31 00 00_YQA_LEWA_17-JUL-26.docx
DOCX document 79 KB Posted
- Solicitation number
- W912DS26RA018
About this file
This is a Specification document (Section 31 00 00 - Earthwork) for the Fort Hamilton Child Development Center construction project. The specification establishes comprehensive requirements for all excavation, fill, and site preparation work associated with the project, which involves construction of a new 16,632 square-foot Child Development Center with adjacent 16,667 square-foot outdoor play areas on Fort Hamilton, NY.
The specification details measurement and payment procedures for classified and unclassified excavation, piping trench excavation, rock excavation, borrow material, and overhaul operations, with payment based on cubic yards or linear feet as appropriate. Key requirements include: stripping and stockpiling of topsoil to 4-inch depth; excavation to specified lines, grades, and elevations with proper drainage; trench widths not exceeding 24 inches plus pipe diameter for pipes under 24 inches ID or 36 inches plus diameter for larger pipes; dewatering procedures maintaining water levels at least 3 feet below working level; and backfill and compaction specifications ranging from 85-98 percent of laboratory maximum density depending on material type and application. The specification mandates soil testing for Total Petroleum Hydrocarbons (TPH), BTEX, and TCLP analysis, with maximum allowances of 100 ppm TPH and 10 ppm BTEX for imported materials. Special requirements include placement of imported clean fill in outdoor areas accessible to children to depths of 2-3 feet with geotextile barriers above and below, conforming to New York State Department of Environmental Conservation residential standards. The specification requires a Site-Specific Soils Management Plan, engagement of a Professional Geotechnical Engineer for inspection and monthly reporting, shoring and sheeting plans certified by a registered professional engineer, and comprehensive field testing including in-place density testing, moisture content verification, and proof rolling of subgrades. Material standards reference ASTM and AWWA specifications, and the specification incorporates requirements from USACE publication EM 385-1-1 for worker safety and excavation protection.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Fort Hamilton Child Developement Center | HAMILTONCDC |
| RTA SPECIFICATION | 07/15/26 |
| Fort Hamilton Child Developement Center | HAMILTONCDC |
| RTA SPECIFICATION | 07/15/26 |
| Fort Hamilton Child Development Center | HAMILTONCDC |
| RTA SPECIFICATION | 07/15/26 |
PROJECT TABLE OF CONTENTS
| Fort Hamilton Child Developement Center | HAMILTONCDC |
| RTA SPECIFICATION | 07/15/26 |
| Fort Hamilton Child Developement Center | HAMILTONCDC |
| RTA SPECIFICATION | 07/15/26 |
| Fort Hamilton Child Development Center | HAMILTONCDC |
| RTA SPECIFICATION | 07/15/26 |
PROJECT TABLE OF CONTENTS Page 1 PROJECT TABLE OF CONTENTS Page 1 PROJECT TABLE OF CONTENTS Page 1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21
| 01 14 00 |
| 11/22, CHG 1: 02/23 |
| 01 20 00 |
| 11/20, CHG 2: 08/21 |
| 01 30 00 |
| 11/20, CHG 2: 05/22 |
| 01 32 01.00 10 |
| 08/23 |
| 01 33 00 |
| 08/18, CHG 4: 02/21 |
| 01 33 29 |
| 02/21 |
| 01 35 26 |
| 05/24 |
| 01 42 00 |
| 02/19 |
| 01 45 00 |
| 08/23, CHG 1: 05/24 |
| 01 45 00.15 10 |
| 11/23 |
| 01 45 35 |
| 11/20 |
| 01 50 00 |
| 11/20, CHG 2: 08/22 |
| 01 57 19 |
| 08/22 |
| 01 58 00 |
| 08/19, CHG 5: 08/22 |
| 01 74 19 |
| 02/19, CHG 3: 11/21 |
| 01 78 00 |
| 05/19, CHG 1: 08/21 |
| 01 78 23 |
| 08/15, CHG 2: 08/21 |
| 01 78 24.00 10 |
| 05/18, CHG 1: 11/21 |
| 01 91 00.15 |
| 03/24 |
| 01 91 19 |
| 05/23 |
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19
DIVISION 05 - METALS
| 05 05 20 |
| 05/22 |
| 05 05 23.16 |
| 08/18 |
| 05 12 00 |
| 08/18, CHG 2: 05/21 |
| 05 30 00 |
| 05/15, CHG 2: 08/18 |
| 05 40 00 |
| 05/15, CHG 1: 08/18 |
| 05 50 13 |
| 05/17, CHG 1: 08/18 |
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
SUSTAINABILITY REQUIREMENTS AND
REPORTING
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA REQUIREMENTS
TOTAL BUILDING COMMISSIONING
BUILDING ENCLOSURE COMMISSIONING
DEMOLITION
CAST-IN-PLACE CONCRETE
UNIT MASONRY
POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
STRUCTURAL WELDING
STRUCTURAL STEEL
STEEL DECKS
COLD-FORMED METAL FRAMING
MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
| 06 61 16 | 08/20 | SOLID SURFACING FABRICATIONS DIVISION 07 - THERMAL AND MOISTURE PROTECTION |
