ADDENDUM_08202019_CG802.pdf

PDF 237 KB Posted

Attached to
Explosive Ordnance Disposal Technical Facility, Picatinny Arsenal, New Jersey
Solicitation number
W912DS19R0021
Issued by

About this file

Drawing amendment 0004 - ADDENDUM_08202019_CG802

View the file

Other files

File Type Posted
ADDENDUM_08202019_21_13_26.01_64.pdf PDF
ADDENDUM_08202019_CU112.pdf PDF
ADDENDUM_08202019_CU101.pdf PDF
ADDENDUM_08202019_2FP501.pdf PDF
ADDENDUM_08202019_2FP001.pdf PDF
ADDENDUM_08202019_2FA101.pdf PDF
ADDENDUM_08202019_2FP101.pdf PDF
ADDENDUM_08202019_TOC_with_DELETION.PDF PDF
Amendment_0005.pdf PDF
ADDENDUM_08202019_21_13_13.00_10.pdf PDF
ADDENDUM_08202019_CU111.pdf PDF
ADDENDUM-08202019-CG701.pdf PDF
ADDENDUM_08202019_CG804.pdf PDF
ADDENDUM_08202019_CG712.pdf PDF
ADDENDUM_08202019_CG805.pdf PDF
ADDENDUM_08202019_CG710.pdf PDF
ADDENDUM_08202019_CG711.pdf PDF
ADDENDUM_08202019_2A112.pdf PDF
ADDENDUM_08202019_CG803.pdf PDF
Amendment_0004.pdf PDF
ADDENDUM_08072019_-_Munitions_Building_Door_Hardware_.pdf PDF
ADDENDUM_08072019_-_Drawings.pdf PDF
ADDENDUM_08072019_-C-002.pdf PDF
01_22_00.00_10_PRICE_AND_PAYMENT.pdf PDF
ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS.pdf PDF
Sign-in_Sheet_for_Site_Visit.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
VisitorControlMap_20190227.pdf PDF
02_SITE_E.pdf PDF
01_GENERAL.pdf PDF
02_SITE_A2.pdf PDF
02_SITE_A1.pdf PDF
Amendment_0001.pdf PDF
02_SITE_C.pdf PDF
02_SITE_D.pdf PDF
05_MAGAZINES.pdf PDF
04_MUNITIONS.pdf PDF
02_SITE_B.pdf PDF
03_ROBOTICS.pdf PDF
EOD_RTA_Submittal_Register.pdf PDF
W912DS19R0021.pdf PDF
EOD_RTA_Drawing_Submittal.pdf PDF
2019-07-17_RTA_SUBMITTAL_EOD_Picatinny__-_FULL_SET.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPLEMENTATION OF SOIL EROSION AND SEDIMENT CONTROL MEASURES

(GENERAL SEQUENCE OF CONSTRUCTION OPERATIONS)

1. NOTIFY MORRIS COUNTY SCD IN WRITING AT LEAST 72 HOURS IN ADVANCE OF ANY

SOIL DISTURBANCE. (1 DAY)

2. REMOVE ANY TREES SO INDICATED WITHIN AREA DESIGNATED "LIMIT OF PROJECT".

(ACTIVITIES ARE LIMITED TO TREE CUTTING AND REMOVAL AND DO NOT CALL FOR

SOIL DISTURBANCE. FURTHERMORE, THE REMOVAL OF TREES SHALL NOT BE

PERMITTED BETWEEN APRIL 1 AND NOVEMBER 15 IN ACCORDANCE WITH

RESTRICTIONS TO PROTECT THE INDIANA BAT, AN ENDANGERED SPECIES;

COORDINATE WITH BASE'S ONSITE BIOLOGIST AS NECESSARY). (WEEKS 1 - 12)

3. PLACE SUPER SILT FENCE, GENERALLY ALONG PERIMETER OF SITE DISTURBANCE.

(WEEKS 1 - 12, CONCURRENT WITH ITEM #2)

4. DEMOLISH EXISTING BUILDINGS AND INFRASTRUCTURE. (WEEKS 12 - 36)

5. CONSTRUCT NEW UTILITIES, STORM SEWER, INLETS AND OUTFALL AS PER

CONSTRUCTION DRAWINGS. (WEEKS 36 - 52)

6. CONSTRUCT NEW BUILDINGS, ROADWAY AND PARKING AS PER CONSTRUCTION

PLANS. (WEEKS 36 - 91, CONCURRENT WITH ITEM #5)

7. INSTALL ANY REMAINING SITE IMPROVEMENTS - i.e., SIGNAGE, TOPSOIL & SEEDING, ETC. - AND REMOVE ANY S.E.S.C. MEASURES FOLLOWING INSPECTION BY MORRIS

COUNTY SCD. (WEEKS 91 - 104).

DURATION OF PROJECT: APPROXIMATELY TWO (2) YEARS OR LESS.

STANDARD FOR TOPSOIL

TOPSOILING ENTAILS THE DISTRIBUTION OF SUITABLE QUALITY SOIL ON AREAS TO BE VEGETATED.

TO IMPROVE THE SOIL MEDIUM FOR PLANT ESTABLISHMENT AND MAINTENANCE.

TOP SOIL SHOULD BE USED WHERE SOILS ARE: SANDS, GRAVELY SOILS, CLAYS, SILTY CLAYS, VERY SHALLOW

OR WHERE THEY ARE EXTREMELY ACID (LESS THAN 4.0) OR SALTY (CONDUCTIVITY GREATER THAN 1.0

MILL MHOS PER CENTIMETER); OR WHERE TOPSOIL IS AVAILABLE ON SITE AND ASSURANCE OF IMPROVED

TOPSOIL SHOULD BE FRIABLE AND LOAMY, FREE OF DEBRIS, OBJECTIONABLE WEEDS AND STONES, AND

CONTAIN NO TOXIC SUBSTANCE THAT MAY BE HARMFUL TO PLANT GROWTH. A PH RANGE OF 5.0-7.5 IS

ACCEPTABLE. SOLUBLE SALTS SHOULD NOT BE EXCESSIVE (CONDUCTIVITY LESS THAN 0.5 MILLIMHOS PER

CENTIMETER). TOPSOIL HAULED IN FROM OFF SITE SHOULD HAVE A MINIMUM ORGANIC MATTER CONTENT

OF 2.75 PERCENT. ORGANIC MATTER CONTENT MAY BE RAISED BY ADDITIVES.

FIELD EXPLORATION SHOULD BE MADE TO DETERMINE WHETHER QUANTITY AND OR QUALITY OF SURFACE

STRIPPING SHOULD BE CONFINED TO THE IMMEDIATE CONSTRUCTION AREA.

WHERE FEASIBLE, LIME MAY BE APPLIED BEFORE STRIPPING AT A RATE DETERMINED BY SOIL TESTS

TO BRING THE SOIL PH TO 6.5. IN LIEU OF SOIL TESTS, SEE LIME RATE GUIDE IN SEEDBED

PREPARATION FOR PERMANENT VEGETATIVE COVER, PAGE 3.2.1.

VEGETATIVE GROWTH IS DESIRED.

METHOD AND MATERIALS

II STRIPPING AND STOCKPILING

SOIL JUSTIFIES STRIPPING.

A.

B.

C.

I. MATERIALS

WHERE APPLICABLE

DEFINITION

PURPOSE

1. THE CONTRACTOR SHALL PREPARE A PLAN FOR THE PROPER DEWATERING OF

EACH STREAM CROSSING PRIOR TO EXCAVATING THE STREAM BED. PLAN

SHALL BE FORWARDED TO THE ENGINEER AND MORRIS COUNTY SOIL

CONSERVATION DISTRICT FOR APPROVAL. THE DISTRICT SHALL BE NOTIFIED

FOR INSPECTION PRIOR TO EACH STREAM CROSSING CONSTRUCTION.

2. ANY AREAS USED FOR THE CONTRACTOR'S STAGING, INCLUDING BUT NOT

LIMITED TO, TEMPORARY STORAGE OF STOCKPILED MATERIALS ( E.G. CRUSHED

STONE, QUARRY PROCESS STONE, SELECT FILL, EXCAVATED MATERIALS, ETC.),

SHALL BE ENTIRELY PROTECTED BY A SILT FENCE ALONG THE LOW ELEVATION

SIDE TO CONTROL SEDIMENT RUNOFF.

3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

NOTIFYING THE MORRIS COUNTY SOIL CONSERVATION DISTRICT OF ANY

STAGING AND/OR STOCKPILE LOCATION AREAS AND FOR OBTAINING A SOIL

EROSION AND SEDIMENT CONTROL CERTIFICATION FOR THESE AREAS.

4. A CRUSHED STONE, VEHICLE WHEEL-CLEANING BLANKET SHALL BE INSTALLED

AT THE CONTRACTOR'S STAGING YARD AND/OR STOCKPILE AREAS TO PREVENT

OFF-SITE TRACING OF SEDIMENT BY CONSTRUCTION VEHICLES ONTO PUBLIC

ROADS. BLANKET SHALL BE 15 FT. X 50 FT. X 6 IN. (MINIMUM), CRUSHED STONE

2-1/2 INCHES IN DIAMETER. SAID BLANKET SHALL BE UNDERLAIN WITH A

SUITABLE SYNTHETIC SEDIMENT FILTER FABRIC AND MAINTAINED IN GOOD

ORDER.

MORRIS COUNTY SOIL CONSERVATION DISTRICT NOTES FOR ROAD WORK

WOOD - FIBER OR PAPER-FIBER MULCH AT THE RATE OF 1,500 POUNDS PER ACRE MAY BEC.

IMMEDIATELY PRIOR TO TOPSOIL DISTRIBUTION, THE SURFACE SHOULD BE SCARIFIED AND DE-COMPACTED

EMPLOY NEEDED EROSION CONTROL PRACTICES SUCH AS DIVERSIONS, GRADE STABILIZATION

STRUCTURES, CHANNEL STABILIZATION MEASURES, SEDIMENTATION BASINS, AND WATERWAYS. SEE

TOPSOIL SHOULD BE HANDLED ONLY WHEN ITS IS DRY ENOUGH TO WORK WITHOUT DAMAGING SOIL

STRUCTURE; I.E., LESS THAN FIELD CAPACITY ( SEE GLOSSARY).

A UNIFORM APPLICATION TO A DEPTH OF 5 INCHES (UNSETTLED). SOILS WITH A PH OF 4.0 OR LESS OR

CONTAINING IRON SULFIDE SHALL BE COVERED WITH A MINIMUM DEPTH OF 12 INCHES OF SOIL HAVING

EMULSIFIED ASPHALT - (SS-1, CSS-1, CMS-2, MS-2, RS-1, RS-2, CRS-1, AND

APPLY 0.04 GAL./SQ./YD. OR 194 GAL./ACRE ON FLAT SLOPES LESS THAN 8 FEET

HIGH. ON SLOPES 8 FEET OR MORE HIGH, USE 0.075 GAL./SY. YD. OR

SYNTHETIC OR ORGANIC BINDERS - BINDERS SUCH AS CURASOL, DCA-70, PETRO-SET,

AND TERRA-TRACK MAY BE USED AT RATES RECOMMENDED BY THE MANUFACTURER TO

MULCH MATERIAL SHOULD BE UNROTTED SMALL GRAIN STRAW, HAY FREE OF SEEDS, OR SALT HAY TO

BE APPLIED AT A RATE OF 1-1/2 TO 2 TONS PER ACRE (70 TO 90 POUNDS PER 1,000 SQUARE

FEET), EXCEPT THAT WHERE A CRIMPER IS USED INSTEAD OF A LIQUID MULCH-BINDER (TACKIFYING

OR ADHESIVE AGENT), THE RATE OF APPLICATION MUST BE DOUBLED THE LOWER RATE. MULCH

SPREAD UNIFORMLY BY HAND OR MECHANICALLY SO THAT APPROXIMATELY 75% TO 95% OF THE SOIL

SURFACE WILL BE COVERED. FOR UNIFORM DISTRIBUTION OF HAND-SPREAD MULCH, DIVIDE AREA

INTO APPROXIMATELY 1,000 SQUARE FEET SECTIONS AND DISTRIBUTE 70 TO 90 POUNDS, WITHIN EACH

MULCH ANCHORING SHOULD BE ACCOMPLISHED IMMEDIATELY AFTER PLACEMENT TO MINIMIZE LOSS BY

WIND OR WATER. THIS MAY BE DONE BY ONE OF THE FOLLOWING METHODS, DEPENDING UPON THE

PEG AND TWINE - DRIVE 8 TO 10 INCH WOODEN PEGS TO WITHIN 2 TO 3 INCHES OF THE SOIL

SURFACE EVERY 4 FEET IN ALL DIRECTIONS. STAKE MAY BE DRIVEN BEFORE OR AFTER

APPLYING MULCH. SECURE MULCH TO SOIL SURFACE BY STRETCHING TWINE BETWEEN PEGS IN A

CRISS-CROSS AND A SQUARE PATTERN. SECURE TWINE NETTING AROUND EACH PEG WITH TWO

MULCH NETTINGS - STAPLE PAPER, JUTE, COTTON, OR PLASTIC NETTINGS TO THE SOIL

SURFACE. USE A DEGRADABLE NETTING IN AREAS TO BE MOWED.

CRIMPER (MULCH ANCHORING TOOL) - A TRACTOR DRAWN IMPLEMENT, SOMEWHAT LIKE A DISC-

HARROW, ESPECIALLY DESIGNED TO PUSH OR CUT SOME OF THE BROADCAST LONG FIBER MULCH 3

TO 4 INCHES INTO THE SOIL SO AS TO ANCHOR IT AND LEAVE PART STANDING UPRIGHT. THIS

TECHNIQUE IS LIMITED TO AREAS TRAVERSABLE BY A TRACTOR, WHICH MUST OPERATE ON THE

CONTOUR OF SLOPE. STRAW MULCH RATE MUST BE 3 TONS PER ACRES. NO TACKIFYING OR

LIQUID MULCH-BINDER - MAY BE USED TO ANCHOR SALT HAY, HAY OR STRAW MULCHES.

APPLICATION SHOULD BE HEAVIER AT EDGES WHERE WIND CATCHES THE MULCH, IN VALLEYS,

AND AT CRESTS OF BANKS. REMAINDER OF AREA SHOULD BE UNIFORM IN APPEARANCE

OR MORE ROUND TURNS.

ADHESIVE AGENT IS REQUIRED.

B.

A.

ANCHOR MULCH MATERIAL.

USE ONE OF THE FOLLOWING:

(2)

CRS-2).

363 GAL./ACRE.

(1)

TO A DEPTH OF 6" TO PROVIDE A GOOD BOND WITH THE TOPSOIL.

STANDARDS 4.2 THROUGH 4.16.

IV APPLYING TOPSOIL

A PH OF 5.0 OR MORE.

CHOPPER-BLOWER MUST NOT GRIND THE MATERIAL.

SIZE OF THE AREA, STEEPNESS OF SLOPE, AND COST.

B.

C.

SECTION.

A.

A.

V MULCHING

B.

C.

D.

STANDARD FOR TOPSOIL

A 4-6 INCH STRIPPING DEPTH IS COMMON, BUT MAY VARY DEPENDING ON THE PARTICULAR SOIL.

STOCKPILES OF TOPSOIL SHOULD BE SITUATED SO AS NOT TO OBSTRUCT NATURAL DRAINAGE OR CAUSE

STOCKPILES SHOULD BE VEGETATED IN ACCORDANCE WITH STANDARDS PREVIOUSLY DESCRIBED HEREIN;

SEE 3.1 OR 3.2. WEEDS SHOULD NOT BE ALLOWED TO GROW ON STOCKPILES.

GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF CONVENTIONAL EQUIPMENT FOR SEEDBED

PREPARATION, SEEDING, MULCH APPLICATION AND ANCHORING, AND MAINTENANCE. SEE PAGE 4.1.

SUBSOIL SHOULD BE TESTED FOR LIME REQUIREMENTS AND LIMESTONE, IF NEEDED, SHOULD BE

APPLIED TO BRING SOIL PH TO 6.5 AND INCORPORATE INTO THE SOIL AS NEARLY AS PRACTICAL TO

II STRIPPING AND STOCKPILING CONTINUED

OFF-SITE ENVIRONMENTAL DAMAGE.

III SITE PREPARATION

A DEPTH OF 4 INCHES.

A.

B.

D.

E.

F.

1. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE INSTALLED IN ACCORDANCE WITH

THE STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL IN NEW JERSEY, AND WILL BE IN PLACE

PRIOR TO ANY MAJOR SOIL DISTURBANCE, OR IN THEIR PROPER SEQUENCE AND MAINTAINED UNTIL

PERMANENT PROTECTION IS ESTABLISHED.

2. ANY DISTURBED AREA THAT WILL BE LEFT EXPOSED FOR MORE THAN THIRTY (30) DAYS AND NOT

SUBJECT TO CONSTRUCTION TRAFFIC SHALL IMMEDIATELY RECEIVE A TEMPORARY SEEDING. IF THE

SEASON PROHIBITS TEMPORARY SEEDING, THE DISTURBED AREAS WILL BE MULCHED WITH STRAW

OR HAY AND TACKED IN ACCORDANCE WITH THE NEW JERSEY STANDARDS. SEE NOTE 21 BELOW.

MORRIS COUNTY SOIL CONSERVATION DISTRICT SOIL EROSION AND

SEDIMENT CONTROL NOTES

3. PERMANENT VEGETATION IS TO BE ESTABLISHED ON EXPOSED AREAS WITHIN TEN (10) DAYS AFTER

FINAL GRADING. MULCH IS TO BE USED FOR PROTECTION UNTIL VEGETATION IS ESTABLISHED. SEE

NOTE 22 BELOW.

4. IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING. ALL CRITICAL AREAS (STEEP

SLOPES, SANDY SOILS, WET CONDITIONS) SUBJECT TO EROSION WILL RECEIVE A TEMPORARY

SEEDING IN ACCORDANCE WITH NOTE 21 BELOW.

5. TEMPORARY DIVERSION BERMS ARE TO BE INSTALLED ON ALL CLEARED ROADWAYS AND EASEMENT

AREAS. SEE THE DIVERSION DETAIL.

6. PERMANENT SEEDING AND STABILIZATION TO BE IN ACCORDANCE WITH THE “STANDARDS FOR

PERMANENT VEGETATIVE COVER FOR SOIL STABILIZATION COVER”. SPECIFIED RATES AND LOCATIONS

SHALL BE ON THE APPROVED SOIL EROSION AND SEDIMENT CONTROL PLAN.

7. THE SITE SHALL AT ALL TIMES BE GRADED AND MAINTAINED SO THAT ALL STORMWATER RUNOFF IS

DIVERTED TO SOIL EROSION AND SEDIMENT CONTROL FACILITIES.

8. ALL SEDIMENTATION STRUCTURES (SILT FENCE, INLET FILTERS, AND SEDIMENT BASINS) WILL BE

INSPECTED AND MAINTAINED DAILY.

9. STOCKPILES SHALL NOT BE LOCATED WITHIN 50’ OF A FLOODPLAIN, SLOPE, DRAINAGE FACILITY, OR

ROADWAY. ALL STOCKPILES BASES SHALL HAVE A SILT FENCE PROPERLY ENTRENCHED AT THE TOE

OF SLOPE.

10. A STABILIZED CONSTRUCTION ACCESS WILL BE INSTALLED, WHENEVER AN EARTHEN ROAD

INTERSECTS WITH A PAVED ROAD. SEE THE STABILIZED CONSTRUCTION ACCESS DETAIL AND CHART

FOR DIMENSIONS.

11. ALL NEW ROADWAYS WILL BE TREATED WITH SUITABLE SUBBASE UPON ESTABLISHMENT OF FINAL

GRADE ELEVATIONS.

12. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES.

13. BEFORE DISCHARGE POINTS BECOME OPERATIONAL, ALL STORM DRAINAGE OUTLETS WILL BE

STABILIZED AS REQUIRED.

14. ALL DEWATERING OPERATIONS MUST BE DISCHARGED DIRECTLY INTO A SEDIMENT FILTER AREA. THE

FILTER SHOULD BE COMPOSED OF A FABRIC OR APPROVED MATERIAL. SEE THE DEWATERING DETAIL.

15. ALL SEDIMENT BASINS WILL BE CLEANED WHEN THE CAPACITY HAS BEEN REDUCED BY 50%. A CLEAN

OUT ELEVATION WILL BE IDENTIFIED ON THE PLAN AND A MARKER INSTALLED ON THE SITE.

16. DURING AND AFTER CONSTRUCTION, THE APPLICANT WILL BE RESPONSIBLE FOR THE MAINTENANCE

AND UPKEEP OF THE DRAINAGE STRUCTURES, VEGETATION COVER, AND ANY OTHER MEASURES

DEEMED APPROPRIATE BY THE DISTRICT. SAID RESPONSIBILITY WILL END WHEN COMPLETED WORK IS

APPROVED BY THE MORRIS COUNTY SOIL CONSERVATION DISTRICT.

17. ALL TREES OUTSIDE THE DISTURBANCE LIMIT INDICATED ON THE SUBJECT PLAN OR THOSE TREES

WITHIN THE DISTURBANCE AREA WHICH ARE DESIGNATED TO REMAIN AFTER CONSTRUCTION ARE TO

BE PROTECTED WITH TREE PROTECTION DEVICES. SEE THE TREE PROTECTION DETAIL.

18. THE MORRIS COUNTY SOIL CONSERVATION DISTRICT MAY REQUEST ADDITIONAL MEASURES TO

MINIMIZE ON SITE OR OFF SITE EROSION PROBLEMS DURING CONSTRUCTION.

19. THE MORRIS COUNTY SOIL CONSERVATION DISTRICT MUST BE NOTIFIED, IN WRITING, AT LEAST 72

HOURS PRIOR TO ANY LAND DISTURBANCE, AND A PRE-CONSTRUCTION MEETING HELD.

20. CONTRACTOR TO SET UP A MEETING WITH THE INSPECTOR FOR PERIODIC INSPECTIONS OF THE

TEMPORARY SEDIMENT BASIN PRIOR TO AND DURING ITS CONSTRUCTION.

21. TOPSOIL STOCKPILE PROTECTION

A) APPLY GROUND LIMESTONE AT A RATE OF 90 LBS PER 1000 SQ. FT.

B) APPLY FERTILIZER (10-20-10) AT A RATE OF 11 LBS. PER 1000 SQ. FT.

C) APPLY PERENNIAL RYEGRASS SEED AT 1 LB. PER 1000 SQ. FT. AND ANNUAL RYEGRASS AT 1 LB.

PER 1000 SQ. FT.

D) MULCH STOCKPILE WITH STRAW OR HAY AT A RATE OF 90 LBS. PER 1000 SQ. FT.

E) APPLY A LIQUID MULCH BINDER OR TACK TO STRAW OR HAY MULCH.

F) PROPERTY ENTRENCH A SILT FENCE AT THE BOTTOM OF THE STOCKPILE.

