This document provides details on a federal contract opportunity for renovation and repair work at Building 20 of the Watervliet Arsenal in New York. The U.S. Army Corps of Engineers seeks to repair and renovate portions of Building 20 that have not recently been updated, including hazardous material removal, window, door and siding replacement, restroom and locker room accessibility upgrades, office renovations, entrance replacements including ramps and vestibules, stair hall and vestibule renovations, and exterior masonry repairs. The estimated construction cost is between $10 and $25 million. The solicitation number is W912DS22B0025 and proposals are due in September 2022, with an award projection also in September 2022. The opportunity is identified as a pre-solicitation and the involved agency is the Department of the Army Corps of Engineers Engineering District New York.

View the file

Other files

File Type Posted
Bid Abstract_W912DS22B0025 BLG 20.pdf PDF
ATL No. CD4849E-01-07-20 Rev 1 Burns - Watervliet Ped Bridge.pdf PDF
09 90 00.pdf PDF
W912DS22B0025 Amend 0007.pdf PDF
ATL No CD4849E-02-07-22 Rev 1 - Burns - Watervliet HVAC Pad.pdf PDF
09 06 00.pdf PDF
RBM Survey Report Watervliet Arsenal NY - Bldg 20 Phase 2 V1 - Final.pdf PDF
Site Visit Sign in Sheet 2022-09-16.pdf PDF
123796 Phase II Final Design - Addendum 003 Project Specifications Binder.pdf PDF
W912DS22B0025 Amend 0006.pdf PDF
WVA Building 20 - Bid Option - Drawing Breakdown.pdf PDF
RBM Survey Report Watervliet Arsenal NY - Bldg 20 V1 - Final w Attachments.pdf PDF
SGH Bridge Crane Steel Inspection Report 052022.pdf PDF
W912DS22B0025 Amend 0005.pdf PDF
Bid bond form SF24-16e.pdf PDF
123796 Arch Addendum002 S and S 3.pdf PDF
123796 Phase II Final Design - Addendum 002 Project Specifications Binder.pdf PDF
123796 Arch Addendum002 S and S 2.pdf PDF
123796 Arch Addendum002 S and S 1.pdf PDF
W912DS22B0025 Amend 0004.pdf PDF
W912DS22B0025 Amend 0003.pdf PDF
Site Visit sign-in Sheet 30-Aug-2022.pdf PDF
123796 Phase II Final Design - Addendum 01 Specification Binder R1-1.pdf PDF
W912DS22B0025 Amend 0002.pdf PDF
W912DS22B0025 Amend 0001.pdf PDF
123796 Phase II 100 percent Final Design Specification Binder - R3.pdf PDF
Pages from 101-125 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 125-156 123796_Full Binder_Phase 2 - V11.pdf PDF
W912DS22B0025.pdf PDF
Pages 26-56 from 123796_Full Binder_Phase 2 100 - V11.pdf PDF
123796 Phase II 100_ Final Design Specification Binder - R3 (1).pdf PDF
Pages from 72-100 123796_Full Binder_Phase 2 100 - V11.pdf PDF
Pages from 257-277 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages 1 to 25 from 123796 Full Binder Phase 2 V11.pdf PDF
Pages from 177-200 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 200-225 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 226-256 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 277-300 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 156-176 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 57-72 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 300-334 123796_Full Binder_Phase 2 - V11.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

LOCATION

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

F

IL

E N

A M

E

S

IZ

E

P L O

T S

C A

L E

IS

S

U E

D A

T E

P R

O J E

C T

N O

C O

N T

R A

C T

N O

X

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

N

E W

Y O

R K

D

IS

T R

IC

T

F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

1 753

A

B

C

D

SHEET ID

2 864 10

E

F

G

B U

IL

D

IN

G

R

E N

O V

A T

IO

N

A N

D R

E P

A

IR

W A

T E

R V

L

IE

T A

R S

E N

A L

N E

W Y

O R

K U

S A

C E

W

A T

E R

V L

IE

T

N E

W Y

O R

K

A S

I N

D

IC

A T

E D

US Army Corps of Engineers ®

P N

O

NOT FOR CONSTRUCTION

PHASE 2 RECAPITALIZATION

100% FINAL DESIGN - ADDENDUM 001

W D

S -1

-D

-0

/1

/2

:3

:2

A

M

G-001

K C

U S

T E

R

N B

U S

C E

M I

K M

A L O

N E

A U

G U

S T

C o o rd in a ti o n .r v t

C O

V E

R S

H E

E T

NTSSCALE:

VICINITY MAP

NTSSCALE:

LOCATION MAP

NTSSCALE:

CAMPUS MAP

PROJECT

LOCATION

US Army Corps of Engineers New York District

WATERVLIET ARSENAL, NEW YORK

BUILDING 20 RENOVATION AND REPAIR

USACE, WATERVLIET, NEW YORK

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

ARCH

- CIVIL

- ELECT

- ENVIR

- MECH

- STRUCT/INTER

- GEOT

- CAD/BIM COORD

THE FOLLOWING SIGNATURES BELOW INDICATE OFFICIAL APPROVAL OF ALL DRAWINGS IN THIS SET.

SUBMITTED BY:

- FIRE

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SUBMITTED BY:

- INTERIORS

W912DS-19-D-0011CONTRACT NO.:

SOLICITATION NO.:

