This is Amendment 0003 to solicitation W912DS26RA018 issued by the U.S. Army Corps of Engineers, W2SD Endist New York, for a Small Child Development Center at Fort Hamilton, NY. The amendment was effective July 21, 2026, and extends the proposal due date to July 27, 2026, at 4:00 PM EDT.

The amendment revises and reissues five drawings (A-416, A-414, IN-601, IN-602, and T-505) and four specification sections (00 22 10, 31 00 00, 01 35 26, and 01 57 19). Key specification changes include detailed requirements for site excavation and soil management in areas accessible to children, requiring excavation to 2–3 feet depth with replacement using certified clean fill meeting NYSDEC residential standards. Specifications mandate development of a Site-Specific Soils Management Plan, laboratory testing of imported fill materials for metals, VOCs, SVOCs, PCBs, pesticides, and PFAS compounds, worker protection measures during excavation, dust control including potential Community Air Monitoring Program implementation, and treatment considerations for construction dewatering. The amendment also provides 18 responses to offeror inquiries addressing cabinet finishes, flooring specifications, room finish schedules, wall base finishes, access control system scope, CCTV and intrusion detection system integration, paging/intercom manufacturer requirements, electrical panel calculations, drawing scales, fire alarm cabling installation, Building Management System vendor compatibility with Niagara, and lighting fixture specifications. Offerors must acknowledge receipt of this amendment by the specified date or risk proposal rejection under FAR 15.208.

View the file

Other files

File Type Posted
FH - CDC - ELECTRICAL - SITE PLAN - LIGHTING_Amendment1-ES-102.pdf PDF
FH - CDC - ELECTRICAL - SITE PLAN - POWER_Amendment1-ES101.pdf PDF
31 00 00_YQA_LEWA_17-JUL-26.docx DOCX document
2026-07-09-FH-CDC RFI DRAWINGS-IN.pdf PDF
Attachment 3 - revised and reissued - updated 14Jul26.pdf PDF
Spec Sect 00 22 10 - Selection Procedure and Basis of Award - Revised and Reissued 16Jul26.pdf PDF
Ft Hamilton CDC T-505 20260708.pdf PDF
Amendment 0002 - SCDC Ft Hamilton - Plans.pdf PDF
Solicitation Amendment W912DS26RA0180002 SF 30.pdf PDF
IN101 from 7-FH-CDC-INTERIORS-UPDATED RTA-DRAW.pdf PDF
Ft Hamilton CDC A-504 20260610.pdf PDF
VOL 1 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
VOL 3 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
Solicitation Amendment W912DS26RA0180001 SF 30.pdf PDF
Solicitation Amendment - W912DS26RA0180001 Professional Appearance.pdf PDF
Daily Waiver.pdf PDF
VOL 2 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 2.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 1.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 3.pdf PDF
075662-FH-CDC DRAWINGS 25 MARCH 26.pdf PDF
Solicitation - W912DS26RA018 Professional Appearance.pdf PDF
Attachment 3 - Fort Hamilton CDC-5.pdf PDF
Appendix A - Fort Hamilton CDC-2.pdf PDF
075662-FH-CDC-CORRECTED RTA SPECS.pdf PDF
Attachment 1 - Fort Hamilton CDC-5.pdf PDF
Appendix G - Fort Hamilton CDC-4.pdf PDF
Appendix F- Fort Hamilton CDC-3.pdf PDF
Attachment 2 - Fort Hamilton CDC-5.pdf PDF
Attachment 4 - Fort Hamilton CDC-5.pdf PDF
Attachment 5 - Fort Hamilton CDC-5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to: Block 14 (Description of Amendment/Modification):

1. revise and reissue drawing:

- Drawing A-416

- Drawing A-414

- Drawing IN-601

- Drawing IN-602

- Drawing T-505

2. revise and reissue specification sections:

- Section 00 22 10

- Section 31 00 00

- Section 01 35 26

- Section 01 57 19

3. Extend proposal due date to 27 July 2026 at 04:00 pm EDT.

4. Answer Offerors inquiries. Responses to Offeror inquiries are provided "for informational purposes only" and do not revise solicitation, plans and specifications.

