This document outlines a planned construction project at the Watervliet Arsenal in New York. The U.S. Army Corps of Engineers intends to renovate portions of Building 20 that have not been recently updated, including hazardous material removal, window and door replacements, bathroom and locker room renovations, office updates and associated HVAC and lighting work. Exterior work will include entrance ramp and vestibule replacements and repairs to the west entrance stair hall and exterior masonry. The estimated cost of construction is between $10-25 million. The solicitation number provided is W912DS22B0025 and proposals are due in September 2022. Award of the contract is projected for later that same month.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RD RD RDRD
RD RD RD RD RD
RDRDRDRDRD
RD RD RD RD RD
RDRDRDRDRD
R1
R5
R8
R9
R10
R11
R12
R13
R14
R2
R3
R4
R6
R7
R11
R12
R13
R14
RD
R15
R16
R17
R18
A1
A-433
A17
A17
A17
A17
A18
A18
A18
A18
GENERAL ROOF PLAN
NOTES:
1. FOR ARCHITECTURAL GENERAL NOTES,
MATERIAL LEGEND, AND ABBREVIATIONS
REFER TO SHEET AG001.
2. REFERENCE ELECTRICAL PLANS FOR
LOCATIONS OF LIGHTING PROTECTION
3. REFERENCE MECHANICAL PLANS FOR
LOCATIONS OF ROOF TOP EQUIPMENT.
4. NEW MECH CURBS SHALL BE FIELD
LOCATED AND FIELD VERIFIED. ACTUAL
CURB SIZE BASED ON MECHANICAL
EQUIPMENT SELECTED. SEE
TYPICAL CURB DETAIL D1/A-571.
RIGID INSULATION
(R-30)
FULLY ADHERED ROOF
MEMBRANE SYSTEM
CONCRETE SUBSTRATE
1/2" COVERBOARD
AIR / VAPOR BARRIER
RIGID INSULATION
(R-30)
FULLY ADHERED ROOF
MEMBRANE SYSTEM
1 1/2" STRUCTURAL METAL
DECK RE: STRUCTURAL
1/2" COVERBOARD
AIR / VAPOR BARRIER
1/2" GYP BOARD SUBSTRATE
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N
E W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-021
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
O V
E R
A L L R
O O
F P
L A
N
SCALE: 1/16" = 1'-0"B1
OVERALL ROOF PLAN
0 8' 16' 32'
N
SCALE: 1 1/2" = 1'-0"A5
EXISTING ROOF MEMBRANE SYSTEM ASSEMBLY
0 1/2' 1' 1 1/2' SCALE: 1 1/2" = 1'-0"A7
EXISITNG METAL DECK ROOF MEMBRANE ASSEMBLY
0 1/2' 1' 1 1/2'
ARCHITECTURE KEYNOTES
KEY
VALUE DESCRIPTION
A17 BID OPTION: NEW
MECHANICAL
EQUIPMENT REFER
TO MECH.
A18 BID OPTION: REFER
TO DETAIL B6/A-577
FOR DUCT
PENETRATION THRU
IMP DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
DN
TOOL ROOM
TOOL ROOM
107A
MEN'S LOCKER
ROOM
107MEN'S LATRINE
WOMEN'S LOCKER
ROOM
WOMEN'S LOCKER
HALL
104C
STAIR HALL
105A
WOMEN'S LATRINE
HALL
104B
BREAK ROOM
SUPERVISOR'S
OFFICE
OFFICE
101A
OFFICE
A1
A-422 A1
A-420
WOMEN'S SHOWER
104D
UTILITY ROOM
107C
BREAK ROOM HALL
103A
ALL GENDER
101C
MEN'S
LATRINE/LOCKER
HALL
106A
HALL
101B
MEN'S SHOWER
107B
J.C.
109D
IT STORAGE
101D
105A3 105A2
105A1
104C1
104A
104C2104C3
104B1
104A1
109D1
106A5106A4
106A1
106A2
106A3
106B2
106B1
101A2
101B1
101A3
101C1 107A1
A1
A-426
DN DN
104B
M1CA
101A1
101A6
C1
A-434
103A3 103A2
103A1
103A5103A4
102A
OPEN OFFICE
CONFERENCE
201D
OFFICE
201C
VESTIBULE
201E
OFFICE
201B
ADMIN
201A
OFFICE
203B
CONFERENCE
203A
MEN'S LATRINE
STAIR ENTRY
OPEN OFFICE
OFFICE
203C
A1
A-424
A3
A-424
MOTHER'S ROOM
200B
WOMEN'S LATRINE
202A
209A3 209A2
200A
200A1
201B1
201A1
202B
203B1
203A1
201D1
201C1
201E1
201E2
203C1
203A3
109A1
109B1
A1
A-426
B1
A-103
DNDN
200B1
E1
A-432
B1
A-432
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
KEY PLAN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-101
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
P L A
N S
SCALE: 3/32" = 1'-0"B1
GROUND FLOOR ENLARGED PLAN
SCALE: 3/32" = 1'-0"E1
SECOND FLOOR ENLARGED PLAN
N
N
0 8' 16' 24'
0 8' 16' 24'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
DN
10c
10b
10a
G
EXISTING PEDESTRIAN
SIDEWALK
A-665D1A-667B1
D1
A-429
C8
A-429
A1
A-429
A4
A-429
1213 14151617
5'
/2
5'
/2
/2
4'
4' - 5 1/2"5' - 9"7' - 10 1/2"8' - 2 1/2"4' - 5 1/2"
TYP. 4" X 4" STEEL POST AS
PART OF PRE-FABRICATED
CANOPY, FINISH PAINTED
ANCHORED TO
STRUCTURE
/8
5'
201E2
5' - 5"
A8
A-429
DN
GALVANIZED WOVEN
WIRE MESH GUARD RAIL
AND HAND RAIL
CONCRETE RAMP,
REF. STRUCTURAL
CONNECT AND ALIGN NEW RAMP
CONCRETE WALKWAY TO
EXISTING CONCRETE SIDEWALK.
PROVIDE FLUSH AND LEVEL
TRANSITION.
CONNECT AND ALIGN NEW RAMP
CONCRETE WALKWAY TO EXISTING
CONCRETE SIDEWALK. PROVIDE
FLUSH AND LEVEL TRANSITION.
/1 6"
4' - 10 1/2"
16' - 1 1/2"
/8
/8
26' - 9"
5'
21' - 1 7/8"
5' - 0 7/16"
5'
/8
5'
/1 6"
/1 6"
5'
10' - 5 7/16"
-9"0"
-2' - 5 1/32"
-4' - 9 27/32"
4' - 8"
G
D1
A-429
C8
A-429
A1
A-429
A4
A-429
1213 14151617
3/
5'
/2
5'
/2
/2
4'
4' - 5 7/16"5' - 9"7' - 10 5/8"8' - 2 5/8"4' - 5 7/16"
/8
5'
5'
/2
6'
A8
A-429
20' - 8" 6' - 3"
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-103
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
R A
M P
P L A
N
SCALE: 1/8" = 1'-0"B1
PROPOSED RAMP - PLAN
0 4' 8' 16' N SCALE: 1/8" = 1'-0"B6
RAMP ROOF PLAN
0 4' 8' 16' N
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
TOOL ROOM
TOOL ROOM
107A
MEN'S LOCKER
ROOM
MEN'S LATRINE
WOMEN'S LOCKER
ROOM
BREAK ROOM
SUPERVISOR'S
OFFICE
OFFICE
OFFICE
101A
WOMEN'S LATRINE
104A
STAIR HALL
105A
IT STORAGE
101D
B1
A-433
A1
A-437
GENERAL REFLECTED CEILING PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
FOR ARCHITECTURAL GENERAL NOTES, MATERIAL LEGEND,
AND ABBREVIATIONS REFER TO SHEET AG001.
ARCHITECTURAL CEILING PLANS INDICATE DIMENSIONING AND
PLACEMENT OF VARIOUS CEILING MOUNTED DEVICES. REFER TO
MEP DRAWINGS AND SPECIFICATIONS FOR ALL OTHER INFORMATION
FOR MEP SYSTEMS INCLUDING BUT NOT LIMITED TO FIRE SUPPRESSION,
FIRE ALARM DEVICES, SECURITY DEVICES, EXIT DEVICES, DIFFUSERS,
LIGHTING, LIGHTING CONTROL DEVICES, AND ACCESS PANELS.
