This document outlines a federal contract opportunity to renovate and repair portions of Building 20 at the Watervliet Arsenal in New York. The U.S. Army Corps of Engineers seeks to hazardous material removal, replace windows, siding, doors and perform accessibility and office renovations. Additional work includes replacement of entrances, ramps, vestibules and exterior masonry repairs. The estimated construction cost is between $10-25 million. The solicitation number is W912DS22B0025 and proposals are due in September 2022 with an anticipated award date also in September 2022. The involved agency is the Department of the Army Corps of Engineers Engineering District New York.

View the file

Other files

File Type Posted
Bid Abstract_W912DS22B0025 BLG 20.pdf PDF
ATL No. CD4849E-01-07-20 Rev 1 Burns - Watervliet Ped Bridge.pdf PDF
09 90 00.pdf PDF
W912DS22B0025 Amend 0007.pdf PDF
ATL No CD4849E-02-07-22 Rev 1 - Burns - Watervliet HVAC Pad.pdf PDF
09 06 00.pdf PDF
Site Visit Sign in Sheet 2022-09-16.pdf PDF
123796 Phase II Final Design - Addendum 003 Project Specifications Binder.pdf PDF
W912DS22B0025 Amend 0006.pdf PDF
WVA Building 20 - Bid Option - Drawing Breakdown.pdf PDF
RBM Survey Report Watervliet Arsenal NY - Bldg 20 V1 - Final w Attachments.pdf PDF
SGH Bridge Crane Steel Inspection Report 052022.pdf PDF
W912DS22B0025 Amend 0005.pdf PDF
Bid bond form SF24-16e.pdf PDF
123796 Arch Addendum002 S and S 3.pdf PDF
123796 Phase II Final Design - Addendum 002 Project Specifications Binder.pdf PDF
123796 Arch Addendum002 S and S 2.pdf PDF
123796 Arch Addendum002 S and S 1.pdf PDF
W912DS22B0025 Amend 0004.pdf PDF
W912DS22B0025 Amend 0003.pdf PDF
Site Visit sign-in Sheet 30-Aug-2022.pdf PDF
123796 Phase II Final Design - Addendum 01 Specification Binder R1-1.pdf PDF
123796_Full Binder_P2_RTA_ADD 001_Revised - V2.pdf PDF
W912DS22B0025 Amend 0002.pdf PDF
W912DS22B0025 Amend 0001.pdf PDF
123796 Phase II 100 percent Final Design Specification Binder - R3.pdf PDF
Pages from 101-125 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 125-156 123796_Full Binder_Phase 2 - V11.pdf PDF
W912DS22B0025.pdf PDF
Pages 26-56 from 123796_Full Binder_Phase 2 100 - V11.pdf PDF
123796 Phase II 100_ Final Design Specification Binder - R3 (1).pdf PDF
Pages from 72-100 123796_Full Binder_Phase 2 100 - V11.pdf PDF
Pages from 257-277 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages 1 to 25 from 123796 Full Binder Phase 2 V11.pdf PDF
Pages from 177-200 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 200-225 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 226-256 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 277-300 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 156-176 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 57-72 123796_Full Binder_Phase 2 - V11.pdf PDF
Pages from 300-334 123796_Full Binder_Phase 2 - V11.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

p

REGULATED BUILDING MATERIALS

SURVEY REPORT

RECAPITALIZATION OF BUILDING 20, PHASE II

Watervliet Arsenal Watervliet, NY

Mabbett Project No.: R2020021.000.002

April 29, 2022

Prepared for:

Burns and McDonnell 9400 Ward Parkway Kansas City, MO 64114

Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180-1260 T. 781-275-6050

Massachusetts | Virginia | Rhode Island | New Jersey

© 2022, Mabbett & Associates, Inc.

www.mabbett.com

REGULATED BUILDING MATERIALS SURVEY REPORT

Recapitalization of Building 20, Phase 2 - Watervliet Arsenal | Watervliet, NY

© 2022, Mabbett & Associates, Inc. Page i April 29, 2022 Mabbett Project No. R2020021.000.002 RBM Survey Report Watervliet Arsenal, NY - Bldg 20 V1 - Final

ACKNOWLEDGEMENT

This Regulated Building Materials Survey Report has been prepared by Mabbett & Associates, Inc. (Mabbett®) for the Recapitalization of Building 20, Phase 2 project at the Watervliet Arsenal located in Watervliet, New York. The information presented herein is based on the facts and information conveyed to or received by Mabbett during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.

The attached Regulated Building Materials Survey Report was prepared by Kevin M. Donovan, Senior Environmental, Health & Safety Specialist of Mabbett & Associates, Inc.

This report has been reviewed and approved by:

Michael F. Delaney Director, Building Sciences Group

© 2022, Mabbett & Associates, Inc. Page ii April 29, 2022

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION

1.1 Purpose and Objectives

1.2 Summary of Phase 2 Survey Results

2.0 PHASE 2 ASBESTOS SURVEY

2.1 Sampling Methodology

2.2 Analytical Methodology

2.3 Summary of Asbestos Containing Materials Findings

3.0 LEAD CONTAINING PAINT SAMPLING

4.0 CONCLUSIONS AND RECOMMENDATIONS

4.1 Asbestos

4.2 Lead Containing Paint

5.0 LIMITATIONS

TABLES

Table 1 – Summary of Identified ACM, Phase 1 & Phase 2 (in text) Table 2 – Summary of Lead Paint Chip Analytical Results, Phase 1 & 2 (in text)

FIGURES

ASB-1 – ACM Sampling Location Plan – Building 20, Floor 1 and Manufacturing Area ASB-2 – ACM Sampling Location Plan – Building 20, Floor 2 Pb-1 – Pb Sampling Location Plan – Building 20, Floor 1 and Manufacturing Area Pb-2 – Pb Sampling Location Plan – Building 20, Floor 2

APPENDICES

Appendix A – Summary of ACM Building Survey Results, Including Negative Results Appendix B – Asbestos Laboratory Reports and Chain of Custody, Phase 1 and Phase 2 Appendix C – Lead Paint Chip Laboratory Reports and Chain of Custody, Phase 1 and Phase 2

© 2022, Mabbett & Associates, Inc. 1 April 29, 2022

1.0 INTRODUCTION

Mabbett and Associates, Inc. (Mabbett®) performed a follow-up survey for regulated building materials (RBM) as part of the Recapitalization of Building 20, Phase 2 project at the Watervliet Arsenal located in Watervliet, New York. This document represents the combined findings of the Phase 1 and Phase 2 Regulated Building Material Surveys requested by Burns & McDonnell Consultants PC (BMcD) in an agreement dated 11 April 2022.

1.1 Purpose and Objectives

The intent of the Phase 2 survey was to identify regulated building materials not previously identified and that may be disturbed by the proposed renovation activities. Mabbett assumes that previously prepared and submitted Accident Prevention Plan (APP), Site Specific Health and Safety Plan and Field Sampling Work Plan (FSP) will be utilized.

While the intent of the survey was to provide a pre-demolition estimate of the types and quantities of Asbestos Containing Materials (ACMs) present, Mabbett prepared this estimate based on observations of those materials that are accessible by reasonable and ordinary means. Mabbett did not conduct extensive destructive/invasive explorations of the interiors of electrical distribution equipment and other mechanical equipment, nor did we dismantle mechanical equipment to access out of reach locations in the building. Reasonable assumptions regarding potential ACMs in out of reach areas and within this type of equipment were made and are addressed in this Phase 2 survey report.

The survey was limited to previously inaccessible areas of the manufacturing area of the building identified in this report that may be impacted by the planned project to renovate and repair facility deficiencies. Sampling locations were determined based upon inspection of each location. Areas and materials outside of this scope of work were not surveyed by Mabbett.