| 07 11 13 | 08/23 | BITUMINOUS DAMPPROOFING |
| 07 21 13 | 08/23 | BOARD AND BLOCK INSULATION |
| 07 21 16 | 08/23 | MINERAL FIBER BLANKET INSULATION |
| 07 22 00 | 08/23 | ROOF AND DECK INSULATION |
| 07 27 10 | 08/23 | BUILDING AIR BARRIER SYSTEM |
| 07 27 19.01 | 08/23 | SELF-ADHERING AIR BARRIERS |
| 07 27 26 | 08/23 | FLUID-APPLIED MEMBRANE AIR BARRIERS |
| 07 27 36 | 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS | |
| 07 31 13 | 08/16, CHG 2: 08/18 ASPHALT SHINGLES | |
| 07 60 00 | 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL | |
| 07 72 50.00 18 05/25 | FALL PROTECTION SYSTEM AND ANCHORAGE | |
| 07 84 00 | 05/10, CHG 1: 08/13 FIRESTOPPING | |
| 07 92 00 | 08/23 | JOINT SEALANTS |
DIVISION 08 - OPENINGS
| 08 11 13 | 08/20 | STEEL DOORS AND FRAMES |
| 08 11 16 | 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES | |
| 08 14 00 | 08/16, CHG 1: 08/18 WOOD DOORS | |
| 08 31 00 | 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS | |
| 08 51 13 | 05/19 | ALUMINUM WINDOWS |
| 08 71 00 | 02/16, CHG 4: 02/22 DOOR HARDWARE | |
| 08 81 00 | 05/19 | GLAZING |
| 08 91 00 | 08/20 | METAL WALL LOUVERS |
DIVISION 09 - FINISHES
| 09 22 00 | 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD | |
| 09 29 00 | 08/16, CHG 4: 02/20 GYPSUM BOARD | |
| 09 30 10 | 08/20 | CERAMIC, QUARRY, AND GLASS TILING |
| 09 51 00 | 08/20 | ACOUSTICAL CEILINGS |
| 09 65 00 | 08/10, CHG 3: 08/18 RESILIENT FLOORING | |
| 09 65 66 | 08/16, CHG 1: 08/18 RESILIENT ATHLETIC FLOORING | |
| 09 68 00 | 11/17, CHG 2: 08/20 CARPETING | |
| 09 90 00 | 02/21 | PAINTS AND COATINGS |
| 09 96 00 | 11/14 | HIGH-PERFORMANCE COATINGS |
| 09 97 13.27 | 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL |
STRUCTURES
DIVISION 10 - SPECIALTIES
| 010 14 00.10 | 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE | |
| 10 14 00.20 | 08/20 | INTERIOR SIGNAGE |
| 10 21 13 | 08/20 | TOILET COMPARTMENTS |
| 10 26 00 | 08/20 | WALL AND DOOR PROTECTION |
| 10 28 13 | 08/20 | TOILET ACCESSORIES |
| 10 44 16 | 11/19 | FIRE EXTINGUISHER AND AED CABINETS |
| 10 51 13 | 08/24 | LOCKERS |
DIVISION 11 - EQUIPMENT
11 05 40 08/17, CHG 1: 02/18 COMMON WORK RESULTS FOR FOODSERVICE
EQUIPMENT
| 11 31 13 | 08/17, CHG 1: 08/18 ELECTRIC KITCHEN EQUIPMENT | |
| 11 41 11 | 08/17 | REFRIGERATED AND FROZEN FOOD STORAGE |
EQUIPMENT
| 11 42 00 | 08/17 | FOOD PREPARATION EQUIPMENT |
| 11 68 13 | 08/17, CHG 1: 08/18 PLAYGROUND EQUIPMENT |
DIVISION 12 - FURNISHINGS
| 12 24 13 | 08/20 | ROLLER WINDOW SHADES |
| 12 35 30.23 20 08/11 | BATHROOM CASEWORK | |
| 12 48 13 | 08/23 | ENTRANCE FLOOR MATS AND FRAMES |
| 12 93 00 | 08/17, CHG 1: 08/18 SITE FURNISHINGS |
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 23 00 05/24 WET CHEMICAL FIRE EXTINGUISHING SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 05/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC 23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
| 23 09 23.02 | 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS | |
| 23 09 93 | 11/15 | SEQUENCES OF OPERATION FOR HVAC CONTROL |
| 23 23 00 | 08/21 | REFRIGERANT PIPING |
| 23 30 00 | 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION | |
| 23 64 10 | 05/25 | WATER CHILLERS, VAPOR COMPRESSION TYPE |
| 23 64 26 | 08/09, CHG 7: 02/24 CHILLED WATER PIPING SYSTEMS 23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS |
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR DIRECT DIGITAL
CONTROL FOR HVAC
25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FIRE ALARM SYSTEM
AND MASS NOTIFICATION
25 05 11.03 05/21, CHG 1: 08/23 CYBERSECURITY FOR PUBLIC ADDRESS
CONTROL SYSTEM
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
DIVISION 26 - ELECTRICAL
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
| 26 05 73 | 08/23 | POWER SYSTEM STUDIES |
| 26 08 00 | 11/22 | APPARATUS INSPECTION AND TESTING |
| 26 12 19.10 | 05/19, CHG 2: 11/23 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED |
TRANSFORMERS
| 26 20 00 | 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM | |
| 26 24 13 | 08/21 | SWITCHBOARDS |
| 26 29 23 | 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS |
UNDER 600 VOLTS
| 26 41 00 | 08/23 | LIGHTNING PROTECTION SYSTEM |
| 26 51 00 | 05/20, CHG 2: 11/21 INTERIOR LIGHTING | |
| 26 56 00 | 08/21 | EXTERIOR LIGHTING |
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 23 11/21 INTERCOMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/24 ELECTRONIC SECURITY SYSTEMS (ESS) 28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
