FH - CDC - ELECTRICAL - SITE PLAN - POWER_Amendment1-ES101.pdf

PDF 300 KB Posted

Attached to
Construction of New Child Development Center, Fort Hamilton, NY
Solicitation number
W912DS26RA018
Issued by

About this file

This is an Electrical Power Site Plan drawing (Sheet ES101) for a Child Development Center construction project at Fort Hamilton, New York. The drawing is prepared by the US Army Corps of Engineers, New York District, under Solicitation No. W912DS23F0031 and Contract No. W912DS19D0007, with an issue date of August 29, 2025.

The contractor is responsible for providing comprehensive electrical service infrastructure to the site, including a primary ductbank, underground structures, splice boxes, a new 750 KVA transformer with concrete pad, meter socket, primary and secondary service conductors, pad-mounted transformer, utility meter, and current transformer (CT). Specific requirements include: installation of a 1000A/480Y-277V/4-wire generator quick-connect junction box for portable generator backup; a manual transfer switch with service-rated main circuit breaker; a 2-way 5-inch PVC Schedule 40 concrete-encased ductbank; a 6-way 4-inch Schedule 40 PVC concrete-encased ductbank with 2 spare conduits; replacement of existing fuse cutouts with new 200-ampere cut-off switch fuses at Utility Pole 119; and provision of bollards for exterior electrical equipment per UFC 3-550-01. The contractor must verify utility accuracy with the facility manager prior to construction, coordinate minimum burial depths and clearances with applicable codes and authorities having jurisdiction, and provide pull strings in all empty conduits. The electrical service connection to the main switchboard in Electrical Room 127 is required, with the contractor responsible for direct coordination with utilities for service connection.

View the file

Other files

File Type Posted
31 00 00_YQA_LEWA_17-JUL-26.docx DOCX document
2026-07-09-FH-CDC RFI DRAWINGS-IN.pdf PDF
FH - CDC - ELECTRICAL - SITE PLAN - LIGHTING_Amendment1-ES-102.pdf PDF
Solicitation Amendment W912DS26RA0180003 SF 30.pdf PDF
Attachment 3 - revised and reissued - updated 14Jul26.pdf PDF
Spec Sect 00 22 10 - Selection Procedure and Basis of Award - Revised and Reissued 16Jul26.pdf PDF
Ft Hamilton CDC T-505 20260708.pdf PDF
Amendment 0002 - SCDC Ft Hamilton - Plans.pdf PDF
Solicitation Amendment W912DS26RA0180002 SF 30.pdf PDF
Ft Hamilton CDC A-504 20260610.pdf PDF
IN101 from 7-FH-CDC-INTERIORS-UPDATED RTA-DRAW.pdf PDF
VOL 1 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
VOL 3 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
Solicitation Amendment W912DS26RA0180001 SF 30.pdf PDF
Solicitation Amendment - W912DS26RA0180001 Professional Appearance.pdf PDF
VOL 2 of 3 - 75662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25.pdf PDF
Daily Waiver.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 1.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 3.pdf PDF
075662-FH-CDC CORRECTED RTA DRAWINGS 13 NOV 25 part 2.pdf PDF
075662-FH-CDC DRAWINGS 25 MARCH 26.pdf PDF
075662-FH-CDC-CORRECTED RTA SPECS.pdf PDF
Attachment 3 - Fort Hamilton CDC-5.pdf PDF
Attachment 1 - Fort Hamilton CDC-5.pdf PDF
Solicitation - W912DS26RA018 Professional Appearance.pdf PDF
Appendix G - Fort Hamilton CDC-4.pdf PDF
Attachment 2 - Fort Hamilton CDC-5.pdf PDF
Appendix A - Fort Hamilton CDC-2.pdf PDF
Appendix F- Fort Hamilton CDC-3.pdf PDF
Attachment 5 - Fort Hamilton CDC-5.pdf PDF
Attachment 4 - Fort Hamilton CDC-5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XXXXXXXX

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X

UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

OHT

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT UGT

UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UE

UE

UE

UE

UE

UE

U E

U E

U E

U E

U E

U E

T

M G

UE

UE

E

MH

E

MH

CHILD DEVELOPMENT CENTER

( SMALL: 0-5 years old )

PLAYGROUND

AREA 'B'

PLAYGROUND

AREA 'C'

PLAYGROUND

AREA 'A'

UE

UE

10'

A1 ELECTRICAL - POWER - SITE PLAN

1" = 20'

SHEET KEYNOTES

GENERAL NOTES

1. REFER TO SHEETS E001 FOR SYMBOLS, ABBREVIATIONS,

AND GENERAL NOTES.

