Amendment 0004

View the file

Other files

File Type Posted
ADDENDUM_08202019_21_13_26.01_64.pdf PDF
ADDENDUM_08202019_CU112.pdf PDF
ADDENDUM_08202019_CU101.pdf PDF
ADDENDUM_08202019_2FP501.pdf PDF
ADDENDUM_08202019_2FP001.pdf PDF
ADDENDUM_08202019_2FA101.pdf PDF
ADDENDUM_08202019_2FP101.pdf PDF
ADDENDUM_08202019_TOC_with_DELETION.PDF PDF
Amendment_0005.pdf PDF
ADDENDUM_08202019_21_13_13.00_10.pdf PDF
ADDENDUM_08202019_CU111.pdf PDF
ADDENDUM-08202019-CG701.pdf PDF
ADDENDUM_08202019_CG804.pdf PDF
ADDENDUM_08202019_CG802.pdf PDF
ADDENDUM_08202019_CG712.pdf PDF
ADDENDUM_08202019_CG805.pdf PDF
ADDENDUM_08202019_CG710.pdf PDF
ADDENDUM_08202019_CG711.pdf PDF
ADDENDUM_08202019_2A112.pdf PDF
ADDENDUM_08202019_CG803.pdf PDF
ADDENDUM_08072019_-_Munitions_Building_Door_Hardware_.pdf PDF
ADDENDUM_08072019_-_Drawings.pdf PDF
ADDENDUM_08072019_-C-002.pdf PDF
01_22_00.00_10_PRICE_AND_PAYMENT.pdf PDF
ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS.pdf PDF
Sign-in_Sheet_for_Site_Visit.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
VisitorControlMap_20190227.pdf PDF
02_SITE_E.pdf PDF
01_GENERAL.pdf PDF
02_SITE_A2.pdf PDF
02_SITE_A1.pdf PDF
Amendment_0001.pdf PDF
02_SITE_C.pdf PDF
02_SITE_D.pdf PDF
05_MAGAZINES.pdf PDF
04_MUNITIONS.pdf PDF
02_SITE_B.pdf PDF
03_ROBOTICS.pdf PDF
EOD_RTA_Submittal_Register.pdf PDF
W912DS19R0021.pdf PDF
EOD_RTA_Drawing_Submittal.pdf PDF
2019-07-17_RTA_SUBMITTAL_EOD_Picatinny__-_FULL_SET.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS19R0021

W16ROE91824887

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise and reissue draw ings 2A112, CG701, CG710, CG711, CG712, CG802, CG803, CG804 and CG805

2. Revise draw ings 2FP001, 2FP101, CD001, CD002 and CD003.

3. Delete Specification section 07 22 000: delete paragraph 1.6.3 and Revise specifications SECTION 01 50 00 paragraph 3.13.2

4. Revised Evaluation Factors Section 5.0 Basis of aw ard and Add Clause 52.208-9

5. Extend Proposal due to 05-Sep-2019 at 02:00PM 6.Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specif ications. NOTE: Off eror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH

THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19R0021

X 9B. DATED (SEE ITEM 11)

26-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2019

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

AMENDMENT 0004

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 03-Sep-2019 02:00 PM to 05-Sep-2019 02:00 PM.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

EVALUATION FACTORS

5.0 BASIS OF AWARD

5.1. The Government will award a firm fixed price contract to the responsible Offeror whose technically acceptable proposal represents the lowest price of the base plus all optional items.

5.2. The basis of award will be the Government’s assessment as to which proposal is determined to be technically acceptable and is the lowest price determined fair and reasonable through the use price analysis.

Offerors that do not receive an acceptable rating (technically acceptable), will not be selected, regardless of their price (lowest Offeror may not be selected).

5.3. Offerors have been reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of an acceptable proposal without discussions, if deemed to be in the best interests of the Government.

5.4. A successful large business offeror will be required to submit and negotiate a Small Business Subcontracting Plan acceptable to the Contracting Officer/PCO. The dollar threshold for subcontractor plan will be $ 36,500,000 for NAICS code 236220.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

52.208-9

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 0004

Explosive Ordnance Disposal Technology Facility, Picatinny Arsenal, NJ

W912DS-19-R-0021

Amendment 0004

To Bidders The purpose of this amendment is to make the following changes to the solicitation.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

2A112

CG701

CG710

CG711

CG712

CG802

CG803

CG804

CG805

2. The following DRAWINGS have been ADDED:

None.

3. The following DRAWINGS have been DELETED:

4. The following DRAWINGS have been REVISED but NOT REISSUED:

2FP001: UFC HAZARD CATEGORY SCHEDULE, HAZARD CATEGORY C is revised to

“PORTABLE ULTRA HIGH SPEED DELUGE”

2FP101: KEYNOTE 5 is revised to ‘PORTABLE UHSD CONNECTION POINT WITH 2"

BUTTERFLY VALVE’

CD001: Add GENERAL NOTE 8: “All equipment within the buildings called out for demolition shall be demolished by the contractor. Mission-unique equipment will be decommissioned or rendered inert by others prior to being demolished by the contractor.”

CD001: Add GENERAL NOTE 9: “At buildings 1505D, 1502, and 1503, where the edge of an outdoor walkway canopy is supported by a building wall called out for demolition, the contractor shall cut the canopy back to the first pole outside of the building. The remnants of canopy destroyed in this manner shall be carted away by the contractor.”

CD001: Add GENERAL NOTE 10: “The limits of demolition for Building 1505D are the outside edge of the perimeter walls of the building.”

CD001: Add GENERAL NOTE 11: “Site Access to Buildings in the 1500 Area is along the existing roads and pathways.”

CD001: Add GENERAL NOTE 12: “Limits of Disturbance for buildings in the 1500 Area are the building perimeters.”

CD001: Add GENERAL NOTE 13: “Well 35-MW-2 is 45 feet deep. Well 35-MW-4 is 23.19 feet deep.”

CD001: Add GENERAL NOTE 14: “Limit of Disturbance for historic foundation B36 is the perimeter of the foundation. Approximate plan dimensions of B36 historic foundation are 200' x 50'. No trees are to be removed when working at historic foundation B36, only hand trimming is allowed in wetland areas. Saw cut to avoid destroying the four historic corners; the four historic corners left intact at historic foundation B36 shall each be 24”x24” in plan dimension.”

CD001: Add GENERAL NOTE 15: “Access building 1372 from South N.G. Road.”

CD002: Remove the statement "1 inch = 50 feet"

CD003: Remove the statement "1 inch = 50 feet"

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

SECTION 21 13 26.00 64

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED:

None.

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

Section 07 22 00: delete paragraph 1.6.3

SECTION 01 50 00 paragraph 3.13.2 is revised to: “Provide and maintain administrative field office facilities within the construction area at the designated site. Government office and warehouse facilities will not be available to the Contractor's personnel. At the Contractor’s administrative field office, the Contractor shall provide one (1) Government office consisting of eighty (80) square feet enclosed by four (4) walls with a door and ceiling, one (1) desk with chair, phone and internet connection.

OFFERORS’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).

Questions and answers are issued to the Offerors for information only and do not revise the solicitation, plans, or specifications.)

Question 1:

We are asking contracting officers for consideration to include FAR Clause 52.208-9, Contractor Use of Mandatory Sources of Supply or Services for construction projects, for door hardware in your current and future acquisition purchases, to follow this Federal Mandated Program.

As you know, the AbilityOne Network Program employs more than 45,000 individuals, including 3,000 of who are military veterans, wounded warriors and others that are blind or have disabilities. This Independent Federal Agency Program leverages a national network of more than 550 community-based nonprofit agencies to provide meaningful employment.

The Javits-Wagner-O'Day (JWOD) Act, 41 U.S.C. 46-48c, established a procurement program, (PL), to increase employment opportunities for these individuals.

This Act makes it mandatory for all federal agencies to purchase certain supplies and services from designated nonprofit agencies.

On 5 February 2016; VisionCorps, a nonprofit agency and PDQ, Manufacturer of Door hardware, both based in Lancaster, Pennsylvania, jointly announced the formation of the co-brand SKILCRAFT/PDQ, an AbilityOne Distributor for SKILCRAFT/PDQ Door Hardware Products.

Additional items may be available from the mandatory source. AbilityOne's procurement products list (PL), can be searched at: www.abilityone.com, or Contact:

SKILCRAFT.ASP@VisionCorps.net.

We thank you for your time and considerations

Government Response 1: Clause will been added in Amendment 0004.

Question 2:

1. Do Government have the Wetland delineation for the project areas?

2. Is this contract exempt for Wetland requirement?

3. Bldg. 1515 – confirm all equipment inside room 12 & room 13 is part of the demo

4. Is walkway canopies going to bldg.. 1502, 1503, and 1505 is part of the demolition?

5. Does the big metal tank next to Bldg- 1505 is part of the demo?

Government Response 2:

1. The Government has the wetland delineation.

2. The contract is not exempt from wetland requirements.

3. All equipment within the buildings called out for demolition shall be demolished by the contractor. Mission-unique equipment will be decommissioned or rendered inert by others prior to being demolished by the contractor.

4. The walkway canopies are not called out for demolition. Where the edge of a canopy is supported by a building wall called out for demolition, the contractor shall cut the canopy back to the first pole outside of the building. The remnants of canopy destroyed in this manner shall be carted away by the contractor.

5. The limits of demolition for Building 1505D are the outside edge of the perimeter walls of the building. The metal tank outside of the building is not called out for demolition.

Question 3:

Drawing Sheet/Detail: CD001 Option 1 & Option 2 listed on CD001 requires demo of buildings 1502, 1503, 1505D, 1514 & 1501, 1515. The walk through of these areas raised the following questions:

1. What is the site access for 1505D, 1503 & 1502?

2 What is the limit of disturbance of these buildings?

3. There is a stream in front of 1502, how will we access areas?

4. What will be required for remediation after demolition?

5. At the walk through, we noted ACM in most sites. Spec section 02 82 00 did not provide a clear scope of work for buildings to be demolished in general and appendix reports do not provide a clear scope of work. Please provide a clear scope of work for asbestos remediation for ALL buildings to be demoed.

6. Drawings CD002 & CD003 appear to have the wrong scale. Please confirm drawing scale.

There are no dimensions for these buildings to be demolished and this is the only way subcontractors can gauge the building sizes.

Government Response 3:

1. Site access along the existing pathways.

2. Limit of Disturbance is the building perimeter.

3. Site access is along the existing pathways.

4. No remediation required, leave the existing slab in place for each building as indicated on

CD001.

5. All HAZMAT information for all applicable buildings is included in the specifications. All ACM is to be removed as part of the building demolition as indicated in the specifications.

6. The scale bar on sheets CD002 and CD003 is accurate. On CD002 and CD 003, the statement "1 inch = 50 feet" is not accurate.

Question 4:

What are the depths of the existing wells in order to calculate decommissioning?

Government Response 4:

Well 35-MW-2 is 45 feet deep.

Well 35-MW-4 is 23.19 feet deep.

Question 5:

Drawing Sheet/Detail: C002 Drawing C-002 Demolition & removal notes 2 requires erosion control measures to be in place prior to performing land disturbance and note 3 states trees outside the limit of construction shall not be disturbed by construction equipment. These two notes have raised the following questions with regard to the demo of B36 (historical foundation):

1. What is the limit of disturbance for this site?

2. What is required for erosion control measures at this site & what is the site access.

3. What trees are to remain & what trees are to be removed in order to remove the foundations?

4. What site remediation is required after foundations are removed?

5. What is the size, depth, etc., of the foundations to be removed? there is no info on drawings.

The 2 notes have also raised the following questions with regard to the demo of building 1372:

1. what is the limit of disturbance for this site?

2. This site appears to be outside the erosion control depicted on CG701. What erosion control measures will be required.

3. What site remediation is required for this site?

4. Please verify where site access will be

Government Response 5:

B36:

1. Limit of Disturbance is the perimeter of the B36 foundation.

2. No erosion control required for foundation removal; no disturbed area beyond the foundation.

3. No trees are to be removed, only hand trimming is allowed in wetland areas.

4. No remediation of the site is required.

5. At the site walkthrough, it was noted the approximate plan dimensions of B36 foundation is 200' x 50'.

Building 1372:

1. Limits extend to N.G. Road as shown on the CD series.

2. Erosion control is part of the overall site, bid as shown on the erosion and sediment control series.

3. Refer to specifications for HAZMAT information.

4. Access building 1372 from South N.G. Road.

Question 6:

Drawing Sheet/Detail: SF1442 Please confirm that the offeror is to submit one (1) original and six (6) copies of Volume 1 – Technical Proposal AND (1) original and six (6) copies of Volume II - Price Proposal

Government Response 6:

Submit one (1) original plus six (6) copies of "VOLUME 1 – TECHNICAL PROPOSAL."

Also submit one (1) original plus six (6) copies of "VOLUME 2 - PRICE PROPOSAL AND

PRO FORMA INFORMATION."

Each volume will be submitted separately bound.

Question 7:

Drawing Sheet/Detail: civil We would like to request the Auto CAD drawings for use in calculating the earthwork.

Government Response 7:

CAD files will be provided after award.

Question 8:

Drawing Sheet/Detail: SF1442 Bid schedule reissued in amendment 3:

Item 008, as previously asked, we are unclear as to what you are looking for on this item. all the buildings/magazines are being provide in items 1-7, what's left???

Option items 0011 and 0012- will an allowance be provided for these items? We are totally unfamiliar with purchasing of "mitigation credits".

Government Response 8:

CLINs 0001 to 0007 include the cost to construct two buildings and five magazines. CLIN 0008 captures all other base scope project costs unattributed to a particular building or magazine including but not limited to: site clearing, earthwork/grading, paving, landscaping, stormwater retention infrastructure, etc.

This website provides general information on Mitigation Banks:

https://www.nj.gov/dep/opi/mitigation-banks.html Offerors must provide prices to purchase mitigation credits in accordance with the specifications noted in CLINs 0011 and 0012.

Question 9:

Drawing Sheet/Detail: civil the vendor for the infiltration tanks has advised that (1) additional tank is required to meet the NJ design requirements NJDEP storm water rule NJAC 7.8 can you please confirm Government Response 9:

Current design meets the NJDEP stormwater management requirements for Pre-development vs Post-development runoff and infiltration requirements.

Question 10:

Design Discipline: Architectural

Spec Section: 72200 Drawing Sheet/Detail: 2A-570 Please clarify the thickness of the glass matt gypsum sheating over the 1-1/2" metal deck.According to spec 072200/1.6.3 roof has to be FR rated, to achieve that we suggest to use 5/8" thick DensDenck instead of 1/2".

Government Response 10:

The drawings 1LS001 and 2LS001 indicate that there is no rating required at the roof of Building 1311 or Building 1312. In specification section 07 22 00, the paragraph 1.6.3 on fire resistance can be disregarded since this is not applicable to this project. The paragraph 1.6.2 Thermal Barrier Requirements applies to the glass mat roof board in question. This refers to IBC Chapter 26, paragraph 2603.4 Thermal Barrier which indicates that 1/2 inch gypsum board is required.

Provide 1/2 inch glass mat gypsum sheathing as noted on the drawings.