ISSUE DATE: AUGUST 2022

10 NORTH PARK PLACE, SUITE 300

MORRISTOWN, NJ 07960

BUILDING LOCATION

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A

F

IN

A L D

E S

IG

N

I S

S U

E F

O R

B

ID

J U

L Y

B A

D D

E N

D U

M

A U

G

08/18/2022

D

S

IG

N E

D B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

F

IL

E N

A M

E

S

IZ

E

P L O

T S

C A

L E

IS

S

U E

D A

T E

P R

O J E

C T

N O

C O

N T

R A

C T

N O

X

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

W

Y O

R K

D

IS

T R

IC

T

F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

1 753

A

B

C

D

SHEET ID

2 864 10

E

F

G

B U

IL

D

IN

G

R

E N

O V

A T

IO

N

A N

D R

E P

A

IR

W A

T E

R V

L

IE

T A

R S

E N

A L

N E

W Y

O R

K U

S A

C E

W

A T

E R

V L

IE

T

N E

W Y

O R

K

A S

I N

D

IC

A T

E D

US Army Corps of Engineers ®

P N

O

NOT FOR CONSTRUCTION

PHASE 2 RECAPITALIZATION

100% FINAL DESIGN - ADDENDUM 001

W D

S -1

-D

-0

/1

/2

:1

:2

P

M

GI001

K C

U S

T E

R

N B

U S

C E

M I

K C

U S

T E

R

A U

G U

S T

C o o rd in a ti o n .r v t

S H

E E

T I N

D E

X

ARCHITECTURE SHEET INDEX

SHEET

NUMBER SHEET NAME

AD152 DEMO CEILING PLAN - SECOND FLOOR

AD153 DEMOLITION CEILING PLAN ENLARGED

AD201 DEMO - EXTERIOR ELEVATIONS

AD202 DEMO - EXTERIOR ELEVATIONS

A-010 SITE PLAN

A-011 OVERALL GROUND FLOOR PLAN

A-012 OVERALL SECOND FLOOR PLAN

A-021 OVERALL ROOF PLAN

A-101 ENLARGED PLANS

A-103 ENLARGED RAMP PLAN

A-151 GROUND FLOOR REFLECTED CEILING PLAN

A-152 SECOND FLOOR REFLECTED CEILING PLAN

A-153 ENLARGED CEILING PLANS

A-201 EXTERIOR BUILDING ELEVATIONS - INSULATED METAL PANEL

A-202 EXTERIOR BUILDING ELEVATIONS - INSULATED METAL PANEL

A-203 ARCHITECTURAL EXTERIOR BUILDING ELEVATIONS- BID OPTION #6

A-204 ARCHITECTURAL EXTERIOR BUILDING ELEVATIONS - BID OPTION #6

A-251 ENLARGED EXTERIOR ELEVATIONS

A-311 WALL SECTIONS

A-410 STAIR RAILING

A-420 ENLARGED PLAN MEN'S LATRINE & LOCKER ROOM - GROUND FLOOR

A-421 MEN'S LATRINE & LOCKER ROOM ELEVATIONS - GROUND FLOOR

A-422 ENLARGED WOMEN'S LATRINE AND LOCKER ROOM - GROUND FLOOR

PLANS

A-423 WOMEN'S LATRINE & LOCKER ROOM ELEVATIONS - GROUND FLOOR

A-424 ENLARGED MEN & WOMEN'S LATRINE PLAN AND ELEVATIONS -

SECOND FLOOR

A-425 ENLARGED PLAN AND INTERIOR ELEVATIONS

A-426 ENLARGED STAIR HALL PLAN - BID OPTION

A-427 ENTRY CANOPY ELEVATIONS - BID OPTION

A-428 ENLARGED RAMP AND CANOPY ELEVATIONS

A-429 RAMP SECTION VIEWS

A-430 ENLARGED RAMP/STAIR RAILING DETAILS

A-431 ENLARGED VESTIBULE PLANS

A-432 ENLARGED OFFICE KITCHENETTE PLANS AND ELEVATIONS

A-433 ENLARGED CONNECTOR PLANS AND ELEVATION

A-434 TOOL ROOM - FLOOR PLANS AND ELEVATIONS

A-435 NORTHEAST RAMP - PLANS AND SECTIONS

A-436 ENTRY LIFT - PLANS AND DETAILS

A-437 ENLARGED MANUFACTURING OFFICE - FLOOR PLANS

A-501 PARTITION TYPES

A-511 PARTITION TYPE DETAILS

A-521 PENETRATION DETAILS

A-551 INTERIOR DETAILS

A-552 FLOOR TRANSITION DETAILS

A-553 MILLWORK DETAILS

A-554 MILLWORK DETAILS

A-571 ROOF DETAILS

A-577 MISCELLANEOUS DETAILS

A-601 DOOR SCHEDULE

A-621 DOOR DETAILS

A-622 DOOR DETAILS

A-623 DOOR DETAILS

A-624 DOOR DETAILS

A-651 WINDOW SCHEDULE AND DETAILS

A-661 WINDOW DETAILS

A-662 WINDOW DETAILS

A-665 STOREFRONT ELEVATIONS

A-666 STOREFRONT ELEVATIONS

A-667 TRANSLUCENT PANELS ELEVATIONS

A-668 TRANSLUCENT PANELS ELEVATIONS

A-669 TRANSLUCENT PANELS ELEVATIONS

A-670 TRANSLUCENT PANELS ELEVATIONS

A-671 STOREFRONT AND TRANSPARENT PANEL DETAILS

A-672 STOREFRONT AND TRANSLUCENT PANEL DETAILS

A-673 STOREFRONT AND TRANSLUCENT PANEL DETAILS

A-701 ROOM FINISH LEGEND AND SCHEDULE

A-711 GROUND FLOOR SIGNAGE AND FINISH PLAN

A-713 SECOND FLOOR SIGNAGE AND FINISH PLAN

ARCHITECTURE SHEET INDEX

SHEET

NUMBER SHEET NAME

AG001 ARCHITECTURAL LEGEND AND ABBREVIATIONS

AG002 ARCHITECTURAL GENERAL NOTES

AG003 ADA INFORMATION

AG004 ADA INFORMATION

AD001 DEMOLITION GENERAL NOTES

AD010 OVERALL GROUND FLOOR DEMOLITION PLAN

AD011 OVERALL SECOND FLOOR DEMOLITION PLAN

AD101 ENLARGED DEMOLITION PLANS

AD102 ENLARGED DEMO ENTRY PLAN

AD103 DEMO AREA PLANS

AD104 DEMO AREA PLANS

AD105 ENLARGED DEMO STAIR ENCLOSURE PLANS

AD106 ENLARGED DEMO RAMP PLAN

AD151 DEMO CEILING PLAN - GROUND FLOOR

STRUCTURAL SHEET INDEX

SHEET

NUMBER SHEET NAME

S-0000 PROJECT STARTUP

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-003 LEGEND AND ABBREVIATIONS

S-004 SPECIAL INSPECTIONS

S-005 SPECIAL INSPECTIONS

S-006 SPECIAL INSPECTIONS

S-011 GROUND FLOOR - STRUCTURAL PLAN - OVERALL

S-012 ROOF - STRUCTURAL PLAN - OVERALL

S-201 WALL/ WINDOW REPLACEMENT ELEVATION - BID OPTION

S-202 WALL/ WINDOW REPLACEMENT ELEVATION- BID OPTION

S-300 FOUNDATION SECTIONS

S-301 FOUNDATION SECTIONS

S-401 ENLARGED EQUIPMENT PAD PLANS

S-402 ENLARGED NORTH RAMP PLANS

S-405 MAIN ENTRY CANOPY FOUNDATION - BID OPTION

S-406 CHILLER PAD ENLARGED PLAN - BID OPTION

S-407 PIT PLANS AND SECTIONS

S-408 ENLARGED EAST RAMP PLANS

S-409 ENLARGED PLANS MECHANICAL EQUIPMENT SUPPORT - BID OPTION

S-410 NORTH RAMP SECTIONS

S-411 NORTH RAMP STAIR SECTIONS

S-412 EAST RAMP SECTIONS

S-500 STANDARD CONCRETE DETAILS

S-501 STANDARD CONCRETE DETAILS

S-502 STANDARD STEEL DETAILS

S-503 TYPICAL PIPE SUPPORT DETAILS

S-504 STANDARD MASONRY DETAILS

S-505 WINDOW/ WALL REPLACEMENT MISC. STEEL DETAILS

S-506 WINDOW/WALL REPLACEMENT MISC STEEL DETAILS

S-520 NORTH RAMP SLAB DETAILS

S-530 TYPICAL STEEL CONNECTION DETAILS

S-531 TYPICAL STEEL CONNECTION DETAILS

MECHANICAL SHEET INDEX

SHEET

NUMBER SHEET NAME

M-001 MECHANICAL GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

MD101 GROUND FLOOR MECHANICAL DEMO PLAN

MD102 MECHANICAL DEMO MEZZANINE PARTIAL PLAN - ENLARGED

MD300 MECHANICAL DEMO GROUND FLOOR PARTIAL PLAN - ENLARGED

M-100 OVERALL PHASING PLANS

M-101 OVERALL GROUND FL. PLAN

M-102 GROUND FLOOR - DUCTWORK PLAN - AREA A

M-103 GROUND FLOOR - DUCTWORK PLAN - AREA B

M-104 GROUND FLOOR - DUCTWORK PLAN - AREA C

M-105 GROUND FLOOR - DUCTWORK PLAN - AREA D

M-106 MEZZANINE - MECHANICAL DUCTWORK PLAN

M-107 ROOF -MECHANICAL PLAN

MP101 GROUND FLOOR - PIPING PLAN - AREA A

MP102 GROUND FLOOR - PIPING PLAN - AREA B

MP103 GROUND FLOOR - PIPING PLAN - AREA C

MP104 GROUND FLOOR - PIPING PLAN - AREA D

MP105 MEZZANINE - PIPING PLAN

M-300 SECTIONS

M-301 SECTIONS

M-302 SECTIONS

M-303 SECTIONS

M-304 SECTIONS

M-305 SECTIONS

M-306 SECTIONS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-507 MECHANICAL DETAILS

M-600 SCHEDULES

M-601 SCHEDULES

M-602 SCHEDULES

M-603 SCHEDULES

M-700 CONTROLS - LEGEND, SYMBOLS & ABBREVIATIONS

M-701 CONTROLS

M-702 CONTROLS - EXISTING RTU'S

M-703 CONTROLS - GMU

M-704 CONTROLS - UH'S & FTR'S

M-705 CONTROLS - DOAS

M-706 CONTROLS - NEW RTU'S

M-707 CONTROLS - NEW RTU'S POINTLIST

M-708 CONTROLS - CUH'S & PUH'S

M-709 CONTROLS - DSS

M-710 CONTROLS - CHILLER PLANT

M-711 CONTROLS - CHILLER PLANT POINTLIST

M-712 CONTROLS - DOOR HEATERS & PRV

M-800 AIRFLOW DIAGRAM

M-801 HYDRONIC PIPING DIAGRAMS

M-802 STEAM PIPING DIAGRAM MFR AREA

M-803 STEAM PIPING DIAGRAM-ADMIN NORTH AREA

M-804 STEAM PIPING DIAGRAM- ADMIN SOUTH AREA

GENERAL SHEET INDEX

SHEET

NUMBER SHEET NAME

G-001 COVER SHEET

GI001 SHEET INDEX

GI002 SHEET INDEX

GC001 PHASING NOTES

GC002 PHASING PLANS

GC003 ENLARGED PHASING PLANS

GC004 ENLARGED PHASING PLANS

GC005 ENLARGED PHASING PLANS

GC006 ACCESS AND LAYDOWN PLAN

PLUMBING SHEET INDEX

SHEET

NUMBER SHEET NAME

P-001 PLUMBING GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

PD010 PLUMBING UNDERSLAB DEMO PLAN

PD101 PLUMBING GROUND FLOOR DEMO PLAN

PD102 GROUND FLOOR OVERALL DEMO PLAN

PD103 SECOND FLOOR OVERALL DEMO PLAN

PD104 GROUND FLOOR - STORM DEMOLITION PLAN - AREA A

PD105 GROUND FLOOR - STORM DEMOLITION PLAN - AREA B

PD106 GROUND FLOOR - STORM DEMOLITION PLAN - AREA C

PD107 GROUND FLOOR - STORM DEMOLITION PLAN - AREA D

PD108 GROUND FLOOR - DCW DEMOLITION PLAN - AREA A

PD109 GROUND FLOOR - DCW DEMOLITION PLAN - AREA B

PD110 GROUND FLOOR - DCW DEMOLITION PLAN - AREA C

PD111 GROUND FLOOR - DCW DEMOLITION PLAN - AREA D

PD112 GROUND FLOOR - COMPRESSED AIR DEMOLITION PLAN - AREA A

PD113 GROUND FLOOR - COMPRESSED AIR DEMOLITION PLAN - AREA B

PD114 GROUND FLOOR - COMPRESSED AIR DEMOLITION PLAN - AREA C

PD115 GROUND FLOOR - COMPRESSED AIR DEMOLITION PLAN - AREA D

PD116 GROUND FLOOR - HVAC DRAIN - DEMOLITION PLAN

PD201 PLUMBING SECOND FLOOR DEMO PLAN

P-101 GROUND FLOOR - PLUMBING PLAN - OVERALL

P-102 GROUND FLOOR - DCW PLUMBING PLAN - AREA A

P-103 GROUND FLOOR - DCW PLUMBING PLAN - AREA B

P-104 GROUND FLOOR - DCW PLUMBING PLAN - AREA C

P-105 GROUND FLOOR - DCW PLUMBING PLAN - AREA D

P-106 GROUND FLOOR - STORM PLUMBING PLAN - AREA A

P-107 GROUND FLOOR - STORM PLUMBING PLAN - AREA B

P-108 GROUND FLOOR - STORM PLUMBING PLAN - AREA C

P-109 GROUND FLOOR - STORM PLUMBING PLAN - AREA D

P-110 GROUND FLOOR - COMPRESSED AIR PLAN - AREA A

P-111 GROUND FLOOR - COMPRESSED AIR PLAN - AREA B

P-112 GROUND FLOOR - COMPRESSED AIR PLAN - AREA C

P-113 GROUND FLOOR - COMPRESSED AIR PLAN - AREA D

P-114 SECOND FLOOR - PLUMBING PLAN - OVERALL

P-400 PLUMBING UNDERSLAB - ENLARGED PLANS

P-401 PLUMBING GROUND FLOOR - ENLARGED PLANS

P-402 PLUMBING SECOND FLOOR - ENLARGED PLANS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-503 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-701 PLUMBING RISER DIAGRAM - DOMESTIC WATER

