Submittals

View the file

Other files

File Type Posted
ADDENDUM_08202019_21_13_26.01_64.pdf PDF
ADDENDUM_08202019_CU112.pdf PDF
ADDENDUM_08202019_CU101.pdf PDF
ADDENDUM_08202019_2FP501.pdf PDF
ADDENDUM_08202019_2FP001.pdf PDF
ADDENDUM_08202019_2FA101.pdf PDF
ADDENDUM_08202019_2FP101.pdf PDF
ADDENDUM_08202019_TOC_with_DELETION.PDF PDF
Amendment_0005.pdf PDF
ADDENDUM_08202019_21_13_13.00_10.pdf PDF
ADDENDUM_08202019_CU111.pdf PDF
ADDENDUM-08202019-CG701.pdf PDF
ADDENDUM_08202019_CG804.pdf PDF
ADDENDUM_08202019_CG802.pdf PDF
ADDENDUM_08202019_CG712.pdf PDF
ADDENDUM_08202019_CG805.pdf PDF
ADDENDUM_08202019_CG710.pdf PDF
ADDENDUM_08202019_CG711.pdf PDF
ADDENDUM_08202019_2A112.pdf PDF
ADDENDUM_08202019_CG803.pdf PDF
Amendment_0004.pdf PDF
ADDENDUM_08072019_-_Munitions_Building_Door_Hardware_.pdf PDF
ADDENDUM_08072019_-_Drawings.pdf PDF
ADDENDUM_08072019_-C-002.pdf PDF
01_22_00.00_10_PRICE_AND_PAYMENT.pdf PDF
ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS.pdf PDF
Sign-in_Sheet_for_Site_Visit.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
VisitorControlMap_20190227.pdf PDF
02_SITE_E.pdf PDF
01_GENERAL.pdf PDF
02_SITE_A2.pdf PDF
02_SITE_A1.pdf PDF
Amendment_0001.pdf PDF
02_SITE_C.pdf PDF
02_SITE_D.pdf PDF
05_MAGAZINES.pdf PDF
04_MUNITIONS.pdf PDF
02_SITE_B.pdf PDF
03_ROBOTICS.pdf PDF
W912DS19R0021.pdf PDF
EOD_RTA_Drawing_Submittal.pdf PDF
2019-07-17_RTA_SUBMITTAL_EOD_Picatinny__-_FULL_SET.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 94 PAGES

EOD Complex

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 G ROList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.4 G ROView Location Map

1.5 G ROProgress and Completion

Pictures

1.10 G ROWork To Be Performed By The

Contractor

1.21 G ROEng Form 93

1.21 G ROEng Form 93

1.21 G ROEng Form 93

SD-04 Samples

1.3 GConstruction Color Board

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G DOPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G DOSustainability Action Plan

1.5.3.1 G DOPreliminary Sustainability

eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 94 PAGES

01 33 29 SD-11 Closeout Submittals

1.5.3.1 G DOFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G DOFinal Sustainability eNotebook

1.5.3.1 G DOAmended Final Sustainability

eNotebook

1.5.3.1 G DOAmended Final High

Performance and Sustainable

Building Checklist

3.2 G DOThird Party Certification

Certificate, Assessment, or

Validation

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.7.2.4 G RONaval Architecture Analysis

1.8 G ROActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 94 PAGES

01 35 26 1.9.1Hot Work Permit

1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet

1.14.1 G ROPortable Gauge Operations

Planning Worksheet

1.9.1 G RODigging Permit

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

1.4 G ROIndoor Air Quality (Iaq)

Management Plan

SD-06 Test Reports

3.9.2Contractor's Verification

Statement

3.10 G ROCqc Report

01 45 20.00 18 SD-01 Preconstruction Submittals

1.3 G ROTest Plan List

01 45 35 SD-01 Preconstruction Submittals

3.1.1 G ROSIOR Letter of Acceptance

3.1.1 G ROProject Manual

3.1.1 G ROProject Manual

3.1.1Written Practices

3.1.3Written Practices

3.1.1NDT Procedures and Equipment

Calibration Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 94 PAGES

01 45 35 3.1.3NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Truss Plant

2.1Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5.10 G ROSpecial Inspector of Record