The site survey was performed by Kevin M. Donovan, Senior Environmental, Health & Safety Specialist and Certified Asbestos Inspector on April 6, 2022, and consisted of the following activities:

A review of the existing facility regulated building materials reports, including Mabbett’s Phase 1 (2020) survey report.

An Asbestos Containing Material (ACM) survey of six (6) samples of suspect materials (Analysis by Polarized Light

Microscopy [PLM], PLM NOB and Transmission Electron Microscopy (TEM), as required by New York State DOL regulations.

Lead Containing Paint (LCP) sampling [analysis by atomic absorption (AA)].

Rental and use of a platform lift to survey elevated materials.

1.2 Summary of Phase 2 Survey Results

Bulk samples of suspected ACM were collected and submitted to a certified analytical laboratory for asbestos analysis by PLM as required by the New York State Environmental Laboratory Approval Program (ELAP). Paint chip samples were collected and submitted to a certified analytical laboratory for lead content analysis using atomic absorption spectroscopy. The survey efforts yielded the following results:

Six (6) bulk samples for suspect ACM were collected in the elevated spaces of the manufacturing area of the building.

o Based on laboratory analysis of the suspect ACM, two (2) of the materials sampled contained asbestos greater than 1%. The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) defines ACM as any material that contains greater than one percent (>1%) asbestos.

Ten (10) paint chip samples from building surfaces were collected in the building for laboratory analysis and reporting.

o Based on laboratory analysis of paint chips, three (3) of the collected samples revealed concentrations of lead in paint that exceeded the U.S. Department of Housing and Urban Development (HUD) threshold of

0.5 percent by weight.

© 2022, Mabbett & Associates, Inc. 2 April 29, 2022

2.0 PHASE 2 ASBESTOS SURVEY

A visual screening inspection was conducted by a Kevin M. Donovan to identify locations of suspect ACM and conceptualize the sampling program. Areas that were previously inaccessible during the Phase 1 survey were inspected, with reasonable efforts made during the field survey work to access areas as necessary to complete the asbestos survey and sampling program.

2.1 Sampling Methodology

Bulk asbestos samples were collected using EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 763, and Asbestos Hazard Emergency Response Act (AHERA) protocols. Bulk suspect ACM sampling was conducted according to the following sampling protocol:

Friable surfacing material:

o At least three bulk samples shall be collected from each homogeneous area that is 1,000 ft2 or less.

o At least five bulk samples shall be collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.

At least seven bulk samples shall be collected from each homogeneous area that is greater than 5,000 ft2.

Thermal system insulation:

o At least three bulk samples shall be collected from each homogeneous area of thermal system insulation.

o At least one bulk sample shall be collected from each homogeneous area of patched area of thermal system insulation.

o Sufficient samples shall be collected from elbows and fittings to determine if they contain ACM.

o Bulk samples shall not be collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-

ACM.

Miscellaneous material:

o At least two bulk sample shall be collected from each homogeneous area that is less than 100 ft2.

o At least three bulk samples shall be collected from each homogeneous area that is greater than 100 ft2.

Examples of areas that were inaccessible, or where the survey was limited to visual observation only, were:

Within walls.

Within fire doors.

Enclosed pipe/duct chases.

Inside mechanical equipment/ductwork.

Above fixed drywall or plaster ceilings.

Electrical equipment.

2.2 Analytical Methodology

The collected bulk samples were submitted under chain of custody (COC) procedures to Ameri Sci of New York, New York for PLM analysis as required by ELAP. PLM analysis of friable materials was performed using NYS ELAP Method 198.1. Four (4) samples were not analyzed as positive stops analysis. Positive Stop Analysis refers to a laboratory analysis protocol that analyzes multiple samples of similar material and stops analysis when asbestos is identified at concentrations greater than 1%. AmeriSci is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP).

Bulk sample results from this analysis are summarized in Appendix A. The EPA, Occupational Safety and Health Administration (OSHA), and Part 56 of Title 12 of the Official Compilation of Codes, Rules and Regulations of the

© 2022, Mabbett & Associates, Inc. 3 April 29, 2022

State of New York (12 NYCRR Part 56) define any material that contains greater than 1% asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of greater than one percent (>1%) asbestos. Laboratory reports and COC documentation are provided in Appendix B of this report.

2.3 Summary of Asbestos Containing Materials Findings

As part of the Phase 2 survey, Mabbett identified two (2) additional types of homogenous materials and collected six (6) additional representative bulk ACM samples. Asbestos sampling locations and results are identified on Figure ASB-1. Both materials were analyzed by PLM (friable) and determined to be ACM. The Phase 1 and Phase 2 laboratory analytical data indicated that twelve (12) homogenous materials had greater than 1% asbestos and are therefore ACM or have been assumed ACM. Estimated quantities of materials identified as ACM or assumed to be ACM from Phases 1 and 2 are presented in Tables 1:

TABLE 1

Summary of Identified ACM

Watervliet Arsenal, Building 20, Phases 1 and 2 Watervliet, NY

Location/Room Description of Material Estimated Quantity

Amount Units

PHASE 1: June 10-12, 2020

1st Floor Rooms 104, 104A and 104B 9"x9" Off-White-with-Black and Green Checkerboard Floor Tile & Mastic* 600 SF

1st Floor Room 101 and 2nd Floor Room 201 Vestibule 12"x12" Green Floor Tile Mastic** 200 SF

Rooms 201 & 203 Black and Burgundy Vinyl Floor Tile & Mastic* 8,200 SF

1st & 2nd Floors - Main Stairwell Brown Terrazzo Floor** 1,300 SF 2nd Floor, Room 200 White Sink Coat** 1 EA

Rooms 200, 202A, 201, Main Stairwell, 203, 2nd Floor North Vestibule, Production

Area, Room 101 Bathroom and Hallway, Rooms 101A, 104, 107, 107A & 108

Pipe and Fitting Insulation* 1,900 LF

Room 203 Perimeter Black Vapor Barrier* 2,750 SF 1st Floor, Production Area Window Glazing (interior) 4,200 LF

Exterior Gray Window Frame Caulk 12,000 LF Exterior Green Transite Panels * 20,000 SF

PHASE 2: April 6, 2022

1st Floor, Manufacturing Area Steam Pipe Insulation (24”) & Associated Fittings 1,600 LF

1st Floor, Manufacturing Area Condensate Pipe Insulation (12”) & Associated Fittings 1,800 LF

Notes:

SF = Square Feet * = Previously Identified as ACM

EA = Each ** = Assumed ACM LF = Linear Feet

© 2022, Mabbett & Associates, Inc. 4 April 29, 2022

3.0 LEAD CONTAINING PAINT SAMPLING

Limited sampling of painted surfaces was conducted for Phase 2 on April 6, 2022. The survey included collection of ten

(10) paint chips from materials and surfaces that may be impacted by the proposed work. Paint chip samples were submitted under standard COC procedures to Scientific Analytical Institute, Inc. (SAI) of Greensboro, North Carolina.

Analysis was conducted using AA EPA method SW846 7000B. The laboratory analytical report is included in Appendix C of this report.

The results of the limited LCP sampling for Phases 1 and 2 are presented in Table 2:

TABLE 2

Summary of Lead Paint Chip Analytical Results

Watervliet Arsenal, Building 20, Phase 1 & 2 Watervliet, NY

Sample # Location Substrate and Component Color Result (% wt.)