P-702 PLUMBING RISER DIAGRAM - DOMESTIC WATER

P-703 PLUMBING RISER DIAGRAM - DOMESTIC WATER

P-704 PLUMBING RISER DIAGRAM - SANITARY AND VENT

P-705 PLUMBING RISER DIAGRAM - SANITARY AND VENT

P-706 PLUMBING RISER DIAGRAM - STORM

P-707 PLUMBING RISER DIAGRAM - COMPRESSED AIR

P-708 PLUMBING RISER DIAGRAM - COMPRESSED AIR

FIRE SHEET INDEX

SHEET

NUMBER SHEET NAME

FA001 FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS

FA101 GROUND FLOOR FIRE ALARM PLAN

FA101D GROUND FLOOR FIRE ALARM PLAN - AREA D

FA102 SECOND FLOOR FIRE ALARM PLAN

FA111 FIRE ALARM ENLARGED PLAN

FA601 FIRE ALARM ONE-LINE DIAGRAM

FX001 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS

FX101 GROUND FLOOR OVERALL FIRE SUPPRESSION PLAN

FX101A GROUND FLOOR FIRE SUPPRESSION PLAN - AREA A

FX101B GROUND FLOOR FIRE SUPPRESSION PLAN - AREA B

FX101C GROUND FLOOR FIRE SUPPRESSION PLAN - AREA C

FX101D GROUND FLOOR FIRE SUPPRESSION PLAN - AREA D

FX102 SECOND FLOOR OVERALL FIRE SUPPRESSION PLAN

FX102A SECOND FLOOR FIRE SUPPRESSION PLAN - AREA A

FX102B SECOND FLOOR FIRE SUPPRESSION PLAN - AREA B

FX102C SECOND FLOOR FIRE SUPPRESSION PLAN - AREA C

FX102D SECOND FLOOR FIRE SUPPRESSION PLAN - AREA D

FX301 FIRE SUPPRESSION SECTIONS

FX601 FIRE SUPPRESSION RISER DIAGRAM

LIFE SAFETY SHEET INDEX

SHEET

NUMBER SHEET NAME

F-001 LIFE SAFETY CODE AND CRITERIA

F-002 OVERALL GROUND FLOOR LIFE SAFETY PLAN

F-010 GROUND FLOOR LIFE SAFETY PLAN

F-011 SECOND FLOOR LIFE SAFETY PLAN

CIVIL SHEET INDEX

SHEET

NUMBER SHEET NAME

C-001 CIVIL LEGEND AND ABBREVIATIONS

C-002 CIVIL GENERAL NOTES

VF100 EXISTING CONDITIONS PLAN

CD100 SITE DEMOLITION PLAN

CS100 SITE PLAN

CS500 SITE DETAILS - 1

CS501 SITE DETAILS - 2

CS502 SITE DETAILS - 3

CU500 UTILITY DETAILS - 1

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A

F

IN

A L D

E S

IG

N

I S

S U

E F

O R

B

ID

J U

L Y

B A

D D

E N

D U

M

A U

G

D

S

IG

N E

D B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

F

IL

E N

A M

E

S

IZ

E

P L O

T S

C A

L E

IS

S

U E

D A

T E

P R

O J E

C T

N O

C O

N T

R A

C T

N O

X

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

W

Y O

R K

D

IS

T R

IC

T

F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

1 753

A

B

C

D

SHEET ID

2 864 10

E

F

G

B U

IL

D

IN

G

R

E N

O V

A T

IO

N

A N

D R

E P

A

IR

W A

T E

R V

L

IE

T A

R S

E N

A L

N E

W Y

O R

K U

S A

C E

W

A T

E R

V L

IE

T

N E

W Y

O R

K

A S

I N

D

IC

A T

E D

US Army Corps of Engineers ®

P N

O

NOT FOR CONSTRUCTION

PHASE 2 RECAPITALIZATION

100% FINAL DESIGN - ADDENDUM 001

W D

S -1

-D

-0

/1

/2

:1

:2

P

M

GI002

D e s ig n e r

C h e c k e r

A u th o r

A U

G U

S T

C o o rd in a ti o n .r v t

S H

E E

T I N

D E

X

ELECTRICAL SHEET INDEX

SHEET

NUMBER SHEET NAME

E-001 ELECTRICAL LEGENDS AND NOTES

E-002 ELECTRICAL ABBREVIATIONS, NOTES AND TYPICAL MOUNTING

HEIGHT DETAIL

E-003 ELECTRICAL NOTES

ED010 GROUND FLOOR - DEMOLITION PLAN - OVERALL

ED011 SECOND FLOOR - DEMOLITION PLAN - OVERALL

ED101 GROUND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA A

ED102 GROUND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA B

ED103 GROUND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA C

ED104 GROUND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA D

ED105 GROUND FLOOR - ELECTRICAL DEMOLITION PLAN - AREAS E & F

ED106 GROUND FLOOR - ELECTRICAL DEMOLITION REFLECTED CEILING

PLAN - AREAS E AND F

ED201 SECOND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA A

ED202 SECOND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA B

ED203 SECOND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA C

ED204 SECOND FLOOR - ELECTRICAL DEMOLITION PLAN - AREA D

ED205 SECOND FLOOR - ELECTRICAL DEMOLITION PLAN - AREAS E & F

ED206 SECOND FLOOR - ELECTRICAL DEMOLITION REFLECTED CEILING

PLAN - AREAS E AND F

ED401 ELEVATIONS

ED701 ONE-LINE DIAGRAM - DEMOLITION - 1 OF 5

ED702 ONE-LINE DIAGRAM - DEMOLITION - 2 OF 5

ED703 ONE-LINE DIAGRAM - DEMOLITION - 3 OF 5

ED704 ONE-LINE DIAGRAM - DEMOLITION - 4 OF 5

ED705 ONE-LINE DIAGRAM - DEMOLITION - 5 OF 5

EG101 ROOF - LIGHTNING PROTECTION PLAN

EG501 LIGHTNING PROTECTION DETAILS & NOTES

EL010 OVERALL - GROUND FLOOR - LIGHTING PLAN

EL011 OVERALL - SECOND FLOOR - LIGHTING PLAN

EL105 GROUND FLOOR - LIGHTING PLAN - AREAS E & F

EL205 SECOND FLOOR - LIGHTING PLAN - AREAS E & F

EL501 LIGHTING DETAILS

EL601 LIGHTING FIXTURE SCHEDULE

EP010 OVERALL - GROUND FLOOR - POWER PLAN

EP011 OVERALL - SECOND FLOOR - POWER PLANS

EP101 GROUND FLOOR - POWER PLAN - AREA A

EP102 GROUND FLOOR - POWER PLAN - AREA B

EP103 GROUND FLOOR - POWER PLAN - AREA C

EP104 GROUND FLOOR - POWER PLAN - AREA D

EP105 GROUND FLOOR - POWER PLAN - AREAS E & F

EP201 BUSWAY - POWER PLAN - AREA A

EP202 BUSWAY - POWER PLAN - AREA B

EP203 BUSWAY - POWER PLAN - AREA C

EP204 BUSWAY - POWER PLAN - AREA D

EP205 SECOND FLOOR - POWER PLAN - AREAS E & F

EP301 GROUND FLOOR - MECHANICAL POWER PLAN - OVERALL

EP302 GROUND FLOOR - MECHANICAL POWER PLAN - AREA C

EP303 GROUND FLOOR - MECHANICAL POWER PLAN - AREA D

EP304 GROUND FLOOR - MECHANICAL POWER PLAN - AREAS E & F

EP305 SECOND FLOOR - MECHANICAL POWER PLAN - OVERALL

EP306 SECOND FLOOR - MECHANICAL POWER PLAN - AREA A

EP307 SECOND FLOOR - MECHANICAL POWER PLAN - AREA B

EP308 SECOND FLOOR - MECHANICAL POWER PLAN - AREA C

EP309 SECOND FLOOR - MECHANICAL POWER PLAN - AREA D

EP310 SECOND FLOOR - MECHANICAL POWER PLAN - AREAS E & F

EP311 ROOF - MECHANICAL POWER PLAN

EP401 ENLARGED POWER PLANS

EP501 ELECTRICAL DETAILS

EP601 PANELBOARD SCHEDULES

EP602 PANELBOARD SCHEDULES

EP603 PANELBOARD / DISTRIBUTION BOARD SCHEDULE

EP604 ELECTRICAL EQUIPMENT SCHEDULES

EP605 MECHANICAL EQUIPMENT SCHEDULE

EP701 ONE-LINE DIAGRAM - 1 OF 5

EP702 ONE-LINE DIAGRAM - 2 OF 5

EP703 ONE-LINE DIAGRAM - 3 OF 5

EP704 ONE-LINE DIAGRAM - 4 OF 5

EP705 ONE-LINE DIAGRAM - 5 OF 5

TELECOMMUNICATIONS SHEET LIST

SHEET

NUMBER SHEET NAME

TN001 TELECOMMUNICATIONS LEGENDS AND ABBREVIATIONS

TN002 TELECOMMUNICATIONS GENERAL NOTES

TN010 GROUND FLOOR - TELECOMMUNICATIONS PLAN - OVERALL

TN011 SECOND FLOOR - TELECOMMUNICATIONS PLAN - OVERALL

TN101 GROUND FLOOR - TELECOMMUNICATIONS PLAN - AREA A

TN102 GROUND FLOOR - TELECOMMUNICATIONS PLAN - AREA B

TN103 GROUND FLOOR - TELECOMMUNICATIONS PLAN - AREA C

TN104 GROUND FLOOR - TELECOMMUNICATIONS PLAN - AREA D

TN105 GROUND FLOOR - TELECOMMUNICATIONS PLAN - AREAS E & F

TN205 SECOND FLOOR - TELECOMMUNICATIONS PLAN - AREAS E & F

TN401 ENLARGED TELECOMMUNICATIONS PLANS

TN501 TELECOMMUNICATIONS DETAILS

TN502 TELECOMMUNICATIONS DETAILS

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A

F

IN

A L D

E S

IG

N

I S

S U

E F

O R

B

ID

J U

L Y

B A

D D

E N

D U

M

A U

G

B

GENERAL NOTES:

1. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN US SURVEY FEET UNLESS INDICATED

OTHERWISE.

2. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.

3. CALLOUTS, COORDINATES, ELEVATIONS, AND DIMENSIONS ARE POINTED TO OR MEASURED TO

STRUCTURE CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION

WALL, UNLESS INDICATED OTHERWISE.

EXISTING CONDITION NOTES:

1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN

OBTAINED FROM EXISTING RECORDS AND INFORMATION GATHERED DURING A GPR INVESTIGATION, BUT MAY NOT BE ALL INCLUSIVE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS. UNDERGROUND

STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.

2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE

IMMEDIATELY REPORTED TO THE COR BEFORE ANY FURTHER WORK COMMENCES.

3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING

DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES PRIOR TO

BEGINNING WORK. CONTRACTOR SHALL CONTACT THE COR AND ALL ASSOCIATED UTILITY

COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING

UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED

DURING CONSTRUCTION.

4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE COR OF OPERATIONAL PLANS. IN

THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS

ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR.

ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE

RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE COR.

5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DISTURBED DURING

DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR

DISTURBED ITEMS TO THE SATISFACTION OF THE COR.