CEILING HEIGHTS ARE SHOWN TO HEIGHT ABOVE FINISH FLOOR.
ALL CEILING GRIDS TO BE CENTERED IN ROOMS UNLESS
NOTED OTHERWISE.
ALL LIGHTS, SPEAKERS, SPRINKLERS, SIGNAGE, STROBES AND
OTHER HARDWARE INSTALLED IN TILED CEILING SYSTEMS TO BE
CENTERED IN TILES IN BOTH DIRECTIONS UNLESS NOTED
OTHERWISE.
ALIGN ALL CEILING MOUNTED DEVICES.
REFERENCE ROOM FINISH SCHEDULE FOR ADDITIONAL
CEILING FINISH INFORMATION.
CEILING MOUNTED EXIT SIGNS TO BE CENTERED WITHIN DOOR
FRAME OR OPENING. MOUNT 4" OFF FACE OF WALL.
ALL SPRINKLERS, JUNCTION BOXES & SMOKE DETECTORS TO ALIGN
WITH ADJACENT LIGHT FIXTURES, UNLESS NOTED OTHERWISE.
COORDINATE LOCATIONS OF CEILING ACCESS PANELS WITH THE
FINAL LOCATIONS OF MECHANICAL EQUIPMENT AS REQUIRED TO
SERVICE EQUIPMENT AND TO PROVIDE ACCESS TO ALL ABOVE
CEILING EQUIPMENT.
AT CONTINUOUS RUNS OF GYPSUM BOARD ASSEMBLIES, PROVIDE
CONTROL JOINTS AT A MAXIMUM OF (1) PER 50 FEET, NOT TO EXCEED
INDIVIDUAL AREAS OF 2,500 SQUARE FEET.
IN ROOMS THAT HAVE OPERABLE WALL PARTITIONS, CEILING
DIMENSIONS AND HEIGHTS NOTED ON ONE SIDE OF THE ROOM
ALSO APPLY TO THE OTHER SIDE OF THE ROOM, UNLESS NOTED
OTHERWISE.
MOISTURE RESISTANT GYPSUM BOARD SHALL BE USED IN
SOFFITS AND CEILINGS OF RESTROOMS, LOCKER ROOMS,
SHOWERS AND OTHER WET AREAS.
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-151
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
G R
O U
N D
F L O
O R
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
0 16' 32' 48'
SCALE: 3/64" = 1'-0"C1
OVERALL RCP - GROUND FLOOR N
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
OPEN OFFICE
OFFICE
201C
CONFERENCE
201D
VESTIBULE
201E
OPEN OFFICE
OFFICE
203C
CONFERENCE
203A
OFFICE
203B
MEN'S LATRINE
STAIR ENTRY
OFFICE
201B
ADMIN
201A
MOTHER'S ROOM
200B
WOMEN'S LATRINE
200A
59 SF
PASSAGE
GENERAL REFLECTED CEILING PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
FOR ARCHITECTURAL GENERAL NOTES, MATERIAL LEGEND,
AND ABBREVIATIONS REFER TO SHEET AG001.
ARCHITECTURAL CEILING PLANS INDICATE DIMENSIONING AND
PLACEMENT OF VARIOUS CEILING MOUNTED DEVICES. REFER TO
MEP DRAWINGS AND SPECIFICATIONS FOR ALL OTHER INFORMATION
FOR MEP SYSTEMS INCLUDING BUT NOT LIMITED TO FIRE SUPPRESSION,
FIRE ALARM DEVICES, SECURITY DEVICES, EXIT DEVICES, DIFFUSERS,
LIGHTING, LIGHTING CONTROL DEVICES, AND ACCESS PANELS.
CEILING HEIGHTS ARE SHOWN TO HEIGHT ABOVE FINISH FLOOR.
ALL LIGHTS, SPEAKERS, SPRINKLERS, SIGNAGE, STROBES AND
OTHER HARDWARE INSTALLED IN TILED CEILING SYSTEMS TO BE
CENTERED IN TILES IN BOTH DIRECTIONS UNLESS NOTED
OTHERWISE.
ALIGN ALL CEILING MOUNTED DEVICES.
ALL SPRINKLERS, JUNCTION BOXES & SMOKE DETECTORS TO ALIGN
WITH ADJACENT LIGHT FIXTURES, UNLESS NOTED OTHERWISE.
COORDINATE LOCATIONS OF CEILING ACCESS PANELS WITH THE
FINAL LOCATIONS OF MECHANICAL EQUIPMENT AS REQUIRED TO
SERVICE EQUIPMENT AND TO PROVIDE ACCESS TO ALL ABOVE
CEILING EQUIPMENT.
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:4
P
M
A-152
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
S E
C O
N D
F L O
O R
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
0 16' 32' 48'
SCALE: 3/64" = 1'-0"C1
SECOND FLOOR REFLECTED CEILING PLAN N
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
J
2' x 2' ACOUSTICAL CEILING TILE
GYPSUM BOARD - PAINT
2 HR RATED ASSEMBLY AT
CEILING & STRUCTURE
RECESSED LIGHT
10' - 0"
CEILING HEIGHT ABOVE FINISH FLOOR
HVAC AIR SUPPLY GRILLE
HVAC EXHAUST OR RETURN GRILLE
STRUCTURAL STEEL BEAM - PAINT
HVAC LINEAR AIR SUPPLY GRILLE
FIXTURE - WALL MOUNTED
COVE LIGHT
EXPOSED CEILING
WALL MOUNTED EXTERIOR LIGHT FIXTURE
EXTERIOR FIXTURE
OTS
1' x 4' EMERGENCY FIXTURE - SUSPENDED
EXIT SIGN
OPEN TO STRUCTURE-PAINTED
1' x 4' FIXTURE - SUSPENDED
2' x 4' EMERGENCY FIXTURE - RECESSED
2' x 4' FIXTURE - RECESSED
2' x 2' FIXTURE - RECESSED
4" STRIP LIGHT - RECESSED
SUSPENDED CAN LIGHT
CEILING LEGEND:
2' x 4' ACOUSTICAL CEILING TILE
A Aa B Ba C Ca Cb Da Db E Ea F Fa G
183 SF
OFFICE
201C
280 SF
CONFERENCE
201D2,722 SF
OPEN
OFFICE
143 SF
ADMIN
201A
211 SF
OFFICE
201B
158 SF
WOMEN'S
LATRINE
200A
77 SF
MOTHER'S
ROOM
200B
3,036 SF
OPEN
OFFICE
239 SF
OFFICE
203C
298 SF
CONFERENCE
203A
208 SF
OFFICE
203B
263 SF
MEN'S
LATRINE
20 SF
J.C.