Offerors must acknowledge receipt of this amendment by date specified in the solicitation (or as amended) by one of the following methods: In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE

SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL IN ACCORDANCE WITH THE

LATE PROPOSAL, LATE MODIFICATION OF PROPOSAL, OR LATE WITHDRAWAL OF

PROPOSAL (FAR 15.208).

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

No prior attachments

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 FH - CDC -

ELECTRICAL -

SITE PLAN - LI

Drawings 21 Jul 2026 1 Attach ment

No

W912DS26RA0180003

GHTING_Ame ndment1-ES-

0002 FH - CDC -

ELECTRICAL -

SITE PLAN - P

OWER_Amend ment1-ES101

Drawings 21 Jul 2026 1 Attach ment

No

0003 2026-07-09-

FH-CDC RFI

DRAWINGS-IN

Drawings 21 Jul 2026 1 Attach ment

No

0004 Attachment 3 -revised and reissued -updated 14Jul26

Attachment 3 21 Jul 2026 1 Attach ment

No

0005 Spec Sect 00 22 10 - Selection Procedure and Basis of Award

- Revised and Reissued 16Jul26

Selection Procedure and Basis of Award

21 Jul 2026 25 Attach ment

No

0006 Ft Hamilton

CDC T-505

20260708

Drawings 21 Jul 2026 1 Attach ment

No

0007 31 00 00_YQA

_LEWA_17-

JUL-26

Specification 21 Jul 2026 25 Attach ment

No

The following contract documents were added:

2026-07-09-FH-CDC RFI DRAWINGS-IN

31 00 00_YQA_LEWA_17-JUL-26

Attachment 3 - revised and reissued - updated 14Jul26 FH - CDC - ELECTRICAL - SITE PLAN - LIGHTING_Amendment1-ES-102 FH - CDC - ELECTRICAL - SITE PLAN - POWER_Amendment1-ES101 Ft Hamilton CDC T-505 20260708 Spec Sect 00 22 10 - Selection Procedure and Basis of Award - Revised and Reissued 16Jul26

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FRO

M

T O

FH - CDC - ELECTRICAL - SITE PLAN - LIGHTING_Amendment1-ES-102 none 1

FH - CDC - ELECTRICAL - SITE PLAN - POWER_Amendment1-ES101 none 1

2026-07-09-FH-CDC RFI DRAWINGS-IN none 1

Attachment 3 - revised and reissued - updated 14Jul26 none 1

Spec Sect 00 22 10 - Selection Procedure and Basis of Award - Revised and Reissued 16Jul26 none 2

Ft Hamilton CDC T-505 20260708 none 1

31 00 00_YQA_LEWA_17-JUL-26 none 2

Section 00 22 16 - Supplementary Instructions to Proposers

Miscellaneous text in this section has been modified to:

Fort Hamilton NY/

Small Child Development Center

W912DS26RA018

Amendment 0003

AMENDMENT 0003 to DRAWINGS and SPECIFICATIONS for r Small Child Development Center, Fort Hamilton NY.

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- Drawing A-416

- Drawing A-414

- Drawing IN-601

- Drawing IN-602

- Drawing T-505

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- Section 00 22 10

- Section 31 00 00

- Section 01 35 26

- Section 01 57 19

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

5. SPECIFICATIONS REVISED AND REISSUED:

Section 31 00 00 Earthwork

1. Excavate the entire Site areas that will be accessible to children (playgrounds, lawn areas, and other outdoor spaces) to a depth of no less than 2-ft and up to 3-ft, and replace the excavated soils with certified clean fill. These areas should be equipped with a minimum 24-inch layer of certified clean backfill, with upper- and lower- demarcation layers (i.e., snow-fence, textile, or similar) or be improved at the surface with hardscape, playground surfacing, building foundation, pavement, or other protective covering that will preclude direct contact with the underlying soils.