| 31 00 00 | 08/08, CHG 2: 02/21 EARTHWORK | |
| 31 05 19.13 | 02/21 | GEOTEXTILES FOR EARTHWORK |
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
| 32 05 33 | 08/17 | LANDSCAPE ESTABLISHMENT |
| 32 11 20 | 05/22 | BASE COURSE FOR RIGID AND SUBBASE |
SELECT-MATERIAL FOR FLEXIBLE PAVING
| 32 11 23 | 08/17 | AGGREGATE BASE COURSES |
| 32 11 26 | 05/20 | HOT-MIX BITUMINOUS BASE COURSE FOR |
ROADS AND STREETS
32 11 26.19 05/20 BITUMINOUS-STABILIZED BASE AND SUBBASE
COURSES
| 32 12 13 | 05/17 | BITUMINOUS TACK AND PRIME COATS |
| 32 12 16.16 | 11/20 | ROAD-MIX ASPHALT PAVING |
| 32 16 19 | 05/18 | CONCRETE CURBS, GUTTERS AND SIDEWALKS |
| 32 17 23 | 08/16 | PAVEMENT MARKINGS |
| 32 18 16.13 | 08/17 | PLAYGROUND PROTECTIVE SURFACING |
| 32 31 13 | 11/21 | CHAIN LINK FENCES AND GATES |
| 32 92 19 | 08/17, CHG 1: 08/21 SEEDING | |
| 32 92 23 | 04/06, CHG 1: 08/21 SODDING | |
| 32 93 00 | 08/17, CHG 1: 08/21 EXTERIOR PLANTS |
DIVISION 33 - UTILITIES
| 33 11 00 | 02/18 | WATER UTILITY DISTRIBUTION PIPING | |
| 33 30 00 | 05/18 | SANITARY SEWERAGE | |
| 33 40 00 | 02/10 | STORM DRAINAGE UTILITIES | |
| 33 71 01 | 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION 33 71 02 | 08/21 | UNDERGROUND ELECTRICAL DISTRIBUTION |
| 33 82 00 | 04/06 | TELECOMMUNICATIONS OUTSIDE PLANT (OSP) |
-- End of Project Table of Contents --
SECTION 31 00 00
EARTHWORK
08/08, CHG 2: 02/21
PART 1 GENERAL
1.1 MEASUREMENT PROCEDURES
1.1.1 Excavation
The unit of measurement for excavation and borrow will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation and borrow operations, including the excavation for ditches, gutters, and channel changes, when the material is acceptably utilized or disposed of as herein specified. The measurements will include authorized excavation of rock (except for piping trenches that is covered below), authorized excavation of unsatisfactory subgrade soil, and the volume of loose, scattered rocks and boulders collected within the limits of the work; allowance will be made on the same basis for selected backfill ordered as replacement. The measurement will not include the volume of subgrade material or other material that is scarified or plowed and reused in-place, and will not include the volume excavated without authorization or the volume of any material used for purposes other than directed. The volume of overburden stripped from borrow pits and the volume of excavation for ditches to drain borrow pits, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.
1.1.2 Piping Trench Excavation
Measure trench excavation by the number of linear feet along the centerline of the trench and excavate to the depths and widths specified for the particular size of pipe. Replace unstable trench bottoms with a selected granular material. Include the additional width at manholes and similar structures, the furnishing, placing and removal of sheeting and bracing, pumping and bailing, and all incidentals necessary to complete the work required by this section.
1.1.3 Rock Excavation for Trenches
Measure and pay for rock excavation by the number of cubic yards of acceptably excavated rock material. Measure the material in place, but base volume on a maximum 30 inches width for pipes 12 inches in diameter or less, and a maximum width of 16 inches greater than the outside diameter of the pipe for pipes over 12 inches in diameter. Provide the measurement to include all authorized overdepth rock excavation as determined by the Contracting Officer. For manholes and other appurtenances, compute volumes of rock excavation on the basis of 1 foot outside of the wall lines of the structures.
1.1.4 Topsoil Requirements
Separate excavation, hauling, and spreading or piling of topsoil and related miscellaneous operations will be considered subsidiary obligations of the Contractor, covered under the contract unit price for excavation.
1.1.5 Overhaul Requirements
Allow the unit of measurement for overhaul to be the station-yard. The overhaul distance will be the distance in stations between the center of volume of the overhaul material in its original position and the center of volume after placing, minus the free-haul distance in stations. The haul distance will be measured along the shortest route determined by the Contracting Officer as feasible and satisfactory. Do no measure or waste unsatisfactory materials for overhaul where the length of haul for borrow is within the free-haul limits.