6. SPECIAL HANDLING AND CONSIDERATION SHALL BE REQUIRED FOR EXCAVATED SOILS THOUGHT TO

CONTAIN CONTAMINATED SUBSTANCES. CONTRACTOR SHALL PERIODICALLY MONITOR EXCAVATED

SOILS. SOILS SHALL BE TREATED ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS AND THE PROJECT SPECIFICATIONS. CONTRACTOR

SHALL COORDINATE REMOVAL OF CONTAMINATED MATERIALS WITH THE COR.

SURVEY NOTES:

1. INFORMATION SHOWN HEREON IS FROM A FIELD SURVEY CONDUCTED BY M.J. ENGINEERING AND

LAND SURVEYING, P.C. ON MARCH 31, 2022.

2. THE HORIZONTAL DATUM IS REFERENCED TO NORTH AMERICAN DATUM OF 1983, NEW YORK STATE

PLANE EAST ZONE 3101.

3. THE VERTICAL DATUM IS REFERENCED TO NGS BENCHMARK J 89 (PID MZ0902) (NAVD88).

4. CONTOUR INTERVAL = 1 FOOT.

5. NORTH IS ORIENTED TO GRID NORTH FROM GPS OBSERVATION.

6. UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON EVIDENCE VISIBLE AT GROUND LEVEL, INFORMATION RECORDED DURING STRUCTURE INVESTIGATION, RECORD INFORMATION PROVIDED

BY THE CLIENT, AND UNDERGROUND UTILITY LOCATING SERVICES, COMPLETED IN ACCORDANCE WITH ASCE STANDARDS FOR QUALITY LEVEL B (QLB) SUBSURFACE UTILITY LOCATING. THIS MAPPING

DOES NOT PURPORT TO SHOW ALL UNDERGROUND UTILITIES ON SITE AND IS SUBJECT TO

VERIFICATION BY EXCAVATION.

7. ALL COORDINATES AND ELEVATIONS SHOWN HEREON ARE IN U.S. SURVEY FEET.

RECORD DRAWING NOTES:

1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES THROUGH THE

DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS IN CAD AND GIS FORMAT SHALL BE SUBMITTED TO THE COR. AS-BUILTS FOR ALL UTILITY SYSTEMS SHALL BE FIELD SURVEYED AND

STAMPED BY LICENSED SURVEYOR IN THE STATE OF NEW YORK.

2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING

TRACK OF ANY COR APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON

APPROVED CONSTRUCTION DRAWINGS. THE REVISIONS SHALL BE USED TO PREPARE RECORD

DRAWINGS OF THE COMPLETED CONSTRUCTION.

3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS AND CONFIGURATIONS, AND ANY OTHER

CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED

CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED

CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING CONSTRUCTION.

4. CONTRACTOR SHALL RETAIN A STATE OF NEW YORK LICENSED SURVEYOR TO LOCATE PROJECT IMPROVEMENTS AND PROVIDE A PLANIMETRIC AND TOPOGRAPHIC SURVEY OF THE PROJECT SITE AFTER CONSTRUCTION IS COMPLETED. HORIZONTAL ACCURACY SHALL BE THIRD ORDER, CLASS II AS INDICATED ON USACE EM 1110-1-005. VERTICAL ACCURACY SHALL BE THIRD ORDER AS INDICATED ON USACE EM 1110-1-005. SURVEY SHALL BE TIED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83)

AND THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). SURVEY SHALL INCLUDE ALL

UTILITIES WITHIN THE SURVEY AREA. UTILITIES SHALL BE LOCATED IN ACCORDANCE WITH THE PRACTICES AND PROCEDURES OUTLINED IN ASCE 38-02, SUE LEVEL B. THE TOPOGRAPHIC SURVEY SHALL DEPICT CONTOURS AT A 1 FOOT INTERVAL. THE DIGITAL TOPOGRAPHIC MAP(S) SHALL BE COMPILED IN AUTOCAD CIVIL 3D FORMAT. CONTRACTOR SHALL PROVIDE 3D DIGITAL MAPPING AND

DIGITAL TERRAIN MODELING TO THE COR AFTER COMPLETION OF THE SURVEY.

GENERAL DEMOLITION NOTES:

1. PRIOR TO ANY EXCAVATION AND/OR DIGGING, A DIG SAFE PERMIT MUST BE REQUESTED A MINIMUM OF TEN (10) BUSINESS DAYS PRIOR TO THE START OF WORK. CONTRACTOR SHALL SUBMIT THE

PERMIT REQUEST ALONG WITH A MAP OF THE AFFECTED AREA TO COR.

2. PRIOR TO THE START OF ANY DEMOLITION WORK, INSTALL ALL SOIL EROSION AND SEDIMENT

CONTROL MEASURES.

3. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS SHALL BE DISPOSED OF OFF

INSTALLATION IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS. SEE

SPECIFICATION SECTION 02 41 00 FOR TESTING REQUIREMENTS ON REMOVAL OF EXCESS MATERIAL.

4. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF THE FOLLOWING MATERIALS:

AGGREGATE, CONCRETE, ASPHALT, MASONRY, FOUNDATIONS, REBAR, FENCE MATERIAL, PIPING, AND MISCELLANEOUS STRUCTURES. LARGE PIECES OF MATERIAL MAY NEED TO BE CRUSHED

AND/OR BROKEN UP FURTHER IN ORDER TO BE HAULED AWAY TO THE WASTE DISPOSAL SITE.

5. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT FULL DEPTH. EXISTING PAVEMENT EDGES

SHALL BE SAWCUT IN LOCATIONS SHOWN TO PROVIDE CLEAN EDGE.

6. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF PAVEMENT AND ANY SUBBASE MATERIAL

PRESENT.

7. CONTRACTOR SHALL COORDINATE WITH THE COR A MINIMUM 21 DAYS PRIOR TO REMOVAL OF EXISTING UTILITIES IN SERVICE. RELOCATED UTILITIES SHALL BE CONSTRUCTED BEFORE REMOVAL OF EXISTING UTILITIES IN THE EVENT THAT UNINTERRUPTED SERVICE TO THE FACILITY IS REQUIRED

BY THE COR. ALL RELOCATIONS SHALL BE COORDINATED WITH THE COR.

8. UTILITY CAPPING METHODS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS FOR SPECIFIC PIPE MATERIAL IN SERVICE OR PIPE CAP WITH THRUST BLOCK. ALL CAPPING SHALL BE

INSPECTED AND APPROVED BY THE COR.

9. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE REMOVED IN ACCORDANCE WITH

SPECIFICATION 02 41 00 AND BACKFILLED IN ACCORDANCE WITH SPECIFICATION 31 00 00.

10. DO NOT BEGIN SITE WORK (GRADING, EXCAVATION, DEMOLITION, OR CONSTRUCTION) UNTIL THE APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AS SHOWN ON SHEETS

CD100 AND CS500.

GENERAL UTILITY NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH DIG SAFE PERMIT REQUIREMENTS

REFERENCED IN GENERAL DEMOLITION NOTE 1 AS WELL AS MAINTAINING DIG SAFE MARKINGS

THROUGHOUT THE DURATION OF CONSTRUCTION.

2. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 30 DAYS FOR ALL REQUIRED UTILITY

SHUTDOWNS FOR UTILITY CONNECTIONS WITH THE COR. CONTRACTOR SHALL PROVIDE A WRITTEN

REQUEST TO COR FOR ANY PLANNED UTILITY SHUTDOWNS.

3. THE MINIMUM DEPTH OF COVER FOR UTILITIES SHALL BE AS FOLLOWS UNLESS INDICATED

OTHERWISE:

a. WATER: 54 INCHES

b. FIRE PROTECTION: 54 INCHES

c. ELECTRICAL AND COMMUNICATION: 30 INCHES

d. SANITARY SEWER: 36 INCHES

e. ALL OTHER UTILITIES: 36 INCHES

4. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY THE COR IN WRITING.

WATER UTILITY NOTES:

1. CONCRETE THRUST BLOCKS ARE REQUIRED AT ALL TEES, BENDS, OR ELBOWS OF PRESSURIZED

PIPING IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, AND MANUFACTURER'S

RECOMMENDATIONS. USE SHEET CU500 FOR TYPICAL THRUST BLOCK DETAILS.

2. WATER LINES SHALL BE INSTALLED A MINIMUM OF 3.00 FEET BEHIND THE EDGE OF PAVEMENT OR FACE OF CURB UNLESS INDICATED OTHERWISE. SEE SPECIFICATIONS FOR ADDITIONAL CLEARANCE

REQUIREMENTS FOR WATER PIPING.

UTILITY STRUCTURE NOTES:

1. ALL UTILITY STRUCTURES ARE TO BE HS-25 RATED.

a. CONTRACTOR SHALL SUBMIT STRUCTURAL DRAWINGS, DESIGN CALCULATIONS, AND

WATERPROOFING METHOD, DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER

REGISTERED IN THE STATE OF NEW YORK FOR APPROVAL.

2. IF A MANHOLE IS LOCATED IN PAVEMENT AREAS, RIM ELEVATION SHALL BE FLUSH WITH FINAL GRADE. IN NON-PAVEMENT AREAS, RIM ELEVATION SHALL BE FINISHED GRADE PLUS 2 INCHES.

3. COVERS AND CASTINGS OF MANHOLES AND STRUCTURES SHALL BE STAMPED PER THE

APPROPRIATE UTILITY TYPE OR PER THE LOCAL STANDARDS, AND SHALL BE STAMPED PER THE

ORIGIN OF MANUFACTURE.

GENERAL GRADING NOTES:

1. NEW ELEVATIONS INDICATED ARE FOR TOP OF FINAL GRADE, PAVEMENT, OR STRUCTURE UNLESS

INDICATED OTHERWISE.

2. ELEVATION DENOTED AS “MATCH” ARE INTENDED TO MEET EXISTING GRADE ELEVATIONS.

CONTRACTOR SHALL VERIFY ELEVATIONS AT TIE-INS AND MATCH POINTS PRIOR TO BEGINNING

CONSTRUCTION AND USE GRADUAL SLOPES WHEN PERFORMING GRADING OPERATIONS.

3. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. ANY DRAINAGE

FEATURE OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO EXISTING

CONDITIONS OR BETTER SUBJECT TO THE APPROVAL OF THE COR.

4. THE CONTRACTOR SHALL REMOVE STANDING WATER FROM THE PROJECT WORK LIMITS AS

NECESSARY TO PROTECT SUBGRADE, SUBBASE, AND/OR BASE COURSE OF NEW PAVEMENT,

SURROUNDING PAVEMENT-TO-REMAIN, OR OTHER COMPLETED WORKS.