202A
9' - 1" 8' - 0" 10' - 0"
10' - 0"
10' - 0" 10' - 0"
10' - 0"
10' - 0"
STAIR ENTRY
A03 A03
A03
A03A03
A Aa B Ba C Ca Cb Da Db E Ea F Fa G
TOOL ROOM
TOOL ROOM
107A
MEN'S LOCKER
ROOM
107MEN'S LATRINE
WOMEN'S LOCKER
ROOM
BREAK ROOM
SUPERVISOR'S
OFFICE
OFFICE
OFFICE
101A
13' - 6"
9' - 11"
13' - 6"13' - 6"13' - 6"
WOMEN'S LOCKER
HALL
104C
WOMEN'S LATRINE
HALL
104B
BREAK ROOM HALL
103A
STAIR HALL
105A
MEN'S
LATRINE/LOCKER
HALL
106A
9' - 2"
9' - 2"
9' - 6" 9' - 9 1/2"
WOMEN'S LATRINE
104A
WOMEN'S SHOWER
104D
A03
A03 A03A03A03A03A03A03A03
A03
A03
ALL GENDER
101C
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
KEY PLAN
W D
S -1
-D
-0
/2
/2
:0
:4
P
M
A-153
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
C E
IL
IN
G P
L A
N S
SCALE: 3/32" = 1'-0"E1
ENLARGED RCP - SECOND FLOOR
SCALE: 3/32" = 1'-0"B1
ENLARGED RCP - GROUND FLOOR
0 8' 16' 24'
0 8' 16' 24'
ARCHITECTURE KEYNOTES
KEY
VALUE DESCRIPTION
A03 INSTALL NEW 2'x2' ACOUSTICAL CEILING TILES
N
N
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
NOTE: CEILINGS THAT ARE NOT TAGGED ARE EXISTING TO REMAIN
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
10c10b10a109a98a87a76a65a54a43a32a21a1
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
W07 W06 W06
W02 W02W02
M.01
M.02
M.11 M.06M.10 M.03 M.02 M.02 M.04
M.09 M.05
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
10c 10b 10a 10 9a 9 8a 8 7a 7 6a 6 5a 5 4a 4 3a 3 2a 2 1a 1
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
W09 W09
W10 W10
W09
W10
M.05
M.10 M.02
M.04 M.01
M.06 M.02 M.02 M.06 M.02 M.02 M.03 M.08 M.07 M.02
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
AAaBBaCCaCbDaDbEEaFFaG
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
W01 W01 W01 W01 W02 W02 W02 W02 W01 W01 W01 W01
W04W03W04W04W06W06W06W06W04W04W04W04
W08 M.09 M.05 M.10
M.02 M.09
M.02
M.04
HATCH LEGEND
INSULATED METAL PANEL
OPAQUE SPANDREL PANEL
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:4
P
M
A-201
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E X
T E
R
IO
R B
U
IL
D
IN
G E
L E
V A
T
IO
N S
IN
S U
L A
T E
D M
E T
A L P
A N
E L
SCALE: 1/16" = 1'-0"F1
NORTH ELEVATION
SCALE: 1/16" = 1'-0"D1
SOUTH ELEVATION
SCALE: 1/16" = 1'-0"B1
WEST ELEVATION
SCALE IN FEET
0 8' 16' 32'
0 8' 16' 32'
0 8' 16' 32'
ARCHITECTURE KEYNOTES
KEY VALUE DESCRIPTION
M.01 INSULATED METAL PANEL SYSTEM (R-16). PANEL AND ALL ASSOCIATED
PRE-FINISHED TRIM COLOR: BROWN TO MATCH SIMILAR BUILDINGS AT THE
ARSENAL
M.02 ALUMINUM STOREFRONT SYSTEM. COLOR: CLEAR ANODIZED
M.03 HOLLOW METAL DOOR AND FRAME. COLOR: BROWN TO MATCH EXISTING
M.04 1" INSULATED METAL INFILL PANEL. COLOR: BROWN SUBSTRATE WITH GLAZED
SPANDREL, BOD: MAPESPAN INSULATED SPANDREL GLASS PANELS BY MAPES
M.05 PRE-FINISHED METAL COPING. COLOR: DARK BRONZE
M.06 PRE-FINISHED METAL FLASHING. COLOR: DARK BRONZE
M.07 OVERHEAD COILING DOOR. EXTERIOR SLAT COLOR: BROWN; INTERIOR SLAT
AND HOOD COLOR: WHITE
M.08 EXPOSED STEEL SURROUND. PREPARE AND PAINT ALL EXPOSED STEEL AT
OVERHEAD DOOR SURROUND. COLOR: BROWN TO MATCH EXISTING
M.09 PRE-FABRICATED CANOPY ROOF AND STRUCTURE. REFER TO ENLARGED PLANS
AND SPECIFICATION. EXPOSED STRUCTURAL FRAMING COLOR: BROWN TO
MATCH EXISTING; ROOF PANEL COLOR: BROWN
M.10 EXISTING BRICK TO REMAIN. REPAINT AND REPAIR AS IDENTIFIED ON DEMO
ELEVATIONS
M.11 EXISTING CONCRETE TO REMAIN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
A Aa B Ba C Ca
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
M.02
M.01
M.02 M.06
M.06 M.08 M.07
M.05 M.10
100D1
PROVIDE NEW INSULATED
METAL PANEL AND WALL
AND ROOF OF ENTRY RAMP
ENCLOSURE REFER TO A-435 FOR
ENLCOSURE DETAILS
HATCH LEGEND
INSULATED METAL PANEL
OPAQUE SPANDREL PANEL
B
INSULATED METAL ROOF
PANELS FASTENED TO
EXISTING STRUCTURE
PRE-FINISHED METAL
TRIM
INSULATED METAL WALL
PANELS FASTENED TO
EXISTING STRUCTURE.
ALIGN JOINTS TO JOINTS
OF WALL PANELS ON
BUILDING WALL
PRE-FINISHED TRIM
AT
BASE
ALIGN BOTTOM EDGE OF
PANEL TO TOP OF FIRST
STAIR TREAD
3'
7' - 4" +/-4' - 2" +/-
11' - 6" +/-
/2
FLASHING AND CONTINUOUS
JOINT SEALANT WHERE NEW
ENCLOSURE ABUTS EXISTING
WALL CONSTRUCTION, TYP.
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:4
P
M
A-202
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E X
T E
R
IO
R B
U
IL
D
IN
G E
L E
V A
T
IO
N S
IN
S U
L A
T E
D M
E T
A L P
A N
E L
SCALE: 1/16" = 1'-0"E1
EAST ELEVATION
0 8' 16' 32'
SCALE: 1/4" = 1'-0"B1
ENLARGED ENTRY STAIR ENCLOSURE
PROVIDE NEW
INSULATED METAL
PANEL AT WALL AND
ROOF OF ENTRY
STAIR ENCLOSURE
REFERENCE
"ENLARGED ENTRY
STAIR ENCLOSURE" VIEW
0 2' 4' 8'
ARCHITECTURE KEYNOTES
KEY
VALUE DESCRIPTION
M.01 INSULATED METAL PANEL SYSTEM (R-16). PANEL AND ALL
ASSOCIATED PRE-FINISHED TRIM COLOR: BROWN TO MATCH SIMILAR
BUILDINGS AT THE ARSENAL
M.02 ALUMINUM STOREFRONT SYSTEM. COLOR: CLEAR ANODIZED
M.05 PRE-FINISHED METAL COPING. COLOR: DARK BRONZE
M.06 PRE-FINISHED METAL FLASHING. COLOR: DARK BRONZE
M.07 OVERHEAD COILING DOOR. EXTERIOR SLAT COLOR: BROWN;
INTERIOR SLAT AND HOOD COLOR: WHITE
M.08 EXPOSED STEEL SURROUND. PREPARE AND PAINT ALL EXPOSED
STEEL AT OVERHEAD DOOR SURROUND. COLOR: BROWN TO MATCH
EXISTING
M.10 EXISTING BRICK TO REMAIN. REPAINT AND REPAIR AS IDENTIFIED ON
DEMO ELEVATIONS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
10c10b10a109a98a87a76a65a54a43a32a21a1
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
W07 W06 W06
W02W02W02
A01A01A01A01
M.01
M.02
M.11 M.06M.10 M.03 M.06
M.02
M.04
M.09 M.05
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
AAaBBaCCaCbDaDbEEaFFaG
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
W01 W01 W01 W01 W02 W02 W02 W02 W01 W01 W01 W01
W04W03W04W04W06W06W06W06W04W04W04W04
M.09 M.05
M.10
M.02 M.09
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
10c 10b 10a 10 9a 9 8a 8 7a 7 6a 6 5a 5 4a 4 3a 3 2a 2 1a 1
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
W09 W09
W10W10
A01A01A01A01
W09
W10
M.05
M.10
M.02
M.04 M.01
M.06 M.06 M.02 M.02 M.06 M.02 M.03 M.07M.06 M.01 M.01
HATCH LEGEND
TRANSLUCENT FIBERGLASS PANELS
OPAQUE SPANDREL PANEL
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:5
P
M
A-203
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
A R
C H
IT
E
C T
U R
A L E
X T
E R
IO
R
B U
IL
D
IN
G
E L E
V A
T
IO
N S
B
ID
O
P T
IO
N
SCALE: 1/16" = 1'-0"F1
NORTH ELEVATION
0 8' 16' 32'
SCALE: 1/16" = 1'-0"B1
WEST ELEVATION
SCALE: 1/16" = 1'-0"D1
SOUTH ELEVATION
0 8' 16' 32'
0 8' 16' 32'
ARCHITECTURE KEYNOTES
KEY
VALUE DESCRIPTION
A01 BID OPTION: INSTALL TRANSLUCENT FIBERGLASS PANELS IN LIEU OF INSULATED
METAL WALL PANELS FOR THE EXTERIOR WALLS.