1.5 G ROSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1Interim Final Report

3.1.3Interim Final Report

3.1.1 G ROComprehensive Final Report

3.1.3 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.9.2 G ROTraffic Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 94 PAGES

01 50 00 2.2.1 G ROHaul Road Plan

1.4 G RODigging Permit

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.5.1Backflow Tester

1.5Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.10 G ROSolid Waste Management Permit

1.6.2 G RORegulatory Notifications

1.7 G ROEnvironmental Protection Plan

3.2.1.2 G ROStormwater Notice of Intent

1.7.9.1 G RODirt and Dust Control Plan

1.6.5 G ROEmployee Training Records

1.6.4 G ROEnvironmental Manager

Qualifications

SD-06 Test Reports

3.2.1.3Inspection Reports

3.6.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.6.5 G ROEmployee Training Records

1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 94 PAGES

01 57 19 3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.6.1 G ROWaste Determination

Documentation

3.6.3.5 G RODisposal Documentation for

Hazardous and Regulated Waste

1.6.5 G ROAssembled Employee Training

Records

1.10 G ROSolid Waste Management Permit

3.6.2.1 G ROSolid Waste Management Report

3.6.3.1 G ROHazardous Waste/Debris

Management

1.6.2 G RORegulatory Notifications

3.6.2.1 G ROSales Documentation

3.2.1.5As-Built Topographic Survey

01 58 00 SD-02 Shop Drawings

1.3.1 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 94 PAGES

01 78 00 SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

3.9 G ROInterim DD FORM 1354

3.9 G ROChecklist for DD FORM 1354

3.9 G ROHigh Performance And

Sustainable Building (Hpsb)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 GTraining Outline

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 94 PAGES

01 78 23 3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.4.1Facility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

3.1 G ROFacility Data Workbook, Construction Progress

3.1 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G ROFacility Data Workbook, Construction Final

1.4.3 G ROFacility Document Set, Construction Final

3.2 G ROFacility Document Set, Construction Final

01 91 00.00 37 SD-01 Preconstruction Submittals

1.9 GDraft Schedule

1.9 GSchedule

SD-02 Shop Drawings

1.11.2Control Drawings

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 94 PAGES

01 91 00.00 37 3.6 GFilled out functional test readiness forms

3.1.3 GCompleted PFT checklists

3.1.4.1 GCompleted startup checklists

3.6.4Completed FPT forms

3.1.5Nonconformance and Approval in

PFT checklists and Startup

3.7Progress reports and test results

SD-07 Certificates

3.2Calibration documentation

3.2Calibration certification

SD-08 Manufacturer’s Instructions

1.10Startup and Checkout Plans

1.10Checkout Forms

1.10Test Procedures

SD-10 Operation and Maintenance

Data

3.9.1 GTraining Plan

3.9.3Training Documentation

3.9.4Training Verification

SD-11 Closeout Submittals

3.7.1Deficiency Report and Resolution

Record

3.7.4Deficiency Report and Resolution

Record

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 94 PAGES

01 91 00.00 37 1.3.4Occupant Comfort Survey With

Results And Corrective Action

Record

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 G RONotification

SD-11 Closeout Submittals

3.3.4Receipts

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 G ROHazardous Waste Management

Plan

3.2 G ROOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.5 G RORecordkeeping

3.5 G ROException Report

3.6Spill Response

SD-07 Certificates

1.4.1 G ROTransportation and Disposal

Coordinator

1.4.2 G ROTraining

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 94 PAGES

02 81 00 1.4.3Certification

3.3.3 G ROShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.4Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

3.1.2.1 GRespirators

3.1.7 GLocal Exhaust Equipment

3.1.7 GPressure Differential Automatic

Recording Instrument

3.1.8 GVacuums

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.13.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 94 PAGES

02 82 00 1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GCompetent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.7 GFederal, State or Local Citations

on Previous Projects

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 G ROCompetent Person

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 94 PAGES

02 83 00 1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.3 GLicenses, Permits and