5. TOP ELEVATION OF ALL UTILITY STRUCTURES TO REMAIN SHALL BE ADJUSTED ACCORDING TO

FINISH GRADE ELEVATION AND UTILITY STRUCTURE NOTE 2.

6. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE RE-VEGETATED OR SEEDED IN ACCORDANCE

WITH THE SPECIFICATION SECTION 32 92 19.

7. INSPECTION REPORTS GENERATED BY THE CONTRACTOR AFTER INSPECTION OF EROSION CONTROL

DEVICES SHALL BE SUBMITTED TO THE COR.

8. PROOF-ROLL SUBGRADE IN ACCORDANCE WITH SPECIFICATION SECTION 31 00 00.

9. GEOTEXTILE FABRIC SHALL MEET THE FOLLOWING REQUIREMENTS UNLESS NOTED OTHERWISE:

9.1. GRAB TENSILE STRENGTH - ASTM D4632 120 LBS (MIN)

9.2. GRAB TENSILE ELONGATION - ASTM D4632 50% (MIN)

9.3. TRAPEZOID TEAR STRENGTH - ASTM D4533 50 LBS (MIN)

9.4. CBR PUNCTURE STRENGTH - ASTM D6241 310 LBS (MIN)

9.5. PERMITIVITY - ASTM D4491 1.7 SEC^-1

9.6. FLOW RATE - ASTM D4491 135 GAL/MIN/FT^2

9.7. THICKNESS - ASTM D5199 40 MILS

ACCESS AND SAFETY NOTES:

COORDINATION AND COMMUNICATION NOTES:

1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO

THE APPROVAL OF THE COR, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL

TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN

PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE

RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR,

7-DAY PER WEEK BASIS. WHEN THE CONTRACTOR'S PRIMARY CONSTRUCTION

REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE

REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT

INFORMATION OF REPRESENTATIVES TO THE COR PRIOR TO THE START OF CONSTRUCTION

ACTIVITIES.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION

BETWEEN ANY SUBCONTRACTORS AND THE COR. ALL CONSTRUCTION ACTIVITIES PLANNED

BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE COR.

TRAFFIC CONTROL NOTES:

1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK

AREA AND ASSOCIATED ROADWAYS AND PARKING AREAS BY USING BARRICADES AND

FENCING APPROVED BY THE COR. TEMPORARY CONSTRUCTION FENCING SHALL BE

INSTALLED ACCORDING TO DETAILS A1, C1, AND F1 ON SHEET GC006.

2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS,

INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE.

3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN

ALARM WHEN MOVING IN REVERSE.

4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT.

5. NO UNAUTHORIZED PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION

LIMITS. AUTHORIZED PEDESTRIAN TRAFFIC INCLUDE ESSENTIAL PERSONNEL, USACE

PERSONNEL, AND OTHER PERSONNEL AUTHORIZED BY COR.

6. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 1 MONTH TO THE COR FOR ROAD

CLOSURE PRIOR TO THE ROAD REQUIRING CLOSURE.

7. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE CONTRACTOR

SHALL REQUEST THE COR TO SCHEDULE AN INSPECTION. NO ROADWAY SHALL BE RE-OPENED

UNTIL THE COR HAS COMPLETED INSPECTION AND APPROVED THE RE-OPENING OF THE ROAD.

TEMPORARY CONSTRUCTION CRANE NOTES:

1. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS

LOWERED TO THEIR LOWEST ELEVATION.

EXCAVATION AND TRENCHES NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING,

AND SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH THE MOST STRINGENT

INTERPRETATION OF LOCAL REGULATIONS AND OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION (OSHA) REGULATIONS FOR CONSTRUCTION, AND USACE EM 385-1-1 "HEALTH

AND SAFETY MANUAL".

2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY

MARKED.

3. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED. ALL

DEWATERING LIQUIDS AND SEDIMENT MUST BE COLLECTED, TREATED AND DISPOSED IN

COMPLIANCE WITH FEDERAL, STATE, LOCAL RULES AND REGULATIONS AND THE

CONSTRUCTION CONTRACT DOCUMENTS.

4. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING

THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK

APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED. MAXIMUM LENGTH OF OPEN

TRENCH SHALL BE LIMITED TO 50 FEET, EXCEPT AS APPROVED BY COR.

5. TRENCHING IN PARKING AREAS MAY BE ALLOWED, SO LONG AS A STEEL PLATE IS PROVIDED

OVER THE TRENCH AND SECURED TO THE GROUND TO ACCOMMODATE VEHICULAR TRAFFIC.

COORDINATE TEMPORARY CLOSURE OF AREAS WITH COR.

OTHER SAFETY REQUIREMENTS:

1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL

SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS, AND "USACE EM 385-1-1 SAFETY

AND HEALTH REQUIREMENTS MANUAL, 30 NOV 2014".

2. THERE SHALL BE NO PERMANENT WASTE SITES ON JOINT BASE PROPERTY. TEMPORARY

WASTE AREAS DO NOT REQUIRE APPROVAL BY THE COR SO LONG AS WASTE IS PROPERLY

STORED WITHIN THE CONTRACTOR'S LAYDOWN AREA AND ARE NOT CREATING A HAZARD,

AND WASTE IS REMOVED DAILY. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS

SUBJECT TO THE DIRECTION OF THE COR.

3. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED

EQUIPMENT WITH THE COR.

4. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT

RESULTING FROM WIND CONDITIONS AND MUST NOT CONTRIBUTE TO WIND DRIVEN DUST

CONDITIONS.

5. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY

CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE

PROJECT SITE, FROM ENTERING ANY HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE.

DUST CONTROL SHALL BE IN ACCORDANCE WITH THE NEW YORK STATE STANDARDS AND

SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.

6. GASOLINE, FUEL, AND OIL STORAGE IN CONTRACTOR AREAS AND PROJECT SITE SHALL HAVE

PROPER SPILL CONTAINMENT IN ACCORDANCE WITH DPW ENVIRONMENTAL REQUIREMENTS.

GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S

OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE

SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM

THE PROJECT PROPERTY.

7. IF CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION OF ANY WATER LINES OR

FIRE HYDRANTS ON PROJECT PROPERTY OR ADJOINING PROPERTY, THE CONTRACTOR SHALL

PROVIDE A MINIMUM ADVANCE NOTICE OF 30 DAYS TO THE LOCAL FIRE AUTHORITY AND ALL

OTHER EMERGENCY SERVICES.

8. FAILURE TO COMPLY WITH THE USACE SAFETY REQUIREMENTS DEFINED IN EM 385-1-1 SHALL

RESULT IN THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS

ARE ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE COR.

9. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN SHALL IMMEDIATELY

BE REMOVED FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN

THROUGHOUT THE REMAINDER OF THE PROJECT.

SECURITY REQUIREMENTS NOTES:

1. ALL CONTRACTOR EMPLOYEES SHALL CARRY CONTRACTOR PHOTO IDENTIFICATION AT ALL

TIMES.

2. CONTRACTOR EMPLOYEES SHALL COMPLY WITH ANY INTEGRATED SECURITY MEASURES THAT

MAY BE NECESSARY DURING CONSTRUCTION. THIS INCLUDES, BUT IS NOT LIMITED TO,

VEHICLE INSPECTIONS, IDENTIFICATION CHECKS, ETC.

CONTRACTOR SAFETY PLAN SUBMITTALS:

1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN AND PROPOSED PROJECT

SCHEDULE TO THE COR FOR APPROVAL IN ACCORDANCE WITH THE SPECIFICATIONS.

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES:

1. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND PRACTICES SHALL BE IN

ACCORDANCE WITH THE NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION

AND SEDIMENT CONTROL (BLUE BOOK) LATEST EDITION.

D

ES

IG

N

ED

B

Y:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

PL

O T

SC

AL

E:

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

C O

N

TR

AC

T

N O

X2

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

W

AR

D P

AR

KW

AY

, K

AN

SA

S C

IT

Y, M O

1 753

A

B

C

D

SHEET ID

2 864 10

E

F

G

BU

IL

D

IN

G

R

EN

O

VA

TI

O N

A N

D R

EP

AI

R W

AT

ER

VL

IE

T

AR

SE

N

AL

, N

EW

Y

O R

K U

SA

C

E, W

AT

ER

VL

IE

T, N

EW

Y

O R

K

AS

IN

D

IC

AT

ED

US Army Corps of Engineers ®

NOT FOR CONSTRUCTION

PHASE 2 RECAPITALIZATION

100% FINAL DESIGN - ADDENDUM 001

W

2D S-

-D

-0

\\BMCD\DFS\CLIENTS\ANF\USCOE\NAN\123796_WVABLDG20RENO\DESIGN\CIVIL\SHEETS\123796-C-002.DWG 8/17/2022 1:58 PM KWARRENDER

P2 N

O

-C

-0

.d w g

C-002

C

IV

IL

G

EN

ER

AL

N

O

TE

S

K, W

AR

R

EN

D

ER

F.

P

AS

C

ER

I

L.

M

O N

ZO

N

A

0% F

IN

AL

D

ES

IG

N

IS

SU

E

FO

R

B

ID

JU

LY

AU

G

B

B

AD

D

EN

D U

M

AU

G

IS

S

U E

D A

T E

A

U G

U S

T

IT IS A VIOLATION OF THE NYS EDUCATION

LAW FOR ANY PERSON TO ALTER ANY

DOCUMENT THAT BEARS THE SEAL OF

PROFESSIONAL ENGINEER, UNLESS THAT

PERSON IS ACTING UNDER THE DIRECTION

OF A LICENCED PROFESSIONAL ENGINEER

LUIS R. MONZON

PROFESSIONAL ENGINEER

LICENSE NO. 092263-1

46.4 W

W W

45.4

D

44.5

46.9

FFE=48.11

45.0 44.4

44.9

44.1

43.0 42.6

41.2 40.4

FFE=33.85

39.439.4 39.4 39.1

38.2 38.5

W

36.8 36.6

CB

CB

34.7 34.7

FFE=43.42

42.3

W

41.2 40.8

W

W

41.6

41.5

FFE=42.23

E

W

38.4

38.2

38.5

38.5 38.6

38.9 39.0 S

39.2

40.141.0 41.340.9

41.3 41.8

40.1

39.2

40.5

39.0

37.9

40.4

41.2

S

CB

W

CB

D

D

FFE=38.21

FFE=38.22

D

FFE=42.20

FFE=38.17

37.4

37.4

CB

CB

M 34.7

34.5

WWWW

CB

W

E

BM

CB

FFE=31.13

MW

MW

30.5

30.2

30.0

30.2

W

W

WW

W

29.8 29.4 29.2

29.229.0 29.6

29.6

CB

29.1 29.2

29.229.4 29.8

29.5

S

29.3

29.129.6

28.529.5

29.8

31.1

32.3

E

31.4

W W

W

D

D

D 30.7

C

W

A/C 33.8

FFE=33.98

33.7

34.4

34.2

34.0

FFE=33.93

34.5

34.9

34.6

34.6

34.734.534.8

34.634.935.0

FFE=35.27FFE=35.34

34.1

35.134.7

34.1

FFE=34.45

CB

34.6 C

E

E

W

WW

36.136.6

FFE=38.15

W

W W

W W

W W

W W

W W

W W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W

W

E

E

E

E

E

E

E

E

E

E

W

HPS

HPS

E

E E E E E

HPS HPS

E E

E

E

E

E E

E E

E E

E E

E E

EE

E

E

E

E

COMM

COMM

COMMCOMMCOMMCOMMCOMM

COMM

COMM

E

E

E E

E

E E

E E

E

E

E E

W

W

W

W

W

W

W

W

W

W

WWWWWWWWW

SAN

X X

E

EEEEEEEEEEEEEEE

EEEEEEEEEEEEE

EE

XXXX

X

EEEE

COMM

35 35

SD

SD

SD

SD

SD

SD

RIM:42.58'

