W912DS22B0025 Amend 0002.pdf
PDF 557 KB Posted
- Solicitation number
- W912DS22B0025
About this file
This amendment to a solicitation modifies drawings and specifications for a construction project at the Watervliet Arsenal in New York. The U.S. Army Corps of Engineers seeks to repair and renovate portions of Building 20, including hazardous material removal, window and door replacement, restroom and locker room accessibility upgrades, office renovations, HVAC and lighting improvements, entrance repairs including ramps and vestibules, stair hall and vestibule renovations, and exterior masonry repairs. The estimated construction cost is between $10 and $25 million. Award is projected for September 2022. Relevant changes include revisions and reissuances of numerous drawings and specifications sections.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise and re-issue draw ings (see continuation sheet for specfic changes)
2. Revise and re-issue specifications (see continuation sheet for specfic changes)
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0025
X 9B. DATED (SEE ITEM 11)
24-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Aug-2022
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22B0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
TO BIDDERS:
The following changes shall be made to the drawings and specifications.
DRAWINGS:
1. The following DRAWINGS have been REVISED and REISSUED:
a. C-002
b. CD100
c. CS100
d. CS500
e. CS501
f. CU500
g. S-001
h. S-402
i. S-407
j. S-408
k. S-410
l. S-412
m. S-502
n. P-401
o. ED102
p. ED103
q. ED104
r. ED105
s. ED106
t. ED205
u. ED401
v. EG101
w. EG501
x. EL010
y. EL011
z. EL101
aa. EL102
bb. EL105
cc. EL205
dd. EL501
ee. EL601
ff. EP102
gg. EP104
hh. EP105
ii. EP201
jj. EP202
kk. EP203
ll. EP204
mm. EP205
nn. EP302
oo. EP303
pp. EP304
qq. EP310
rr. EP401
ss. EP601
tt. EP604
uu. EP701
vv. EP702
ww. EP703
xx. EP704
yy. TN104
2. The following DRAWINGS have been REVISED but NOT REISSUED:
a. None
3. The following DRAWINGS have been ADDED:
a. ED401
4. The following DRAWINGS have been DELETED:
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
a. 00 00 02
b. 00 10 00
c. 00 21 16
d. 00 22 10
e. 00 24 00
f. 00 45 00
g. 00 72 00
h. 00 90 00
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
a. 00 00 01
b. 01 11 00
c. 01 14 00
d. 01 20 00
e. 01 45 00.00 10
f. 01 45 00.15 10
g. 01 45 35
h. 01 74 19
i. 01 78 00
j. 01 91 00.15 10
k. 02 41 00
l. 02 84 16
m. 02 85 00
n. 03 30 00
o. 04 03 00
p. 04 20 00
q. 05 05 20.00 27
r. 05 05 23.16
s. 05 12 00
t. 05 30 00
u. 05 40 00
v. 05 50 13
w. 05 52 00
x. 06 10 00
y. 06 20 00
z. 06 41 16.00 10
aa. 06 61 16
bb. 07 21 13
cc. 07 21 16
dd. 07 22 00
ee. 07 42 63
ff. 07 53 23
gg. 07 60 00
hh. 07 84 00
ii. 07 92 00
jj. 08 11 13
kk. 08 31 00
ll. 08 33 23
mm. 08 41 13
nn. 08 51 13
oo. 08 60 45
pp. 08 71 00
qq. 08 81 00
rr. 09 22 00
ss. 09 29 00
tt. 09 30 10
uu. 09 51 00
vv. 09 65 00
ww. 09 67 23.13
xx. 09 90 00
yy. 10 21 13
zz. 10 26 00 aaa. 10 28 13 bbb. 10 44 16 ccc. 10 51 13 ddd. 12 21 00 eee. 13 12 00 fff. 13 48 73 ggg. 14 42 00 hhh. 21 13 13
iii. 21 13 16 jjj. 22 00 00 kkk. 23 05 48.00 40 lll. 23 05 48.19 mmm. 23 05 93 nnn. 23 07 00 ooo. 23 09 00 ppp. 23 21 23 qqq. 23 22 26.00 20 rrr. 23 30 00 sss. 23 57 10.00 10 ttt. 23 64 10 uuu. 23 64 26
vvv. 23 73 13.00 40 www. 23 81 00
xxx. 25 10 10 yyy. 26 05 48.00 10 zzz. 26 20 00 aaaa. 26 28 01.00 10 bbbb. 26 51 00 cccc. 26 56 00 dddd. 27 10 00 eeee. 28 31 79 ffff. 31 00 00 gggg. 32 01 19.61 hhhh. 32 11 23
iiii. 32 12 16 jjjj. 32 16 19 kkkk. 32 17 23 llll. 32 31 13 mmmm. 33 11 00
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
(End of Summary of Changes)
File details come from the government source that posted it. Updated .