2. IT SHALL BE THE SOLE RESPONSIBILITY OF THE

CONTRACTOR TO VERIFY THE ACCURACY AND

COMPLETENESS OF UTILITIES SHOWN ON THIS DRAWING

WITH THE FACILITY MANAGER PRIOR ANY

CONSTRUCTION ACTIVITY AND REPORT DISCREPANCIES

TO THE COR.

3. MINIMUM BURIAL DEPTHS AND SUFFICIENT CLEARANCES

BETWEEN NEW AND EXISTING UTILITIES AND/OR

STRUCTURES SHALL BE COORDINATED WITH THE

RESPECTIVE DISCIPLINES AND MAINTAINED IN

ACCORDANCE WITH APPLICABLE CODES AND AUTHORITY

HAVING JURISDICTION. NEW UTILITIES SHALL BE PLACED

ABOVE OR BELOW EXISTING UTILITIES/STRUCTURES AT

CROSSINGS IN ACCORDANCE WITH REQUIRED DEPTHS

AND CLEARANCES.

4. ALL EMPTY CONDUITS SHALL BE PROVIDED WITH PULL

STRINGS.

5. REFER TO SHEET EG101 FOR GROUNDING AND

LIGHTNING PROTECTION INFORMATION.

6. REFER TO EP600 SERIES FOR ONE LINE DIAGRAMS.

7. PROVIDE BOLLARDS FOR EXTERIOR ELECTRICAL

EQUIPMENT PER UFC 3-550-01.

8. ELECTRICAL SERVICE SHALL BE PROVIDED TO THE SITE

BY THE CONTRACTOR. THE CONTRACTOR SHALL

CONTRACT DIRECTLY TO MAKE THE SERVICE

CONNECTION.

9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PRIMARY

DUCTBANK, UNDERGROUND STRUCTURES, SPLICE

BOXES, TRANSFORMER PAD, DUCT BANK FROM THE

TRANSFORMER TO THE METER, METER SOCKET, THE

PRIMARY SERVICE CONDUCTORS, PAD-MOUNTED

TRANSFORMER, UTILITY METER, CT, AND SECONDARY

CONDUCTORS FROM THE TRANSFORMER TO THE METER.

1. 'FEEDER A' EXISTING BASE OVERHEAD POWER LINE

2. NEW 750KVA TRANSFORMER AND NEW CONCRETE PAD

3. CONNECTION TO MAIN SWBD IN ELEC RM 127

4. CONTRACTOR SHALL PROVIDE 1000A/480Y-277V/4 WIRE

GENERATOR QUICK CONNECT JUNCTION BOX FOR

PORTABLE GENERATOR.

5. CONTRACTOR SHALL PROVIDE MANUAL TRANSFER

SWITCH WITH SERVICE RATED MAIN CIRCUIT BREAKER.

6. CONTRACTOR SHALL PROVIDE 2-WAY 5'' PVC SCHEDULE

40 CONCRETE ENCASED DUCTBANK

7. CONTRACTOR SHALL PROVIDE 6-WAY 4'' SCHEDULE 40

PVC CONCRETE ENCASED DUCTBANK, OF WHICH 2

CONDUITS ARE SPARES.

8. METER AND METER SOCKET

9. CT CABINET

10. EXISTING UTILITY POLE 119, CONTRACTOR SHALL

REPLACE EXISTING FUSE CUTOUTS WITH NEW CUT OFF

SWITCH FUSES AT 200A.

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R

FO

R T

H

AM

IL

TO

N , N

EW

Y

O R

K

PR

O

JE

C T

N O

. 7

US Army Corps of Engineers ®

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

K.

S

C H

N

ED

LE

R

K.

S

C H

N

ED

LE

R

Y.

B

AR

R

ET

T

M . G

IU

R

G

IU

AU

G

U

ST

9, W

2D S2

3F

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

W

2D S1

9D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

, N

EW

Y O

R K

N Y

N

20' 40'0

SCALE: 1" = 20'

EL

EC

TR

IC

AL

PO

W

ER

SI

TE

P

LA

N

ES101

C

O R

R

EC

TE

D

S C

AL

E

/2

AutoCAD SHX Text 221'-1.25"

AutoCAD SHX Text 74'-7.25"

AutoCAD SHX Text 221'-1.25"

AutoCAD SHX Text 74'-7.25"

Sheets and Views
ES101

File details come from the government source that posted it. Updated .