2. Imported fill material must meet the definition of "clean fill" to be used onsite, and either should be sourced from a certified clean quarry, or if other source shall be utilized, it must be laboratory tested for total metals, VOCs, SVOCs, PCBs, pesticides, and PFAS compounds, with results below NYSDEC residential standards.

3. For soil excavation and disposal activities, a Site-Specific Soils Management Plan shall be developed and utilized at the Site to guide the handling of soils and their management during the removal process. This Plan will also include the process for imported clean fill from a certified clean quarry, and/or if utilizing a non-quarry source include clean fill sampling methods, frequency, and analyses to confirm clean prior to import acceptance. Only soils meeting NYSDEC residential standards will be considered acceptable.

4. Excavated soils are not expected to be considered hazardous, but should be tested in accordance with disposal facility requirements and disposed of at a State-approved facility in accordance with Federal and State regulations.

Section 01 35 26 - Government Safety Requirement

5. During excavation and removal of the soils, worker protection should be utilized to protect construction workers from exposure to dust and dermal contact from the soils. These considerations will be included in the site-specific health and safety plan prepared and utilized by the construction contractor.

6. As part of the health and safety plan, offsite migration of airborne dust should be controlled. In addition, a Community Air Monitoring Program (CAMP) may be required to confirm airborne levels of dust do not exceed NYSDEC standards.

Section 01 57 19

7. If it is determined that construction dewatering is needed, considerations should be made to potentially treat generated effluent to prevent the spread of contaminants noted in Site soil and groundwater

PROPOSER'S QUESTIONS AND GOVERNMENT REPLY

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.

1. There appear to be two different exterior laminate colors shown on a single elevation. Please confirm if this is the intent. -Staff Lounge 103: Elevation A1/A414 calls for PL-3 at the base cabinet, while section A1/A421 calls for PL-1 at the upper cabinet and does not indicate a finish for the base cabinet. Please confirm the intended finishes. -Laundry 110 and Nursing 107: Elevation A9 /A414 and A16/A414 do not indicate finishes at the base cabinets. Please confirm the intended finish.

Response 1. At Staff Lounge 103, base and upper cabinets to be PL-1. At Nursing Mothers RM 107 and Laundry 110, base and upper cabinets to be PL-1.

2. Athletic Flooring ATH-1 Gerflor Taraflex is 6.2mm vs 6.4 as listed on Drawing IN601; please advise 6.2mm is OK for this bid scope.

Response 2. ATH-1 Gerflor Taraflex Multi-Use is only available in 6.2mm. Interior Finish Legend to be updated to reflect accurate sizing.

3. Carpeting Section 096800-5 para 2.1.3.2 is 24" x 24"; Interface CPT-1 Open Air 404 is 50cm x 50cm, please advise 50cm x 50cm is OK for this bid scope.

Response 3. CPT-1 Open Air 404 is only available in 50cm x 50cm. Specifications to be updated to reflect accurate sizing.

4. Can a room finish schedule by provided with Floor and Base finishes listed by room, please advise.

Response 4. Interior Finish Schedule to be provided.

5. Please advise Wall Base finishes in room; 108, 114, 118, 118B and 127.

Response 5. Per General Sheet Notes on IN101 and IN102, all new interior partitions shall be painted PT-1 & RB-1 shall be installed unless otherwise noted.

6. Please confirm No Flooring Alternates are required for this bid scope

Response 6. There is no "no flooring alternative" requirement for this project.

7. Please confirm what the scope is for access control? Is the intent to tie in the new double door of access control into an existing access control system or provide a new access control system?

Please clarify what the basis of design is for the manufacturer of the access control system?

Response 7. A new ACS is not part of the project and the double doors are not tying into any existing ACS. Will be further clarified by amendment.

8. Please confirm, is all Cameras and head-end equipment such as Network video recorders, software and licensing furnished and installed by contractor or others? If contractor is to provide any of the above, licensing furnished and installed by contractor or others? If contractor is to provide any of the above, please clarify what manufacturer video management system and cameras are to be included?

Response 8. CCTV system equipment is by others. Will be further clarified by amendment.

