHTS, CEILING GRID, AND OTHER
OBSTRUCTIONS.
2. FIELD VERIFY ALL MEASUREMENTS AND DIMENSIONS OF
PROPOSED EQUIPMENT TO ENSURE THAT THE
EQUIPMENT WILL FIT IN THE DESIGNATED SPACE.
3. PROVIDE 6" THICK EQUIPMENT PADS. THESE PADS SHALL
EXTEND 6" BEYOND THE FOOTPRINT OF THE EQUIPMENT
IN ALL DIRECTIONS. FINAL EQUIPMENT PAD SIZE TO BE
BASED ON EQUIPMENT MANUFACTURER REQUIREMENTS.
4. INSTALL FLOW METERS IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDATIONS.
SHEET KEYNOTES
1. PROVIDE GLYCOL RUN-AROUND COIL LOOP FOR HEAT
RECOVERY WITH IN-LINE PUMP (HRP-1).
2. PROVIDE CONNECTION TO MAIN DOMESTIC WATER
SUPPLY LINE FOR CHILLED WATER SYSTEM MAKE-UP
WATER.
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-501
D
ET
AI
LS
C H
IL
D
D
EV
EL
O
PM
EN
T C
EN
TE
R N
EW
Y
O R
K D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y O
R K, N Y
D es ig ne r
Au th or
C he ck er
AU
G
U
ST
9, W
2D S2
3F
W
2D S1
9D
U
SA
G F
O R
T H
AM
IL
TO
N
, N
EW
Y O
R K
PR
O
JE
C
T N
O . 7
NTS2
TYPICAL ELECTRIC UNIT HEATER
DETAIL
NTS1
TYPICAL REFRIGERANT LINE
PENETRATION DETAIL
NTS3
TYPICAL SINGLE DUCT VAV BOX WITH
ELECTRIC REHEAT
NTS4 TYPICAL BRANCH DUCT CONNECTION
NTS5 TYPICAL ROUND DUCT CONSTRUCTION
NTS6 TYPICAL END SUCTION PUMP
NTS7
TYPICAL OUTDOOR PIPING SUPPORT
DETAIL
NTS8 TYPICAL EQUIPMENT PAD DETAIL
S U
BM
I S
SI
O
N
/1 5/
S U
BM
I S
SI
O
N
/0 3/
NTS9…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .