2019-07-17_RTA_SUBMITTAL_EOD_Picatinny__-_FULL_SET.pdf

PDF 41 MB Posted

Attached to
Explosive Ordnance Disposal Technical Facility, Picatinny Arsenal, New Jersey
Solicitation number
W912DS19R0021
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
ADDENDUM_08202019_21_13_26.01_64.pdf PDF
ADDENDUM_08202019_CU112.pdf PDF
ADDENDUM_08202019_CU101.pdf PDF
ADDENDUM_08202019_2FP501.pdf PDF
ADDENDUM_08202019_2FP001.pdf PDF
ADDENDUM_08202019_2FA101.pdf PDF
ADDENDUM_08202019_2FP101.pdf PDF
ADDENDUM_08202019_TOC_with_DELETION.PDF PDF
Amendment_0005.pdf PDF
ADDENDUM_08202019_21_13_13.00_10.pdf PDF
ADDENDUM_08202019_CU111.pdf PDF
ADDENDUM-08202019-CG701.pdf PDF
ADDENDUM_08202019_CG804.pdf PDF
ADDENDUM_08202019_CG802.pdf PDF
ADDENDUM_08202019_CG712.pdf PDF
ADDENDUM_08202019_CG805.pdf PDF
ADDENDUM_08202019_CG710.pdf PDF
ADDENDUM_08202019_CG711.pdf PDF
ADDENDUM_08202019_2A112.pdf PDF
ADDENDUM_08202019_CG803.pdf PDF
Amendment_0004.pdf PDF
ADDENDUM_08072019_-_Munitions_Building_Door_Hardware_.pdf PDF
ADDENDUM_08072019_-_Drawings.pdf PDF
ADDENDUM_08072019_-C-002.pdf PDF
01_22_00.00_10_PRICE_AND_PAYMENT.pdf PDF
ADDENDUM_08072019_-_SPEC_08_34_59_ARMORY_DOORS.pdf PDF
Sign-in_Sheet_for_Site_Visit.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
VisitorControlMap_20190227.pdf PDF
02_SITE_E.pdf PDF
01_GENERAL.pdf PDF
02_SITE_A2.pdf PDF
02_SITE_A1.pdf PDF
Amendment_0001.pdf PDF
02_SITE_C.pdf PDF
02_SITE_D.pdf PDF
05_MAGAZINES.pdf PDF
04_MUNITIONS.pdf PDF
02_SITE_B.pdf PDF
03_ROBOTICS.pdf PDF
EOD_RTA_Submittal_Register.pdf PDF
W912DS19R0021.pdf PDF
EOD_RTA_Drawing_Submittal.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTA SUBMITTAL SPECIFICATIONS

Explosive Ordnance Disposal (EOD) Technology Facility Picatinny Arsenal, NJ

Date:

July 15, 2019

Contract Number:

W912DS18D0005

Prepared For:

U.S. Army Corps of Engineers New York District

EOD Complex 016701 RTA Submittal

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 COVER SHEET

00 00 02 CHECK LIST FOR BIDDERS

00 10 00 SF 1442 AND BIDDING SCHEDULE

00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

00 22 10 TECHNICAL PROPOSAL DESIGN -BID-BUILD SELECTION PROCEDURES

00 22 20 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

00 24 00 EVALUATION FACTORS FOR AWARD

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 90 00 WAGE RATES

00 90 01 INSTALLATION REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 FACILITY DATA REQUIREMENTS

01 91 00.00 37 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

02 85 00 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

PROJECT TABLE OF CONTENTS Page 1

03 45 33 PRECAST STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL TRUSSES AND FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 34 02 BULLET-RESISTANT COMPONENTS

08 39 53 BLAST RESISTANT DOORS (OVAL ARCH MAGAZINES)

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 56 53 BLAST RESISTANT POLYCARBONATE WINDOWS

08 71 00 DOOR HARDWARE

ROBOTICS BUILDING HARDWARE SET NO. B1-01

MUNITIONS BUILDING HARDWARE SET NO. B2-01

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.01 64 RESINOUS FLOORING - STATIC DISSIPATIVE (CONC-2)

09 67 23.02 64 RESINOUS FLOORING - CONDUCTIVE (CONC-3)

