W912DS22B0025 Amend 0005.pdf
PDF 875 KB Posted
- Solicitation number
- W912DS22B0025
About this file
This amendment to solicitation W912DS22B0025 provides additional details for the renovation and repair project at Building 20 of the Watervliet Arsenal in New York. The U.S. Army Corps of Engineers intends to complete hazardous material removal, window replacement, siding and door upgrades, restroom and locker room renovations, office renovations, HVAC and lighting improvements, entrance replacements including ramps and vestibules, stair hall and vestibule renovations, and exterior masonry repairs. The amendment revises the bid schedule, schedules a site visit for September 16th, and provides responses to bidder questions to clarify project scope. Pricing is to be provided for the base project and multiple options. The estimated construction cost is between $10-25 million and award is projected for September 2022. The response summarizes an amendment to a solicitation for renovation and repair work at a federal facility.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. revise bid schedule to add optional CLINs 0010 and 0011.
2. Schedule site visit for 16 September 2022.
3. Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specif ications.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0025
X 9B. DATED (SEE ITEM 11)
24-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2022
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22B0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0005
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
BIDDER’S QUESTIONS AND GOVERNMENT REPLY:
Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.
Q&A number
Comment Response
1 Please postpone the bid. the bid due date will not be postponed.
2 Per the item 1.3 of the Specification section 05 12 00 “Structural Steel” the work must be fabricated and erected by an AISC Certified Structural Steel Fabricator and Erector.
The steel work for this project is very limited and the amount of structural steel is very small to be attractable to the AISC Certified Structural Steel Fabricators and Erectors.
Please waive these requirements.
The certification for steel fabrication must not be waived. The certification for the erector can be waved only if the engineer of record reviews and approves the erectors quality assurance plan as equivalent to that of AISC 207
3 The option #7 is for “Upgrades to entrance & 1st floor”. Could you be more specific regarding this option’s scope of work?
Does “Upgrade entrance” means a canopy depicted on the drawing A-427 or also something else?
The 1st floor means the ground floor? Does it means that all works on the ground floor are Alternate? Please provide a list of works belongs to the Option #7
Refer to sheets A-426 & A-427 for scope associated with “upgrade entrance” portion of the bid option #7. The note, “1st floor” refers to the ground floor in the plan set. Details A1, F1 & F4 on sheet A-425 denote scope associated with bid option #7 as well.
Additionally, demolition work keyed as DA55 associated with break room 103 shown on sheet AD103 will be part of this option.
4 The Bid documents do not provide the locations or schedule of the fire extinguishers and cabinets. The specification 10 44 16 “Fire Extinguishers” doesn’t provide the type, Fire extinguishers for building will remain. No scope associated with fire extinguishers requirements, sizes of the fire extinguisher cabinets.
5 The Sheet Index drawing GI001 listed drawing S-0000 is missing, not attached.
This sheet is listed in error and is not part of the contract drawing set. Please disregard.
6 The Sheet Index drawing GI002 do not list included in the bid documents the EL 101 and EL 102 drawings.
These two sheets will be added to the Sheet Index drawing GI002
7 Some of our subs wanted to walk the site for the subject project. Is it possible to have another site visit for this project?
A second site visit has been scheduled as part of this amedment
8 The bid documents doesn’t provide the own Bid Bond Form. Could AIA Bid Bond Form be used?
Bid form is SF24-16e and can be GSA.gov. a copy will be posted with this amendment.
9 The Payment and Performance Bonds requirements are missing, do they required?
The Payment and Performance Bonds is required.
See block 12A. Also Clause 52.228-15 Performance and Payment Bonds--Construction JUN 2020 included in solicitation.
SECTION 00 10 00 - SOLICITATION
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Renovation of Building 20
FFP
All work associated with the renovation of Building 20 and its supporting typical infrastructure as indicated in the corresponding construction documents and specifications.
FOB: Destination
PSC CD: Y1EA
NET AMT
0002 1 Job OPTION Replacement of electrical bus bars
FFP
0003 1 Job OPTION Manufacturing floor electric
FFP
0004 1 Job OPTION Install manufacturing floor cooling
FFP
0005 1 Job OPTION Install metal wall panels
FFP
0006 1 Job OPTION Install translucent wall panels in
FFP
lieu of metal wall panels
0007 1 Job OPTION Upgrades to entrance & 1st floor
FFP
renovations
0008 1 Job OPTION Replace windows at manufacturing
FFP
floor
0009 1 Job OPTION Replace windows at administrative
FFP
areas
0010 1 Job OPTION Manufacturing floor Interior
FFP
painting & epoxy floor finishes
0011 1 Job OPTION Masonry Repairs
FFP
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 545 dys. ANP 1 WATERVLIET RESIDENCY
SCOTT KOSNICK
CONSTRUCTION DIVISION 1
BUFFINGTON STREET, BL
E 206
WATERVLIET NY 12189
518-266-6362
W912DS
0002 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
W912DS
0003 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0004 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0005 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0006 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0007 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0008 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0009 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0010 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0011 545 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
TOTALS
Total Base Bid CLIN 0001 ____________________________________________
Total Options (CLINs Item 0002 thru 0011)__________________________________
Total Estimated Base Bid + Options (CLIN Item 0001 thru 0011)_________________
NOTES TO BIDDERS
(1) Total Offer shall include all costs associated with each item number including all bonding, overhead and profit.
(2) Offeror must submit a price for every CLIN. Failure to do so may result in Offer being unacceptable.
(3) Optional Items (Additives) may be exercised at any time within 180 calendar days after contract award. The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order.
(4) Contract Duration is 545 Days.
(5) Offer Acceptance Period: Offers are to be valid for 90 calendar days for offer acceptance from the Offer Acceptance.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
An organized site visit has been scheduled for:
Friday, 16 September at 1100
a) Participants will meet at:
Building 20 - West Exterior Entrance Watervliet Arsenal Watervliet, New York 12189
Email all requests to Kyle Davis, Lance Woodworth, and Lewis Hatch site visit POC's listed on the form.
POC: Kyle Davis, Resident Engineer Email: Kyle.T.Davis@usace.army.mil Office Phone: (518) 266-6365 Mobile Phone: (347) 843-3398
POC: Lance Woodworth, Project Engineer Email: Lance.A.Woodworth@usace.army.mil Office Phone: (518) 266-6374 Mobile Phone: (518) 804-5727
POC: Lewis (Lew) Hatch, Project Engineer Email: Lewis.A.Hatch@usace.army.mil Office Phone: (518) 266-6125 Mobile Phone: (845) 750-2406
All requests must be in NLT 1100 EST Thursday, 15 August 2022 in order to be approved in time for the visit. Please anticipate up to one (1) hour on day of site visit to clear the WVA security background check at the South Gate Visitor’s center. Also, all visitors will need to bring proper ID and PPE (hard hat, eye glasses, safety shoes) to access the project area. Due to WVA security requirements, no photographic documentation will be permitted. Photographs were taken by the Government during the site visit on 30 Aug 2022 and can be requested per the instructions in Amendment 0004.
This amendment does not change or extend the due dates set for bidder RFIs or final bids.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0010:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0011:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
(End of Summary of Changes)