1.1.6 Select Granular Material
Measure select granular material in place as the actual cubic yards replacing wet or unstable material in trench bottoms in authorized overdepth areas. Provide unit prices which include furnishing and placing the granular material, excavation and disposal of unsatisfactory material, and additional requirements for sheeting and bracing, pumping, bailing, cleaning, and other incidentals necessary to complete the work.
1.2 PAYMENT PROCEDURES
Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete the work.
1.2.1 Classified Excavation
Classified excavation will be paid for at the contract unit prices per cubic yard for common or rock excavation.
1.2.2 Piping Trench Excavation
Payment for trench excavation will constitute full payment for excavation and backfilling, including specified overdepth, if any, except in rock or unstable trench bottoms.
1.2.3 Rock Excavation for Trenches
Payment for rock excavation will be made in addition to the price bid for the trench excavation, and will include all necessary drilling and blasting and all incidentals necessary to excavate and dispose of the rock. Select granular material, used as backfill replacing rock excavation, will not be paid for separately, but will be included in the unit price for rock excavation.
1.2.4 Unclassified Excavation
Unclassified excavation will be paid for at the contract unit price per cubic yard for unclassified excavation.
1.2.5 Classified Borrow
Classified borrow will be paid for at the contract unit prices per cubic yard for common or rock borrow.
1.2.6 Unclassified Borrow
Unclassified borrow will be paid for at the contract unit price per cubic yard for unclassified borrow.
1.2.7 Authorized Overhaul
The number of station-yards of overhaul to be paid for will be the product of number of cubic yards of overhaul material measured in the original position, multiplied by the overhaul distance measured in stations of 100 feet and will be paid for at the contract unit price per station-yard for overhaul in excess of the free-haul limit as designated in paragraph DEFINITIONS.
1.2.8 Sheeting and Bracing
Sheeting and bracing, when shown or authorized by the Contracting Officer to be left in place, will be paid for as follows:
1.2.8.1 Timber Sheeting
Timber sheeting will be paid for as the number of board feet of lumber below finish grade measured in place prior to backfilling. Include in the measurement sheeting wasted when cut off between the finished grade and 1 foot below the finished grade.
1.2.8.2 Steel Sheeting and Soldier Piles
Steel sheeting, soldier piles, and steel bracing will be paid for according to the number of pounds of steel calculated. Calculate the steel by multiplying the measured in-place length in feet below finish grade by the unit weight of the section in pounds per foot. Obtain unit weight of rolled steel sections from recognized steel manuals.
1.3 CRITERIA FOR BIDDING
Base bids on the following criteria:
a. Surface elevations are as indicated.
b. Pipes or other artificial obstructions, except those indicated, will not be encountered.
c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.
d. Ground water elevation is 17 feet below existing surface elevation.
e. Material character is indicated by the boring logs.
f. Hard materials and rock is not expected be encountered in majority of the excavations with notable exception of 6.5 feet below existing surface elevations for boring B-3
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA P5 (2015) Standard for Waterborne Preservatives
ASTM INTERNATIONAL (ASTM)
| ASTM A139/A139M |
| (2016) Standard Specification for |
Electric-Fusion (ARC)-Welded Steel Pipe (NPS 4 and over)
| ASTM A252 |
| (2010) Standard Specification for Welded and Seamless Steel Pipe Piles |
| ASTM C33/C33M |
| (2018) Standard Specification for Concrete |
Aggregates
| ASTM C136/C136M |
| (2019) Standard Test Method for Sieve |
Analysis of Fine and Coarse Aggregates
| ASTM D698 |
| (2012; E 2014; E 2015) Laboratory |
Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.
(600 kN-m/cu. m.))
| ASTM D1140 |
| (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by |
Washing
| ASTM D1556/D1556M |
| (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method |
| ASTM D1557 |
| (2012; E 2015) Standard Test Methods for |
Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
| ASTM D1883 |
| (2016) Standard Test Method for California |
Bearing Ratio (CBR) of Laboratory-Compacted Soils
| ASTM D2434 |
| (1968; R 2006) Permeability of Granular |
Soils (Constant Head)
| ASTM D2487 |
| (2017; E 2020) Standard Practice for |
Classification of Soils for Engineering Purposes (Unified Soil Classification System)
| ASTM D4318 |
| (2017; E 2018) Standard Test Methods for |
Liquid Limit, Plastic Limit, and Plasticity Index of Soils
| ASTM D4718/D4718M |
| (2015) Standard Practice for Correction of |
Unit Weight and Water Content for Soils Containing Oversize Particles
| ASTM D6938 |
| (2017a) Standard Test Method for In-Place |
Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes EPA SW-846.3-3 (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods
1.5 DEFINITIONS
1.5.1 Satisfactory Materials
Satisfactory materials comprise any materials classified by ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, SW, SP, SM, SW-SM, SW-SC. Satisfactory materials for grading comprise of stones less than 8 inches, except for fill material for pavements and railroads which comprise stones less than 3 inches in any dimension.