M.01 INSULATED METAL PANEL SYSTEM (R-16). PANEL AND ALL ASSOCIATED PRE-FINISHED
TRIM COLOR: BROWN TO MATCH SIMILAR BUILDINGS AT THE ARSENAL
M.02 ALUMINUM STOREFRONT SYSTEM. COLOR: CLEAR ANODIZED
M.03 HOLLOW METAL DOOR AND FRAME. COLOR: BROWN TO MATCH EXISTING
M.04 1" INSULATED METAL INFILL PANEL. COLOR: BROWN SUBSTRATE WITH GLAZED
SPANDREL, BOD: MAPESPAN INSULATED SPANDREL GLASS PANELS BY MAPES
M.05 PRE-FINISHED METAL COPING. COLOR: DARK BRONZE
M.06 PRE-FINISHED METAL FLASHING. COLOR: DARK BRONZE
M.07 OVERHEAD COILING DOOR. EXTERIOR SLAT COLOR: BROWN; INTERIOR SLAT AND
HOOD COLOR: WHITE
M.09 PRE-FABRICATED CANOPY ROOF AND STRUCTURE. REFER TO ENLARGED PLANS AND
SPECIFICATION. EXPOSED STRUCTURAL FRAMING COLOR: BROWN TO MATCH
EXISTING; ROOF PANEL COLOR: BROWN
M.10 EXISTING BRICK TO REMAIN. REPAINT AND REPAIR AS IDENTIFIED ON DEMO
ELEVATIONS
M.11 EXISTING CONCRETE TO REMAIN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
A Aa B Ba C Ca
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
A01A01A01A01
HATCH LEGEND
TRANSLUCENT FIBERGLASS PANELS
OPAQUE SPANDREL PANEL
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:5
P
M
A-204
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
A R
C H
IT
E
C T
U R
A L E
X T
E R
IO
R
B U
IL
D
IN
G
E L E
V A
T
IO
N S
B
ID
O
P T
IO
N
SCALE: 1/16" = 1'-0"F1
EAST ELEVATION
0 8' 16' 32'
ARCHITECTURE KEYNOTES
KEY
VALUE DESCRIPTION
A01 BID OPTION: INSTALL TRANSLUCENT FIBERGLASS PANELS IN LIEU
OF INSULATED METAL WALL PANELS FOR THE EXTERIOR WALLS.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
CbDa
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
A4
A-624
F4
A-624
B8
A-427
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:5
P
M
A-251
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
E X
T E
R
IO
R E
L E
V A
T
IO
N S
SCALE: 3/16" = 1'-0"D1
ENLARGED ENTRY ELEVATION
0 4' 8' 12'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. PARAPET
131' - 7"
F7
A-671
D7
A-671
A4
A-671
C4
A-671
EXISTING BRICK WALL TO
REMAIN
BACK FASTENED
TRANSLUCENT PANEL SYSTEM
EXISTING STRUCTURE TO
REMAIN
ALUMINUM STOREFRONT
SYSTEM
EXISTING SILL TO
REMAIN
EXISTING BRICK TO
REMAIN
EXISTING STRUCTURAL
FOOTING/FOUNDATION TO
REMAIN
EXISTING FLOOR
FINISH TO
REMAIN
A8
A-673
EXISTING
ROOF TO
REMAIN
B7
A-671
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. PARAPET
131' - 7"
F4
A-671
A4
A-671
C4
A-671
EXISTING SILL TO
REMAIN
EXISITING BRICK TO
REMAIN
EXISTING STRUCTURAL
FOOTING/FOUNDATION TO
REMAIN
ALUMINUM STORERONT
SYSTEM
EXISTING BRICK WALL TO
REMAIN
EXISTING STRUCTURE TO
REMAIN
INSULATED METAL PANEL
SYSTEM, R-16
EXISTING FLOOR
FINISH TO
REMAIN
A8
A-672
EXISTING
ROOF TO
REMAIN
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. PARAPET
131' - 7"
E4
A-672
C1
A-672
EXISTING SILL TO
REMAIN
EXISITING BRICK TO
REMAIN
EXISTING STRUCTURAL
FOOTING/FOUNDATION TO
REMAIN
EXISTING BRICK WALL TO
REMAIN
EXISTING STRUCTURE TO
REMAIN
INSULATED METAL PANEL
SYSTEM, R
BACK FASTENED
TRANSLUCENT PANEL SYSTEM
F4
A-671
EXISTING FLOOR
FINISH TO
REMAIN
EXISTING
ROOF TO
REMAIN
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:0
P
M
A-311
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
W A
L L S
E C
T
IO
N S
SCALE: 1/2" = 1'-0"A1
WALL SECTION - NORTH KALWALL - BID OPTION
SCALE: 1/2" = 1'-0"A4
WALL SECTION - NORTH IMP
SCALE: 1/2" = 1'-0"A6
WALL SECTION - SOUTH
0 1' 2' 4' 0 1' 2' 4' 0 1' 2' 4'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
1-1/2" Ø PAINTED STEEL STANDARD WEIGHT PIPE
HANDRAIL WITH WALL BRACKETS AT 5'-0" O.C. MAX.
STAIRS
11"
1" NOSING TYP
T O
C E
N T
E R
O F
H A
N D
R A
IL
2'
HANDRAIL RETURN TO WALL OR
POST TYP.
3'
1' - 0"
1' - 0"
3'
M A
X
7"
A4
A-410
1 1/2" ∅ STD WT
PIPE GUARD RAIL
2 1/4" 1 1/2"
ANCHOR TO POST
3'
DIMENSIONS TO MATCH
EXISTING STEEL GUARD RAIL
STEEL POST EXTENSION TO
NEW GUARD RAIL.
DIMENSIONS TO MATCH
EXISTING. WELD TO EXISTING
RAIL. GRIND WELD SMOOTH
1/4" LAMINATED GLASS
STAINLESS STEEL CLIP
3'
3'
3'
DIMENSIONS TO MATCH
EXISTING STEEL GUARD RAIL
STEEL POST EXTENSION TO
NEW GUARD RAIL.
DIMENSIONS TO MATCH
EXISTING. WELD TO EXISTING
RAIL. GRIND WELD SMOOTH
1 1/2" ∅ STD WT PIPE
RAILING
1/4" LAMINATED GLASS
STAINLESS STEEL CLIP
STEEL BRACKET
5'-0" O.C. MAX.
1-1/2" DIA. O.D.
PAINTED STEEL
PIPE
HANDRAIL
RETURN END TO
WALL/ CLOSE END
ANCHOR TO WALL
1 1/2"
1/4"
2 1/4"
DIMENSIONS TO MATCH EXISTING
STEEL GUARD RAIL
STEEL POST EXTENSION TO
NEW GUARD RAIL.
DIMENSIONS TO MATCH
EXISTING. WELD TO EXISTING
RAIL. GRIND WELD SMOOTH
1 1/2" ∅ STD WT PIPE
HAND RAILING
1/4" LAMINATED GLASS
STAINLESS STEEL CLIP
EXISTING STEEL GUARDRAIL
EXISTING STAIRS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:0
P
M
A-410
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
S T
A
IR
R A
IL
IN
G
SCALE: 1" = 1'-0"D7
WALL MOUNTED HANDRAIL DETAIL
SCALE: 3" = 1'-0"A4
RAILING DETAIL
SCALE: 1" = 1'-0"A1
RAILING DETAIL
SCALE: 6" = 1'-0"A7
WALL MOUNTED HAND RAIL DETAIL
0 1" 2" 4"3"
0 1/2' 1' 2'
0 1" 2" 4"3"0 1/2' 1' 2'
0 1/2' 1' 2'
NOTE:
STR-01 THRU STR-03 IS GOVERNED BY NFPA 101 FOR TREAD AND RISERS, RAILINGS AND CLEARANCES.