Notifications

1.5.2.2 G ROLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 GInitial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1 G RORespirators

1.6.4 G ROVacuum Filters

2.1 G ROMaterials and Equipment

2.1.1 G ROExpendable Supplies

SD-06 Test Reports

1.3.3 G ROSampling and Analysis

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report

1.5.2.3 G ROSampling Results

SD-07 Certificates

1.5.1.3 G ROTesting Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 94 PAGES

02 83 00 1.5.1.4 G ROThird Party Consultant

Qualifications

3.1.1.1 G RONotification of the

Commencement of LBP Hazard

Abatement

3.5.1.1 G ROClearance Certification

SD-11 Closeout Submittals

3.5.2.1 G ROHazardous Waste Manifest

02 84 16 SD-07 Certificates

1.8.1 G ROQualifications of CIH

1.8.1 G ROTraining Certification

1.8.2 G ROPCB and Lamp Removal Work

Plan

1.8.3 G ROPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 G ROTransporter certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3DD Form 1348-1

3.3.1Testing results

02 84 33 SD-07 Certificates

1.7.1 G ROTraining certification

1.7.2 G ROQualifications of CIH

1.7.3 G ROPCB removal work plan

1.7.4 G ROPCB disposal plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 94 PAGES

02 84 33 1.7.5 G RONotification

3.8Transporter certification

3.5.4 G ROCertification of Decontamination

3.5.5 G ROPost cleanup sampling

3.8.1 G ROCertificate of disposal

02 85 00 SD-01 Preconstruction Submittals

1.2.26 G ROVentilation System Mold

Remediator Qualifications

1.4.1.1 G ROPreliminary Visual Assessment

Report

1.4.1.2 G ROMicrobial Remediation Plan

1.4.1.3 G RORespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 G ROCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 G ROMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11 G RODisinfectants or Biocide

Sanitizing Solutions

1.2.14 G ROFungicidal Agents, (EPA)

1.2.21 G ROPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 94 PAGES

02 85 00 2.2 G ROSafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 G ROIH Daily Reports

SD-11 Closeout Submittals

1.4.4 G ROSubmittals at Completion of

Remediation Work

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G DOFormwork for 1311

2.2.1 G DOFormwork for 1312

SD-03 Product Data

2.2 G DOForm Material

2.2.2 G AEForm Connectors for 1312

2.2.2 G DOForm Connectors for 1311

SD-04 Samples

1.3 G ROSample Panels

SD-05 Design Data

2.1Calculations

1.3Crack mitigation plan

SD-06 Test Reports

3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

3.1 G AEJoint Locations and Details for

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 94 PAGES

03 15 00.00 10 3.1 G DOJoint Locations and Details for

2.4Waterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

SD-04 Samples

2.3.1Field-Molded Type

2.4Waterstops

SD-07 Certificates

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 G AEReinforcement for ECM

3.1 G AEReinforcement for 1312

3.1 G DOReinforcement for 1311

3.1 G AEReinforcement for All Other

Concrete

SD-07 Certificates

2.3Reinforcing Steel

03 30 00.00 10 SD-01 Preconstruction Submittals

1.4.2 G ROQuality Control Plan

1.4.1Laboratory Accreditation

3.8.1.6 G ROSampling Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 94 PAGES

03 30 00.00 10 Part 2Recycled Content Products

2.2Cementitious Materials

2.10Vapor Retarder and Vapor Barrier

2.1.5Floor Finish

2.8Floor Hardener

2.4 G ROChemical Admixtures

2.4.5 G ROCorrosion Protection Admixture

2.4.5 G ROCorrosion Protection Admixture

SD-05 Design Data

2.1.1 G AEMixture Proportions for 1312

2.1.1 G DOMixture Proportions for 1311

2.1.1 G AEMixture Proportions for ECM

SD-06 Test Reports

2.1.1 G ROMixture Proportions

3.8 G ROTesting and Inspection for CQC

2.2.3Fly Ash

2.2.5Ground Granulated Blast-Furnace

(GGBF) Slag

2.3Aggregates

3.8.1.1Air Content

3.8.1.3Slump

3.8.1.6 G ROCompressive Strength;

2.5Water

SD-07 Certificates

1.4Contractor Quality Control personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 94 PAGES

