DEMOLITION AND REMOVAL NOTES: LAYOUT NOTES:
GRADING AND STORM DRAINAGE NOTES:
EROSION CONTROL NOTES:
UTILITY NOTES:
CONTRACTOR STAGING AREA:
1.
1.
SURVEY NOTES:
COORDINATES AND STATIONING ARE IN ENGLISH UNITS.
DIMENSIONS ARE FROM BACK OF CURB OR CENTER OF
PAVEMENT MARKING UNLESS OTHERWISE NOTED OR SHOWN.
1.
2.
STAGING AREA SHALL BE WITHIN THE LIMITS OF CONSTRUCTION.
REFER TO CU SERIES SHEETS FOR WATER, SEWER AND GAS INFORMATION.
THE CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL UTILITIES WITHIN
THE LIMITS OF CONSTRUCTION PRIOR TO THE START OF ANY DESIGN
CONSTRUCTION.
1.
2.
HORIZONTAL COORDINATES ARE BASED ON THE NEW JERSEY STATE PLAN COORDINATES
ELEVATIONS ARE BASED ON THE NEW JERSEY STATE PLANE NAVD 1988 VERTICAL DATUM.
THE SURVEY DATA DEPICTED ON THIS MAP WAS OBTAINED ON JUNE 15, 2018.
THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF SURVEY MADE ON THE
DATE INDICATED ABOVE AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS
AT THAT TIME.
COORDINATES SHOWN FOR BM'S AND OTHER CONTROL POINTS ARE SHOWN IN FORMAT OF ID,
EASTING, NORTHING, AND ELEVATION
WHERE NOT FIELD LOCATED, THE UTILITY LINES (WATER, SANITARY SEWER, GAS, STORM DRAINAGE, AND OTHER NOTED UTILITES) WERE INPUT PER GIS INFORMATION PROVIDED BY PICATINNY ARSENAL
DPW. CONTRACTOR RESPONSIBLE FOR LOCATING THESE UTILITIES AT NO ADDITIONAL COST TO THE
GOVERNMENT.
DUE TO NO SUPPORTING DATA, SOME UTILITIES WERE NOT CONNECTED. THESE UTILITIES SHOULD
BE VERIFIED BEFORE ANY CONSTRUCTION.
THE EXISTING UNDERGROUND UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE SURVEYS AND
RECORDS AND THEREFORE LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. THE
VERIFICATION OF THE LOCATION OF ALL UTILITIES AND STRUCTURES SHOWN ON THESE PLANS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL FIELD VERIFY
LOCATION WITHOUT ADDITIONAL COST TO THE GOVERNMENT. IF ANY DISCREPANCIES EXIST, THE
CONTRACTOR SHALL NOTIFY THE GOVERNMENT IMMEDIATELY.
SEE CG801 FOR STANDARD EROSION AND SEDIMENT CONTROL NOTES.
1.
2.
3.
4.
5.
6.
7.
8.
TOPSOIL SHALL BE STRIPPED FROM THE SITE AND STOCKPILED. ALL STOCKPILE
AREAS SHALL BE PROTECTED WITH PROPER EROSION CONTROL MEASURES. REFER
TO CG701 THRU CG805 FOR DETAILS. TOPSOIL SHALL BE SPREAD AND COMPACTED
5 INCHES THICK ON AREAS IDENTIFIED TO BE GRASSED.
EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO PERFORMING
ANY LAND DISTURBING ACTIVITIES OR DEMOLITION.
TREES OUTSIDE THE LIMITS OF CONSTRUCTION SHALL NOT BE DISTURBED BY
CONSTRUCTION EQUIPMENT.
THE LIMITS OF CONSTRUCTION AS SHOWN ON THE CONTRACT PLANS SHALL NOT BE
ADJUSTED WITHOUT PRIOR APPROVAL FROM THE CONTRACTING OFFICER.
TEMPORARY STOCKPILE LOCATIONS OF EXCAVATED MATERIALS SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER. ALL STOCKPILE AREAS
SHALL BE PROTECTED WITH PROPER EROSION CONTROL MEASURES. REFER
TO CG701 THRU CG805 FOR DETAILS.
NO UTILITY LINES SHALL BE ABANDONED IN PLACE. ALL LINES THAT ARE PARTIALLY
REMOVED SHALL BE CAPPED ON THE ACTIVE SIDE.
OFF-SITE VEHICLE TRACKING OF DIRT, SOILS, SEDIMENT AND DUST SHALL BE MINIMIZED OR
ELIMINATED TO THE MAXIMUM EXTENT POSSIBLE. REFER TO CG701 THRU CG805 FOR
MORE INFORMATION.