STR-04 IS GOVERN BY OSHA FOR STAIR COMPLIANCE FOR TREAD AND RISERS AND RAILINGS
SCALE: 1" = 1'-0"D1
RAILING DETAIL
GUARDRAIL FINISH NOTES:
1. PREP AND PAINT ENTIRE GUARDRAIL / HANDRAIL. COLOR: TBD M
A R
K D
E S
C R
IP
T
IO
N
D A
T E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
10c
10b
10a
Da Db E
20' - 1"2' - 1"
MEN'S LOCKER
ROOM
16' - 8"
/2
S2AE
S2AA
S2AA
FLOOR DRAIN
RE: PLUMBING
106A5106A4
106A2 106A3
MEN'S
LATRINE/LOCKER
HALL
106A
UTILITY ROOM
107C
T-09
T-05
T-09
106B2
106B1
MEN'S LATRINE
HANDWASH
STATIONS
MEN'S SHOWER
107B
106A1 107A1
A-421 D4F4
D1
F1
A-421 A7A1
CONCRETE SLAB-ON-
GRADE SLOPED TO FLOOR
DRAINS
T-09
T-09
T-09
T-09
T-09
T-09
T-09
3'
1" 3'
1"
3'
1" 5'
3'
1" 3'
1"
3'
1" 3'
1"
3'
T-02
T-01
T-07
T-06
T-03
T-07
T-06
LK-1 (QTY 96)
BH-2 (ACCESSIBLE
BENCH)
BH-1
BH-1
EQ EQ
3'
3'
BH-1
5' - 6"
T-10
T-04
T-03
T-03
T-03
T-04
T-04
T-04
S2AA
S2AA
MOP SINK
S2AA
ACCESSIBLE
LOCKERS (BOTTOM
ONLY)
3'
/2
9'
1/ 2"
T-05
2' - 7 1/2"
2' - 0"
S2AA
5' - 1"
5'
" 3'
3' - 0"1' - 0"
3'
S1AE S1AE
S1AES1AE
2' - 0"2' - 0"2' - 0"4' - 2"
WALL INFILL
GENERAL NOTES:
1. REFER TO SHEET AG001 FOR ARCHITECTURAL
LEGEND AND
ABBREVIATIONS.
2. REFER TO AG003 AND AG004 FOR ACCESSORY
MOUNTING HEIGHTS.
3. REFER TO SHEET A-701 FOR FINISH LEGEND AND
SCHEDULE.
4. DIMENSIONS TO URINAL SCREENS AND TOILET
ENCLOSURES ARE
FROM FACE OF WALL FINISH. ALL OTHER
DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU
WALL OR CENTER OF COLUMN LINE, UNO.
5. PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL
LOCATIONS OF WALL HUNG PARTITIONS, GRAB
BARS, AND ACCESSORIES.
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:0
P
M
A-420
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
P L A
N M
E N
'S L
A T
R
IN
E
L O
C K
E R
R O
O M
G
R O
U N
D F
L O
O R
SCALE: 3/8" = 1'-0"A1
ENLARGED PLAN -
MEN'S LATRINE & LOCKER ROOM - GROUND FLOOR
0 2' 4' 6'
TOILET ACCESSORY SCHEDULE
KEY DESCRIPTION
T-01 GRAB BARS HORIZONTAL & VERTICAL
T-02 GRAB BARS HORIZONTAL & VERTICAL
WITH BACK BAR
T-03 WALL MOUNTED SOAP DISPENSER
T-04 MIRROR - 36"x48"
T-05 SURFACE MOUNTED PAPER TOWEL
DISPENSER AND WASTE RECEPTACLE
T-06 SHOWER CURTAIN, HOOKS AND ROD
T-07 TOWEL PIN - 48" AND 60" MOUNTING
HEIGHT
T-08 SANITARY NAPKIN DISPENSER
T-09 TOILET TISSUE DISPENSER
T-10 ADA FOLDING SHOWER SEAT
T-11 MOP & BROOM HOLDER W/ UTILITY
SHELF
T-12 MIRROR - 30"X48"
N
* WALLS TO EXTEND
UP TO UTILITY ROOM
HEIGHT
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
SOLID SURFACE
TROUGH SINK (SSF-1)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
OPEN TO
BEYOND
T-09 T-09 T-09 T-09 T-09
T-04 T-04 T-04 T-04
T-03T-03T-03
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T-05
T-02
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T Y
P
F
U
LL
T
IL
E S
T-05
106B2
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T-03T-05
EPOXY INTEGRAL
COVE BASE
SOLID SURFACE WALL
PANELS (SSF-2)
HDPE LOCKERS
(LK-1)
EPOXY PAINT (PE-1)
OPEN TO
BEYOND
EPOXY INTEGRAL
COVE BASE
HDPE BENCH (BH-1)
HDPE LOCKERS
(LK-1)
EPOXY PAINT (PE-1)
GENERAL NOTES:
1. REFER TO SHEET AG001 FOR ARCHITECTURAL
LEGEND AND
ABBREVIATIONS.
2. REFER TO AG003 AND AG004 FOR ACCESSORY
MOUNTING HEIGHTS.
3. REFER TO SHEET A-701 FOR FINISH LEGEND AND
SCHEDULE.
4. DIMENSIONS TO URINAL SCREENS AND TOILET
ENCLOSURES ARE
FROM FACE OF WALL FINISH. ALL OTHER
DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU
WALL OR CENTER OF COLUMN LINE, UNO.
5. PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL
LOCATIONS OF WALL HUNG PARTITIONS, GRAB
BARS, AND ACCESSORIES.
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:0
P
M
A-421
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
M E
N 'S
L A
T R
IN
E
L
O C
K E
R R
O O
M E
L E
V A
T
IO
N S
G
R O
U N
D F
L O
O R
SCALE: 3/8" = 1'-0"D4
SOUTH ELEVATION - MEN'S LATRINE
SCALE: 3/8" = 1'-0"F4
NORTH ELEVATION - MEN'S LATRINE
SCALE: 3/8" = 1'-0"F1
EAST ELEVATION - MEN'S LATRINE
SCALE: 3/8" = 1'-0"D1
WEST ELEVATION - MEN'S LATRINE
0 2' 4' 6'
TOILET ACCESSORY SCHEDULE
KEY DESCRIPTION
T-01 GRAB BARS HORIZONTAL & VERTICAL
T-02 GRAB BARS HORIZONTAL & VERTICAL
WITH BACK BAR
T-03 WALL MOUNTED SOAP DISPENSER
T-04 MIRROR - 36"x48"
T-05 SURFACE MOUNTED PAPER TOWEL
DISPENSER AND WASTE RECEPTACLE
T-06 SHOWER CURTAIN, HOOKS AND ROD
T-07 TOWEL PIN - 48" AND 60" MOUNTING
HEIGHT
T-08 SANITARY NAPKIN DISPENSER
T-09 TOILET TISSUE DISPENSER
T-10 ADA FOLDING SHOWER SEAT
T-11 MOP & BROOM HOLDER W/ UTILITY
SHELF
T-12 MIRROR - 30"X48"
SCALE: 3/8" = 1'-0"A1
NORTH ELEVATION - MEN'S LOCKER ROOM
SCALE: 3/8" = 1'-0"A7
SOUTH ELEVATION - MEN'S LOCKER ROOM
0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
C Ca Cb
11' - 5"
467 SF
WOMEN'S
LOCKER
ROOM
288 SF
WOMEN'S
LATRINE
104A
149 SF
WOMEN'S
LOCKER
HALL
104C
21' - 7"
33' - 6"
BH-2 (ACCESSIBLE
BENCH)
MOP SINK
CONCRETE SLAB-
ON-GRADE SLOPED
TO FLOOR DRAINS
104A1
104A
104C1
104B1
104C3 104C2
30 SF
J.C.
109D
43 SF
WOMEN'S
SHOWER
104D
NEW WALL OPENING
BH-1
HANDWASH
STATIONS
A-423F4 D4 A-423A1 A7
HC FLOOR
CLEARANCE
(30'X48")
T-07
T-06
T-03
T-06
T-07
FLOOR DRAIN
RE: PLUMBING
T-05
BH-1
LK-1 (QTY 74)
BH-1
BH-1
EQ EQ EQ EQ
6'
C
LE
A R
C
LE
A R
9' - 7" 9' - 7"
T-09
T-09
T-09
T-09
T-08
T-08
T-08
T-08
T-08
T-09
T-02
5'
1" 3'
1"
3'
1" 3'
1"
3'
1"
T-11 A-423 F7
4' - 0"
T-04
T-03
T-03
T-03
T-04
T-04
T-04
T-05
ACCESSIBLE
LOCKERS (BOTTOM
ONLY)
S2AA
S2AA
S1ACS1AC
2' - 1"
5'
9'
1/ 2"
1' - 0 1/2"
109D1
104B
6'
4' - 6"
6'
4' - 11"
3' - 0"1' - 0"
3'
1'
3' - 5 1/2"
S1AES1AE
S1AES1AE
S2AE
S2AE
S2AAS2AA
S2AE
S1AA
S1AA
S2AA
S1AA
GENERAL NOTES:
1. REFER TO SHEET AG001 FOR ARCHITECTURAL
LEGEND AND
ABBREVIATIONS.
2. REFER TO AG003 AND AG004 FOR ACCESSORY
MOUNTING HEIGHTS.
3. REFER TO SHEET A-701 FOR FINISH LEGEND AND
SCHEDULE.
4. DIMENSIONS TO URINAL SCREENS AND TOILET
ENCLOSURES ARE
FROM FACE OF WALL FINISH. ALL OTHER
DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU
WALL OR CENTER OF COLUMN LINE, UNO.
5. PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL
LOCATIONS OF WALL HUNG PARTITIONS, GRAB
BARS, AND ACCESSORIES.
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:1
P
M
A-422
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
W O
M E
N 'S
L A
T R
IN
E
A N
D L
O C
K E
R R
O O
M
G R
O U
N D
F L O
O R
P L A
N S
SCALE: 3/8" = 1'-0"A1
GROUND FLOOR ENLARGED PLAN
TOILET ACCESSORY SCHEDULE
KEY DESCRIPTION
T-01 GRAB BARS HORIZONTAL & VERTICAL
T-02 GRAB BARS HORIZONTAL & VERTICAL
WITH BACK BAR
T-03 WALL MOUNTED SOAP DISPENSER
T-04 MIRROR - 36"x48"
T-05 SURFACE MOUNTED PAPER TOWEL
DISPENSER AND WASTE RECEPTACLE
T-06 SHOWER CURTAIN, HOOKS AND ROD
T-07 TOWEL PIN - 48" AND 60" MOUNTING
HEIGHT
T-08 SANITARY NAPKIN DISPENSER
T-09 TOILET TISSUE DISPENSER
T-10 ADA FOLDING SHOWER SEAT
T-11 MOP & BROOM HOLDER W/ UTILITY
SHELF
T-12 MIRROR - 30"X48"
0 2' 4' 6'
N
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T Y
P
F
U
LL
T
IL
E S
4"
T-05 T-05
T-03T-03T-03
T-04 T-04 T-04 T-04
109D1
EF-1
4" RAMP UP
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
OPEN TO
BEYOND
T-02
T-09 T-09 T-09 T-09
1'
EPOXY INTEGRAL
COVE BASE
HDPE BENCH (BH-1)
HDPE LOCKERS
(LK-1)
EPOXY PAINT (PE-1)
OPEN TO
BEYOND
EPOXY INTEGRAL
COVE BASE
HANDWASH STATIONS
HDPE LOCKERS
(LK-1)
EPOXY PAINT (PE-1)
GENERAL NOTES:
1. REFER TO SHEET AG001 FOR ARCHITECTURAL
LEGEND AND
ABBREVIATIONS.
2. REFER TO AG003 AND AG004 FOR ACCESSORY
MOUNTING HEIGHTS.
3. REFER TO SHEET A-701 FOR FINISH LEGEND AND
SCHEDULE.
4. DIMENSIONS TO URINAL SCREENS AND TOILET
ENCLOSURES ARE
FROM FACE OF WALL FINISH. ALL OTHER
DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU
WALL OR CENTER OF COLUMN LINE, UNO.
5. PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL
LOCATIONS OF WALL HUNG PARTITIONS, GRAB
BARS, AND ACCESSORIES.
2'
0"
2'
2'
7'
3' - 0" 1' - 3"
CLEAR
2' - 0" 1" FILLER
RESILIENT BASE, 4"H
(RB-1)
PLASTIC LAMINATE
(PLAM-1)
SOLID SURFACE
COUNTERTOP (SSF-1)
PLASTIC LAMINATE
(PLAM-1)
PAINT (PA-1)
ADA UNDERCOUNTER
REFRIGERATOR (NIC)
T-12
SD-1
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:1
P
M
A-423
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
W O
M E
N 'S
L A
T R
IN
E
L
O C
K E
R R
O O
M E
L E
V A
T
IO
N S
G
R O
U N
D F
L O
O R
SCALE: 3/8" = 1'-0"F4
NORTH ELEVATION - WOMEN'S LATRINE
SCALE: 3/8" = 1'-0"D4
SOUTH ELEVATION - WOMEN'S LATRINE
TOILET ACCESSORY SCHEDULE
KEY DESCRIPTION
T-01 GRAB BARS HORIZONTAL & VERTICAL
T-02 GRAB BARS HORIZONTAL & VERTICAL
WITH BACK BAR
T-03 WALL MOUNTED SOAP DISPENSER
T-04 MIRROR - 36"x48"
T-05 SURFACE MOUNTED PAPER TOWEL
DISPENSER AND WASTE RECEPTACLE
T-06 SHOWER CURTAIN, HOOKS AND ROD
T-07 TOWEL PIN - 48" AND 60" MOUNTING
HEIGHT
T-08 SANITARY NAPKIN DISPENSER
T-09 TOILET TISSUE DISPENSER
T-10 ADA FOLDING SHOWER SEAT
T-11 MOP & BROOM HOLDER W/ UTILITY
SHELF
T-12 MIRROR - 30"X48"
0 2' 4' 6'
SCALE: 3/8" = 1'-0"A1
NORTH ELEVATION - WOMEN'S LOCKER ROOM
SCALE: 3/8" = 1'-0"A7
SOUTH ELEVATION - WOMEN'S LOCKER ROOM
0 2' 4' 6'
0 2' 4' 6' 0 2' 4' 6'
SCALE: 3/8" = 1'-0"F7
EAST ELEVATION - MOTHER'S ROOM
0 2' 4' 6'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
Cb
263 SF
MEN'S
LATRINE
11' - 10 1/2"
9' - 7"
7'
202A
202B
A-424A6 C6
20 SF
J.C.
202A
T-09
T-09
T-09
T-09
1" 3'
1"
3'
1" 3'
1"
5'
T-02
T-03
T-05
T-04
T-05
T-04
T-04
T-04
T-03
T-03
A-423 F7
S2AE
S2AE
S2AE
1'
M
IN
6'
/2
2' - 0"
1'
M
IN
2'
2'
2'
1' - 6"
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T-09 T-09 T-09
T-02
T-09
1'
1'
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)T-05 T-05
T-04T-04T-04T-04
T-03 T-03 T-03
10c
10b
Da
0"
12' - 0"
77 SF
MOTHER'S
ROOM
200B
158 SF
WOMEN'S
LATRINE
200A
200A1
200A
T-09
T-05
A-424 F6E6
T-02
T-08 1"
5'
1" 3'
T-09
T-08
T-04
T-03
T-04
T-03
T-04
A-424
F4
59 SF
PASSAGE
200B1
S2AE
S2AE
2' - 1"
8'
/2
6' - 5 1/2"
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T-04 T-04 T-04
T-03T-03
EPOXY INTEGRAL
COVE BASE
PORCELAIN TILE
(TLP-1)
PORCELAIN TILE,
ACCENT (TLP-2)
METAL EDGE TRIM
(MT-1)
EPOXY PAINT (PE-1)
T Y
P
F
U
LL
T
IL
E S
4"
T-02
T-09 T-09
1'
GENERAL NOTES:
1. REFER TO SHEET AG001 FOR ARCHITECTURAL
LEGEND AND
ABBREVIATIONS.
2. REFER TO AG003 AND AG004 FOR ACCESSORY
MOUNTING HEIGHTS.
3. REFER TO SHEET A-701 FOR FINISH LEGEND AND
SCHEDULE.
4. DIMENSIONS TO URINAL SCREENS AND TOILET
ENCLOSURES ARE
FROM FACE OF WALL FINISH. ALL OTHER
DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU
WALL OR CENTER OF COLUMN LINE, UNO.
5. PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL
LOCATIONS OF WALL HUNG PARTITIONS, GRAB
BARS, AND ACCESSORIES.