1.5.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. Notify the Contracting Officer when encountering any contaminated materials.
1.5.3 Imported Clean Fill
Imported fill material, to be used for backfilling excavations in outdoor areas that will be accessible to children (playgrounds, lawn areas, and other outdoor spaces) must meet the definition of “clean fill” to be used onsite and either should be sourced from a certified clean quarry, or if other source shall be utilized, it must be laboratory tested for total metals, VOCs, SVOCs, PCBs, pesticides, and PFAS compounds, with results below NYSDEC residential standards.
1.5.4 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Perform testing, required for classifying materials, in accordance with ASTM D4318, ASTM C136/C136M and ASTM D1140.
1.5.5 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with ASTM D4718/D4718M. To maintain the same percentage of coarse material, use the "remove and replace" procedure as described in NOTE 8 of Paragraph 7.2 in AASHTO T 180.
1.5.6 Overhaul
Overhaul is the authorized transportation of satisfactory excavation or borrow materials in excess of the free-haul limit of 53 stations. Overhaul is the product of the quantity of materials hauled beyond the free-haul limit, and the distance such materials are hauled beyond the free-haul limit, expressed in station yards.
1.5.7 Topsoil
Material suitable for topsoils obtained from offsite areas is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
1.5.8 Hard/Unyielding Materials
Hard/Unyielding materials comprise weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 3 inch in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.
1.5.9 Rock
Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.
1.5.10 Unstable Material
Unstable materials are too wet to properly support the utility pipe, conduit, or appurtenant structure.
1.5.11 Select Granular Material
1.5.11.1 General Requirements
Select granular material consist of materials classified as GW, GP, SW, SP, by ASTM D2487 where indicated. The liquid limit of such material must not exceed 30 percent when tested in accordance with ASTM D4318. The plasticity index must not be greater than 5 percent when tested in accordance with ASTM D4318, and not more than 5 percent by weight may be finer than No. 200 sieve when tested in accordance with ASTM D1140. Provide a minimum coefficient of permeability of 0.002 feet per minute when tested in accordance with ASTM D2434.
1.5.11.2 California Bearing Ratio Values
Bearing Ratio: At 0.1 inch penetration, provide a bearing ratio of 50 percent at 95 percent ASTM D1557 maximum density as determined in accordance with ASTM D1883 for a laboratory soaking period of not less than 4 days. Conform the combined material to the following sieve analysis:
| Sieve Size |
| Percent Passing by Weight |
| 2-1/2 inches |
| 100 |
| No. 4 |
| 40 - 85 |
| No. 10 |
| 20 - 80 |
| No. 40 |
| 10 - 60 |
| No. 200 |
| 5 - 25 |
1.5.12 Initial Backfill Material
Initial backfill consists of select granular material or satisfactory materials free from rocks 3 inches or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller. When the pipe is coated or wrapped for corrosion protection, free the initial backfill material of stones larger than 3 inches in any dimension or as recommended by the pipe manufacturer, whichever is smaller.
1.5.13 Expansive Soils
Expansive soils are defined as soils that have a plasticity index equal to or greater than 25 when tested in accordance with ASTM D4318.
1.5.14 Non-frost Susceptible (NFS) Material
Non-frost susceptible material are a uniformly graded washed sand with a maximum particle size of 0.25 inch and less than 5 percent passing the No. 200 size sieve, and with not more than 3 percent by weight finer than 0.02 mm grain size.
1.5.15 Pile Supported Structure
As used herein, a structure where both the foundation and floor slab are pile supported.
1.6 SYSTEM DESCRIPTION
Subsurface soil boring logs are shown on the drawings. This data represents the best subsurface information available; however, variations may exist in the subsurface between boring locations.
1.6.1 Classification of Excavation
No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.
1.6.1.1 Common Excavation
Include common excavation with the satisfactory removal and disposal of all materials not classified as rock excavation.
1.6.1.2 Excavation in Outdoor Spaces
Excavations located in all outdoor areas that will be accessible to children (playgrounds, lawn areas, and other outdoor spaces) to a depth of no less than two (2) feet and up to three (3) feet. Areas that will be paved with concrete and/or asphaltic concrete are excluded from this definition.
1.6.1.3 Rock Excavation
Submit notification of encountering rock in the project. Include rock excavation with blasting, excavating, grading, disposing of material classified as rock, and the satisfactory removal and disposal of boulders 1/2 cubic yard or more in volume; solid rock; rock material that is in ledges, bedded deposits, and unstratified masses, which cannot be removed without systematic drilling and blasting; firmly cemented conglomerate deposits possessing the characteristics of solid rock impossible to remove without systematic drilling and blasting; and hard materials (see Definitions). Include the removal of any concrete or masonry structures, except pavements, exceeding 1/2 cubic yard in volume that may be encountered in the work in this classification. If at any time during excavation, including excavation from borrow areas, the Contractor encounters material that may be classified as rock excavation, uncover such material and notify the Contracting Officer. Do not proceed with the excavation of this material until the Contracting Officer has classified the materials as common excavation or rock excavation and has taken cross sections as required. Failure on the part of the Contractor to uncover such material, notify the Contracting Officer, and allow ample time for classification and cross sectioning of the undisturbed surface of such material will cause the forfeiture of the Contractor's right of claim to any classification or volume of material to be paid for other than that allowed by the Contracting Officer for the areas of work in which such deposits occur.