(E) INV. OUT: 29.22', 15" VCP

(W) INV. IN: 29.78', 15' VCP

(NW) INV. IN: 32.63', 12" VCP

(SW) INV. IN: 36.18', 12" CMP

(S) INV. IN: 38.18', 6" CMP

(N) INV. IN: 38.68', 6" CMP

SD

SD

SD

RIM:31.92'

INV. OUT: 27.70', 12" VCP

SD RIM: 31.94

INV. OUT: 29.00', 12" VCP

SAN

SAN

SAN SAN

RIM: 38.89'

(SE) INV. OUT: 30.01', 12" VCP

(NW) INV. IN: 31.19', 10" VCP

(W) INV. IN: 30.15', 10" VCP

SAN

SAN

RIM: 41.29'

(SE) INV. OUT: 32.49', 12" VCP

(W) INV. IN: 32.64', 12" VCP

(SW) INV. IN: 37.49', 4" CMP

RIM: 36.68'

INV. OUT:31.62', 12" CMP

RIM: 36.94'

INV. OUT: 32.41', 12" CMP

SD

SD

RIM: 37.66'

(N) INV. OUT: 29.91', 12" CMP

(NW) INV. IN: 32.56', 12" CMP

(SW) INV. IN: 32.26', 12" VCP

(W) INV. IN: 30.31', 12" CMP

RIM: 37.65'

(E) INV. OUT: 29.01', 12" CMP

(S) INV. IN: 29.05', 12" CMP

RIM: 37.19'

(SE) INV. OUT: 31.14', 12" CMP

(NW) INV. IN: 31.40', 12" CMP

RIM: 34.31'

INV. OUT: 31.23', 12" UKN.

RIM: 34.01'

(NW) INV. OUT: 29.38', 10" VCP

(SW) INV. IN: 29.41', 12" UNK.

(PIPE RECESSED)

RIM: 28.95'

(SE) INV. OUT: 14.23', 36" CMP

(NW) INV. IN: 14.85', 24" VCP

(W) INV. IN: 14.05', 15" VCP

SD

RIM: 30.30'

INV. OUT: 26.08', 6" VCP

SD

SD

SD

SD

SD

RIM: 30.12'

(S) INV. OUT: 25.01', 15" VCP

(SE) INV. IN: 25.41', 12" RCP

(N) INV. IN: 25.31', 6" VCP

(NW) INV. IN: 25.21', 12" VCP RIM: 28.94'

12" RCP

INV. OUT: 25.64'

SANSANSANSANSANSANSANSANSANSANSANSAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

RIM: 29.43'

(S) INV. OUT: 16.33', 24" VCP

(N) INV. IN: 16.38', 24" VCP

(W) INV. IN: 18.07', 15" VCP

RIM:31.51'

(SE) INV. OUT: 22.09', 15" VCP

(N) INV. IN: 22.18', 12" VCP

(NW) INV. IN: 23.41', 12"' VCP

RIM: 31.14'

(SE) INV. OUT: 21.93', 15" VCP

(NW) 15" VCP, PIPE RECESSED

UNDER ROCK LEDGE

RIM: 30.83'

(SE) INV. OUT: 21.53', 15" VCP

(NW) INV. IN: 21.93', 15" VCP

RIM: 33.87'

FILLED WITH DEBRIS

BUILDING 20

2 STORY BRICK BUILDING

WESTERVELT AVE.

G

IB

S O

N S

T.

4" CMP

INV: 28.39'

4" CMP

INV: 28.57'

BUILDING 25

BUILDING 23

BUILDING 24

12' CHIMNEY PIPE

ASPHALT

CONC.

C O

N C

COVERED CONCRETE WITHMECHANICAL EQUIPMENT

S

TO

P

LI

N E

CONC.

METAL STORAGE

CONTAINER

ASPHALT

CONC.

6' CHAINLINK

FENCE WITH

BARBWIRE

ENCLOSED

CONC. STEPS

GATE

CONC.

CONC.

ASPHALT

PARKING

PAINTED WALK

P A

IN

TE

D W

A

LK

ASPHALT

PARKING

CONC.

C O

N C

. S

ID

E W

A

LK

CONC.

CONC.

ASPHALT

PARKING

PAINTED WALK

C O

N C

CONC.

STONE

STOP SIGN

ST

O

P

LI

N E

C R

O

SS

W

AL

K

C O

N C

SIDEW

ALK DC DC

CROSS WALK

C R

O

SS

W

AL

K

STOPLINE

CONC. SIDEWALK

C R

O S

S W

A

LK"STOP "

CONC.

C O

N C

. R A

M P

RIP-RAP

CONC.

"WATERVLIET ARSENAL

BUILDING 20"

CONC.

CONC. HEADWALL RIP-RAP

CONC. SIDEWALK

CONC.STEPS

CONC.

RIP-RAP CONC.

HEADWALLCONC.

ENCLOSED

CONC. STEPS

S

TO

N E

A N

D C

O N

C . R

E

TA

IN

IN

G W

A

LL

CONC. CURB

C O

N C

. C U

R B

C O

N C

. C U

R B

C O

N C

. C U

R B

C O

N C

. W

AL

K

ST

AI

R S

METAL

STAIRS

CONC. CURB

BENCHMARK:

NGS DISK J89

ELEV: 34.27'

C O

N C

. C U

R B

C O

N C

. R

ET

AI

N

IN

G

W

AL

L

NITROGEN TANKS

STANCHION STANCHION

STOP BAR

ASPHALT

ASPHALT

VAULT

PIV

VENT

METAL STAIRS

(3) CONDUITS

C S

C S

C S

C S

C S

C S

C S

CS

CS

CS

C S

M

M

M

M

M

M M M

M

E

E E

E E

E E

E E

E E

E E

E E E E E E E

E E

E E

E

E

E

E

E

E E

E E

E

E E

E E

E E

E E

E E

E E

E

E

E

CHAIN LINK FENCE

W W W W W

W

HPS

E E

E E

E E

E E

E E

E

E

E E

E E

E

HPS

HPS

1 STORY STEEL

SIDED ADDITION

CANOPIED DRIVE

THROUGH PORT

2 STORY BRICK BUILDING

OVERHEAD DOOR

GATE

GATE

CONTROL

POINT

GPS-1

CONTROL

POINT

GPS-2

L O C

L O C

L O C

L O C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

L O C

L O C

L O C

L O C

L O C

LOC

LOC

LOCLOCLOCLOCLOCLOCLOCLOCLOC

LOC

LOC

LOC

L O C

L O C

L O C

L O C

46.4 W

W W

45.4

D

44.5

46.9

FFE=48.11

45.0 44.4

44.9

44.1

43.0 42.6

41.2 40.4

FFE=33.85

39.439.4 39.4 39.1

38.2 38.5

W

36.8 36.6

CB

CB

34.7 34.7

FFE=43.42

42.3

W

41.2 40.8

W

W

41.6

41.5

FFE=42.23

E

W

38.4

38.2

38.5

38.5 38.6

38.9 39.0 S

39.2

40.141.0 41.340.9

41.3 41.8

40.1

39.2

40.5

39.0

37.9

40.4

41.2

S

CB

W

CB

D

D

FFE=38.21

FFE=38.22

D

FFE=42.20

FFE=38.17

37.4

37.4

CB

CB

M 34.7

34.5

WWWW

CB

W

E

BM

CB

FFE=31.13

MW

MW

30.5

30.2

30.0

30.2

W

W

WW

W

29.8 29.4 29.2

29.229.0 29.6

29.6

CB

29.1 29.2

29.229.4 29.8

29.5

S

29.3

29.129.6

28.529.5

29.8

31.1

32.3

E

31.4

W W

W

D

D

D 30.7

C

W

A/C 33.8

FFE=33.98

33.7

34.4

34.2

34.0

FFE=33.93

34.5

34.9

34.6

34.6

34.734.534.8

34.634.935.0

FFE=35.27FFE=35.34

34.1

35.134.7

34.1

FFE=34.45

CB

34.6 C

E

E

W

WW

36.136.6

FFE=38.15

W

W W

W W

W W

W W

W W

W W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W

W

W

W W

W

W

E

E

E

E

E

E

E

E

E

E

W

HPS

HPS

E

E E E E E

HPS HPS

E E

E

E

E

E E

E E

E E

E E

E E

EE

E

E

E

E

COMM

COMM

COMMCOMMCOMMCOMMCOMM

COMM

COMM

E

E

E E

E

E E

E E

E

E

E E

W

W

W

W

W

W

W

W

W

W

WWWWWWWWW

SAN

X X

E

EEEEEEEEEEEEEEE

EEEEEEEEEEEEE

EE

XXXX

X

EEEE

COMM

35 35

SD

SD

SD

SD

SD

SD

RIM:42.58'

(E) INV. OUT: 29.22', 15" VCP

(W) INV. IN: 29.78', 15' VCP

(NW) INV. IN: 32.63', 12" VCP

(SW) INV. IN: 36.18', 12" CMP

(S) INV. IN: 38.18', 6" CMP

(N) INV. IN: 38.68', 6" CMP

SD

SD

SD

RIM:31.92'

INV. OUT: 27.70', 12" VCP

SD RIM: 31.94

INV. OUT: 29.00', 12" VCP

SAN

SAN

SAN SAN

RIM: 38.89'

(SE) INV. OUT: 30.01', 12" VCP

(NW) INV. IN: 31.19', 10" VCP

(W) INV. IN: 30.15', 10" VCP

SAN

SAN

RIM: 41.29'

(SE) INV. OUT: 32.49', 12" VCP

(W) INV. IN: 32.64', 12" VCP

(SW) INV. IN: 37.49', 4" CMP

RIM: 36.68'

INV. OUT:31.62', 12" CMP

RIM: 36.94'

INV. OUT: 32.41', 12" CMP

SD

SD

RIM: 37.66'

(N) INV. OUT: 29.91', 12" CMP

(NW) INV. IN: 32.56', 12" CMP

(SW) INV. IN: 32.26', 12" VCP

(W) INV. IN: 30.31', 12" CMP

RIM: 37.65'

(E) INV. OUT: 29.01', 12" CMP

(S) INV. IN: 29.05', 12" CMP

RIM: 37.19'

(SE) INV. OUT: 31.14', 12" CMP

(NW) INV. IN: 31.40', 12" CMP

RIM: 34.31'

INV. OUT: 31.23', 12" UKN.