03 30 00.00 10 3.2Ready-Mix Plant

03 35 00.00 10 SD-03 Product Data

2.1 G ROConcrete Waterproofing Sealant

3.2 G ROConcrete Waterproofing Sealant

Part 2Recycled Content Products

SD-04 Samples

1.3.1 G ROField Test Panels

1.3.1.1 G ROSample Wall Panels

1.3.1.2Slab Panels

SD-08 Manufacturer’s Instructions

3.2 G ROConcrete Waterproofing Sealant

Instructions

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 45 33 SD-02 Shop Drawings

2.1.1.2 G AEDrawings of Precast Members

SD-03 Product Data

2.2.8.1Inserts

2.2.9Bearing Pads

SD-05 Design Data

2.1.1.2 G AEDesign Calculations

1.4.3 G AEConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 94 PAGES

03 45 33 SD-06 Test Reports

1.4.3 G AEConcrete Mix Design

SD-07 Certificates

2.3Quality Control Procedures

3.11 G AEConstruction Records

SD-11 Closeout Submittals

1.4.4Batch Ticket

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

04 20 00 SD-02 Shop Drawings

3.3.1.2 G DOCut CMU Drawings for 1311

3.4.1.1 G AEReinforcement Detail Drawings

for 1312

3.4.1.1 G DOReinforcement Detail Drawings

for 1311

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.2.2.1 G ROCement

2.4.1.1 G ROCementitious Materials

SD-04 Samples

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.4.1.3 G ROAdmixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 94 PAGES

04 20 00 2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

SD-05 Design Data

2.1.2 G ROMasonry Compressive Strength

2.2.2.3Fire-Rated Concrete Masonry

Units

3.2.5 G DOBracing Calculations for 1311

SD-06 Test Reports

2.2.2.3Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 94 PAGES

04 20 00 SD-10 Operation and Maintenance

Data

3.8Take-Back Program

05 12 00 SD-02 Shop Drawings

1.4.1 G AEFabrication Drawings for 1312

1.4.1 G DOFabrication Drawings for 1311

1.4.1 G AEFabrication Drawings for ECM

SD-03 Product Data

2.5.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

SD-05 Design Data

1.4.2Design Calculations for Steel

Connections

1.4.1Shoring and Temporary Bracing

SD-06 Test Reports

3.5.1.2Weld Inspection Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3AISC Structural Steel Fabricator

Quality Certification

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 94 PAGES

05 21 00 SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 G AEDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.3 G ROFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.10Mechanical Fasteners

2.1.3Touch-Up Paint

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

2.1Deck Units

SD-07 Certificates

1.3.2.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 94 PAGES

05 40 00 SD-02 Shop Drawings

1.7.2.3 G DOTruss Design Drawings

1.7.8.1 G DOTruss Design Drawings

3.4.1 G DOTruss Design Drawings

3.4.1 G DOTruss Design Drawings

1.7.2.3 G DOTruss Permanent Bracing

Drawings

1.7.8.1 G DOTruss Permanent Bracing

Drawings

1.7.2.3 G DOTruss Temporary Bracing

Drawings

1.7.8.1 G DOTruss Temporary Bracing

Drawings

3.4.1 G DOTruss Temporary Bracing

Drawings

1.7.2.3 G DOTruss Placement Diagram

1.7.8.1 G DOTruss Placement Diagram

1.7.8.2 G DOTruss Framing Components

2.1 G DOTruss Framing Components

SD-03 Product Data

Truss Components

Truss Component Manufacturer's descriptive literature for each item of cold-formed metal framing and each accessory specified in this section.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 94 PAGES

05 40 00 3.4.1Truss Installation Instructions

SRecycled Content of Steel

Products

SD-05 Design Data

G DOTruss Calculations

G DOTruss Connections

G DOBlocking Shear Calculations

G DOTruss Reactions

SD-07 Certificates

1.5Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.4 G AEBollards/Pipe Guards