1.6.2 Blasting
Blasting will not be permitted.
1.6.3 Dewatering Work Plan
Submit procedures for accomplishing dewatering work.
1.7 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals Shoring; G, DO Dewatering Work Plan; G, DO Site-Specific Soil Management Plan; G, DO Geotextiles; G, DO SD-03 Product Data Utilization of Excavated Materials; G, DO Rock Excavation; G, DO Excavation or Borrow Pit; G, DO Shoulder Construction; G, DO SD-06 Test Reports Testing; G, DO Borrow Site Testing; G, DO Within 24 hours of the conclusion of physical tests, submit 10 copies of test results, including calibration curves and results of calibration tests.
SD-07 Certificates Testing
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
Test offsite soils brought in for use as backfill for Total Petroleum Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Provide backfill containing a maximum of 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and a maximum of 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and passing the TCPL test. Determine TPH concentrations by using EPA 600/4-79/020 Method 418.1. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5030/8020. Perform TCLP in accordance with EPA SW-846.3-3 Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Do not bring material onsite until tests have been approved by the Contracting Officer. For imported clean fill, the requirements shown in paragraph 1.5.3 shall also apply.
2.2 BURIED WARNING AND IDENTIFICATION TAPE
Provide polyethylene plastic and metallic core or metallic-faced, acid- and alkali-resistant, polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines.
Provide tape on rolls, 3 inches minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Provide permanent color and printing, unaffected by moisture or soil.
Warning Tape Color Codes
| Red |
| Electric |
| Yellow |
| Gas, Oil; Dangerous Materials |
| Orange |
| Telephone and Other Communications |
| Blue |
| Water Systems |
| Green |
| Sewer Systems |
| White |
| Steam Systems |
| Gray |
| Compressed Air |
2.2.1 Warning Tape for Metallic Piping
Provide acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.003 inch and a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation.
2.2.2 Detectable Warning Tape for Non-Metallic Piping
Provide polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.004 inch, and a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Manufacture tape with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.
2.3 DETECTION WIRE FOR NON-METALLIC PIPING
Insulate a single strand, solid copper detection wire with a minimum of 12 AWG.
2.4 MATERIAL FOR RIP-RAP
Provide Bedding material and rock conforming to for construction indicated.
2.4.1 Bedding Material
Provide bedding material consisting of sand, gravel, or crushed rock, well graded, with a maximum particle size of 0.75 inches. Compose material of tough, durable particles. Allow fines passing the No. 200 standard sieve with a plasticity index less than six.
2.4.2 Grout
Not Used
2.4.3 Rock
Provide rock fragments sufficiently durable to ensure permanence in the structure and the environment in which it is to be used. Use rock fragments free from cracks, seams, and other defects that would increase the risk of deterioration from natural causes. Provide fragments sized so that no individual fragment exceeds a weight of 150 pounds and that no more than 10 percent of the mixture, by weight, consists of fragments weighing 2 pounds or less each. Provide rock with a minimum specific gravity of 2.50. Do not permit the inclusion of more than trace 1 percent quantities of dirt, sand, clay, and rock fines.
2.5 CAPILLARY WATER BARRIER
Provide capillary water barrier of clean, poorly graded crushed rock, crushed gravel, or uncrushed gravel placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below. Conform to ASTM C33/C33M for fine aggregate grading with a maximum of 3 percent by weight passing ASTM D1140, No. 200 sieve, and a maximum aggregate size of 1-1/2 inch and no more than 2 percent by weight passing the No. 4size sieve.
2.6 PIPE CASING
2.6.1 Casing Pipe
ASTM A139/A139M, Grade B, or ASTM A252, Grade 2, smooth wall pipe. Match casing size to the outside diameter and wall thickness as indicated on Drawing Sheet. Protective coating is not required on casing pipe.
2.6.2 Wood Supports
Locally available, rough, structural grade. Provide wood with nonleaching water-borne pressure preservative (ACA or CCA) and treatment conforming to AWPA P5. Secure wood supports to carrier pipe with stainless steel or zinc-coated steel bands.
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
Where indicated or directed, strip topsoil to a depth of 4 inches. Spread topsoil on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified. Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in largest dimension, and other materials that would interfere with planting and maintenance operations. Remove from the site any surplus of topsoil from excavations and gradings.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. Transport satisfactory excavated materials and place in fill or embankment within the limits of the work. Excavate unsatisfactory materials encountered within the limits of the work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation. Dispose surplus satisfactory excavated material not required for fill and unsatisfactory excavated material as specified in paragraph DISPOSITION OF SURPLUS MATERIAL. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times. Excavate material required for fill or embankment in excess of that produced by excavation within the grading limits from other approved areas selected by the Contractor as specified.