RIM: 34.01'

(NW) INV. OUT: 29.38', 10" VCP

(SW) INV. IN: 29.41', 12" UNK.

(PIPE RECESSED)

RIM: 28.95'

(SE) INV. OUT: 14.23', 36" CMP

(NW) INV. IN: 14.85', 24" VCP

(W) INV. IN: 14.05', 15" VCP

SD

RIM: 30.30'

INV. OUT: 26.08', 6" VCP

SD

SD

SD

SD

SD

RIM: 30.12'

(S) INV. OUT: 25.01', 15" VCP

(SE) INV. IN: 25.41', 12" RCP

(N) INV. IN: 25.31', 6" VCP

(NW) INV. IN: 25.21', 12" VCP RIM: 28.94'

12" RCP

INV. OUT: 25.64'

SANSANSANSANSANSANSANSANSANSANSANSAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

RIM: 29.43'

(S) INV. OUT: 16.33', 24" VCP

(N) INV. IN: 16.38', 24" VCP

(W) INV. IN: 18.07', 15" VCP

RIM:31.51'

(SE) INV. OUT: 22.09', 15" VCP

(N) INV. IN: 22.18', 12" VCP

(NW) INV. IN: 23.41', 12"' VCP

RIM: 31.14'

(SE) INV. OUT: 21.93', 15" VCP

(NW) 15" VCP, PIPE RECESSED

UNDER ROCK LEDGE

RIM: 30.83'

(SE) INV. OUT: 21.53', 15" VCP

(NW) INV. IN: 21.93', 15" VCP

RIM: 33.87'

FILLED WITH DEBRIS

BUILDING 20

2 STORY BRICK BUILDING

WESTERVELT AVE.

G

IB

S O

N S

T.

4" CMP

INV: 28.39'

4" CMP

INV: 28.57'

BUILDING 25

BUILDING 23

BUILDING 24

12' CHIMNEY PIPE

ASPHALT

CONC.

C O

N C

COVERED CONCRETE WITHMECHANICAL EQUIPMENT

S

TO

P

LI

N E

CONC.

METAL STORAGE

CONTAINER

ASPHALT

CONC.

6' CHAINLINK

FENCE WITH

BARBWIRE

ENCLOSED

CONC. STEPS

GATE

CONC.

CONC.

ASPHALT

PARKING

PAINTED WALK

P A

IN

TE

D W

A

LK

ASPHALT

PARKING

CONC.

C O

N C

. S

ID

E W

A

LK

CONC.

CONC.

ASPHALT

PARKING

PAINTED WALK

C O

N C

CONC.

STONE

STOP SIGN

ST

O

P

LI

N E

C R

O

SS

W

AL

K

C O

N C

SIDEW

ALK DC DC

CROSS WALK

C R

O

SS

W

AL

K

STOPLINE

CONC. SIDEWALK

C R

O S

S W

A

LK"STOP "

CONC.

C O

N C

. R A

M P

RIP-RAP

CONC.

"WATERVLIET ARSENAL

BUILDING 20"

CONC.

CONC. HEADWALL RIP-RAP

CONC. SIDEWALK

CONC.STEPS

CONC.

RIP-RAP CONC.

HEADWALLCONC.

ENCLOSED

CONC. STEPS

S

TO

N E

A N

D C

O N

C . R

E

TA

IN

IN

G W

A

LL

CONC. CURB

C O

N C

. C U

R B

C O

N C

. C U

R B

C O

N C

. C U

R B

C O

N C

. W

AL

K

ST

AI

R S

METAL

STAIRS

CONC. CURB

BENCHMARK:

NGS DISK J89

ELEV: 34.27'

C O

N C

. C U

R B

C O

N C

. R

ET

AI

N

IN

G

W

AL

L

NITROGEN TANKS

STANCHION STANCHION

STOP BAR

ASPHALT

ASPHALT

VAULT

PIV

VENT

METAL STAIRS

(3) CONDUITS

C S

C S

C S

C S

C S

C S

C S

CS

CS

CS

C S

M

M

M

M

M

M M M

M

E

E E

E E

E E

E E

E E

E E

E E E E E E E

E E

E E

E

E

E

E

E

E E

E E

E

E E

E E

E E

E E

E E

E E

E

E

E

CHAIN LINK FENCE

W W W W W

W

HPS

E E

E E

E E

E E

E E

E

E

E E

E E

E

HPS

HPS

1 STORY STEEL

SIDED ADDITION

CANOPIED DRIVE

THROUGH PORT

2 STORY BRICK BUILDING

OVERHEAD DOOR

GATE

GATE

CONTROL

POINT

GPS-1

CONTROL

POINT

GPS-2

REMOVE LINEAR SITE FEATURE

ASPHALT PAVEMENT REMOVAL

LIMIT OF CONSTRUCTIONLOC

SAWCUT LINE (FULL DEPTH)

SIDEWALK/CONCRETE REMOVAL

REMOVE LINEAR SITE FEATURE

ASPHALT PAVEMENT REMOVAL

LIMIT OF CONSTRUCTIONLOC

SAWCUT LINE (FULL DEPTH)

SIDEWALK/CONCRETE REMOVAL

A1 OVERALL SITE PLAN

SCALE 1" = 30' 60'0 30'

WESTERVLET AVENUE

G

IB

SO

N

S

TR

EE

T

SEE ARCHITECTURAL PLANS FOR

LIMITS OF WALKWAY DEMOLITION

D

ES

IG

N

ED

B

Y:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

PL

O T

SC

AL

E:

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

C O

N

TR

AC

T

N O

X2

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

W

AR

D P

AR

KW

AY

, K

AN

SA

S C

IT

Y, M O

1 753

A

B

C

D

SHEET ID

2 864 10

E

F

G

BU

IL

D

IN

G

R

EN

O

VA

TI

O N

A N

D R

EP

AI

R W

AT

ER

VL

IE

T

AR

SE

N

AL

, N

EW

Y

O R

K U

SA

C

E, W

AT

ER

VL

IE

T, N

EW

Y

O R

K

AS

IN

D

IC

AT

ED

US Army Corps of Engineers ®

NOT FOR CONSTRUCTION

PHASE 2 RECAPITALIZATION

100% FINAL DESIGN - ADDENDUM 001

W

2D S-

-D

-0

\\BMCD\DFS\CLIENTS\ANF\USCOE\NAN\123796_WVABLDG20RENO\DESIGN\CIVIL\SHEETS\123796-CD100.DWG 8/17/2022 11:14 AM KWARRENDER

P2 N

O

-C

D

0.

dw g

CD100

SI

TE

D

EM

O

LI

TI

O

N P

LA

N

K, W

AR

R

EN

D

ER

F.

P

AS

C

ER

I

L.

M

O N

ZO

N

A

0% F

IN

AL

D

ES

IG

N

IS

SU

E

FO

R

B

ID

JU

LY

AU

G

GENERAL NOTES

1. SEE SHEET C-002 FOR GENERAL DEMOLITION NOTES.

2. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS

SHALL BE DISPOSED OF OFF SITE IN COMPLIANCE WITH ALL FEDERAL,

STATE, AND LOCAL REGULATIONS. NO STORAGE PERMITTED, REMOVAL

REQUIRED DAILY.

3. WITH THE EXCEPTION OF TOPSOIL, THERE SHALL BE NO MATERIALS

SALVAGED FOR REUSE ON SITE. ALL MATERIALS AND EQUIPMENT

REMOVED SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE

REMOVED FROM GOVERNMENT PROPERTY. NO STORAGE PERMITTED,

REMOVAL REQUIRED DAILY.

4. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF THE

FOLLOWING MATERIALS: AGGREGATE, CONCRETE, ASPHALT, MASONRY,

FOUNDATIONS, REBAR, FENCE MATERIAL, PIPING, AND MISCELLANEOUS

STRUCTURES. LARGE PIECES OF MATERIAL MAY NEED TO BE CRUSHED

AND/OR BROKEN UP FURTHER IN ORDER TO BE HAULED AWAY TO THE

WASTE DISPOSAL SITE. NO STORAGE PERMITTED, REMOVAL REQUIRED

DAILY.

5. ALL ABATEMENT OF HAZARDOUS MATERIAL SHALL BE COMPLETED PRIOR

TO COMMENCEMENT OF DEMOLITION.

6. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT FULL DEPTH.

SIDEWALKS SHALL BE SAWCUT AND REMOVED TO THE NEAREST JOINT.

7. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE

REPAIRED OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO

GOVERNMENT.

8. CONTRACTOR SHALL LOCATE GATE VALVES IN WATER LINE WHICH WILL

ISOLATE THE PORTION OF THE LINE WHERE WORK IS BEING PERFORMED

PRIOR TO PERFORMING WATER SERVICE CONNECTION WORK. ALL WORK

ON EXISTING WATER LINES SHALL BE COORDINATED WITH BASE INCLUDING

BUT NOT LIMITED TO SHUT DOWNS, TIE-INS AND INSPECTIONS.

9. PROTECT EXISTING TREES, LAWN AND SHRUBS TO REMAIN. ANY DAMAGE

TO EXISTING PLANTS AND LAWN WILL REQUIRE REPLACEMENT AT NO

ADDITIONAL COST TO THE GOVERNMENT.

10. FENCE DEMOLITION SHALL BE TO NEAREST POST AND CONFIRMED IN FIELD

WITH CONTRACTING OFFICER PRIOR TO DEMOLITION.

