Attachment 2 - Fort Hamilton CDC-5.pdf

PDF 407 KB Posted

Attached to
Construction of New Child Development Center, Fort Hamilton, NY
Solicitation number
W912DS26RA018
Issued by

About this file

This document is the Past Performance Questionnaire (PPQ) Form PPQ-0 for the Child Development Center project at Fort Hamilton, NY (Contract W912DS26RA011), issued by NAVFAC/USACE.

The form is a template designed to collect past performance data from contractors and their clients. It consists of two main sections: contractor-completed blocks (1-4) and client-completed blocks (5-8). The contractor section requires submission of firm information, work role designation (prime, subcontractor, joint venture, or other), contract details including contract number, type (firm fixed price, cost reimbursement, or other), award/completion dates, original and final contract prices, and project description with complexity rating. The client section requires identification of the client contact person and their role in the project. The form emphasizes that clients should submit completed questionnaires directly to the offeror, though submission directly to USACE is permitted, with a note that the Government reserves the right to verify all information.

The evaluation portion uses a six-point adjective rating scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, and Not Applicable) to assess contractor performance across seven major categories: Quality (technical data, quality standards, problem resolution, quality control), Schedule/Timeliness of Performance (delivery schedules, resource utilization), Customer Satisfaction (end-user satisfaction, cooperativeness, responsiveness), Management/Personnel/Labor (on-site management, workforce qualification, government property control, personnel expertise, small business utilization, multi-project management, change incorporation), Cost/Financial Management (price compliance, cost innovations, invoice accuracy, accounting systems, termination history, financial stability), Safety/Security (safety environment maintenance, security compliance), and General (emergency response capability, contractual compliance, overall satisfaction). Clients must provide narrative remarks addressing specific strengths, weaknesses, and deficiencies to assist in evaluating performance risk.

View the file

Other files

File Type Posted
31 00 00_YQA_LEWA_17-JUL-26.docx DOCX document
2026-07-09-FH-CDC RFI DRAWINGS-IN.pdf PDF
FH - CDC - ELECTRICAL - SITE PLAN - LIGHTING_Amendment1-ES-102.pdf PDF
Solicitation Amendment W912DS26RA0180003 SF 30.pdf PDF
Attachment 3 - revised and reissued - updated 14Jul26.pdf PDF
Spec Sect 00 22 10 - Selection Procedure and Basis of Award - Revised and Reissued 16Jul26.pdf PDF
Ft Hamilton CDC T-505 20260708.pdf PDF
FH - CDC - ELECTRICAL - SITE PLAN - POWER_Amendment1-ES101.pdf PDF
Amendment 0002 - SCDC Ft Hamilton - Plans.pdf PDF
Solicitation Amendment W912DS26RA0180002 SF 30.pdf PDF
Ft Hamilton CDC A-504 20260610.pdf PDF
IN101 from 7-FH-CDC-INTERIORS-UPDATED RTA-DRAW.pdf PDF
VOL 1 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
VOL 3 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
Solicitation Amendment W912DS26RA0180001 SF 30.pdf PDF
Solicitation Amendment - W912DS26RA0180001 Professional Appearance.pdf PDF
VOL 2 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
Daily Waiver.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 1.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 3.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 2.pdf PDF
075662-FH-CDC DRAWINGS 25 MARCH 26.pdf PDF
075662-FH-CDC-CORRECTED RTA SPECS.pdf PDF
Attachment 3 - Fort Hamilton CDC-5.pdf PDF
Attachment 1 - Fort Hamilton CDC-5.pdf PDF
Solicitation - W912DS26RA018 Professional Appearance.pdf PDF
Appendix A - Fort Hamilton CDC-2.pdf PDF
Appendix F- Fort Hamilton CDC-3.pdf PDF
Attachment 5 - Fort Hamilton CDC-5.pdf PDF
Attachment 4 - Fort Hamilton CDC-5.pdf PDF
Appendix G - Fort Hamilton CDC-4.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Child Development Center Fort Hamilton, NY

CUI W912DS26RA011

ATTACHMENT 2 – PAST PERFORMANCE QUESTIONNAIRE (PPQ)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.

CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS

FORM.

ATTACHMENT 2 – PAST PERFORMANCE QUESTIONNAIRE (PPQ) (cont.)

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E

VG

S

M

U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes

No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM, Engineer-in-Charge, or Contracting Officer in a timely manner regarding urgent contractual issues).

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .