ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS.pdf

PDF 12 KB Posted

Attached to
Explosive Ordnance Disposal Technical Facility, Picatinny Arsenal, New Jersey
Solicitation number
W912DS19R0021
Issued by

About this file

ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS

View the file

Other files

File Type Posted
ADDENDUM_08202019_21_13_26.01_64.pdf PDF
ADDENDUM_08202019_CU112.pdf PDF
ADDENDUM_08202019_CU101.pdf PDF
ADDENDUM_08202019_2FP501.pdf PDF
ADDENDUM_08202019_2FP001.pdf PDF
ADDENDUM_08202019_2FA101.pdf PDF
ADDENDUM_08202019_2FP101.pdf PDF
ADDENDUM_08202019_TOC_with_DELETION.PDF PDF
Amendment_0005.pdf PDF
ADDENDUM_08202019_21_13_13.00_10.pdf PDF
ADDENDUM_08202019_CU111.pdf PDF
ADDENDUM-08202019-CG701.pdf PDF
ADDENDUM_08202019_CG804.pdf PDF
ADDENDUM_08202019_CG802.pdf PDF
ADDENDUM_08202019_CG712.pdf PDF
ADDENDUM_08202019_CG805.pdf PDF
ADDENDUM_08202019_CG710.pdf PDF
ADDENDUM_08202019_CG711.pdf PDF
ADDENDUM_08202019_2A112.pdf PDF
ADDENDUM_08202019_CG803.pdf PDF
Amendment_0004.pdf PDF
ADDENDUM_08072019_-_Munitions_Building_Door_Hardware_.pdf PDF
ADDENDUM_08072019_-_Drawings.pdf PDF
ADDENDUM_08072019_-C-002.pdf PDF
01_22_00.00_10_PRICE_AND_PAYMENT.pdf PDF
Sign-in_Sheet_for_Site_Visit.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
VisitorControlMap_20190227.pdf PDF
02_SITE_E.pdf PDF
01_GENERAL.pdf PDF
02_SITE_A2.pdf PDF
02_SITE_A1.pdf PDF
Amendment_0001.pdf PDF
02_SITE_C.pdf PDF
02_SITE_D.pdf PDF
05_MAGAZINES.pdf PDF
04_MUNITIONS.pdf PDF
02_SITE_B.pdf PDF
03_ROBOTICS.pdf PDF
EOD_RTA_Submittal_Register.pdf PDF
W912DS19R0021.pdf PDF
EOD_RTA_Drawing_Submittal.pdf PDF
2019-07-17_RTA_SUBMITTAL_EOD_Picatinny__-_FULL_SET.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EOD Complex 016701 RTA Submittal

SECTION 08 34 59

ARMORY DOORS

08/08

ADDENDUM 08/ 07/ 2019

ADDENDUM

08/07/2019***********************************************************

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS AA-D-600 (Rev D, Am 1; Am 4) Door, Vault, Security

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System

1.2 SUSTAINABILITY REQUIREMENTS

Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project LEED NC local/ regional materials and recycled content requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that reviews the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Armory door unit; G

SD-03 Product Data

Armory Door and Frame

SD-07 Certificates

Armory Door and Frame; G

SD-08 Manufacturer's Instructions

SECTION 08 34 59 Page 1

EOD Complex 016701 RTA Submittal

Installation

SD-11 Closeout Submittals

SUSTAINABILITY

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver door and frame assemblies to the jobsite in a protective covering with the brand and name clearly marked thereon. Inspect materials delivered to the jobsite for damage, and unload them with a minimum of handling. Store in a dry location with adequate ventilation, free from dust, water, and other contaminants, and allowing easy access for inspection and handling. Store door assemblies off the floor on nonabsorptive strips or wood platforms. Prevent damage to doors and frames during handling. Replace damaged items that cannot be restored to like-new condition.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

The armory door unit shall be a steel security-armory type door with frame and ramp type threshold, which is a standard product of a manufacturer specializing in this type of fabrication. Submit drawings showing head, jamb, and sill sections, and elevations of the doors.

Basis of Design: Scimitar by International Vault, Inc.

2.2 ARMORY DOOR AND FRAME

Design and construction of the door and frame assembly shall conform to FS AA-D-600 . Provide a door which is Class 5A, Type IIL - without optical device. Lock on vault door shall be mechanical combination lock and shall conform to GSA FF-L-2937 Specification and have a drill resistant metal plate for protection of lock case and locking mechanism. Submit manufacturer's catalog data including catalog cuts and brochures showing that the proposed vault door unit conforms with the requirements in FS AA-D-600 , and has been tested and approved by the General Services Administration (GSA). Submit certification stating that vault-door units that do not bear the GSA label are constructed to Class 5A standards.

PART 3 EXECUTION

3.1 INSTALLATION

Install the vault door assembly in strict compliance with the printed instructions and drawings provided by the manufacturer. After installation, adjust the door, the locking mechanism, and the inner escape device for proper operation. Submit printed instructions and drawings provided by the manufacturer.

***********************************************************ADDENDUM

08/07/2019

-- End of Section --

SECTION 08 34 59 Page 2

08 34 59 - ARMORY DOORS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUSTAINABILITY REQUIREMENTS
1.3 SUBMITTALS
1.4 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 ARMORY DOOR AND FRAME
PART 3 EXECUTION
3.1 INSTALLATION