SD-03 Product Data

2.1 SRecycled Content

05 51 33 SD-02 Shop Drawings

2.3 G AELadders

SD-03 Product Data

2.3 G AELadders

SD-07 Certificates

1.3 G AEFabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

2.1 G AEFabrication Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 94 PAGES

05 52 00 2.2.7 G AEConcrete Inserts

2.2.9 G AESteel Railings and Handrails

06 10 00 SD-06 Test Reports

1.4.2Preservative-Treated

SD-07 Certificates

1.11.1Certificates of Grade

1.11.2Certified Sustainably Harvested

Wood

1.7Preservative Treatment

SD-10 Operation and Maintenance

Data

3.3Take-back Program

06 61 16 SD-02 Shop Drawings

1.5.2Detail Drawings

3.1Installation

SD-03 Product Data

2.1Solid Polymer Material

1.5.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1Material

2.3.5 G AECounter and Vanity Tops

2.3.4 G AEWindow Stools

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 94 PAGES

06 61 16 2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G ROThermal Imaging Camera

SD-05 Design Data

3.2 G ROEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G ROPressure Test Procedures

3.5.8 G ROAir Leakage Test Report

3.6.5 G RODiagnostic Test Report

07 13 53 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 94 PAGES

07 13 53 1.3 G AEManufacturer's Standard Details

2.2 G AEElastomeric Waterproofing Sheet

Material

2.6 G AEProtection Board

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-06 Test Reports

2.2 G AEElastomeric Waterproofing Sheet

Material

3.6 G AEProtective Covering

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

1.4 G AEProtective Coverings

1.8 G AESpecial Warranties

1.8 G AESpecial Warranties

2.1.1 G AECertificates Of Compliance

2.1.2 G AECertificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1Certificates Of Compliance

2.1.2Certificates Of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 94 PAGES

07 19 00 SD-03 Product Data

2.2Water Repellents

SD-07 Certificates

1.3.1Manufacturer's Qualifications

1.11Warranty

SD-08 Manufacturer’s Instructions

3.4Application

1.6.1Safety Data Sheets

07 21 13 SD-03 Product Data

1.3Manufacturer's Standard Details

2.2 G AEBlock or Board Insulation

2.2 G AEBlock or Board Insulation

1.4Protection Board or Coatings

2.4Accessories

SD-07 Certificates

2.2 G AEBlock or Board Insulation

2.2 G AEBlock or Board Insulation

1.5ULE Greenguard

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.4.1Adhesive

SD-11 Closeout Submittals

1.5 SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 94 PAGES

07 22 00 SD-03 Product Data

2.2 G AEInsulation

2.2 G AEInsulation

2.4 G AEFasteners

2.4 G AEFasteners

SD-06 Test Reports

1.6.1 G AEFlame Spread Rating

1.6.1 G AEFlame Spread Rating

SD-07 Certificates

1.7 G AEVolatile Organic Compounds

(VOC) Content

1.7 G AEVolatile Organic Compounds

(VOC) Content

SD-08 Manufacturer’s Instructions

2.4Fasteners

2.2Insulation

SD-11 Closeout Submittals

1.7Volatile Organic Compounds

(VOC) Content

07 27 10.00 10 SD-06 Test Reports

1.8 G RODesign Review Report

3.1.2 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 G ROQualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 94 PAGES

07 27 19.01 1.8.2 G ROQualifications of Installer

SD-02 Shop Drawings

1.4Self-adhering Air Barrier

SD-03 Product Data

1.4 G ROSelf-adhering Air Barrier

2.3 G ROPrimers, Adhesives, and Mastics

1.4.2 G ROSafety Data Sheets

SD-06 Test Reports

1.6Field Peel Adhesion Test

1.4.4Flame Propagation of Wall

Assemblies

1.4.4Flame Spread and Smoke

Developed Index Ratings

3.4.1Site Inspections and Testing

SD-07 Certificates

1.4 G ROSelf-adhering Air Barrier

1.8.1 G ROQualifications of Manufacturer

1.8.2 G ROQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4Self-adhering Air Barrier

2.3Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content

07 60 00 SD-02 Shop Drawings

2.2.1Exposed Sheet Metal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 94 PAGES