9. 9. For the intrusion detection scope of work, are the new door contacts to be tied into an existing Starwatch control panel, or are a new intrusion detection panel required? Is a Bosch or Honeywell vista intrusion detection system acceptable?

Response 9. The door contacts are not intended to be integrated into the IDS system. Bid as shown.

10. Please clarify what manufacturer the paging/intercom system to be?

Response 10. The Government does not specify proprietary products, specific manufacturers, or model numbers in order to promote full and open competition. Bid as shown.The solicitation's internal numbering is inconsistent. The Table of Contents lists Volume 1 (Performance Capability) as (S)5.0, Volume 2 (Small Business) as (S)6.0, and Volume 3 (Price) as (S)7.0 with Tabs A-C only; the body text numbers these (S)4.x-(S)6.x and references a Volume 3 'Tab D - Required Pre- Award Information' and 'Tab E - Representations & Certifications' that do not appear in the TOC's three-tab structure.

11. The solicitation's internal numbering is inconsistent. The Table of Contents lists Volume 1 (Performance Capability) as (S)5.0, Volume 2 (Small Business) as (S)6.0, and Volume 3 (Price) as (S)7.0 with Tabs A-C only; the body text numbers these (S)4.x-(S)6.x and references a Volume 3 'Tab D - Required Pre-Award Information' and 'Tab E - Representations & Certifications' that do not appear in the TOC's three-tab structure.

Response 11. Section 00 22 10 has been revised and reissued to clarify the internal numbering of this section.

12. (S)4.5 lists 'Airfield Lighting Vault' among the key-subcontractor work categories for which firms should be identified. This project is a Child Development Center with no apparent airfield scope.

Please confirm whether this reference is inadvertent boilerplate, or identify the corresponding CDC scope element intended.

Response 12. Airfield Lighting Vault' is not among the key subcontractor tasks for this project.

Section 00 22 10 has been revised and reissued to update this criteria.

13. Please confirm that all 20 A/1P Circuit Breaker wire size shown in panels RP-1, RP-2 panel scedule is calculated for voltage drop for branch circuit runs.

Response 13. Confirmed. Voltage drop calculations are in accordance with National Electrical Code (NEC) and ASHRAE 90.1.

14. Please confirm the Scale for Drawing ES-101, the scale listed is 5/8".

Response 14. Please see amended sheet ES-101 and ES-102. Drawing at correct scale, scale bar and scale listed under drawing title are incorrect.

15. Please confirm if the fire alarm cabling can be Plenum Rated cable installed Free Air above 8FT ceilings and exposed areas.

Response 15. All Fire Alarm cabling to be provided in conduit per specification 28 31 76.

16. Please advise who is the existing BMS vendor for FT Hamilton UMCS? As per drawings, there is one (see below) and BAS/BMS in the Child Center should be compatible with it. Per Specifications for this project, system should be Tridium Niagara, but the existing or approved vendors/installers are not specified. Wondering if we need to reach out to someone in particular or if this is an open bid?

Response 16. BMS system is currently under evaluation. Must be Niagara compliant. Contractor will be responsible for monetary cost and coordination with DPW for all HVAC tie-in.

17. Please provide us with the Manufacture Specs/ Catalog for the light fixtures.

Response 17. Please refer to Sheet EL601 for salient features of lighting fixtures and General Notes #4 and #5 for more information.

18. Please provide us with the lighting control manufacture specs and wiring schematic diagram

Response 18. Please provide us with the Manufacture Specs/ Catalog for the light fixtures.

IDCode: J
Page: 1
Pages: 9
AmendNo: 0003
EffDate: 21 JUL 2026
ReqNo:
ProjNo: 75662
IssCode: W912DS
AdmCode:
IssuedBy: W2SD ENDIST NEW YORK

KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300

NEW YORK, NY 10278-0004

UNITED STATES

MOHENDA SURAGE, EMAIL: MOHENDA.R.SURAGE@USACE.ARMY.MIL TELEPHONE: 917-940-8013

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912DS26RA018
SolDate: 27 MAY 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: MOHENDA R. SURAGE
ContDate:
CODate: 21 JUL 2026