RESILIENT BASE, 4"H
(RB-1)
PLASTIC LAMINATE
(PLAM-1)
SOLID SURFACE
COUNTERTOP (SSF-1)
PLASTIC LAMINATE
(PLAM-1)
PAINT (PA-1)
ADA UNDERCOUNTER
REFRIGERATOR (NIC)
2'
0"
2'
2'
7'
1" FILLER 3' - 0"
CLEAR
2' - 0" 1' - 3" 1" FILLER
6' - 5 1/2"
T-12
SD-1
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:1
P
M
A-424
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
M E
N
W O
M E
N 'S
L A
T R
IN
E
P L A
N A
N D
E L E
V A
T
IO
N S
S
E C
O N
D F
L O
O R
SCALE: 3/8" = 1'-0"A1
ENLARGED PLAN -
MEN'S LATRINE - SECOND FLOOR
0 2' 4' 6'
N
TOILET ACCESSORY SCHEDULE
KEY DESCRIPTION
T-01 GRAB BARS HORIZONTAL & VERTICAL
T-02 GRAB BARS HORIZONTAL & VERTICAL
WITH BACK BAR
T-03 WALL MOUNTED SOAP DISPENSER
T-04 MIRROR - 36"x48"
T-05 SURFACE MOUNTED PAPER TOWEL
DISPENSER AND WASTE RECEPTACLE
T-06 SHOWER CURTAIN, HOOKS AND ROD
T-07 TOWEL PIN - 48" AND 60" MOUNTING
HEIGHT
T-08 SANITARY NAPKIN DISPENSER
T-09 TOILET TISSUE DISPENSER
T-10 ADA FOLDING SHOWER SEAT
T-11 MOP & BROOM HOLDER W/ UTILITY
SHELF
T-12 MIRROR - 30"X48"
SCALE: 3/8" = 1'-0"C6
SOUTH ELEVATION - MEN'S LATRINE
SCALE: 3/8" = 1'-0"A6
NORTH ELEVATION - MEN'S LATRINE
SCALE: 3/8" = 1'-0"A3
ENLARGED PLAN -
WOMEN'S LATRINE - SECOND FLOOR
SCALE: 3/8" = 1'-0"F6
SOUTH ELEVATION - WOMEN'S LATRINE
SCALE: 3/8" = 1'-0"E6
NORTH ELEVATION - WOMEN'S LATRINE
0 2' 4' 6'
0 2' 4' 6'
0 2' 4' 6'
0 2' 4' 6'
0 2' 4' 6'
N
SCALE: 3/8" = 1'-0"F4
NORTH ELEVATION - MOTHER'S ROOM
0 2' 4' 6'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
RESILIENT BASE, 4"H
(RB-1)
ACCENT PAINT
(PA-3)
EQUIPMENT
(NIC)
RESILIENT BASE, 4"H
(RB-1)
PLASTIC LAMINATE
(PLAM-1)
SOLID SURFACE
COUNTERTOP (SSF-1)
PLASTIC LAMINATE
(PLAM-1)
ACCENT PAINT
(PA-3)
TILE BACKSPLASH
(TLP-1)
A-425F1 F5
BREAK ROOM
BREAK ROOM HALL
103A
S1AE
S1AE
S1AE
S1AE
S1AE S1AE
S2AB
12' - 9"
10' - 8"2'
8'
2'
3' - 9"
2'
2'
103A3 103A2
103A1
103A5103A4
102A
2' - 9"
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:1
P
M
A-425
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
P L A
N A
N D
I N
T E
R
IO
R E
L E
V A
T
IO
N S
SCALE: 3/8" = 1'-0"F1
WEST ELEVATION - BREAK ROOM
SCALE: 3/8" = 1'-0"F5
EAST ELEVATION - BREAK ROOM
SCALE: 3/16" = 1'-0"A1
ENLARGED BREAK ROOM PLAN
0 2' 4' 6' 0 2' 4' 6'
0 2' 4' 8'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
10c 10b 10a
Cb
Da
8' - 10" +/- 16' - 10" +/-
10' - 10" +/-
5'
4'
4'
718 SF
STAIR
ENTRY
209A2
200A200A1
209A3
202A
202B
D N
D N
A-426 B5
E5
A-426
E1
A-436
200B1
130 SF
MID LEVEL
ENTRY
VESTIBULE
109A
295 SF
MID LEVEL
STAIR HALL
109B
109A1 109B1 A-426 B5
A-423
F7
A-424F4
D3
A-576
C1
A-436
E5
A-426
10c 10b
Cb
Da
296 SF
STAIR HALL
105A
104C1
105A1
105A2
105A3
322 SF
IT STORAGE
101D
D N
A1
A-436
E5
A-426
1' - 7" 14' - 9" 1' - 7"
1'
RESILIENT BASE, 4"H
(RB-1)
DISPLAY CASE
(PLAM-1)
WALL GRAPHIC
(TBD)
ACCENT PAINT
(PA-3)
2'
0"
5'
5' - 0" 5' - 0"
17' - 11"
3'
VESTIBULE
RESILIENT BASE, 4"H
(RB-1)
LINEAR SCONCE
LIGHTING
RE: ELECTRICAL
WALL PANELS
(PLAM-1)
PAINT (PA-1)
MODIFY RAILING SEE PAGE A-410
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
KEY PLAN
W D
S -1
-D
-0
/2
/2
:0
:2
P
M
A-426
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
S T
A
IR
H A
L L P
L A
N
B
ID
O P
T
IO
N
SCALE: 1/8" = 1'-0"E1
ENLARGED SECOND FLOOR ENTRY PLAN
SCALE: 1/8" = 1'-0"C1
ENLARGED ENTRY FLOOR PLAN
SCALE: 1/8" = 1'-0"A1
ENLARGED GROUND FLOOR ENTRY PLAN
0 4' 8' 16'
0 4' 8' 16'
0 4' 8' 16'
N
N
N
0 2' 4' 8'
SCALE: 3/8" = 1'-0"B5
NORTH ELEVATION - DISPLAY
SCALE: 1/4" = 1'-0"E5
WEST ELEVATION - ENTRY
0 2' 4' 6'
BID OPTION
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
A1
A-427
8' - 10"6"
/4
PREFINISHED STANDING
SEAM METAL ROOF ON
PREFINISHED PURLINS
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
1' - 3"
4"
A1
A-427
PREFABRICATED PREFINISHED
CANOPY STRUCTURE WITH CURVED
STANDING SEAM METAL ROOFING
EXISTING PAVED AREA
REINFORCED CONCRETE
FOUNDATION, REF.
STRUCTURAL
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
CbDa
ENTRY LOBBY
108' - 3 1/4"
19' - 3 1/2"
6' - 9"
' - 3
/3
9' - 7 1/2" 9' - 8"
7' - 1 1/2"
PREFINISHED STANDING
SEAM METAL ROOF ON
PREFINISHED PURLINS
9'
PREFABRICATED PREFINISHED
CANOPY STRUCTURE WITH CURVED
STANDING SEAM METAL ROOFING
B8
A-427
SECOND FLOOR
114' - 0"
CbDa
ENTRY LOBBY
108' - 3 1/4"
A5
A-427
B8
A-427
A5
A-427
A1
A-427
PREFINISHED
STANDING
SEAM METAL
ROOFING, 12" WIDE
B8
A-427
CANOPY
SEALANT
PREFINSIHED METAL
FLASHING
HOLD DOWN CLEAT
METAL CLEAT
FASTENER PAINT TO
MATCH FLASHING
ROOF PANEL TURN UP
EDGE
CANOPY STRUCTURE
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:2
P
M
A-427
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
T R
Y C
A N
O P
Y E
L E
V A
T
IO
N S
B
ID
O
P T
IO
N
SCALE: 3/16" = 1'-0"E1
ENLARGED ENTRY ELEVATION - SOUTH ELEVATION
SCALE: 3/8" = 1'-0"A5
ENTRANCE CANOPY- SECTION VIEW
SCALE: 1/4" = 1'-0"E5
ENLARGED ELEVATION - ENTRANCE CANOPY
0 4' 8' 12'
0 2' 4' 6'
0 2' 4' 8'
0 2' 4' 8'
SCALE: 1/4" = 1'-0"A1
ENTRANCE CANOPY - SECTION VIEW
SCALE: 3/16" = 1'-0"A7
ENTRANCE CANOPY ROOF PLAN
0 4' 8' 12'
BID OPTION
NTSSCALE:B8
DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
D1
A-429
C8
A-429
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
11' - 2 9/16"
A1
A-429
A4
A-429
A8
A-429
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
ROOF
128' - 0"
T.O. SKYLIGHT
136' - 2"
T.O. PARAPET
131' - 7"
C8
A-429
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:2
P
M
A-428
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
R A
M P
A N
D C
A N
O P
Y E
L E
V A
T
IO
N S
SCALE: 3/16" = 1'-0"D1
PROPOSED RAMP - WEST ELEVATION
SCALE: 1/8" = 1'-0"D6
PROPOSED RAMP - NORTH ELEVATION
SCALE: 1/8" = 1'-0"A1
PROPOSED RAMP- EAST ELEVATION
0 4' 8' 12'
0 4' 8' 12'
0 4' 8' 12'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
A1
A-429
A4
A-429
18192021222324252627
5' - 8" 5' - 2 9/16"5' - 8"20' - 10 11/16"4' - 8 1/16"31' - 0 7/16"
8'
/2
3'
' - 8
A8
A-429
1' - 0" HAND RAIL EXTENSION
EXISTING WALKWAY
EXISTING
WALKWAY SEE DETAIL E1/A-430
TYP.