For soil excavation and disposal activities, a Site-Specific Soils Management Plan shall be developed and utilized at the Site to guide the handling of soils and their management during the removal process. This Plan shall also include the process for imported clean fill from a certified clean quarry, and/or if utilizing a non-quarry source include clean fill sampling methods, frequency, and analyses to confirm clean prior to import acceptance. Only soils meeting NYSDEC residential standards will be considered acceptable.
Excavated soil is not expected to be considered hazardous but shall be tested in accordance with disposal facility requirements and disposed of at a New York State-approved facility in accordance with Federal and State regulations.
3.2.1 Ditches, Gutters, and Channel Changes
Finish excavation of ditches, gutters, and channel changes by cutting accurately to the cross sections, grades, and elevations shown on Drawing Sheet. Do not excavate ditches and gutters below grades shown. Backfill the excessive open ditch or gutter excavation with satisfactory, thoroughly compacted, material or with suitable stone or cobble to grades shown. Dispose excavated material as shown or as directed, except in no case allow material be deposited a maximum 4 feet from edge of a ditch. Maintain excavations free from detrimental quantities of leaves, brush, sticks, trash, and other debris until final acceptance of the work.
3.2.2 Drainage Structures
Make excavations to the lines, grades, and elevations shown, or as directed. Provide trenches and foundation pits of sufficient size to permit the placement and removal of forms for the full length and width of structure footings and foundations as shown. Clean rock or other hard foundation material of loose debris and cut to a firm, level, stepped, or serrated surface. Remove loose disintegrated rock and thin strata. Do not disturb the bottom of the excavation when concrete or masonry is to be placed in an excavated area. Do not excavate to the final grade level until just before the concrete or masonry is to be placed. Where pile foundations are to be used, stop the excavation of each pit at an elevation 1 foot above the base of the footing, as specified, before piles are driven. After the pile driving has been completed, remove loose and displaced material and complete excavation, leaving a smooth, solid, undisturbed surface to receive the concrete or masonry.
3.2.3 Drainage
Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry. Construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.
3.2.4 Dewatering
Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Do not permit French drains, sumps, ditches or trenches within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Take control measures by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, maintain the water level continuously, at least 3 feet below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. Measure and record performance of dewatering system at same time each day by use of observation wells or piezometers installed in conjunction with the dewatering system.
3.2.5 Trench Excavation Requirements
Excavate the trench as recommended by the manufacturer of the pipe to be installed. Slope trench walls below the top of the pipe, or make vertical, and of such width as recommended in the manufacturer's printed installation manual. Provide vertical trench walls where no manufacturer's printed installation manual is available. Shore trench walls, cut back to a stable slope, or provide with equivalent means of protection for employees who may be exposed to moving ground or cave in, as determined by the Contractor’s Safety Engineer or other competent person; refer to USACE publication EM 385-1-1. Excavate trench walls which are cut back to at least the angle of repose of the soil. Give special attention to slopes which may be adversely affected by weather or moisture content. Do not exceed the trench width below the pipe top of 24 inches plus pipe outside diameter (O.D.) for pipes of less than 24 inches inside diameter, and do not exceed 36 inches plus pipe outside diameter for sizes larger than 24 inches inside diameter. Where recommended trench widths are exceeded, provide redesign, stronger pipe, or special installation procedures by the Contractor. The Contractor is responsible for the cost of redesign, stronger pipe, or special installation procedures without any additional cost to the Government.
3.2.5.1 Bottom Preparation
Grade the bottoms of trenches accurately to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Excavate bell holes to the necessary size at each joint or coupling to eliminate point bearing. Remove stones of 2 inches or greater in any dimension, or as recommended by the pipe manufacturer, whichever is smaller, to avoid point bearing.
3.2.5.2 Removal of Unyielding Material
Where unyielding material is encountered in the bottom of the trench, remove such material 6 inch below the required grade and replaced with suitable materials as provided in paragraph BACKFILLING AND COMPACTION.
3.2.5.3 Removal of Unstable Material
Where unstable material is encountered in the bottom of the trench, remove such material to the depth directed and replace it to the proper grade with select granular material as provided in paragraph BACKFILLING AND COMPACTION. When removal of unstable material is required due to the Contractor's fault or neglect in performing the work, the Contractor is responsible for excavating the resulting material and replacing it without additional cost to the Government.
3.2.5.4 Excavation for Appurtenances
Provide excavation for manholes, catch-basins, inlets, or similar structures sufficient to leave at least 12 inches clear between the outer structure surfaces and the face of the excavation or support members. Clean rock or loose debris and cut to a firm surface either level, stepped, or serrated, as shown or as directed. Remove loose disintegrated rock and thin strata. Specify removal of unstable material. When concrete or masonry is to be placed in an excavated area, take special care not to disturb the bottom of the excavation. Do not excavate to the final grade level until just before the concrete or masonry is to be placed.
3.2.5.5 Jacking, Boring, and Tunneling
Unless otherwise indicated, provide excavation by open cut except that sections of a trench may be jacked, bored, or tunneled if, in the opinion of the Contracting Officer, the pipe, cable, or duct can be safely and properly installed and backfill can be properly compacted in such sections.
3.2.6 Underground Utilities
The Contractor is responsible for movement of construction machinery and equipment over pipes and utilities during construction. Excavation made with power-driven equipment is not permitted within 3 feet of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer.