PHASE 1: June 10-12, 2020 Pb-01 Roof Metal Roofing White 0.43 Pb-02 Roof Metal Roofing White <0.50 Pb-03 Production West Brick Floor Black <0.0053 Pb-04 Production West Metal Column Tan 16 Pb-05 Production West Metal Ladder Yellow 2.1 Pb-06 Production West Brick Wall Tan 0.040 Pb-07 Production West Metal Door Frame Brown 0.16 Pb-08 Production West Metal Railing Yellow <0.018 Pb-09 Production NW Metal Bracing Tan 1.5 Pb-10 Production North Brick Floor Mark Yellow 0.0042 Pb-11 Production North Stone Window Sill Tan 0.057 Pb-12 Production North Metal Column Tan 12 Pb-13 Production North Brick Wall Tan 0.096 Pb-14 Production North Metal Window Brown <0.025 Pb-15 Production NE Metal Ballard Yellow <0.0041 Pb-16 Production East Metal Ladder Yellow 1.1 Pb-17 Production East Brick Floor Black <0.0049 Pb-18 Production SE Metal Door Frame Brown 9.3 Pb-19 Production SE Brick Floor Marking Yellow <0.011 Pb-20 Production South Metal Window Brown <0.016 Pb-21 Production South Metal Bracing Tan 2.5 Pb-22 Production South Metal Ballard Yellow <0.050 Pb-23 Production South Metal Railing Yellow 0.031 Pb-24 Room 203 SW Metal Door Frame Tan <0.019 Pb-25 Room 203 SW Metal Door Brown <0.040 Pb-26 Room 203 SW Metal Radiator Cover Tan <0.013 Pb-27 Room 203 SW Plaster Wall White <0.014

© 2022, Mabbett & Associates, Inc. 5 April 29, 2022

TABLE 2

Summary of Lead Paint Chip Analytical Results

Watervliet Arsenal, Building 20, Phase 1 & 2 Watervliet, NY

Sample # Location Substrate and Component Color Result (% wt.)

Pb-28 Room 203A Gypsum Wall White <0.0050 Pb-29 Main Stairwell 2 Metal Railing Tan 0.021 Pb-30 Room 201A Metal Door Frame Tan <0.017 Pb-31 Room 201 East Plaster Column White 0.021 Pb-32 Room 201 NE Gypsum Wall White <0.0059 Pb-33 Room 201C Metal Radiator Cover Tan <0.014 Pb-34 Room 201C Metal Door Tan <0.024 Pb-35 Room 202A Metal Ladder Black 14 Pb-36 Room 107A Gypsum Wall White <0.0073 Pb-37 Room 107 Concrete Floor Gray <0.0067 Pb-38 Room 107 Plaster Wall White 0.012 Pb-39 Room 106 CMU Wall White <0.022 Pb-40 Room 106 Metal Door Frame Tan 0.13 Pb-41 Room 106 Metal Door Tan <0.0064 Pb-42 Main Stairwell 1 Metal Railing Tan 0.82 Pb-43 Room 105 Concrete Wall Yellow 0.41 Pb-44 Room 105 Concrete Ceiling Yellow 0.060 Pb-45 Room 104 Gypsum Wall White 0.012 Pb-46 Room 103 Gypsum Wall Green <0.0049 Pb-47 Room 103 Metal Door Frame Green <0.019 Pb-48 Room 103 Metal Door Green <0.011 Pb-49 Room 103 Metal Radiator Cover Yellow <0.015 Pb-50 Room 103 Metal Window Frame White <0.0060 Pb-51 Room 102 Plaster Wall Yellow 0.0091 Pb-52 Room 102 Metal Door Frame White 0.065 Pb-53 Room 102 Wood Door White 0.12 Pb-54 Room 101 Plaster Wall White 0.24 Pb-55 Room 101 Bathroom Concrete Ceiling White 0.23 Pb-56 Room 101 Metal Door Frame Tan 1.0 Pb-57 Exterior West Metal Door Frame Brown <0.030 Pb-58 Exterior West Transite Panel Green <0.038 Pb-59 Exterior West Metal Lintel Green 21 Pb-60 Exterior NW Ramp Metal Railing Tan 0.17 Pb-61 Exterior North Metal Window Green <0.031 Pb-62 Exterior North Metal Railing Yellow <0.048 Pb-63 Exterior NE Metal Wall Panel Red 0.12

© 2022, Mabbett & Associates, Inc. 6 April 29, 2022

TABLE 2

Summary of Lead Paint Chip Analytical Results

Watervliet Arsenal, Building 20, Phase 1 & 2 Watervliet, NY

Sample # Location Substrate and Component Color Result (% wt.)

Pb-64 Exterior SE Metal Fence Silver 0.15 Pb-65 Exterior SE Metal Overhead Door Frame Brown 11 Pb-66 Exterior South Metal Ballard Yellow 0.012 Pb-67 Exterior SE Metal Overhead Door Frame Yellow 12 Pb-68 Exterior South Metal Window Green <0.15 Pb-69 Exterior SW Metal Stairs Black 31

PHASE 2: April 6, 2022 Pb-70 Manufacturing Area, Bay F9 Metal Truss White 0.014 Pb-71 Manufacturing Area, Bay F9 Metal Conduit White 0.013 Pb-72 Manufacturing Area, Bay F9 Brick Wall White 0.066 Pb-73 Manufacturing Area, Bay D9 Metal Catwalk Yellow 0.87 Pb-74 Manufacturing Area, Bay A5 Metal Duct White 0.070 Pb-75 Manufacturing Area, Bay A1 Metal Beam White 3.1 Pb-76 Manufacturing Area, Bay D1 Metal Cross Support White 0.28 Pb-77 Manufacturing Area, Bay D6 Metal Truss White 5.8 Pb-78 Manufacturing Area, Bay F1 Metal Wall Panel White 0.077 Pb-79 Manufacturing Area, Bay F1 Metal Column White 1.1

NOTES: % wt. = Percent by Weight

© 2022, Mabbett & Associates, Inc. 7 April 29, 2022

4.0 CONCLUSIONS AND RECOMMENDATIONS

4.1 Asbestos

Identified ACM materials must be removed by a licensed asbestos abatement contractor prior to being disturbed by renovation activities. Any suspect materials encountered during renovation or demolition activities that were not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, should be assumed to contain asbestos if discovered during any renovation or demolition process or until otherwise verified.

4.2 Lead Containing Paint

The purpose of the Phase 2 limited LCP survey was to identify similar areas of LCP. During the on-site survey, representative samples of similar areas of interior and exterior building coatings were collected and analyzed for lead content.

The regulations addressing LCP in non-residential buildings are focused on occupational exposures involved with paint-disturbing activities and related waste-disposal activities. Occupational exposure to lead in construction is regulated by OSHA regulation 29 CFR 1926.62 “Lead in Construction,” as well as other applicable state and local regulations. These regulations involve the air monitoring of workers to determine exposure levels when disturbing paint containing measurable concentrations of lead. A LCP survey cannot determine the safe level of lead for the purpose of paint-disturbing activities, but is intended to provide guidance as to the locations of LCP. Employers and contractors may use this information to better determine where worker exposures to airborne lead may occur and, through the interpretation of LCP concentration data, assess the potential magnitude of exposure to their employees and visitors and identify the controls necessary to limit health risks.

A concentration of lead greater than or equal to 0.5 mg/kg percent by weight or 1.0 mg/cm2 exceeds EPA and HUD residential standards and is considered an indicator of risk. Representative samples of LCP waste to be generated during building renovation, or following demolition but prior to disposal, should be collected and analyzed using toxicity characteristic leaching procedure (TCLP) in accordance with 40 CFR Part 261. Management and disposal of lead containing waste must be done in accordance with all applicable local, state, and federal regulations.

OSHA regulations may require certain procedures for any paint that contains lead, even if it is below these levels. All LCP identified, regardless of the lead content, should either be sampled and analyzed by TCLP and then handled/disposed of accordingly, or segregated from other large-scale debris and then managed as hazardous waste in accordance with federal, state, and local hazardous waste disposal regulations.

© 2022, Mabbett & Associates, Inc. 8 April 29, 2022

5.0 LIMITATIONS

This survey report is the result of a diligent and thorough inspection for regulated building materials of the areas and materials that may be impacted by the proposed Recapitulation of Building 20. Inaccessible areas were not included in this survey. Although a comprehensive inspection was performed, Mabbett does not claim to have identified all hazardous materials that could be present in the facility (for example, materials potentially located within the inaccessible areas). Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with generally accepted industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

FIGURES

Sampling Location Plans

© 2022, Mabbett & Associates, Inc. FIGURES April 29, 2022

20-24B

20-30C

20-27C

20-06C 20-04B*

20-27B

20-27A

20-30A

20-03B

20-03C

20-28B*

20-03A

20-24C

20-31A

20-31B 20-31C

20-28C*

20-06B20-04A

20-11B

20-12B

20-18

20-22

20-23C

20-17

20-29A

20-04B*

20-29B

20-06A

20-07B

20-08B

20-09C

20-10C

20-07C

20-08C

20-29C

20-16

Roof Samples

32A,B,C

33A,B,C

34A,B,C

35A,B,C

36A,B,C

20-37A

20-37B

20-37C

20-30B

20-39C**(Phase 2)

20-38C**(Phase 2)

20-38A*, 20-38B**(Phase 2)

20-38A*, 20-38B**(Phase 2)

LEGEND

STOP POSITIVE SAMPLE FOR ASBESTOS

NO ASBESTOS DETECTED (NAD)

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

20-01A*

20-01A**

20-01A

Scale as Noted

ACM Survey Floor Plan - 1st Floor

GRAPHIC SCALE

( IN FEET )

1 INCH ~ FEET

100'50'25'

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180

T. 781-275-6050 www.mabbett.com

S:\CADD\WORK\LIBRARY\Mabbett-02 (Pantone 300 High Res) R for CADD.jpg

U.S.Army Watervliet Arsenal

1 Buffington Street Watervliet, New York 12189

Building-20

First Floor ACM

Survey Plan

Phase 2

AutoCAD SHX Text

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text R2020021.001.001

AutoCAD SHX Text

PEH

AutoCAD SHX Text

MFD

AutoCAD SHX Text 1"~50'-0"

AutoCAD SHX Text

ASB-1

AutoCAD SHX Text Copyright, 2022

AutoCAD SHX Text Mabbett & Associates, Inc.

AutoCAD SHX Text C

20-01C

20-23A

20-19

20-20

20-07A

20-08A

20-09B

20-10B

20-26A

20-26B

20-26C

20-01B

20-14

20-02A

20-02B

20-15

20-09A

20-10A

20-05A

20-05B

20-05C

20-13

20-11A

20-12A

20-23B

20-01A

RAMP

20-25A

20-25B

20-25C

20-24A

20-28A*

20-21

LEGEND

STOP POSITIVE SAMPLE FOR ASBESTOS

NO ASBESTOS DETECTED (NAD)

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

20-01A*

20-01A**

20-01A

Scale as Noted

ACM Survey Floor Plan - 2nd Floor

GRAPHIC SCALE

( IN FEET )

1 INCH ~ FEET

100'50'25'

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180

T. 781-275-6050 www.mabbett.com

S:\CADD\WORK\LIBRARY\Mabbett-02 (Pantone 300 High Res) R for CADD.jpg

U.S.Army Watervliet Arsenal

1 Buffington Street Watervliet, New York 12189

Building-20

Second Floor ACM

Survey Plan

Phase 2

AutoCAD SHX Text

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text R2020021.001.001

AutoCAD SHX Text

PEH

AutoCAD SHX Text

MFD

AutoCAD SHX Text 1"~50'-0"

AutoCAD SHX Text

ASB-2

AutoCAD SHX Text Copyright, 2022

AutoCAD SHX Text Mabbett & Associates, Inc.

Pb-62

Pb-61 Pb-11

Pb-12

Pb-13

Pb-14

Pb-15

Pb-63

Pb-16

Pb-59

Pb-36

Pb-58

Pb-17

Pb-18

Pb-19

Fenced in area

Pb-64

Pb-65

Pb-66

Pb-20

Pb-21

Pb-22

Pb-23

Pb-68

Pb-55

Pb-54

Pb-52

Pb-53

Pb-51

Pb-50

Pb-49

Pb-48

Pb-46

Pb-47

Pb-45

Pb-43

Pb-44

Pb-57

Pb-42

Pb-03

Pb-08

Pb-05

Pb-04

Pb-06

Pb-07

Pb-41

Pb-40

Pb-10

Pb-09

Pb-37

Pb-38

Pb-39

Pb-56

Pb-67

Pb-74(Phase 2)

Pb-75(Phase 2)

Pb-76(Phase 2)

Pb-78(Phase 2), Pb-79(Phase 2)

Pb-77(Phase 2)

Pb-70(Phase 2), Pb-71(Phase

2),Pb-72(Phase 2)

Pb-73(Phase 2)

LEGEND

APPROXIMATE SAMPLE LOCATION

Scale as Noted

Pb Survey Floor Plan - 1st Floor

GRAPHIC SCALE

( IN FEET )

1 INCH ~ FEET

100'50'25'

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180

T. 781-275-6050 www.mabbett.com

S:\CADD\WORK\LIBRARY\Mabbett-02 (Pantone 300 High Res) R for CADD.jpg

LEAD PAINT SAMPLE LOCATION

Pb-01

U.S.Army Watervliet Arsenal

1 Buffington Street Watervliet, New York 12189

Building-20

First Floor Pb

Survey Plan

Phase 2

AutoCAD SHX Text

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text R2020021.001.001

AutoCAD SHX Text

PEH

AutoCAD SHX Text

MFD

AutoCAD SHX Text 1"~50'-0"

AutoCAD SHX Text Pb-1

AutoCAD SHX Text Copyright, 2022

AutoCAD SHX Text Mabbett & Associates, Inc.

RAMP

Pb-60

Pb-32

Pb-31

Roof Samples

Pb-01

Pb-02

Pb-30

Pb-35

Pb-29

Pb-28

Pb-33

Pb-34

Pb-26

Pb-69

Pb-25

Pb-24

Pb-27

LEGEND

APPROXIMATE SAMPLE LOCATION

Scale as Noted

Pb Survey Floor Plan - 2nd Floor

GRAPHIC SCALE

( IN FEET )

1 INCH ~ FEET

100'50'25'

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180

T. 781-275-6050 www.mabbett.com

S:\CADD\WORK\LIBRARY\Mabbett-02 (Pantone 300 High Res) R for CADD.jpg

LEAD PAINT SAMPLE LOCATION

Pb-01

U.S.Army Watervliet Arsenal

1 Buffington Street Watervliet, New York 12189

Building-20

Second Floor Pb

Survey Plan

Phase 2

AutoCAD SHX Text

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text R2020021.001.001

AutoCAD SHX Text

PEH

AutoCAD SHX Text

MFD

AutoCAD SHX Text 1"~50'-0"

AutoCAD SHX Text Pb-2

AutoCAD SHX Text Copyright, 2022

AutoCAD SHX Text Mabbett & Associates, Inc.