07 60 00 3.1.15 G ROGutters

3.1.16 G RODownspouts

3.1.20Expansion Joints

3.1.10Base Flashing

3.1.11Counterflashing

3.1.21 G ROFlashing at Roof Penetrations

2.2.11Reglets

3.1.14Drip Edges

3.1.18Eave Flashing

2.1 SRecycled Content

SD-04 Samples

1.4.2 G AEFinish Samples

1.4.2 G AEFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

3.5Quality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3Cleaning and Maintenance

SD-11 Closeout Submittals

3.5Quality Control Plan

07 61 14.00 20 SD-02 Shop Drawings

1.2.3 G AERoofing

1.2.3 G AERoofing

SD-03 Product Data

2.1 G AERoofing Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 94 PAGES

07 61 14.00 20 2.1 G AERoofing Panels

2.1 SEnergy Star Label for Steel

Roofing Product

2.1.1 SRecycled Content for Steel

Roofing Product

2.1 SHeat Island Reduction

2.2Attachment Clips

2.3.1Closures

2.3Accessories

2.3.2Fasteners

2.3.3Sealants

1.7 G AEWarranty

1.7 G AEWarranty

SD-04 Samples

2.1 G AEPanel

2.1 G AEPanel

2.3Accessories

2.3.3Sealants

SD-05 Design Data

1.5Design Calculations

SD-06 Test Reports

3.6Field Inspection

1.3.3Structural Performance

1.6.6Finish

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 94 PAGES

07 61 14.00 20 1.6.3Manufacturer's Technical

Representative

1.6.4Installer's Qualifications

2.1 G ROCoil Stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-11 Closeout Submittals

3.8Information Card

1.7Warranty

07 84 00 SD-02 Shop Drawings

2.1Firestopping System

SD-06 Test Reports

3.3Inspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1 G ROSealants

2.2Primers

2.3Bond Breakers

2.4Backstops

3.1Field Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 94 PAGES

07 92 00 2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.5 SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 G DODoors for 1311

2.1 G DODoors for 1311

2.1 G AEDoors for 1312

2.1 G AEDoors for 1312

2.7 G DOFrames for 1311

2.7 G DOFrames for 1311

2.7 G AEFrames for 1312

2.7 G AEFrames for 1312

2.5Accessories

SD-03 Product Data

2.1Doors

2.7Frames

2.5Accessories

08 33 23 SD-02 Shop Drawings

2.2.1 G AEOverhead Coiling Doors

2.2.1 G AEOverhead Coiling Doors

2.2.3Counterbalancing Mechanism

2.2.4 G AEElectric Door Operators

2.2.4 G AEElectric Door Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 94 PAGES

08 33 23 2.2.1.3Bottom Bars

2.1.1.1Guides

2.2.3.1Mounting Brackets

2.2.1.8Overhead Drum

3.3.2Hood

SD-03 Product Data

2.2.1 G AEOverhead Coiling Doors

2.2.1 G AEOverhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Electric Door Operators

SD-05 Design Data

2.2.1Overhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Electric Door Operators

SD-10 Operation and Maintenance

Data

3.3.2Operation and Maintenance

Manuals

3.3.2Materials

3.3.2Devices

3.3.2Procedures

3.3.2Manufacture's Brochures

3.3.2Parts Lists

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 94 PAGES

08 33 23 3.3.1Warranty

08 34 02 SD-02 Shop Drawings

3.3 G DOInstallation

SD-03 Product Data

1.2.3 G DOBullet Resistant Components

1.2.3 G DOBullet Resistant Components

2.1 G DOBullet Resistant Components

SD-07 Certificates

1.2.3 G DOBullet Resistant Components

1.2.3 G DOBullet Resistant Components

2.1 G DOBullet Resistant Components

SD-10 Operation and Maintenance

Data

1.2.3 G DOBullet Resistant Components

1.2.3 G DOBullet Resistant Components

2.1 G DOBullet Resistant Components

08 39 53 SD-02 Shop Drawings

2.5.1 G AEBlast Resistant Doors

2.4 G AETrolley Track

2.2 G AETrolleys

SD-03 Product Data

2.2 G AETrolleys

SD-05 Design Data

2.3 G AEManual Operator

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 94 PAGES

08 39 53 2.5.1 G AEBlast Resistant Doors

08 41 13 SD-01 Preconstruction Submittals

1.2.1Sample Warranty

1.2.1List of Product Installations

SD-02 Shop Drawings

3.3 G DOInstallation Drawings

2.2 G DOFabrication Drawings

SD-03 Product Data

1.2.1 G DOManufacturer's Catalog Data

2.1 G DODesign Analysis

SD-04 Samples

1.2.1 G DOFinish and Color Samples

SD-06 Test Reports

1.2.1Certified Test Reports

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.6Manufacturer's Product Warranty

08 51 13 SD-02 Shop Drawings

2.1 G DOWindows

1.10Fabrication Drawings

SD-03 Product Data

2.1 G DOWindows

2.1 SRecycled Content of Aluminum

Windows

2.2.7.1 G DOHardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 94 PAGES

08 51 13 2.2.3 G DOFasteners

1.11 G DOWindow Performance

2.3 G DOThermal-Barrier Windows

2.2.2 G DOWeatherstripping

2.2.7 G DOAccessories

2.2.4Adhesives

1.11.4 G DOThermal Performance

SD-04 Samples

1.4.2.1Finish Sample

1.4.2.2Window Sample

SD-05 Design Data

2.1 G DOStructural Calculations for

Deflection

SD-06 Test Reports

1.4.4Minimum Condensation

Resistance Factor

SD-10 Operation and Maintenance

Data

2.1 G DOWindows

1.7Plastic Identification

08 56 53 SD-02 Shop Drawings

2.1 G AEWindow units

SD-03 Product Data

2.1 G AEWindow units

2.3Setting materials

08 71 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 94 PAGES

08 71 00 1.3 G AEManufacturer's Detail Drawings

1.3 G AEManufacturer's Detail Drawings

1.3Verification of Existing Conditions

1.5 G AEHardware Schedule

1.5 G AEHardware Schedule

2.3.7 G ROKeying System

SD-03 Product Data

2.3 G AEHardware Items

2.3 G AEHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G ROHardware Schedule

SD-11 Closeout Submittals

1.6.1 G ROKey Bitting

08 81 00 SD-03 Product Data

1.6.1 G DOInsulating Glass

1.3Glazing Accessories

SD-04 Samples

1.6.1 G DOInsulating Glass

SD-07 Certificates

1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 94 PAGES

08 91 00 SD-02 Shop Drawings

1.4 G ROWall louvers

1.5 G ROWall louvers

SD-03 Product Data

2.2 G ROMetal Wall Louvers

SD-04 Samples

1.4Wall louvers

1.5Wall louvers

09 22 00 SD-02 Shop Drawings

2.1Metal support systems

09 29 00 SD-03 Product Data

2.2.6Cementitious Backer Units

2.2.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.2.4Glass Mat Covered or Reinforced

Gypsum Sheathing

2.2.4.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.2.5Abuse Resistant Gypsum Board

2.2.10Accessories

1.3Certifications

2.2.1Gypsum Board

SD-07 Certificates

2.2 G ROAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.2Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 94 PAGES

09 29 00 SD-10 Operation and Maintenance

Data

2.2Manufacturer Maintenance

Instructions

SD-11 Closeout Submittals

2.2.1 SRecycled Content for Gypsum

Board

2.2.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.2.1 SIndoor Air Quality for Gypsum

Board

2.2.7 SVOC Content of Joint Compound

2.2.9 SIndoor Air Quality for Non-aerosol

Adhesives

2.2.9 SIndoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2 G AEDetail Drawings

SD-03 Product Data

2.1.1 G AEPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1.2 G AEMosaic Tile

2.1.2 SRecycled Content for Mosaic Tile

2.4 G AEMortar, Grout, and Adhesive

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C…

This is the start of the file's text. The full file is on GovTribe.