3.2.7 Structural Excavation
Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement. Excavate to bottom of pile cap prior to placing or driving piles, unless authorized otherwise by the Contracting Officer. Backfill and compact over excavations and changes in grade due to pile driving operations to 95 percent of ASTM D698 maximum density.
3.3 SELECTION OF BORROW MATERIAL
Select borrow material to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Obtain borrow material from the borrow areas from approved private sources. Unless otherwise provided in the contract, the Contractor is responsible for obtaining the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling from the owners. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, do not obtain borrow within the limits of the project site without prior written approval. Consider necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon related operations to the borrow excavation.
3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS
Notify the Contracting Officer sufficiently in advance of the opening of any excavation or borrow pit or borrow areas to permit elevations and measurements of the undisturbed ground surface to be taken. Except as otherwise permitted, excavate borrow pits and other excavation areas providing adequate drainage. Transport overburden and other spoil material to designated spoil areas or otherwise dispose of as directed. Provide neatly trimmed and drained borrow pits after the excavation is completed. Ensure that excavation of any area, operation of borrow pits, or dumping of spoil material results in minimum detrimental effects on natural environmental conditions.
3.5 SHORING
3.5.1 General Requirements
Submit a Shoring and Sheeting plan for approval 15 days prior to starting work. Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring and sheeting of excavations. Finish shoring, including sheet piling, and install as necessary to protect workmen, banks, adjacent paving, structures, and utilities. Remove shoring, bracing, and sheeting as excavations are backfilled, in a manner to prevent caving.
3.5.2 Geotechnical Engineer
Hire a Professional Geotechnical Engineer to provide inspection of excavations and soil/groundwater conditions throughout construction. The Geotechnical Engineer is responsible for performing pre-construction and periodic site visits throughout construction to assess site conditions. The Geotechnical Engineer is responsible for updating the excavation, sheeting and dewatering plans as construction progresses to reflect changing conditions and submit an updated plan if necessary. Submit a monthly written report, informing the Contractor and Contracting Officer of the status of the plan and an accounting of the Contractor's adherence to the plan addressing any present or potential problems. The Contracting Officer is responsible for arranging meetings with the Geotechnical Engineer at any time throughout the contract duration.
3.6 GRADING AREAS
Where indicated, divide work into grading areas within which satisfactory excavated material will be placed in embankments, fills, and required backfills. Do not haul satisfactory material excavated in one grading area to another grading area except when so directed in writing. Place and grade stockpiles of satisfactory as specified. Keep stockpiles in a neat and well drained condition, giving due consideration to drainage at all times. Clear, grub, and seal by rubber-tired equipment, the ground surface at stockpile locations; separately stockpile excavated satisfactory and unsatisfactory materials. Protect stockpiles of satisfactory materials from contamination which may destroy the quality and fitness of the stockpiled material. If the Contractor fails to protect the stockpiles, and any material becomes unsatisfactory, remove and replace such material with satisfactory material from approved sources.
3.7 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE
Do not excavate to final grade until just before concrete is to be placed. Only use excavation methods that will leave the foundation rock in a solid and unshattered condition. Roughen the level surfaces, and cut the sloped surfaces, as indicated, into rough steps or benches to provide a satisfactory bond. Protect all surfaces from erosion resulting from ponding or water flow.
3.8 GROUND SURFACE PREPARATION
3.8.1 General Requirements
Remove and replace unsatisfactory material with satisfactory materials, as directed by the Contracting Officer, in surfaces to receive fill or in excavated areas. Scarify the surface to a depth of 6 inches before the fill is started. Plow, step, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so that the fill material will bond with the existing material. When subgrades are less than the specified density, break up the ground surface to a minimum depth of 6 inches, pulverizing, and compacting to the specified density. When the subgrade is part fill and part excavation or natural ground, scarify the excavated or natural ground portion to a depth of 12 inches and compact it as specified for the adjacent fill.
3.8.2 Placing Imported Clean Fill
In all outdoor areas that will be accessible to children (playgrounds, lawn areas, and other outdoor spaces), excavate the soil to a depth of no less than two (2) feet and up to three (3) feet. Place a thick imported clean fill layer whose thickness shall be no less than 24 inches. Place geotextiles below and above the compacted, imported clean fill. The type of geotextile shall be acceptable to the New York District’s Design Branch. The compaction requirements shall be in accordance with this specification section depending on the type of finished grade (landscaped areas, etc.) The area above the top geotextile shall be filled with topsoil, or other materials as shown on the plans, in accordance with the applicable specification section.
3.8.3 Frozen Material
Do not place material on surfaces that are muddy, frozen, or contain frost. Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Moisten material as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used.
3.9 UTILIZATION OF EXCAVATED MATERIALS
Use satisfactory material removed from excavations, insofar as practicable, in the construction of fills, embankments, subgrades, shoulders, bedding (as backfill), and for similar purposes. Submit procedure and location for disposal of unused satisfactory material. Dispose surplus satisfactory excavated material not required for fill and unsatisfactory excavated material as specified in paragraph DISPOSITION OF SURPLUS MATERIAL.