APPENDIX A

Summary of ACM Building Survey Results, Including Negative Results

© 2022, Mabbett & Associates, Inc. APPENDIX A April 29, 2022

© 2022, Mabbett & Associates, Inc. Appendix A Page 1 of 3 April 29, 2022 Mabbett Project No. R2020021.000.002 RBM Survey Report Watervliet Arsenal, NY - Bldg 20 V1 - Final

APPENDIX A

Summary of ACM Building Survey Results, Including Negative Results

Watervliet Arsenal, Building 20, Phase 1 & 2 Watervliet, NY

Sample No. Sample Location Description of Material Percent and Type of Asbestos

PHASE 1: June 10-12, 2020 20-01A 2nd Floor, Room 201D White Window Sill Caulk NAD 20-01B 2nd Floor, Room 202 White Window Sill Caulk NAD 20-01C 2nd Floor, Room 203 White Window Sill Caulk NAD 20-02A 2nd Floor, Room 200 White Sink Coat IMA 20-02B 2nd Floor, Room 200 White Sink Coat IMA 20-03A 1st Floor, Production Area, NE Area Gray Door Frame Caulk NAD

20-03B 1st Floor, Production Area, North Side Gray Door Frame Caulk NAD

20-03C 1st Floor, Production Area, North Side Gray Door Frame Caulk NAD

20-04A 1st Floor, Production Area, SW Area Window Glazing (interior) Trace Anthophyllite*

20-04B 1st Floor, Production Area, NE Area Window Glazing (interior) 2.8% Chrysotile 20-05A 2nd Floor, Room 202A Concrete Deck Panel NAD 20-05B 2nd Floor, Room 202A Concrete Deck Panel NAD 20-05C 2nd Floor, Room 202A Concrete Deck Panel NAD 20-06A 1st Floor, Production Area, West Black Brick Flooring NAD 20-06B 1st Floor, Production Area, South Black Brick Flooring NAD 20-06C 1st Floor, Production Area, NE Black Brick Flooring NAD 20-07A 2nd Floor, Room 202 6"x6" Red Ceramic Floor Tile NAD 20-07B 1st Floor, Room 104 6"x6" Red Ceramic Floor Tile NAD 20-07C 1st Floor, Room 106 6"x6" Red Ceramic Floor Tile NAD 20-08A 2nd Floor, Room 202 6"x6" Ceramic Floor Tile Grout NAD 20-08B 1st Floor, Room 104 6"x6" Ceramic Floor Tile Grout NAD 20-08C 1st Floor, Room 106 6"x6" Ceramic Floor Tile Grout NAD 20-09A 2nd Floor, Room 200 5"x12" Beige Ceramic Wall Block NAD 20-09B 2nd Floor, Room 202 5"x12" Beige Ceramic Wall Block NAD 20-09C 1st Floor, Room 106 5"x12" Beige Ceramic Wall Block NAD 20-10A 2nd Floor, Room 200 5"x12" Beige Block Grout NAD 20-10B 2nd Floor, Room 202 5"x12" Beige Block Grout NAD 20-10C 1st Floor, Room 106 5"x12" Beige Block Grout NAD 20-11A 2nd Floor, Room 201 12"x12" Green Floor Tile NAD 20-11B 1st Floor, Room 101 12"x12" Green Floor Tile NAD 20-12A 2nd Floor, Room 201 Vestibule 12"x12" Green Floor Tile Mastic IMA 20-12B 1st Floor, Room 101 12"x12" Green Floor Tile Mastic IMA 20-13 2nd Floor, Room 201 4" Cove Base Mastic NAD

© 2022, Mabbett & Associates, Inc. Appendix A Page 2 of 3 April 29, 2022 Mabbett Project No. R2020021.000.002 RBM Survey Report Watervliet Arsenal, NY - Bldg 20 V1 - Final

APPENDIX A

Summary of ACM Building Survey Results, Including Negative Results

Watervliet Arsenal, Building 20, Phase 1 & 2 Watervliet, NY

Sample No. Sample Location Description of Material Percent and Type of Asbestos

20-14 2nd Floor, Room 202 2'x4' White Ceiling Tile (Old Fissured) NAD 20-15 2nd Floor, Room 200 2'x2' White Ceiling Tile (Rough Texture) NAD 20-16 1st Floor, Room 106 2'x2' White Ceiling Tile (Fissured) NAD 20-17 1st Floor, Room 103 2'x2' White Ceiling Tile (Smooth) NAD 20-18 1st Floor, Room 101A 2'x4' White Ceiling Tile (Fissured) NAD 20-19 2nd Floor, Room 202A Wall Plaster (Base Coat) NAD 20-20 2nd Floor, Room 202A Wall Plaster (Finish Coat) NAD 20-21 2nd Floor, Room 202 Sheetrock NAD 20-22 1st Floor, Room 101 Yellow Carpet Adhesive NAD

20-23A 2nd Floor, Room 203 Joint Compound NAD 20-23B 2nd Floor, Room 201 Joint Compound NAD 20-23C 1st Floor, Room 103 Joint Compound NAD 20-24A Exterior, NW Area Brick Mortar NAD 20-24B Exterior, NE Area Brick Mortar NAD 20-24C Exterior, SW Area Brick Mortar NAD 20-25A Exterior, NW Ramp Gray Ramp Caulk NAD 20-25B Exterior, NW Ramp Gray Ramp Caulk NAD 20-25C Exterior, NW Ramp Gray Ramp Caulk NAD 20-26A Exterior, West Side Vent Caulk NAD 20-26B Exterior, West Side Vent Caulk NAD 20-26C Exterior, West Side Vent Caulk NAD

20-27A Exterior, North Side Window Glazing Trace Anthophyllite*

20-27B Exterior, North Side Window Glazing Trace Anthophyllite*

20-27C Exterior, North Side Window Glazing Trace Anthophyllite*

20-28A Exterior, NE Ramp Area Gray Window Frame Caulk 1.1% Chrysotile 20-28B Exterior, North Side Gray Window Frame Caulk NA/PS 20-28C Exterior, South Side Gray Window Frame Caulk NA/PS 20-29A Exterior, West Side Black Window Frame Caulk NAD 20-29B Exterior, West Side Black Window Frame Caulk NAD 20-29C Exterior, West Side Black Window Frame Caulk NAD 20-30A Exterior, North Side Black Foundation Material (Type 1) NAD 20-30B Exterior, NE Area Black Foundation Material (Type 1) NAD 20-30C Exterior, NE Area Black Foundation Material (Type 1) NAD 20-31A Exterior, SE Area Black Foundation Material (Type 2) Trace Chrysotile*

© 2022, Mabbett & Associates, Inc. Appendix A Page 3 of 3 April 29, 2022 Mabbett Project No. R2020021.000.002 RBM Survey Report Watervliet Arsenal, NY - Bldg 20 V1 - Final

APPENDIX A

Summary of ACM Building Survey Results, Including Negative Results

Watervliet Arsenal, Building 20, Phase 1 & 2 Watervliet, NY

Sample No. Sample Location Description of Material Percent and Type of Asbestos

20-31B Exterior, SE Area Black Foundation Material (Type 2) Trace Chrysotile* 20-31C Exterior, South Black Foundation Material (Type 2) Trace Chrysotile* 20-32A Roof Asphalt Base Layer NAD 20-32B Roof Asphalt Base Layer NAD 20-32C Roof Asphalt Base Layer NAD 20-33A Roof Rubber Roof Sealant <1% Chrysotile 20-33B Roof Rubber Roof Sealant <1% Chrysotile 20-33C Roof Rubber Roof Sealant <1% Chrysotile 20-34A Roof Foamboard Insulation Backing Trace Chrysotile* 20-34B Roof Foamboard Insulation Backing NAD 20-34C Roof Foamboard Insulation Backing NAD 20-35A Roof Metal Roof Anchor Gasket NAD 20-35B Roof Metal Roof Anchor Gasket NAD 20-35C Roof Metal Roof Anchor Gasket IMA 20-36A Roof Fan Housing Caulk NAD 20-36B Roof Fan Housing Caulk NAD 20-36C Roof Fan Housing Caulk NAD 20-37A 1st Floor Red Fire Stop Trace Chrysotile* 20-37B 1st Floor Red Fire Stop NAD 20-37C 1st Floor Red Fire Stop NAD

PHASE 2: April 6, 2022 20-38A Manufacturing Area, Bay D9 Steam Pipe Insulation (24") 18.2% Chrysotile 20-38B Manufacturing Area, Bay D9 Steam Pipe Insulation (24") NA/PS 20-38C Manufacturing Area, Bay A5 Steam Pipe Insulation (24") NA/PS 20-39A Manufacturing Area, Bay D9 Condensate Pipe Insulation (12") 23.5% Chrysotile 20-39B Manufacturing Area, Bay D9 Condensate Pipe Insulation (12") NA/PS 20-39C Manufacturing Area, Bay A5 Condensate Pipe Insulation (12") NA/PS

NOTES: NAD = No Asbestos Detected

NA/PS = Not Analyzed/Positive Stop

IMA = Insufficient Material for Analysis

* = Sample Analyzed by TEM

© 2022, Mabbett & Associates, Inc. APPENDIX B April 29, 2022 Mabbett Project No. R2020021.000.002 RBM Survey Report Watervliet Arsenal, NY - Bldg 20 V1 - Final

APPENDIX B

Asbestos Laboratory Reports and Chain of Custody visit our web site - www.amerisci.com

Michael Delaney Valeriu Voicu Mabbett & Associates, Inc. 222041550

ELAP-PLM-FRIABLE 3 day Results R2020021.000.001; Watervliet Arsenal; Watervliet, NYdelaney@mabbett.com

Sunday, April 10, 2022 12:53:56

Please Reply To:

Number of Pages:

Client Project:

Fax #:

Time:

From:

Date:

Certified Analysis Service 24 Hours A Day • 7 Days A Week Competitive Prices

LABORATORY ELECTRONIC TRANSMITTAL

Comments:

NOTE: Attached report is to be considered preliminary until final review with accompanying analysis summary letter is issued.

CONFIDENTIALITY NOTICE: Unless otherwise indicated, the information contained in this communication is confidential information intended for use of the individual named above. If the reader of this communication is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is prohibited. If you have received this communication in error, please immediately notify the sender by telephone and return the original message to the above address via the US Postal Service at our expense.

Samples are disposed of in 60 days or unless otherwise instructed by the protocol or special instructions in writing. Thank you.

To:

Subject:

(including cover sheet)

Boston • Los Angeles • New York • Richmond

Email:

AmeriSci Job #:

AmeriSci New York

117 EAST 30TH ST.

NEW YORK, NY 10016

TEL: (212) 679-8600 • FAX: (212) 679-3114

AmeriSci New York

117 EAST 30TH ST.

NEW YORK, NY 10016

TEL: (212) 679-8600 • FAX: (212) 679-3114

04/07/22 AmeriSci Job # 222041550 04/10/22 4709

ELAP # 11480 1 2

R2020021.000.001; Watervliet Arsenal; Watervliet, NY

PLM Bulk Asbestos Report Date Received Date Examined

RE:

ofPage

P.O. # Mabbett & Associates, Inc.

5 Alfred Circle

Bedford, MA 01730

Attn: Michael Delaney

Asbestos Present Total % AsbestosClient No. / HGA Lab No.

Location:

Analyst Description:

Asbestos Types:

Other Material:

Yes20-38A 222041550-01 18.2% 1st Floor, Machine Shop - Bay D9 - Steam Pipe Insulation (24")1

White, Homogeneous, Fibrous, Bulk Material Chrysotile 18.2 % Cellulose 3%, Non-fibrous 78.8%

(by NYS ELAP 198.1) by Valeriu Voicu on 04/10/22

Location:

Analyst Description:

Asbestos Types:

Other Material:

20-38B 222041550-02 NA/PS

1st Floor, Machine Shop - Bay D9 - Steam Pipe Insulation (24")1

Bulk Material

Location:

Analyst Description:

Asbestos Types:

Other Material:

20-38C 222041550-03 NA/PS

1st Floor, Machine Shop - Bay A5 - Steam Pipe Insulation (24")1

Bulk Material

Location:

Analyst Description:

Asbestos Types:

Other Material:

Yes20-39A 222041550-04 23.5% 1st Floor, Machine Shop - Bay D9 - Condensate Pipe Insulation (12")2

Gray, Homogeneous, Fibrous, Bulk Material Amosite 23.5 % Cellulose Trace, Non-fibrous 76.5%

(by NYS ELAP 198.1) by Valeriu Voicu on 04/10/22

Location:

Analyst Description:

Asbestos Types:

Other Material:

20-39B 222041550-05 NA/PS

1st Floor, Machine Shop - Bay D9 - Condensate Pipe Insulation (12")2

Bulk Material

See Reporting notes on last page

AmeriSci Job #: 222041550 Page 2 of 2

R2020021.000.001; Watervliet Arsenal; Watervliet, NY

PLM Bulk Asbestos Report Client Name: Mabbett & Associates, Inc.

Asbestos Present Total % AsbestosClient No. / HGA Lab No.

Location:

Analyst Description:

Asbestos Types:

Other Material:

20-39C 222041550-06 NA/PS

1st Floor, Machine Shop - Bay A5 - Condensate Pipe Insulation (12")2

Bulk Material

Reporting Notes:

*NAD/NSD =no asbestos detected; NA =not analyzed; NA/PS=not analyzed/positive stop, (SOF-V) = Sprayed On Fireproofing containing Vermiculite;

(SM-V) = Surfacing Material containing Vermiculite; PLM Bulk Asbestos Analysis using Olympus, Model BH-2 Pol Scope, Microscope, Serial #: 229915, by Appd E to Subpt E, 40 CFR 763 quantified by either CVES or 400 pt ct as noted for each analysis (NVLAP 200546-0), ELAP PLM Method 198.1 for NY friable samples, which includes the identification and quantitation of vermiculite, or ELAP 198.6 for NOB samples, or EPA 400 pt ct by EPA 600- M4-82-020 (NY ELAP Lab 11480); Note:PLM is not consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. NAD or Trace results by PLM are inconclusive, TEM is currently the only method that can be used to determine if this material can be considered or treated as non asbestos-containing in NY State (also see EPA Advisory for floor tile, FR 59,146,38970,8/1/94) National Institute of Standards and Technology Accreditation requirements mandate that this report must not be reproduced except in full without the approval of the lab.This PLM report relates ONLY to the items tested. RI Cert AAL-094, CT Cert PH-0186, Mass Cert AA000054, NJ Lab ID #NY031.

____________END OF REPORT___________

Analyzed by: Valeriu Voicu Date: 4/10/2022

Reviewed by: Valeriu Voicu

G I oG=\loEtr ootro(,5oE

2-F

I oEJ.9Eq) q@o)&J]Uz(.)

ooL.9=Io)oFU o-oT L ooz=T U tJ(L(LJT U zii \oao)

'-oo(L

E il

5J&E I{,'6

:;sqY ooo E

E E

F I.F

\\\ooo #9.E

IE

G

I ooo oEosp.Esoc.

ot,oE.9.E.=od s

\l-hIrG J oJP a

?U 1)-s

01$ooo!,E

\)clcC I aooo1JC d ltxIElrlro=oou

\i\nc\!S r rtAsa;Eo tsU-dc,e

F13oh ursila.

3;E :5$[ j E

F ;qH

X

5-F

F

J3m

=oo6L ,-d,., u,= ii<tui 5=E ou)tU J

{ils:t:q

@o(\ltrGaEooo!EcooooE

Repair Facility Deficiencies, Building 20 - Watervliet Arsenal | Watervliet, NY

© 2022, Mabbett & Associates, Inc. APPENDIX C April 29, 2022

APPENDIX C

Lead Paint Chip Laboratory Reports and Chain of Custody

Analysis Report

Client:

Project/Test Address:

Ameri-Sci

7469 Whitepine Rd

Telephone: 800.347.4010 Richmond, VA 23237

Environmental Hazards Services, L.L.C.

1206-06-1761; R2020021.000.001; Watervliet Arsenal Bldg 20

Client Number:

48-3042

Fax Number:

804-763-1800Laboratory Results

Analyzed Date:

Client Sample Number

Lab Sample Number

Pb (ug/g) ppm

Lead Paint Chip

06/22/2020

06/18/2020

20-06-02423

Reported Date:

Received Date:

Report Number:

13635 Genito Road Midlothian, VA 23112-400

Narrative

ID

06/22/2020

Collection Location % Pb by Wt.

06/11/2020Collection Date:

PB-0120-06-02423-001 L03WHITE METAL ROOFING

ROOF

4300 0.43

PB-0220-06-02423-002 L03WHITE METAL ROOFING

ROOF

<5000 <0.50

PB-0320-06-02423-003 BLACK BRICK FLOOR

PRODUCTION WEST

<53 <0.0053

PB-0420-06-02423-004 TAN METAL COLUMN

PRODUCTION WEST

160000 16

PB-0520-06-02423-005 YELLOW METAL LADDER

PRODUCTION WEST

21000 2.1

PB-0620-06-02423-006 TAN BRICK WALL

PRODUCTION WEST

400 0.040

PB-0720-06-02423-007 BROWN METAL DOOR

FRAME PRODUCTION WEST

1600 0.16

PB-0820-06-02423-008 L03YELLOW METAL RAILING

PRODUCTION WEST

<180 <0.018

PB-0920-06-02423-009 TAN METAL BRACING

PRODUCTION NW

15000 1.5

PB-1020-06-02423-010 YELLOW BRICK FLOOR

MARKING PRODUCTION

NORTH

42 0.0042

PB-1120-06-02423-011 TAN STONE WINDOW SILL

PRODUCTION NORTH

570 0.057

Page 5of1

PB-1220-06-02423-012 TAN METAL COLUMN

PRODUCTION NORTH

120000 12

PB-1320-06-02423-013 TAN BRICK WALL

PRODUCTION NORTH

960 0.096

PB-1420-06-02423-014 L03BROWN METAL WINDOW

PRODUCTION NORTH

<250 <0.025

PB-1520-06-02423-015 YELLOW METAL BALLARD

PRODUCTION NE

<41 <0.0041

PB-1620-06-02423-016 YELLOW METAL LADDER

PRODUCTION EAST

11000 1.1

PB-1720-06-02423-017 BLACK BRICK FLOOR

PRODUCTION EAST

<49 <0.0049

PB-1820-06-02423-018 BROWN METAL DOOR

FRAME PRODUCTION SE

93000 9.3

PB-1920-06-02423-019 L03YELLOW BRICK FLOOR

MARKING PRODUCTION SE

<110 <0.011

PB-2020-06-02423-020 L03BROWN METAL WINDOW

PRODUCTION SOUTH

<160 <0.016

PB-2120-06-02423-021 TAN METAL BRACING

PRODUCTION SOUTH

25000 2.5

PB-2220-06-02423-022 L03YELLOW METAL BALLARD

PRODUCTION SOUTH

<500 <0.050

PB-2320-06-02423-023 L03YELLOW METAL RAILING

PRODUCTION SOUTH

310 0.031

PB-2420-06-02423-024 L03TAN METAL DOOR FRAME

ROOM 203 SW

<190 <0.019

PB-2520-06-02423-025 L03BROWN METAL DOOR ROOM

203 SW

<400 <0.040

PB-2620-06-02423-026 L03TAN METAL RADIATOR

COVER ROOM 203 SW

<130 <0.013

PB-2720-06-02423-027 L03WHITE PLASTER WALL

ROOM 203 SW

<140 <0.014

PB-2820-06-02423-028 WHITE GYPSUM WALL ROOM

203A

<50 <0.0050

Report Number:

Environmental Hazards Services, L.L.C

Project/Test Address:

Client Number: 20-06-02423

1206-06-1761; R2020021.000.001; Watervliet Arsenal Bldg 20

48-3042

Collection LocationClient Sample Number

Lab Sample Number

% Pb by Wt.

Narrative

ID

Pb (ug/g) ppm

Page 5of2

PB-2920-06-02423-029 TAN METAL RAILING MAIN

STAIRWELL 2

210 0.021

PB-3020-06-02423-030 L03TAN METAL DOOR FRAME

ROOM 201A

<170 <0.017

PB-3120-06-02423-031 WHITE PLASTER COLUMN

ROOM 201 EAST

210 0.021

PB-3220-06-02423-032 WHITE GYPSUM WALL ROOM

201 NE

<59 <0.0059

PB-3320-06-02423-033 L03TAN METAL RADIATOR

COVER ROOM 201C

<140 <0.014

PB-3420-06-02423-034 L03TAN METAL DOOR ROOM

201C

<240 <0.024

PB-3520-06-02423-035 BLACK METAL LADDER

ROOM 202A

140000 14

PB-3620-06-02423-036 L04WHITE GYPSUM WALL ROOM

107A

<73 <0.0073

PB-3720-06-02423-037 GRAY CONCRETE FLOOR

ROOM 107

<67 <0.0067

PB-3820-06-02423-038 WHITE PLASTER WALL

ROOM 107

120 0.012

PB-3920-06-02423-039 L03WHITE CMU WALL ROOM 106 <220 <0.022

PB-4020-06-02423-040 L03TAN METAL DOOR FRAME

ROOM 106

1300 0.13

PB-4120-06-02423-041 TAN METAL DOOR ROOM 106 <64 <0.0064

PB-4220-06-02423-042 L03TAN METAL RAILING MAIN

STAIRWELL 1

8200 0.82

PB-4320-06-02423-043 YELLOW CONCRETE WALL

ROOM 105

4100 0.41

PB-4420-06-02423-044 YELLOW CONCRETE

CEILING ROOM 105

600 0.060

PB-4520-06-02423-045 WHITE GYPSUM WALL ROOM

120 0.012

Report Number:

Environmental Hazards Services, L.L.C

Project/Test Address:

Client Number: 20-06-02423

1206-06-1761; R2020021.000.001; Watervliet Arsenal Bldg 20

48-3042

Collection LocationClient Sample Number

Lab Sample Number

% Pb by Wt.