11. EXACT LIMITS OF CONCRETE PAVEMENT REMOVAL SHALL BE CONFIRMED IN

FIELD WITH CONTRACTING OFFICER PRIOR TO DEMOLITION. SAWCUT TO

NEAREST JOINTS.

12. BENCHMARK TO BE RE-ESTABLISHED AT THE COMPLETION OF PROJECT BY

PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF NEW YORK WITH

VERIFICATION SUBMITTED TO CONTRACTING OFFICER.

13. FOR UTILITIES DAMAGED BY THE CONTRACTOR, THE CONTRACTOR MUST

PERFORM IMMEDIATE EMERGENCY CONTINUOUS REPAIRS UNLESS

CONTRACTING OFFICER AGREES TO ANOTHER SCHEDULE AND ACTION IS

CONFIRMED IN WRITING. UTILITY REPAIR MUST BE PERFORMED AT NO

ADDITIONAL COST TO THE GOVERNMENT.

LEGEND

REMOVE PAVEMENT1

KEYED NOTES

REMOVE CURB

REMOVE CONCRETE / SIDEWALK

REMOVE FENCE WITH CURB

5 REMOVE PAVEMENT STRIPING

SAWCUT LINE,

TYPICAL

SAWCUT LINE,

TYPICAL

SEE NOTE 10

SEE NOTE 11

6 6

6 REMOVE GATE

(STONE SET IN

CONCRETE)

SAWCUT LINE,

TYPICAL

SAWCUT LINE,

TYPICAL

SAWCUT LINE,

TYPICAL

SEE NOTE 12

10.0'+/-

.0

5.5'+/-

9.3'+/-

7 INLET PROTECTION

CS502

A7

BID OPTION

9.3'+/-

.1

.1

.1

B

AD

D

EN

D U

M

AU

G

B

B

B

SAWCUT LINE,

TYPICAL

B

IS

S

U E

D A

T E

A

U G

U S

T

IT IS A VIOLATION OF THE NYS EDUCATION

LAW FOR ANY PERSON TO ALTER ANY

DOCUMENT THAT BEARS THE SEAL OF

PROFESSIONAL ENGINEER, UNLESS THAT

PERSON IS ACTING UNDER THE DIRECTION

OF A LICENCED PROFESSIONAL ENGINEER

LUIS R. MONZON

PROFESSIONAL ENGINEER

46.4 W

W W

45.4

D

44.5

46.9

FFE=48.11

45.0 44.4

44.9

44.1

43.0 42.6

41.2 40.4

FFE=33.85

39.439.4 39.4 39.1

38.2 38.5

W

36.8 36.6

CB

CB

34.7 34.7

FFE=43.42

42.3

W

41.2 40.8

W

W

41.6

41.5

FFE=42.23

E

W

38.4

38.2

38.5

38.5 38.6

38.9 39.0 S

39.2

40.141.0 41.340.9

41.3 41.8

40.1

39.2

40.5

39.0

37.9

40.4

41.2

S

CB

W

CB

D

D

FFE=38.21

FFE=38.22

D

FFE=42.20

FFE=38.17

37.4

37.4

CB

CB

M 34.7

34.5

WWWW

CB

W

E

BM

CB

FFE=31.13

MW

MW

30.5

30.2

30.0

30.2

W

W

WW

W

29.8 29.4 29.2

29.229.0 29.6

29.6

CB

29.1 29.2

29.229.4 29.8

29.5

S

29.3

29.129.6

28.529.5

29.8

31.1

32.3

E

31.4

W W

W

D

D

D 30.7

C

W

A/C 33.8

FFE=33.98

33.7

34.4

34.2

34.0

FFE=33.93

34.5

34.9

34.6

34.6

34.734.534.8

34.634.935.0

FFE=35.27FFE=35.34

34.1

35.134.7

34.1

FFE=34.45

CB

34.6 C

E

E

W

WW

36.136.6

FFE=38.15

W W

W

W

W W W

W W

W W

W W

W W

W W

W W

W W

W W

W W W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W W

W W

W W

W

W

W

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

W

W

H

PS

HPS

H

PS

HPS HPS

G E

E E E E E

E E

E E E E E

COMMCOMM

HPS HPS HPS HPS

E

E

E E

E

E

E

E

E

E

E

E E

E E

E

E E

E E

E E

E E

E E

E E

E E

E

EEEEE

E

E

E

E

E

E

E

E

COMM

COMM

COMM

COMM

COMM

COMM

COMMCOMMCOMMCOMM

COMMCOMMCOMM

COMM

COMMCOMM

COMM

COMM

COMM

E E

E

E

E E

E E

E E

E

E E

E E

E E

E

E

E

E

E

E

E

E E

W W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWWWWWWWWWWWWWWWW

SAN SAN

X

X X

X

EEE

EEE

EEEEEEEEEEEEEEE

EEEEEEEEEEEEE

EEE

EEEEEEEEEEEEEEEEEEEEEEEE

EEEE W

XXXXXXXXX

X

EEEEEEEEE CO

M

M

COMM

35 35

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

RIM:42.58'

(E) INV. OUT: 29.22', 15" VCP

(W) INV. IN: 29.78', 15' VCP

(NW) INV. IN: 32.63', 12" VCP

(SW) INV. IN: 36.18', 12" CMP

(S) INV. IN: 38.18', 6" CMP

(N) INV. IN: 38.68', 6" CMP

SD

SD

SD

SD

SD

SD

RIM:31.92'

INV. OUT: 27.70', 12" VCP

SD

SD

RIM: 31.94

INV. OUT: 29.00', 12" VCP

SAN

SAN

SAN

SAN

SAN

SAN SAN SAN SAN SAN

RIM: 38.89'

(SE) INV. OUT: 30.01', 12" VCP

(NW) INV. IN: 31.19', 10" VCP

(W) INV. IN: 30.15', 10" VCP

SAN SAN

SAN

SAN

RIM: 41.29'

(SE) INV. OUT: 32.49', 12" VCP

(W) INV. IN: 32.64', 12" VCP

(SW) INV. IN: 37.49', 4" CMP

SD

RIM: 36.68'

INV. OUT:31.62', 12" CMP

RIM: 36.94'

INV. OUT: 32.41', 12" CMP

SD

SD

SD

SD

RIM: 37.66'

(N) INV. OUT: 29.91', 12" CMP

(NW) INV. IN: 32.56', 12" CMP

(SW) INV. IN: 32.26', 12" VCP

(W) INV. IN: 30.31', 12" CMP

SD

RIM: 37.65'

(E) INV. OUT: 29.01', 12" CMP

(S) INV. IN: 29.05', 12" CMP

RIM: 37.19'

(SE) INV. OUT: 31.14', 12" CMP

(NW) INV. IN: 31.40', 12" CMP

SD

RIM: 34.31'

INV. OUT: 31.23', 12" UKN.

SD

RIM: 34.01'

(NW) INV. OUT: 29.38', 10" VCP

(SW) INV. IN: 29.41', 12" UNK.

(PIPE RECESSED)

SD

SD

SD

RIM: 28.95'

(SE) INV. OUT: 14.23', 36" CMP

(NW) INV. IN: 14.85', 24" VCP

(W) INV. IN: 14.05', 15" VCP

SD

SD

SD

RIM: 30.30'

INV. OUT: 26.08', 6" VCP

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

RIM: 30.12'

(S) INV. OUT: 25.01', 15" VCP

(SE) INV. IN: 25.41', 12" RCP

(N) INV. IN: 25.31', 6" VCP

(NW) INV. IN: 25.21', 12" VCP RIM: 28.94'

12" RCP

INV. OUT: 25.64'

SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

RIM: 29.43'

(S) INV. OUT: 16.33', 24" VCP

(N) INV. IN: 16.38', 24" VCP

(W) INV. IN: 18.07', 15" VCP

RIM:31.51'

(SE) INV. OUT: 22.09', 15" VCP

(N) INV. IN: 22.18', 12" VCP

(NW) INV. IN: 23.41', 12"' VCP

RIM: 31.14'

(SE) INV. OUT: 21.93', 15" VCP

(NW) 15" VCP, PIPE RECESSED

UNDER ROCK LEDGE

SD

RIM: 30.83'

(SE) INV. OUT: 21.53', 15" VCP

(NW) INV. IN: 21.93', 15" VCP

RIM: 33.87'

FILLED WITH DEBRIS

BUILDING 20

2 STORY BRICK BUILDING

WESTERVELT AVE.

G

IB

S O

N S

T.

4" CMP

INV: 28.39'

4" CMP

INV: 28.57'

BUILDING 25

BUILDING 23

BUILDING 24

12' CHIMNEY PIPE

ASPHALT

CONC.

C O

N C

COVERED CONCRETE WITHMECHANICAL EQUIPMENT

S

TO

P

LI

N E

CONC.

METAL STORAGE

CONTAINER

ASPHALT

CONC.

6' CHAINLINK

FENCE WITH

BARBWIRE

ENCLOSED

CONC. STEPS

GATE

CONC.

CONC.

ASPHALT

PARKING

PAINTED WALK

P A

IN

TE

D W

A

LK

ASPHALT

PARKING

CONC.

C O

N C

. S

ID

E W

A

LK

CONC.

CONC.

ASPHALT

PARKING

PAINTED WALK

C O

N C

CONC.

STONE

STOP SIGN

ST

O

P

LI

N E

C R

O

SS

W

AL

K

C O

N C

SIDEW

ALK DC DC

CROSS WALK

C R

O

SS

W

AL

K

STOPLINE

CONC. SIDEWALK

C R

O S

S W

A

LK"STOP "

CONC.

C O

N C

. R A

M P

RIP-RAP

CONC.

"WATERVLIET ARSENAL

BUILDING 20"

CONC.

CONC. HEADWALL RIP-RAP

CONC. SIDEWALK

CONC.STEPS

CONC.

RIP-RAP CONC.

HEADWALLCONC.

ENCLOSED

CONC. STEPS

S

TO

N E

A N

D C

O N

C . R

E

TA

IN

IN

G W

A

LL

CONC. CURB

C O

N C

. C U

R B

C O

N C

. C U

R B

C O

N C

. C U

R B

C O

N C

. W

AL

K

ST

AI

R S

METAL

STAIRS

CONC. CURB

BENCHMARK:

NGS DISK J89

ELEV: 34.27'

C O

N C

. C U

R B

C O

N C

. R

ET

AI

N

IN

G

W

AL

L

NITROGEN TANKS

STANCHION STANCHION

STOP BAR

ASPHALT

ASPHALT

VAULT

PIV

VENT

METAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .