ADDENDUM_08202019_2FP001.pdf

PDF 152 KB Posted

Attached to
Explosive Ordnance Disposal Technical Facility, Picatinny Arsenal, New Jersey
Solicitation number
W912DS19R0021
Issued by

About this file

ADDENDUM_08202019_2FP001

View the file

Other files

File Type Posted
ADDENDUM_08202019_21_13_26.01_64.pdf PDF
ADDENDUM_08202019_CU112.pdf PDF
ADDENDUM_08202019_CU101.pdf PDF
ADDENDUM_08202019_2FP501.pdf PDF
ADDENDUM_08202019_2FA101.pdf PDF
ADDENDUM_08202019_2FP101.pdf PDF
ADDENDUM_08202019_TOC_with_DELETION.PDF PDF
Amendment_0005.pdf PDF
ADDENDUM_08202019_21_13_13.00_10.pdf PDF
ADDENDUM_08202019_CU111.pdf PDF
ADDENDUM-08202019-CG701.pdf PDF
ADDENDUM_08202019_CG804.pdf PDF
ADDENDUM_08202019_CG802.pdf PDF
ADDENDUM_08202019_CG712.pdf PDF
ADDENDUM_08202019_CG805.pdf PDF
ADDENDUM_08202019_CG710.pdf PDF
ADDENDUM_08202019_CG711.pdf PDF
ADDENDUM_08202019_2A112.pdf PDF
ADDENDUM_08202019_CG803.pdf PDF
Amendment_0004.pdf PDF
ADDENDUM_08072019_-_Munitions_Building_Door_Hardware_.pdf PDF
ADDENDUM_08072019_-_Drawings.pdf PDF
ADDENDUM_08072019_-C-002.pdf PDF
01_22_00.00_10_PRICE_AND_PAYMENT.pdf PDF
ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS.pdf PDF
Sign-in_Sheet_for_Site_Visit.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
VisitorControlMap_20190227.pdf PDF
02_SITE_E.pdf PDF
01_GENERAL.pdf PDF
02_SITE_A2.pdf PDF
02_SITE_A1.pdf PDF
Amendment_0001.pdf PDF
02_SITE_C.pdf PDF
02_SITE_D.pdf PDF
05_MAGAZINES.pdf PDF
04_MUNITIONS.pdf PDF
02_SITE_B.pdf PDF
03_ROBOTICS.pdf PDF
EOD_RTA_Submittal_Register.pdf PDF
W912DS19R0021.pdf PDF
EOD_RTA_Drawing_Submittal.pdf PDF
2019-07-17_RTA_SUBMITTAL_EOD_Picatinny__-_FULL_SET.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

UFC HAZARD CATEGORY SCHEDULE

HAZARD CATEGORY

LIGHT

TYPE

WET PIPE

DENSITY

(gpm/SF)

0.10

NOTES

AREA

(SF)

1,500*

HOSE STREAM

(gpm)

DURATION

(min)

*AREAS MAY NOT BE DECREASED AS ALLOWED BY NFPA 13, IN ACCORDANCE WITH UFC.

D

PORTABLE ULTRA HIGH

SPEED DELUGE

0.50 N/A N/A 15DELUGE

PER NFPA 15, ACCEPT AS NOTED IN

UFC 3-600-01 (LOCAL APPLICATION)

PER NFPA 13, ACCEPT AS NOTED IN

UFC 3-600-01 UP TO 30'-0"

0.20WET PIPE 2,500 250 90ORDINARY HAZARD

PER NFPA 13, ACCEPT AS NOTED IN

UFC 3-600-01 UP TO 30'-0"

MAX DIST. BTWN.

SPRINKLERS

MAX AREA OF

COVERAGE (SF)

N/AN/A

15'-0" 255

15'-0" 130

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

SPRINKLER AND ASSOCIATED PIPING INDICATED ON THE PLAN VIEW

DRAWINGS ARE FOR REFERENCE AND DESIGN LEVEL HYDRAULIC

CAPABILITY VERIFICATION CALCULATION ONLY. THE FIRE SPRINKLER

CONTRACTOR SHALL BE RESPONSIBLE FOR SHOP LEVEL SYSTEM

LAYOUT, DRAWINGS, AND ASSOCIATED CALCULATIONS DESIGNED AND

PREPARED IN ACCORDANCE WITH ALL APPLICABLE CODES AND

STANDARDS.

THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SYSTEM

REQUIREMENTS WITH ALL CONDITIONS OF THE BUILDING AND SITE

INCLUDING, BUT NOT LIMITED TO, BLIND SPACES, SHELVING, LIGHTS,

GRILLES AND DIFFUSERS, PIPING, DUCT WORK, DOORS, WINDOWS,

EQUIPMENT PLATFORMS, WALLS (FIRE RATED AND NON-FIRE-RATED),

BEAMS, JOISTS, COLUMNS, HVAC EQUIPMENT, ELECTRICAL PANELS

AND EQUIPMENT, CEILINGS, AREAS WITHOUT CEILINGS, WALL

CONSTRUCTION, FLOORS AND ALL CONSTRUCTION, EQUIPMENT AND

BUILDING APPURTENANCES.

FOR ULTRA HIGH SPEED DELUGE SYSTEMS (FIXED AND PORTABLE),

THE CERTIFIED INSTALLER SHALL MAKE FINAL ADJUSTMENTS TO

NOZZLES & DETECTORS/SENSORS AFTER THE END USER'S

EQUIPMENT HAS BEEN INSTALLED IN ITS FINAL LOCATION.

ALL PENETRATIONS OF ELECTRICAL, TELECOM, AND SIMILAR ROOMS

SHALL BE LIMITED TO LOCATIONS ABOVE THE ACCESS DOORS TO

THOSE ROOMS TO THE MAXIMUM EXTENT POSSIBLE. IN CASES WHERE

THE PENETRATION IS NOT ABOVE THE DOOR, THE FIRE SUPPRESSION

CONTRACTOR SHALL COORDINATE THE LOCATION WITH OTHER

TRADES TO ENSURE THAT AT LEAST SIX FEET OF CLEARANCE IS

PROVIDED ABOVE ALL PANELS.

TELECOM ROOMS: ALL SPRINKLERS SHALL BE PROVIDED WITH

GUARDS SPECIFICALLY LISTED FOR USE WITH THE SPRINKLER (BY

MODEL/SIN). DRAIN TROUGHS SHALL BE PROVIDED UNDER SPRINKLER

PIPING IN TELECOM ROOMS.

ARMS VAULTS: ALL SPRINKLERS SHALL BE PROVIDED WITH GUARDS

SPECIFICALLY LISTED FOR USE WITH THE SPRINKLER (BY MODEL/SIN).

MECHANICAL COUPLINGS SHALL BE OF THE SAME MANUFACTURER AS

THE CONNECTED FITTINGS, OR SHALL BE SPECIFICALLY LISTED FOR

USE WITH THE CONNECTED FITTINGS.

FIRE SPRINKLER HANGERS SHALL BE LOCATED AND INSTALLED IN

ACCORDANCE WITH NFPA 13.

FIRE SPRINKLER CONTRACTOR SHALL PROVIDE AND INSTALL ALL

NECESSARY WATERFLOW, PRESSURE, AND TAMPER SWITCHES FOR

MONITORING BY THE BUILDING FAS. MONITORING PROVIDED BY THE

FIRE ALARM CONTRACTOR.

ALL SPRINKLERS SHALL BE INSTALLED AFTER THE PIPING HAS BEEN

INSTALLED AT ITS FINAL ELEVATION AND NOT WHILE THE PIPING IS AT

THE FLOOR LEVEL.

ALL LOW POINT AREAS SHALL BE PROVIDED WITH LOW-POINT DRAIN

CONNECTIONS AND VALVES. TO THE EXTENT POSSIBLE, THESE

DRAINS SHALL BE ROUTED TO THE BUILDING EXTERIOR, OTHERWISE

CAPS OR PLUGS SHALL BE PROVIDED.

THRUST ROD ALL PIPE PENETRATIONS THROUGH THE GRADE FLOOR

SLAB, UNLESS FLANGED OR WELDED JOINTS ARE USED THROUGHOUT

THE BELOW SLAB PIPING. ALL PIPE PENETRATIONS THROUGH THE

GRADE FLOOR SLAB SHALL BE SLEEVED AND SEALED.

PENDENT SPRINKLER, QUICK-RESPONSE

PENDENT SPRINKLER, CONCEALED, QUICK-RESPONSE

HYDRAULIC CALCULATION DESIGN AREA

HYDRAULIC CALCULATION NODE DESIGNATION

A HAZARD DESIGNATION - NUMBER REPRESENTS SPRINKLER

ZONE, LETTER REPRESENTS HAZARD

HAZARD CLASSIFICATION SCHEDULE AREA DELINEATION

UPRIGHT SPRINKLER, QUICK-RESPONSE

UPRIGHT SPRINKLER, QUICK-RESPONSE, WITH GUARD

HORIZONTAL SIDEWALL SPRINKLER, QUICK-RESPONSE

SPRINKLER RISER - WET

FIRE DEPARTMENT CONNECTION

NOTE: ALL THE SYMBOLS IN THE LEGEND MAY NOT HAVE BEEN USED ON

THE PLANS. SYMBOLS NOT LISTED IN THE LEGEND ARE IDENTIFIED WHERE

THEY OCCUR.

SPECIAL WALL PERIMETER - PENETRATE PERIMETERS IN ONE LOCATION ONLY AND

SEAL PENETRATION FOR ACOUSTICS.

WALL HYDRANT

SHEET ID

1 2 6 7

D R

A W

N B

Y

D E

S

IG

N B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

A N

S I D

F

A

C A

T E

G O

R Y

C O

D E

3 4 5 8 9 10

G

E

D

C

B

E X

P L

O S

IV

E

O R

D N

A N

C E

D

IS

P O

S A

L

E O

D

T E

C H

N O

L O

G Y

F A

C

IL

IT

Y

M U

N

IT

IO

N

S D

IS

A

S S

E M

B L Y

F A

C

IL

IT

Y

J U

L Y

W

D S

-1 -D

-0

L J A

R V

IS

D B

IN

G

A M

A N

M P

O E

2FP001

D L

A Y

O U

L E

G E

N D

N

O T

E S

A

N D

A B

B R

E V

IA

T

IO

N

S

P

IC

A T

IN

N

Y A

R S

E N

A L N

J

F

P

RTA SUBMITTAL

N E

W Y

O R

K D

IS

T

R

IC

T

F

E D

E R

A L

P L

Z N

E W

Y O

R K

N

Y

ABBREVIATIONS

ABV ABOVE

AFF ABOVE FINISHED FLOOR

AFFF AQUEOUS FILM-FORMING FOAM

BEL BELOW

BFP BACKFLOW PREVENTER

BLDG BUILDING

CF CUBIC FOOT (FEET)

CONT CONTINUED

DN DOWN

DWG DRAWING

EC EXTENDED COVERAGE (SPRINKLER)

EH1 EXTRA HAZARD (GROUP 1)

EH2 EXTRA HAZARD (GROUP 2)

ELEC ELECTRIC OR ELECTRICAL

ESFR EARLY SUPPRESSION-FAST RESPONSE

FAS FIRE ALARM SYSTEM

FHV FIRE HOSE VALVE

FM FM GLOBAL (FACTORY MUTUAL)

FP FIRE PUMP

FSCP FIRE SUPPRESSION CONTROL PANEL

FT FOOT (FEET)

GPM GALLONS PER MINUTE

HSW HORIZONTAL SIDEWALL (SPRINKLER)

IBC INTERNATIONAL BUILDING CODE

IFC INTERNATIONAL FIRE CODE

IN INCH(ES)

IRAS IN-RACK AUTOMATIC SPRINLERS

ITC INSPECTOR'S TEST CONNECTION

JP JOCKEY (PRESSURE-MAINTENANCE) PUMP

KPA KILOPASCALS

LD LARGE DROP (SPRINKLER)

LH LIGHT HAZARD

LPM LITERS PER MINUTE

LSC LIFE SAFETY CODE

M METER(S)

mm MILLIMETER(S)

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NH NATIONAL HOSE THREAD

NIC NOT IN CONTRACT

NPS NATIONAL PIPE THREAD - STRAIGHT

NPT NATIONAL PIPE THREAD - TAPERED

NTS NOT TO SCALE

OBS OBSTRUCTION

OH1 ORDINARY HAZARD (GROUP 1)

OH2 ORDINARY HAZARD (GROUP 2)

PIV POST INDICATING VALVE

PSI POUNDS PER SQUARE INCH

RM ROOM

SF SQUARE FOOT (FEET)

SSP STANDARD SPRAY PENDENT (SPRINKLER)

SSU STANDARD SPRAY UPRIGHT (SPRINKLER)

TYP TYPICAL

U/F UNDERFLOOR

UG UNDERGROUND

UHSD ULTRA HIGH SPEED DELUGE

UL UNDERWRITERS' LABORATORIES

UNO UNLESS NOTED OTHERWISE

W/ WITH

W/O WITHOUT

*NOTE NOT ALL ABBREVIATIONS MAY BE USED

GENERAL NOTESLEGEND

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A

D D

E N

D U

M

C O

N V

E R

T E

D F

IX

E

D U

H S

D S

Y S

T E

M T

O P

O R

T A

B L E

U H

S D

S Y

S T

E M

/2

/2

Sheets
2FP001 - LEGEND, NOTES, AND ABBREVIATIONS
2FP101 - FLOOR PLAN
2FP501 - DETAILS

File details come from the government source that posted it.