Narrative

ID

Pb (ug/g)

Page 5of3

PB-4620-06-02423-046 GREEN GYPSUM WALL

ROOM 103

<49 <0.0049

PB-4720-06-02423-047 L03GREEN METAL DOOR FRAME

ROOM 103

<190 <0.019

PB-4820-06-02423-048 L03GREEN METAL DOOR ROOM

<110 <0.011

PB-4920-06-02423-049 L03YELLOW METAL RADIATOR

COVER ROOM 103

<150 <0.015

PB-5020-06-02423-050 WHITE METAL WINDOW

FRAME ROOM 103

<60 <0.0060

PB-5120-06-02423-051 YELLOW PLASTER WALL

ROOM 102

91 0.0091

PB-5220-06-02423-052 WHITE METAL DOOR FRAME

ROOM 102

650 0.065

PB-5320-06-02423-053 L03WHITE WOOD DOOR ROOM

1200 0.12

PB-5420-06-02423-054 WHITE PLASTER WALL

ROOM 101

2400 0.24

PB-5520-06-02423-055 WHITE CONCRETE CEILING

ROOM 101 BATHROOM

2300 0.23

PB-5620-06-02423-056 TAN METAL DOOR FRAME

ROOM 101

10000 1.0

PB-5720-06-02423-057 L03BROWN METAL DOOR

FRAME EXTERIOR WEST

<300 <0.030

PB-5820-06-02423-058 L03GREEN TRANSITE PANEL

EXTERIOR WEST

<380 <0.038

PB-5920-06-02423-059 GREEN METAL LINTEL

EXTERIOR WEST

210000 21

PB-6020-06-02423-060 TAN METAL RAILING

EXTERIOR NW RAMP

1700 0.17

PB-6120-06-02423-061 L03GREEN METAL WINDOW

EXTERIOR NORTH

<310 <0.031

PB-6220-06-02423-062 L03YELLOW METAL RAILING

EXTERIOR NORTH

<480 <0.048

Report Number:

Environmental Hazards Services, L.L.C

Project/Test Address:

Client Number: 20-06-02423

1206-06-1761; R2020021.000.001; Watervliet Arsenal Bldg 20

48-3042

Collection LocationClient Sample Number

Lab Sample Number

% Pb by Wt.

Narrative

ID

Pb (ug/g)

Page 5of4

PB-6320-06-02423-063 L03RED METAL WALL PANEL

EXTERIOR NE

1200 0.12

PB-6420-06-02423-064 L03SILVER METAL FENCE

EXTERIOR SE

1500 0.15

PB-6520-06-02423-065 BROWN METAL OH DOOR

FRAME EXTERIOR SE

110000 11

PB-6620-06-02423-066 YELLOW METAL BALLARD

EXTERIOR SOUTH

120 0.012

PB-6720-06-02423-067 YELLOW METAL OH DOOR

FRAME EXTERIOR SE

120000 12

PB-6820-06-02423-068 L03GREEN METAL WINDOW

EXTERIOR SOUTH

<1500 <0.15

PB-6920-06-02423-069 BLACK METAL STAIRS

EXTERIOR SW

310000 31

Missy Kanode QA/QC Clerk

Analysis Method: EPA SW846 7000B

The HUD lead guidelines for lead paint chips are 0.50% by Weight, 5000 ppm, or 1.0 mg/cm². The Reporting Limit (RL) for samples prepared by ASTM E-1979-17 is 10.0 ug Total Pb. The RL for samples prepared by EPA SW846 3050B is 25.0 ug Total Pb. Paint chip area and results are calculated based on area measurements determined by the client. All internal quality control requirements associated with this batch were met, unless otherwise noted.

LEGEND Pb= lead ug = microgram ppm = parts per million ug/g = micrograms per gram Wt. = weight

Reviewed By Authorized Signatory:

L03: Sample submitted was less than the recommended amount. A minimum of 0.1 grams should be submitted.

L04: Sample contains substantial amounts of substrate which may affect the calculated results with units of ppm and % by weight.

Sample Narratives:

Preparation Method: ASTM E-1979-17

The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Results represent the analysis of samples submitted by the client. Sample location, description, area, etc., was provided by the client. Results reported above in mg/cm3 are calculated based on area supplied by client. This report shall not be reproduced except in full, without the written consent of the Environmental Hazards Service, L.L.C.

ELLAP Accredtitation through AIHA-LAP, LLC (100420), NY ELAP #11714.

Report Number:

Environmental Hazards Services, L.L.C

Project/Test Address:

Client Number: 20-06-02423

1206-06-1761; R2020021.000.001; Watervliet Arsenal Bldg 20

48-3042

Collection LocationClient Sample Number

Lab Sample Number

% Pb by Wt.

Narrative

ID

Pb (ug/g)

Page 5of5

Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Customer:

Analysis ID: 71989454_PBP

Attn: Michael Delaney

Date Reported: 4/12/2022

Date Received: 4/7/2022

Project: Watervliet Arsenal Bldg #20 #R2020021.000.001

Lab Order ID: 71989454

Lab Notes

Description

Lab Sample ID

Sample ID

Analysis for Lead Concentration in Paint Chips by Flame Atomic Absorption Spectroscopy

EPA SW-846 3050B/6010C/7000B

Concentration

(ppm)(g)

Mass Concentration

(% by weight)

71989454PBP_1

White metal truss 1st floor, machine shop - bay F9Pb-70

1400.0840 0.014%

71989454PBP_2

White metal conduit 1st floor, machine shop - bay F9Pb-71

1300.0649 0.013%

71989454PBP_3

White brick wall 1st floor, machine shop - bay F9Pb-72

6600.0606 0.066%

71989454PBP_4

Yellow metal catwalk 1st floor, machine shop - bay D9Pb-73

87000.1077 0.87%

71989454PBP_5

White metal duct 1st floor, machine shop - bay A5Pb-74

7000.1022 0.070%

71989454PBP_6

White metal beam 1st floor, machine shop - bay A1Pb-75

310000.0952 3.1%

71989454PBP_7

White metal cross support 1st floor, machine shop -bay D1Pb-76

28000.0855 0.28%

71989454PBP_8

White metal truss 1st floor, machine shop - bay D6Pb-77

570000.0921 5.8%

71989454PBP_9

White metal wall panel 1st floor, machine shop - bay F1Pb-78

7700.0649 0.077%

71989454PBP_10

White metal column 1st floor, machine shopPb-79

110000.0718 1.1%

Unless otherwise noted blank sample correction was not performed on analytical results. Scientific Analytical Institute participates in the AIHA ELPAT program. ELPAT Laboratory ID: 173190. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. Analytical uncertainty available upon request. The quality control samples run with the samples in this report have passed all EPA required specifications unless otherwise noted. RL: (Report Limit for an undiluted 50ml sample is 4µg Total Pb). Unless indicated, areas and volumes were provided by the customer.

Xaviera Watkins (10)

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Analyst Laboratory Director

Page 1 of 1pbRpt_4.0.01_pbp001

L-F-021 r17 2/14/2023

Scientific Analytical Institute 4604 Dundas Dr. Greensboro, NC 27407

Phone: 336.292.3888 Fax: 336.292.331.3 www.sailab.com /ab@sailab.com

Lab Use Onlyq l ~ q La_b Order ID: <s 00 Chent Code: _____ 7"_

Contact Information Billing/Invoice Information Company Name:

Address:

Contact:

Phone 161:

Fax0:

Email

PO Number:

A•F-020 EXP: 2/4/2021

., (,05_0

D

A vse~""' \ ,3~-1olO

i. oo b , 001

Other D

Description/Location

Company: ~ /

Address: .. J /J /Vi-t:, Contact:

PltoneO:

Fax0:

EmailLJ:

Turn Around Times 3 Hours • 72 Hours ~ · 6 Hours • 96 Hours • 12 Hours • 120 Hours • 24 Hours • 144+ Hours • 48 Hours • Volume/Area Comments .

Total Number of Samples ,

1.0 INTRODUCTION
1.1 Purpose and Objectives
1.2 Summary of Phase 2 Survey Results
2.0 PHASE 2 ASBESTOS SURVEY
2.1 Sampling Methodology
2.2 Analytical Methodology
2.3 Summary of Asbestos Containing Materials Findings
3.0 LEAD CONTAINING PAINT SAMPLING
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 Asbestos
4.2 Lead Containing Paint
5.0 LIMITATIONS
FIGURES
APPENDIX A
APPENDIX B
APPENDIX C
2022-04-29T09:31:43-0400
Michael F. Delaney