24. TEMPORARY STABILIZATION SPECIFICATIONS

G) APPLY GROUND LIMESTONE AT A RATE OF 90 LBS PER 1000 SQ. FT.

H) APPLY FERTILIZER (10-20-10) AT A RATE OF 11 LBS. PER 1000 SQ. FT.

I) APPLY PERENNIAL RYEGRASS SEED AT 1 LB. PER 1000 SQ. FT. AND ANNUAL RYEGRASS AT 1 LB.

PER 1000 SQ. FT.

J) MULCH STOCKPILE WITH STRAW OR HAY AT A RATE OF 90 LBS. PER 1000 SQ. FT.

K) APPLY A LIQUID MULCH BINDER OR TACK TO STRAW OR HAY MULCH.

25. PERMANENT STABILIZATION SPECIFICATIONS

L) APPLY TOPSOIL TO A DEPTH OF 5 INCHES (UNSETTLED).

M) APPLY GROUND LIMESTONE AT A RATE OF 90 LBS PER 1000 SQ. FT. AND WORK FOUR INCHES INTO

N) SOIL.

O) APPLY FERTILIZER (10-20-10) AT A OF RATE 11 LBS. PER 1000 SQ. FT.

P) APPLY HARD FESCUE SEED AT 2.7 LBS. PER 1000 SQ. FT. AND CREEPING RED FESCUE SEED AT

Q) 0.7 LBS PER 1000 SQ. FT. AND PERENNIAL RYEGRASS SEED AT 0.25 LBS PER 1000 SQ. FT.

R) MULCH STOCKPILE WITH STRAW OR HAY AT A RATE OF 90 LBS. PER 1000 SQ. FT.

S) APPLY A LIQUID MULCH BINDER OR TACK TO STRAW OR HAY MULCH.

* NOTE: 72 HOURS PRIOR TO ANY SOIL DISTURBANCE, NOTICE IN WRITING,

* SHALL BE GIVEN TO THE MORRIS COUNTY SOIL CONSERVATION

* DISTRICT AND A PRE-CONSTRUCTION MEETING HELD.

NOTE: ALL NAMES GIVEN ABOVE ARE REGISTERED TRADE NAMES. THIS DOES NOT CONSTITUTE

A RECOMMENDATION OF THESE PRODUCTS TO THE EXCLUSION OF OTHER PRODUCTS.

MULCHING IS REQUIRED ON ALL SEEDING. MULCH WILL INSURE AGAINST EROSION BEFORE GRASS IS

ESTABLISHED AND WILL PROMOTE FASTER AND EARLIER ESTABLISHMENT. ( THE EXISTENCE OF

SATISFACTORY PERMANENT VEGETATION AT THE TIME OF PROJECT OR UNIT COMPLETION SHALL BE

DEEMED AS COMPLIANCE WITH THIS MULCH REQUIREMENTS.

S E

D I M

E N

T

A

N D

E

R O

S I O

N

C O

N T

R O

L

N

O T

E S

J U

L Y

P E

O D

C

G d w g

CG802

W D

S D

X

J

L O

C K

M

S

O U

T H

M

M

A Y

E R

M

P

O E

A N

S I

D

RTA SUBMITTAL

P I C

A T

I N

A

S

E N

A L

N

W

J

R S

E Y

E X

P L O

S I V

E

O

R D

N A

N C

E

D

I S

P O

S A

L

E

O D

T E

C H

N O

L O

G

F

C

I L I T

Y

F Y

P

N

N E

W

Y

O R

K

D

I S

T R

I C

T

N E

W

Y

O R

K

N

W

O R

K

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

F I L E

N A

M E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

US Army Corps of Engineers

C A

T E

G O

C

D

E

D E

S C

R I P

T I O

N

P P r o j e c t s

C

A D

B

I M

S h e e t s C i v i l P

E O

D C

G d w g u g a m

A D

D E

N D

U M

File details come from the government source that posted it.