ALL DEMOLITION MATERIALS SHALL BE HAULED OFF SITE AND DISPOSED OF IN AN
APPROVED DISPOSAL AREA OFF THE ARSENAL BY THE CONTRACTOR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ALL EXCAVATION SHALL BE PERFORMED SO THAT THE SITE AND THE AREA IMMEDIATELY
SURROUNDING THE SITE WHICH AFFECTS OPERATIONS ARE CONTINUALLY AND
EFFECTIVELY DRAINED DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR
SHALL PROVIDE DEWATERING AS REQUIRED SO THAT ALL FOOTING EXCAVATIONS ARE
ACCOMPLISHED IN THE DRY. ALL FOOTING EXCAVATIONS SHALL REMAIN DRY AND
FIRM UNTIL THE FOOTINGS ARE IN PLACE AND BACKFILLED. DEWATERING OF ANY
SURFACE WATER, GROUNDWATER, AND/OR ANY PERCHED WATER CONDITION
WHICH MAY BE ENCOUNTERED DURING EXCAVATIONS SHALL BE ACCOMPLISHED BY
ANY ACCEPTABLE MEANS AS APPROVED BY THE CONTRACTING OFFICER. SEE
PARAGRAPHS ON DRAINAGE AND DEWATERING OF SPECIFICATION SECTION 31 00 00
EARTHWORK FOR ADDITIONAL REQUIREMENTS.
ALL STORM DRAINAGE PIPES 15 INCHES OR GREATER SHALL HAVE THEIR JOINTS WRAPPED
WITH FILTER FABRIC. FILTER FABRIC SHALL EXTEND 1 FOOT PAST THE JOINT. FILTER FABRIC
SHALL HAVE AN OVERLAP OF 18 INCHES.
ROOF DRAINS WILL DISCHARGE TO STORM SYSTEM AND DIRECTED AWAY FROM THE BUILDING.
SEE ARCHITECTURAL SHEETS FOR LOCATION OF DOWNSPOUTS AND/OR ROOF DRAINS.
ALL EXISTING MANHOLES SHOWN ON CG SHEETS, ES SHEETS, AND V- SHEETS SHALL BE
RAISED OR LOWERED TO MATCH THE NEW FINISHED GRADES UNLESS NOTED OTHERWISE
ON THESE SHEETS.
THE CONTRACTOR MAY ENCOUNTER "PERCHED WATER" CONDITIONS IN SOME
EXCAVATIONS REQUIRED FOR THIS PROJECT. SEE BORING LOCATION PLAN AND LOGS.
A. A "PERCHED WATER" CONDITION OCCURS WHEN WATER SEEPING DOWNWARD IS BLOCKED
BY AN IMPERMEABLE SOIL LAYER, SUCH AS CLAYEY SAND, CLAY OR SILT, AND SATURATES
THE MORE PERMEABLE SOIL ABOVE IT. THE TRUE GROUND WATER LEVEL CAN BE SEVERAL
TO MANY FEET BELOW THE "PERCHED WATER" LEVEL.
B. IT IS ANTICIPATED THAT SATISFACTORY DEWATERING TO PERMIT THE REQUIRED
CONSTRUCTION CAN BE ACCOMPLISHED BY THE USE OF FRENCH DRAINS, DITCHES,
TRENCHES, AND PUMPING FROM FILTERED SUMPS. THE CONTRACTOR SHALL PERFORM
WHICHEVER MEASURES NECESSARY SO THAT ALL REQUIRED WORK IS
PERFORMED IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND THE
SPECIFICATIONS.
C. REFER TO LOGS OF SOIL BORINGS IN THE CONTRACT DRAWINGS FOR WATER LEVELS
OBSERVED DURING DRILLING. HOWEVER, BOTH "PERCHED WATER" AND TRUE
GROUNDWATER LEVELS CAN FLUCTUATE DEPENDING ON VARIATIONS IN PRECIPITATION,
DRAINAGE PATTERNS, SURFACE WATER RUNOFF, AND THE APPLICATION OF IRRIGATION
WATER.
ALL FILL AND CUT SLOPES SHALL BE NO STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL
UNLESS NOTED OTHERWISE ON THE DRAWINGS.
REFER TO SPECIFICATION 32 92 19 SEEDING FOR ADDITIONAL INFORMATION.
THE CONTRACTOR SHALL COORDINATE ALL GRADING OPERATIONS WITH OTHER UTILITIES
TO BE INSTALLED. WHERE EARTHWORK CUT IS TO BE ACCOMPLISHED, ALL NEW UTILITIES
SHALL BE CONSTRUCTED WITH THE REQUIRED COVER AND COORDINATION WITH PRIVATIZED
UTILITIES.
TRENCH BOXES SHALL BE USED TO INSTALL STORM DRAINAGE LINES AROUND EXISTING
TREES TO REMAIN. NO FILL FROM THE EXCAVATIONS SHALL BE STOCKPILED WITHIN THE
DRIP LINE OF THE TREES TO REMAIN.
SEE CG SHEETS FOR STORM DRAINAGE SCHEDULE AND DETAILS.
SURPLUS MATERIAL OR OTHER SOIL MATERIAL NOT REQUIRED OR SUITABLE FOR FILLING
OR BACKFILLING SHALL BE WITHIN THE PROJECT SITE.
REFER TO SPECIFICATION SECTION 31 00 00 EARTHWORK FOR ADDITIONAL INFORMATION.
ELEVATIONS SHOWN ON CURBS ARE SHOWN AT BOTTOM OF CURB UNLESS OTHERWISE NOTED.
STRUCTURAL EXCAVATION: EXCAVATION BELOW THE BUILDING FOOTPRINT SHALL BE PERFORMED
TO A MINIMUM DEPTH OF FOUR (4) FEET BELOW EXISTING GRADE. THIS EXCAVATION SHALL EXTEND A
HORIZONTAL DISTANCE OF THREE (3) FEET BEYOND THE PERIMETER OF THE
FOUNDATION. CONTRACTOR SHALL REMOVE ALL EXISTING MANMADE MATERIAL BELOW THE BUILDING
FOOTPRINT. ENSURE THAT FOOTING SUBGRADES HAVE BEEN INSPECTED AND APPROVED BY THE
CONTRACTOR'S GEOTECHNICAL ENGINEER BEFORE CONCRETE PLACEMENT. THE GEOTECHNICAL
REPORT IS ATTACHED TO SPECIFICATION 31 00 00 FOR REFERENCE ONLY.
ALL STRUCTURAL FILL PLACED TO FACILITATE DESIRED SITE GRADES SHALL BE CONSTRUCTED FROM
SATISFACTORY MATERIAL FREE FROM ORGANIC MATERIAL AND ROCKS WITH ANY DIMENSION
GREATER THAN THREE (3) INCHES. ALL FOOTINGS SHALL BE PLACED OVER A MINIMUM OF THREE (3)
FOOT THICK LAYER OF SELECT GRANULAR MATERIAL. THE FILL SHALL BE PLACED IN MAXIMUM 6-INCH
LOOSE LIFTS AND COMPACTED TO THE CRITERIA LISTED IN SPECIFICATION 31 00 00 EARTHWORK.
PAVEMENT AREA EXCAVATION: EXCAVATION BELOW PAVEMENT AREAS SHALL BE PERFORMED TO A
MINIMUM DEPTH OF TWO (2) FEET BELOW EXISTING GRADE. ENSURE THE SUBGRADE HAS BEEN
INSPECTED AND APPROVED BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT
OF MATERIAL. COMPACT THE SUBGRADE IN ACCORDANCE WITH SPECIFICATION 31 00 00
EARTHWORK.
1.
2.
3.
4.
5.
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO
CONSTRUCTION.
REFER TO SHEET V-101 FOR HORIZONTAL & VERTICAL CONTROL.
REFER TO ELECTRICAL SITE DRAWING ES101 FOR ELECTRICAL SITE WORK.
ALL MATERIALS WHICH ARE REMOVED AND NOT SCHEDULED TO BE REUSED OR
SALVAGED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED FROM GOVERNMENT PROPERTY.
THE CONTRACTOR SHALL NOT DISTURB THE EXISTING STREAM RUNNING FROM FORD
AVENUE TO THE 48" CULVERT CROSSING UPPER X.H.E. ROAD FROM MAY 1 THRU JULY 31.
CD GENERAL NOTES
1.
2.
3.
REFER TO CG SERIES DRAWINGS FOR STORM DRAINAGE PIPING AND
STRUCTURES.
CONTRACTOR TO COORDINATE UTILITY INSTALLATION WITH FINAL PAVING
AND PRIVATIZED UTILITIES TO AVOID UTILITY CUTS IN NEW PAVEMENT.
REFER TO SHEET CS SERIES FOR SITE LAYOUT DRAWINGS.
PROVIDE THRUST BLOCK AT ALL BENDS OF DOMESTIC WATER AND FIRE
WATER LINES.
CU GENERAL NOTES
DISTURBED AREAS ARE TO BE GRADED TO MATCH ADJACENT EXISTING SLOPES
AND SEEDED PERMANENTLY.
ALL RCP DRAINAGE PIPES TO BE CLASS III UNLESS NOTED OTHERWISE. ALL
PERFORATED PIPES TO HAVE MINIMUM 1.9 SQUARE INCHES OPEN AREA PER
LINEAR FOOT OF PIPE. ALL PIPES LESS THAN 12" IN DIAMETER TO BE PVC.
NO UNDERGROUND STORAGE TANKS (UST) ARE ANTICIPATED TO BE FOUND
DURING CONSTRUCTION. IMMEDIATELY CONTACT THE CONTRACTING OFFICER
IF A (UST) IS ENCOUNTERED DURING CONSTRUCTION.
REFER TO SHEET CG601 FOR STORM DRAINAGE SCHEDULE.
CONTOUR INTERVAL 1.0' (FEET).
DUE TO THE POTENTIAL FOR MUNITIONS AND EXPLOSIVES OF CONCERN (MEC)
ALL SOIL DISTURBANCE ACTIVITIES REQUIRE MILITARY MUNITIONS RESPONSE
PROGRAM (MMRP) CONSTRUCTION SUPPORT THROUGH THE BALTIMORE
DISTRICT CORPS OF ENGINEERS. THE CONTRACTOR SHALL COORDINATE WITH
TED GABEL (973-724-6748) AND THE CONTRACTING OFFICER TO ALL MMRP
CONSTRUCTION SUPPORT PERSONNEL TO CLEAR ALL AREAS TO BE DISTURBED
INCREMENTAL LAYERS NOT EXCEEDING DETECTION DEPTH OF THE EQUIPMENT
EXTENDING 2' BELOW FINAL WORKING ELEVATION.
CG GENERAL NOTES
1.
2.
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO CONSTRUCTION.
REFER TO SHEET V-101 FOR HORIZONTAL & VERTICAL
CONTROL.
CS GENERAL NOTES
SAFETY GUIDANCE FOR WORK CONDUCTED
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL ITS EMPLOYEES,
SUB-CONTRACTORS OR AGENTS WORKING AT THE SITE HAVE RECEIVED THE
MUNITIONS EXPLOSIVE OF CONCERN (MEC) AWARENESS INFORMATION
CONSISTING OF:
A) DISCUSSION AND UNDERSTANDING OF SERGEANT WOLF POSTER'S GUIDELINES;
AND
B) MUNITIONS EXPLOSIVES OF CONCERN (MEC) AWARENESS PAMPHLET OF MEC
ITEMS FOUND AT PICATINNY ARSENAL.
C) CONTRACTOR IS RESPONSIBLE OF VISIBLY POSTING SPANISH AND ENGLISH
VERSIONS OF SERGEANT WOOF POSTER'S AT THE WORKSITE.
D) CONTRACTOR IS RESPONSIBLE OF VISIBLY POSTING AT THE WORKSITE A MEC
AWARENESS PAMPHLET OF MEC ITEMS FOUND AT PICATINNY ARSENAL.
E) CONTRACTOR'S EMPLOYEES ARE RESPONSIBLE OF ADHERING TO THE
FOLLOWING PROTOCOL UPON DETECTION OF SUSPECTED AMMUNITION:
E)1. RECOGNIZE THAT YOU MAY HAVE FOUND AMMUNITION AND DO NO TOUCH,
MOVE OR DISTURB THE SUSPECTED AMMUNITION;
E)2. RETREAT AT LEAST 300-FEET (A CELL PHONE MAY SET IT OFF); AND
E)3. REPORT FINDING TO PICATINNY ARSENAL DIRECTORATE OF EMERGENCY
SERVICES AT 787-707-4911.
F) CONTRACTOR IS RESPONSIBLE OF POSTING AS MANY OBSERVERS AS IT DEEMS
NECESSARY DURING THE EXCAVATION PROCESS AND THAT MAY ASSIST IN
RECOGNIZING ANY AMMUNITION PRESENT.
SEE CG GENERAL NOTE 6.
1.
2.
3.
4.
5.
6.
MUNITION EXPLOSIVES OF CONCERN (MEC)
AT PICATINNY ARSENAL
1.
2.
3.
4.
5.
6.
7.
1.
2.
C I V
I L
G
E N
E R
A L
N
O T
E S
J U
L Y
P E
O D
C d w g
C-002
W D
S D
X
J
L O
C K
M
S
O U
T H
M
M
A Y
E R
M
P
O E
A N
S I
D
RTA SUBMITTAL
P I C
A T
I N
N
A
R S
E N
A L
N
W
J
R S
E Y
E X
P L O
S I V
E
O
R D
N A
N C
E
D
I S
P O
S A
L
E
O D
T E
C H
N O
L O
G
F
C
I L I T
Y
F Y
P
N
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
W
O R
K
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
US Army Corps of Engineers
C A
T E
G O
R
C
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s C i v i l P
E O
D C d w g u g p m
A D
D E
N D
U M