SEE DETAIL B1/A-430
TYP.
FINAL STAIR HEIGHT VERIFY
IN FIELD, REFER TO STRUC
FOR DETAIL
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
A1
A-429
3' - 0"
7'
3/ 4"
5' - 8"
3'
1/ 2"
PREFABRICATED,
PREFINISHED
CANOPY SYSTEM
GALVANIZED WOVEN
WIRE GUARD RAIL
AND HAND RAIL
REINFORCED. CONCRETE RAMP
REF. STRUCTURAL
PAINTED STRUCTURAL
STEEL SUPPORTS
REINFORCED CONCRETE
FOUNDATION, REF. STRUCTURAL
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
D1
A-429
C8
A-429 1213151617
3'
7'
20' - 9 13/16" 6' - 1"
4'
/4
8'
9'
/4
2' - 8"
GROUND FLOOR
100' - 0"
SECOND FLOOR
114' - 0"
ENTRY LOBBY
108' - 3 1/4"
D1
A-429
C8
A-429 1213151617
26' - 10 7/8"
8'
6' - 1"
7'
" D1
A-429
' - 1
1' - 0" HAND RAIL EXTENSION
6 3/16" 10' - 6 7/16"
8'
/1 6"
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-429
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
R A
M P
S E
C T
IO
N
V
IE
W S
SCALE: 3/16" = 1'-0"D1
PROPOSED RAMP CANOPY - SECTION VIEW
SCALE: 3/8" = 1'-0"C8
RAMP CANOPY - BUILDING ENTRANCE
SCALE: 1/4" = 1'-0"A1
RAMP CANOPY - SECTION VIEW
SCALE: 1/4" = 1'-0"A4
RAMP CANOPY - MID SECTION VIEW
0 4' 8' 12'
0 2' 4' 8' 0 2' 4' 6'
0 2' 4' 6'
SCALE: 3/16" = 1'-0"A8
Detail 18
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
1 1/2" ∅ STD WT PIPE
RAILING
1 1/2" X 1 1/2" STEEL
GUARD RAIL
SUPPORT WELDED
TO TOP OF STRINGER
1 1/2" SQUARE MESH INFILL
3/4" U - CHANNEL FRAME ALL SIDES.
STEEL STRINGER3'
"3'
STEEL PAN WITH
POURED-IN-PLACE
CONCRETE TREAD
1 1/2" X 1 1/2" STEEL
GUARD RAIL
NOTE:
EXTERIOR RAILING SHALL BE GALVANIZED FINISH
1 1/2" ∅ STD WT PIPE
RAILING WHERE APPLICABLE
1 1/2" X 1 1/2" STEEL GUARD
RAIL SUPPORT WELDED TO
STRINGER
1 1/2" SQUARE MESH INFILL
3/4" U - CHANNEL FRAME ALL SIDES
STEEL STRINGER
CONCRETE TREAD
/ LANDING
1 1/2" X 1 1/2" STEEL GUARD
RAIL
3'
2"
3'
NOTE:
EXTERIOR RAILING SHALL BE GALVANIZED FINISH
1 1/2" SQUARE
MESH INFILL
1 1/2" x 3/16" SQ TUBE
3/4" CHANNEL PANEL
FRAME, WELD TO 1-1/2" SQ.
TUBE RAILING
1 1/2" ∅ STD WT
PIPE GUARD RAIL
NOTE:
EXTERIOR RAILING SHALL BE GALVANIZED FINISH
2 1/4" 1 1/2"
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-430
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
R A
M P
/S T
A
IR
R A
IL
IN
G D
E T
A
IL
S
SCALE: 1" = 1'-0"E1
RAILING DETAIL
SCALE: 1" = 1'-0"B1
RAILING DETAIL
SCALE: 6" = 1'-0"B4
RAILING DETAIL
0 1" 2" 4"3"
0 1/2' 1' 2'
0 1/2' 1' 2'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
16 SF
VESTIBULE
100E
4' - 10" 4'
/2
100E2
S2AE
S2AE
S2AE
REINSTALLED SALVAGED
DOOR AND FRAME
E4
A-431
31 SF
VESTIBULE
100C
6' - 1"
6'
S2AE
S2AE
S2AE
REINSTALLED
SALVAGED DOOR AND
FRAME
C4
A-431
16 SF
VESTIBULE
100E
S2AE
2 3/4" / 1'-0"
S2AE
2" / 1'-0"
31 SF
VESTIBULE
100CS2AE
S2AE
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-431
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
I
J U
L Y
P ro j.
N o .1
E N
L A
R G
E D
V E
S T
IB
U
L E
P L A
N S
SCALE: 3/8" = 1'-0"E1
ENLARGED VESTIBULE PLAN
SCALE: 3/8" = 1'-0"C1
ENLARGED VESTIBULE PLAN
0 2' 4' 6'
N
0 2' 4' 6'
N
SCALE: 3/8" = 1'-0"E4
ENLARGED VESTIBULE SECTION
SCALE: 3/8" = 1'-0"C4
ENLARGED VESTIBULE SECTION
0 2' 4' 6'
0 2' 4' 6'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
F
IN
A L D
E S
IG
N
I S
S U
E F
O R
B
ID
J U
L Y
REF.
E
F
203B1
A-432 E4
E8
3' - 9 1/2"
S2AE
S2AE
2'
2' - 9"
ALIGN
6'
2'
3' - 2"
" 8'
A-432B4
S2AE
S2AE
ALIGN
SECOND FLOOR
114' - 0"
203B1
1' - 4"
S2AE
2'
4"
PLASTIC LAMINATE
(PLAM-1)
SOLID SURFACE
COUNTERTOP (SSF-1)
TILE BACKSPLASH
(TLP-1)
SECOND FLOOR
114' - 0"
2'
4"
PLASTIC LAMINATE
(PLAM-1)
SOLID SURFACE
COUNTERTOP
(SSF-1)
TILE
BACKSPLASH
(TLP-1)
SECOND FLOOR
114' - 0"
2' - 2"
S2AE
4" 2'
PLASTIC LAMINATE
(PLAM-1)
SOLID SURFACE
COUNTERTOP (SSF-1)
TILE BACKSPLASH
(TLP-1)
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
IS
S
U E
D A
T E
P R
O J E
C T
N O
C O
N T
R A
C T
N O
X
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
W
Y O
R K
D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K N
Y
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
1 753
A
B
C
D
SHEET ID
2 864 10
E
F
G
B U
IL
D
IN
G
R
E N
O V
A T
IO
N
A N
D R
E P
A
IR
W A
T E
R V
L
IE
T A
R S
E N
A L
N E
W Y
O R
K U
S A
C E
W
A T
E R
V L
IE
T
N E
W Y
O R
K
A S
I N
D
IC
A T
E D
US Army Corps of Engineers ®
P N
O
NOT FOR CONSTRUCTION
PHASE 2 RECAPITALIZATION
100% FINAL DESIGN
W D
S -1
-D
-0
/2
/2
:0
:3
P
M
A-432
B .B
A K
A S
C .R
E E
D
R .A
L F
A O
U R
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .