W912DS22B0025 Amend 0001.pdf

PDF 370 KB Posted

Attached to
Renovate & Repair – Building 20 Construction project at the Watervliet Arsenal, NY
Solicitation number
W912DS22B0025
Issued by

About this file

This amendment to a solicitation provides additional details for a construction project opportunity with the U.S. Army Corps of Engineers. The project involves renovating and repairing portions of Building 20 at the Watervliet Arsenal in New York, including hazardous material removal, window and door replacement, restroom and locker room upgrades, office renovations, entrance replacements, and exterior masonry repairs. The estimated cost is between $10-25 million. A site visit has been scheduled for August 30th at 10am at the building's west entrance, and all visitors must RSVP in advance and bring proper identification and safety equipment. Proposals are due in September 2022, and award is projected later that same month. The opportunity is available through the Department of the Army Corps of Engineers New York District.

View the file

Other files

File Type Posted
Bid Abstract_W912DS22B0025 BLG 20.pdf PDF
ATL No. CD4849E-01-07-20 Rev 1 Burns - Watervliet Ped Bridge.pdf PDF
09 90 00.pdf PDF
W912DS22B0025 Amend 0007.pdf PDF
ATL No CD4849E-02-07-22 Rev 1 - Burns - Watervliet HVAC Pad.pdf PDF
09 06 00.pdf PDF
RBM Survey Report Watervliet Arsenal NY - Bldg 20 Phase 2 V1 - Final.pdf PDF
Site Visit Sign in Sheet 2022-09-16.pdf PDF
123796 Phase II Final Design - Addendum 003 Project Specifications Binder.pdf PDF
W912DS22B0025 Amend 0006.pdf PDF
WVA Building 20 - Bid Option - Drawing Breakdown.pdf PDF
RBM Survey Report Watervliet Arsenal NY - Bldg 20 V1 - Final w Attachments.pdf PDF
SGH Bridge Crane Steel Inspection Report 052022.pdf PDF
W912DS22B0025 Amend 0005.pdf PDF
Bid bond form SF24-16e.pdf PDF
123796 Arch Addendum002 S and S 3.pdf PDF
123796 Phase II Final Design - Addendum 002 Project Specifications Binder.pdf PDF
123796 Arch Addendum002 S and S 2.pdf PDF
123796 Arch Addendum002 S and S 1.pdf PDF
W912DS22B0025 Amend 0004.pdf PDF
W912DS22B0025 Amend 0003.pdf PDF
Site Visit sign-in Sheet 30-Aug-2022.pdf PDF
123796 Phase II Final Design - Addendum 01 Specification Binder R1-1.pdf PDF
123796_Full Binder_P2_RTA_ADD 001_Revised - V2.pdf PDF
W912DS22B0025 Amend 0002.pdf PDF
123796 Phase II 100 percent Final Design Specification Binder - R3.pdf PDF
Pages from 101-125 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 125-156 123796_Full Binder_Phase 2 - V11.pdf PDF
W912DS22B0025.pdf PDF
Pages 26-56 from 123796_Full Binder_Phase 2 100 - V11.pdf PDF
123796 Phase II 100_ Final Design Specification Binder - R3 (1).pdf PDF
Pages from 72-100 123796_Full Binder_Phase 2 100 - V11.pdf PDF
Pages from 257-277 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages 1 to 25 from 123796 Full Binder Phase 2 V11.pdf PDF
Pages from 177-200 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 200-225 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 226-256 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 277-300 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 156-176 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 57-72 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 300-334 123796_Full Binder_Phase 2 - V11.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Add site visit information

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0025

X 9B. DATED (SEE ITEM 11)

24-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS22B0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

(b) An organized site visit has been scheduled for:

Tuesday, 30 August at 1000

(c) Participants will meet at:

Building 20 - West Exterior Entrance Watervliet Arsenal Watervliet, New York 12189

Email all requests to Kyle Davis, Lance Woodworth, and Lewis Hatch site visit POC's listed on the form.

POC: Kyle Davis, Resident Engineer Email: Kyle.T.Davis@usace.army.mil Office Phone: (518) 266-6365 Mobile Phone: (347) 843-3398

POC: Lance Woodworth, Project Engineer Email: Lance.A.Woodworth@usace.army.mil Office Phone: (518) 266-6374 Mobile Phone: (518) 804-5727

POC: Lewis (Lew) Hatch, Project Engineer Email: Lewis.A.Hatch@usace.army.mil Office Phone: (518) 266-6125 Mobile Phone: (845) 750-2406

W912DS22B0025

All requests must be in NLT 1000 EST Tuesday, 30 August 2022 in order to be approved in time for the visit. Please anticipate up to one (1) hour on day of site visit to clear the WVA security background check at the South Gate Visitor’s center. Also, all visitors will need to bring proper ID and PPE (hard hat, eye glasses, safety shoes) to access the project area. Due to WVA security requirements, no photographic documentation will be permitted. Photographs may be taken by the Government as per request during the site visit. Site visit photos taken by the Government will be posted to sam.gov as a solicitation amendment.

(End of provision)

(End of Summary of Changes)