PROJECT TABLE OF CONTENTS Page 2

09 67 23.13 03 STANDARD RESINOUS FLOORING (CONC-1)

09 90 00 PAINTS AND COATINGS

09 97 23 ABOVE-GRADE WATERPROOF COATING OF CONCRETE SURFACES

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 00.00 48 TOILET AND BATH ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 48 60 FIREARMS TRAINING EQUIPMENT

11 67 10 BAFFLE AND SAFETY CEILING SYSTEMS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 26.00 64 ULTRA HIGH SPEED DELUGE FIRE SUPPRESSION SYSTEM

21 13 26.01 64 PORTABLE ULTRA HIGH SPEED DELUGE FIRE SUPPRESSION SYSTEM

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 23 HYDRONIC PUMPS

23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR

OUTPUT)

23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 TERMINAL HEATING UNITS

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

PROJECT TABLE OF CONTENTS Page 3

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 10 APPARATUS INSPECTION AND TESTING

26 09 26 LIGHTING CONTROL SYSTEM AND CONTROL DEVICES

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00.00 40 SWITCHBOARDS AND SWITCHGEAR

26 27 13.10 30 ELECTRIC METERS AND MONITORING SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION AND ARC FLASH HAZARD

ANALYSIS

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE SYSTEM

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDIX A - FIELD INVESTIGATION REPORT

APPENDIX B - GEOTECH REPORT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION 00 00 01

COVER SHEET

01/18

PART 1 GENERAL

NEW YORK DISTRICT

CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

INVITATION FOR BIDS

FOR

Explosive Ordinance Disposal Technology Facility (EOD) Picatinny Arsenal, New Jersey

1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-18-D-0005

2. BIDS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 21 16 of this IFB).

5. REPRESENTATIONS AND CERTIFICATIONS - SECTION 00 45 00 Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

Within Section 00 45 00, note in particular the PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause

(1984 APR).

6. THIS PROJECT IS A MILTARY PROGRAM PROCUREMENT AND IS FUNDED BY THE

DEPARTMENT OF DEFENSE. BUY AMERICAN ACT - CONSTRUCTION MATERIALS (MAY

1993) IN ACCORDANCE WITH FAR 52.225-5 DOES NOT APPLIES.

7. Please review all bonds and accompanying documents required to be submitted. Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures and/or seals generated as part of a document, as opposed to being affixed to the document after its generation, will not be accepted. Submission of such documents may render the bid or offer

DOCUMENT 00 00 01 Page 1 non-responsive and ineligible for award.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

DOCUMENT 00 00 01 Page 2

SECTION 00 00 02

CHECK LIST FOR BIDDERS

01/18

PART 1 GENERAL

ATTACHED IS IFB NO. W912DS-18-D-0005

Explosive Ordinance Disposal (EOD) Technology Facility Picatinny Arsenal, New Jersey

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE

FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR OFFER INELIGIBLE FOR

AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED

TO THOSE LISTED BELOW. THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU

IN SUBMITTING A PROPER BID

____HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

____HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION

00 45 00) PORTION OF THE SOLICITATION?

____IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

____IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY

AND ARE ALL SEALS AFFIXED?

____DO THE BID BOND AND ACCOMPANYING DOCUMENTS BEAR SIGNATURES AND SEALS

AFFIXED AFTER THE DOCUMENT WAS GENERATED, AS OPPOSED TO COMPUTER

PRINTER-GENERATED SIGNATURES AND/OR SEALS?

____HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR OFFER BY ALTERING

THE PROVISIONS OF THE SOLICITATION?

____WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH PRICE ITEM?

(THE SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)

____ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES

LEGIBLE?

____IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY

INITIALED BY THE PERSON SIGNING THE BID?

____DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT ISA

SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID

OPENING TIME?

____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF

THE SOLICITATION.)

____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF

THE SOLICITATION.)

DOCUMENT 00 00 02 Page 1

NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K. JAVITS

FEDERAL BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE TIME IT TAKES

TO ENTER THE BUILDING. BIDDERS IS RESPONSIBLE TO ENSURE THAT ITS BID

IS SUBMITTED TIMELY.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 00 02 Page 2

SECTION 00 10 00

SF 1442 AND BIDDING SCHEDULE

03/18

PART 1 GENERAL

1.1 SF 1442 SOLICITATION, OFFER, AND AWARD

To be provided by Contracting Division.

1.2 BID SCHEDULE

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 10 00 Page 1

LEFT BLANK INTENTIONALLY

DOCUMENT 00 10 00 Page 2

SECTION 00 21 16

INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

09/16

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 21 16 Page 1

DOCUMENT 00 21 16 Page 2

SECTION 00 22 10

TECHNICAL PROPOSAL DESIGN -BID-BUILD SELECTION PROCEDURES

09/17

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 22 10 Page 1

DOCUMENT 00 22 10 Page 2

SECTION 00 22 20

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

09/17

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 22 20 Page 1

DOCUMENT 00 22 20 Page 2

SECTION 00 24 00

EVALUATION FACTORS FOR AWARD

06/17

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 24 00 Page 1

DOCUMENT 00 24 00 Page 2

SECTION 00 45 00

REPRESENTATIONS AND CERTIFICATIONS

09/16

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 45 00 Page 1

DOCUMENT 00 45 00 Page 2

SECTION 00 72 00

CONTRACT CLAUSES

09/16

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 72 00 Page 1

DOCUMENT 00 72 00 Page 2

SECTION 00 90 00

WAGE RATES

06/17

PART 1 GENERAL

1.1 NOTE:

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 90 00 Page 1

DOCUMENT 00 90 00 Page 2

SECTION 00 90 01

INSTALLATION REQUIREMENTS

04/19

PART 1 GENERAL

1.1 General Compliance

The contractor in prosecution of the contract, and all persons working at ARDEC in connection with the contract, including employees of the contractor and all subcontractors and suppliers, shall comply with all applicable Federal, State, and Local laws and regulations, and the applicable rules and regulations of ARDEC.

1.2 PRE- BID CONFERENCE AND/OR SITE VISIT, AND VISITOR AND CAMERA

REGISTRATION FORMS

Prospective offerors shall meet with Government representatives on a date to be determined in Building to be determined , Picatinny Arsenal, Dover, New Jersey, at time to be determined. There will be only one Site Visit for all prospective offerors. Prospective offerors shall register at least 3 business days prior to the date of the Site Visit by supplying the following information: Names of individuals attending and US citizenship status, associated company names, addresses and telephone numbers. Visitor access and camera forms shall not be faxed in.

These forms must be filled out and returned by email to Robert.T.Moran@usace.army.mil and Doug Leite (Douglas.F.Leite@usace.army.mil).

There will be only one (1) site visit for all prospective offerors.

Prospective offerors should arrive at least 120 minutes prior to Site Visit for processing in at the Main Gate Visitor Control Center. Visitors and/or vehicles will not be permitted access to Picatinny without prior registration and presenting the the following at the Visitor Control Center:

Employment Eligibility Form, INS Form I-9 (if not a US Citizen); Driver's License or other type of approved photo identification; Current vehicle registration, insurance, and DMV inspection sticker. Visitors who are picking up a camera pass may need to allow an additional one hour from their arrival time at the Main Gate before arriving at the meeting site.

It is requested that completed forms are emailed as soon as possible.

Camera pass request forms must be received at least 5 business days prior to the date of the Site Visit. Visitor request forms must be received at least 3 business days prior to the date of the Site Visit.

Important: Please also be advised that the Picatinny Security Office requires that camera passes are picked up before attempting to gain entrance to the Installation with the camera. This means a group coming in will check in at visitor control, then persons needing to pick up camera passes drive onto Installation (leaving camera with others in their party at the Visitor's Center parking lot), secure camera passes at Security Headquarters (Bldg 173), then return to the Visitor Control Center parking lot. Only then, once the pass is secured, will the camera be allowed onto the Installation. Failure to comply will result in delaying your access to the Installation and may also include confiscation of your camera equipment until your departure from the Installation.

DOCUMENT 00 90 01 Page 1

The Contractor is responsible to determine existing conditions of the site, and the buildings to be renovated.

Questions from bidders shall be submitted in written form, and sent to the following address:

_______________ (TBD) Contract Specialist Contracting Division US Army Engineer District, New York 26 Federal Plaza New York, NY 10278-0090

Responses to bidders questions will be issued by amendments.

Visitor Notification/Registration Form

a. (Form must be transmitted to Corps of Engineers via email, only to - Robert.T.Moran@usace.army.mil and Doug Leite .)

May indicate additional visitors here if all information below is the same for each visitor. Otherwise, submit new form (i.e. submit separate forms for Drivers and Passengers, etc.).

a. Visitor's Name(s):

1. ___________________

2. ___________________

Visitor's Employer:

Employer's Address:_____________ Employer's Tel. #:______________ Purpose of Visit: Site visit for BEC U.S. Citizen ? Yes: No:

Enclosure Access Needed ? Yes: No:

Duration of Visit:(Arrival date to end date) Will visitor have a vehicle ? Yes: No:

(If yes, fill-in vehicle info below) Vehicle Make:____________ Vehicle Model:___________ License Plate No:_________ Prime Contractor POC:___________ Government POC: Robert Tim Moran: 973-989-0802 Location of Work/Visit: Range 636

Notes:

1. All visitor requests must be submitted to the US Army Corps of Engineers office, POCs identified above, at least three (3) business days prior to the person(s)' scheduled visit to Picatinny. Failure to adhere to all requirements shall be cause for the Security Division to deny entrance the Installation.

2. Visitors should allow at least 2 hours once arriving at the main gate for processing at Visitor Control, vehicle search, and arrival at Site Visit. Processing time may be greater during the hours of 8-10am, so please plan ahead.

3. Status change in any information previously provided (including change in vehicle) to obtain a Visitor Pass/ID Badge shall render that Visitor

DOCUMENT 00 90 01 Page 2

Pass/ID Badge invalid, and shall require re-notification as indicated above, and re-processing at the Visitor Control Center.

4. If vehicle is a Government Vehicle or rental vehicle, just indicate this in the vehicle info blocks.

5. Government personnel with Government ID, need not register. Government personnel with Government ID; but, using their POV, must pre-register their POV as indicated above.

6. Visitors and/or vehicles will not be permitted access to Picatinny without prior registration and the following: Employment Eligibility Form, INS Form I-9 (if not a US citizen), Driver's license or other type of approved photo identification.

7. Vehicle operators must possess current vehicle registration, insurance, DMV inspection sticker, and driver's license.

(End of Visitor Notification/Registration Form)

Camera Pass Registration Form Cameras of any type, including video recorders and/or cell phone cameras, are prohibited within Picatinny without prior authorization via email at least five (5) business days in advance to

Name: Robert Moran Email: robert.t.moran@usace.army.mil Phone: (917)790-6260 Department: CENAN-CO-NP

PURPOSE FOR CAMERA: The person identified below is required to take pictures of the project site at Picatinny as part of proposal development for the BEC contract solicitation and will be using the camera at the Range 636 Area of the Installation. Request the following person be issued a camera pass for the period of date to be determined to date to be determined .

INDIVIDUAL'S NAME:

The camera information is as follows:

MAKE:______________________

1.3 COMPLIANCE

The Contractor in prosecution of the contract, and all Contractor employees working on the U.S. Army installation, Picatinny in the State of New Jersey, in connection with this contract, shall conform to all applicable local, federal or state laws and regulations, and published rules and regulations of the Departments of Defense and Army, as well as any applicable regulations promulgated by RDECOM-ARDEC and/or Picatinny, including but not limited to traffic regulations. Contractor employees and vehicles entering Picatinny are subject to search, and this may result in a wait of 15-30 minutes if traffic is heavy. Contractor employees may only gain enter Picatinny through the main gate and truck gate, which are accessed via Route 15.

Additionally, all contractor employees working on classified contracts shall comply with the requirements of the National Industrial Security

DOCUMENT 00 90 01 Page 3

Program (NISPOM) and Army Regulation 380-5, Department of the Army Information Security Program. The term "contractor employee" includes employees, agents, guests, or representatives and all employees, agents or representatives of all subcontractors and suppliers. Contractors are responsible for obtaining/returning identification badges /passes and vehicle decals/passes for each contractor employee who will work on the contract or enter Picatinny. The badges/passes/decals are required for the term of the contract until completion or until release of the employee.

Procedures are subject to change. Prior to bidding, the contractor(s) shall consult with the Security Division of ARDEC and be fully cognizant of any and all security requirements, which may be in addition to those listed herein. Prior to entering, and while on ARDEC, the contractor(s) shall be subject to random identification checks of personnel and searches of personnel, vehicles, and their content. The contractor should also be cognizant that if the Base implements heightened security measures, up to two hour delays should be anticipated for entry and deliveries to ARDEC, or areas within ARDEC.

a. To obtain proper identification, contractor employees requiring recurring access (more than 90 days), must complete an application identification form (SMCAR Form 3058) for access to the installation.

The form can be obtained from the Contracting Officer Representative (COR). The form must be signed by the COR and also identify the contract number and expiration date before the badge can be issued.

This form is brought to the Security Division, Badge and Identification Section, Visitor Control Center, for processing of proper identification required per terms of the contract. Badge & ID Office operating hours Monday through Friday are 0700 - 1200 hrs. Vehicle Decals shall also be obtained and displayed as required. Contractors requiring access for less than 90 days will be required to obtain a pass (Visitor Registration Form) from the Visitor Control Center at the Main Gate.

Passes will be issued for dates access is required, not to exceed 90 days. The contractor must notify the COR, and copy two members of the Resident Office staff, between 8:00 AM and 11:00 AM on the business day that precedes the day of arrival of any contractor employee without a valid badge/pass, seeking access to Picatinny (Notification outside of this timeframe is not acceptable). The notification shall be submitted via email and Fax Memo, and with an attached electronic visitor notification form (MS Word file). One visitor notification form per contractor employee. The visitor notification form shall include basic identification information, and shall be obtained from the COR. Some of the basic identification information required includes: Name, US Citizenship status, Employer name, address, telephone #, Vehicle make, model, license plate #. Status change in any information provided to obtain a visitor pass/ID Badge will render that visitor pass/ID Badge invalid, and require re-notification, and re-processing at the Visitor Control Center. The subject header of the email shall include the contract title, "visitor notification", and the arrival date of the visitors. Only one arrival date is permitted per email message and vice versa.

b. For the performance of this contract, the contractor shall employ only employees who are U.S. Citizens or Lawful Permanent Residents.

c. Before contractor employees and vehicles will be granted a vehicle decal, badge or pass, and be allowed to access/work on Picatinny, the contractor shall, at his own expense, furnish the COR and the Picatinny Security Division the following at the time of processing:

DOCUMENT 00 90 01 Page 4

i. Evidence of compliance with paragraph 1.4b above, including but not limited to supplying a copy of each employee's Employment Eligibility Form, INS Form I-9.

ii. A completed background check (including fingerprinting) by the New Jersey (NJ) State Police for NJ Residents, or a completed background check (including fingerprinting) by the State Police of the State that the contractor employee resides, or a completed background check (including fingerprinting) by the Federal Bureau of Investigation for Lawful Permanent Residents.

iii. Driver's license with photo, or other type of approved photo identification.

iv. Current vehicle registration, insurance, DMV inspection sticker, and driver's license.

v. Paper copy of the notification email and notification form, described above.

(d) Any delay in the furnishing of the above, including any delay in the obtaining of the background checks, is at the sole risk of the contractor and will not be the basis of any equitable adjustment or other change to the contract.

(e) The contractor shall utilize only qualified, responsible, and capable employees in the performance of the work on the contract. The Contractor shall not employ persons for contract work to be conducted on the installation who have criminal history. The Contracting Officer will require that the contractor remove from performance of work, employees who have a criminal history, endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of military security. Additionally, the TACOM-ARDEC Commander may bar such employees from the installation.

(f) The identification badge or pass issued to each employee of the contractor is for his own use only. Misuse of the badge or pass, such as permitting others to use it will result in criminal charges under Title 18 USC 499 and 701; and barring the employee from Picatinny.

Should the employee lose the badge or pass, the contractor may be charged for the cost of re-issuance of the badge or pass. Additionally, the employee and the contractor must submit a sworn affidavit as to the circumstances of the loss before a new badge or pass is issued.

(g) Fingerprinting of employee and any other procedure deemed necessary for the security of Picatinny may be required at the discretion of Picatinny Security.

1.3.1 Badge

All contractor employees, while on the premises at Picatinny, shall continually wear the badge, obtained pursuant to above procedures. The badge shall be worn so as to be visible to others at all times. Individuals issued passes will have on their person the pass. Passes will be presented upon request by Security personnel or other government official charged with security of the area.

All contractor employees meeting with Government employees or attending meetings at Picatinny, shall, at the beginning of the meeting, announce to all other attendees that they are contractor employees, employed by (Name of Contractor's name/address), and the name of all other companies or

DOCUMENT 00 90 01 Page 5 individuals that currently employs them or that the contractor employee currently represents. In addition, contractor employees shall wear a visible badge that displays their company's name. If a visiting contractor is working on a classified contract his/her visit request with security clearance information must be approved by the RDECOM-ARDEC Industrial Security Specialist and be held on file the RDECOM-ARDEC Security Division.

Government employees hosting meetings will verify the contractor employee's security clearance information is on file in the RDECOM-ARDEC Security Division prior to contractor access to classified information.

When the contract number under which the badge / pass was obtained is completed (date of last delivery or performance of last service, termination of the contract or release of the employee) including any exercise of an option pursuant to the terms of the contract is completed, the contractor shall return the badges / passes for all of their employees to Picatinny Security and obtain a receipt for each within (3) three business days.

Failure to comply with the above requirements will be grounds for withholding any funds due the contractor until completion of the requirement, notwithstanding any other clause or requirements in the contract. Failure to comply may also be used as an adverse factor with respect to contractor past performance in connection with award of future contracts to the firm.

If the contractor obtains a new or follow-on contract for work at Picatinny Arsenal, he shall obtain new badges / passes for each of his employees indicating the new or follow-on contract number and comply with the applicable provisions of the follow-on contract which cover the subject matter of this Clause. This paragraph does not apply to the exercise of an option.

The contractor and each contractor employee working on Picatinny shall sign a Non-disclosure Agreement on their company's letterhead prior to commencing work under the contract or obtaining the badges / passes required by subparagraph 1.4 above. There will be one Non-disclosure Agreement for each employee. The Non-disclosure Agreement shall be in the format indicated below.

The COR/Government Point of Contact (POC) shall coordinate the contractor's obtaining and returning of badges / passes and signature of the Nondisclosure Agreement. The contractor shall furnish, before initiating work under the contract, the COR/Government POC two (2) copies of each fully completed, signed, SMCAR 3058 and non-disclosure statement for each contractor employee. One copy shall be maintained in the COR/Government POC file. The COR/Government POC shall furnish the other copy to the Contracting Officer for inclusion in the official contract file.

Before any contractor employee can be given access to "non- public information" (as defined below) there must be a signed, written agreement between the recipient contractor/contractor employee and the owner of the non-public information. A copy of the agreement will be made a part of the contract file.

Format for Non-Disclosure Agreement

I, ____________________, an employee and authorized representative of ___________________________________________________________, a Contractor providing support services to Picatinny or its tenants (hereinafter PICATINNY), and likely to have access to nonpublic information

DOCUMENT 00 90 01 Page 6

(hereinafter RECIPIENT), under contract number ______________________, agrees to and promises the following:

WHEREAS RECEIPIENT is engaged in delivery support services to PICATINNY under contract; and WHEREAS, It is the intention of PICATINNY to protect and prevent unauthorized access to and disclosure of nonpublic information to anyone other than employees of the United States Government who have a need to know; and, WHEREAS, PICATINNY acknowledges that RECIPIENT will from time to time have or require access to such nonpublic information in the course of delivering the contract services; and, WHEREAS, RECIPIENT may be given or other have access to nonpublic information while providing such services;

and, WHEREAS, "nonpublic information" includes, but is not limited to such information as: proprietary information (e.g., information submitted by a contractor marked as proprietary); advanced procurement information (e.g., future requirements, statements of work, and acquisition strategies);

source selection information (e.g., bids before made public, source selection plans, and rankings of proposals); trade secrets and other confidential business information (e.g., confidential business information submitted by the contractor); attorney work product; information protected by the Privacy Act (e.g., social security numbers, home addresses and telephone numbers); and other sensitive information that would not be released by Picatinny under the Freedom of Information Act (e.g., program, planning and budgeting system information);

NOW THEREFORE, RECIPIENT agrees to and promises as follows:

RECIPIENT shall not seek access to nonpublic information beyond what is required for the performance of the support services contract;

RECIPIENT will ensure that his or her status as a contractor employee is known when seeking access to and receiving such nonpublic information of Government employees;

As to any nonpublic information to which RECIPIENT has or is given access, RECIPIENT shall not use or disclose such information for any purpose other than providing the contract support services, and will not use or disclose the information to any unauthorized person or entity for personal, commercial, or any unauthorized purposes; and

If RECIPIENT becomes aware of any improper release or disclosure of such nonpublic information, RECIPIENT will advise the contracting officer in writing as soon as possible.

The RECIPIENT agrees to return any nonpublic information given to him or her pursuant to this agreement, including any transcriptions by RECIPIENT of nonpublic information to which RECIPIENT was given access, if not already destroyed, when RECIPIENT no longer performs work under the contract.

RECIPIENT understands that any unauthorized use, release or disclosure of nonpublic information in violation of this Agreement will subject the RECIPIENT and the RECIPIENT's employer to administrative, civil or criminal remedies as may be authorized by law.

RECIPIENT: _____________________________ (signature)

PRINTED NAME: _________________________

TITLE: __________________________________

EMPLOYER: ______________________________

PART 2 PRODUCTS

Not Used

DOCUMENT 00 90 01 Page 7

PART 3 EXECUTION

Not Used

DOCUMENT 00 90 01 Page 8

DOCUMENT 00 90 01 Page 9

Visitor Access

Duty Hours: M-F 0700-1500

□ Sponsors submit request in Visitor Net

□ Visitor completes NCIC form

□ Visitors/sponsor submits NCIC form to:

usarmy.pica.usag.mbx.visitor center@mail.mil, kevin.m.goodwin10.civ@mail.mil & gregory.p.hale.civ@mail.mil

OR

Bring the completed form to the VCC

□ Visitor goes to VCC to turn-in/pickup pass

NOTES:

After Hours

M-F 1500-0700/Weekends/Holidays

□ Sponsors call Main Gate@ 973-724-4579 to announce visitor arriving

□ Visitor shows up at Main Gate with or without NCIC form complete (more time to process without)

□ NCIC check is conducted via telephone to

Police Desk

• Receive Pass periodically

• NOTE: If not previously cleared processing time could take up to 10-20 Minutes.

• Groups of 10 or more submit NCIC check 5-10 days in advance.

• Background checks are now good for 1 year.

LTC Jeffrey E. Ivey/ IMPI-ZA / DSN 880-7011 / jeffrey.e.ivey.mil@mail:l'Tlil

UNCLASSIFIED

1 of Date TimeGroup - Arial 8

Notification

DEPARTMENT OF THE ARMY

UNITED STATES ARMY INSTALLATION MANAGEMENT AGENCY

PICATINNY ARSENAL, NEW JERSEY 07806-5000

Notification and Authorization to Release Criminal Information for Entry

For the purpose of accessing Picatinny Arsenal I am required to consent to a criminal background check as a condition of being granted access. This check includes the following:

Criminal history reference searches for felony and misdemeanor convictions at the county and federal levels of every jurisdiction where I currently reside or where I have resided during the past 7 years; and sex offender registry searches at the county and federal levels in every jurisdiction where I currently reside or where I have resided. If I decline to submit to a Criminal background check I understand that I will be denied access to Picatinny Arsenal.

Authorization I hereby authorize Picatinny Arsenal to conduct the criminal background check described above.

I also am aware that records of arrests on pending charges and/or convictions are not an absolute bar to entrance to Picatinny Arsenal. Such information will be used to determine whether the results of the background check reasonably bear on my ability to enter in a manner which is safe for Picatinny Arsenal visitors, employees, and other community members.

Please print (for identification purposes):

Full Legal Name: __________________________ _ First Middle Last

Other Names You Have Used in Past Seven Years: -----------------

Current Address: ____________________________ _

Previous Address (most recent): _______________________ _

Addresses in the 7 years prior to completing this authorization: ____________ _

Phone Number: __________ _ Alternate Phone Number: ______ _

Date of Birth: __________ _ Gender: Female-=l==-=---1 __ Male D Month/DayN ear

Place of Birth Social Security Number: ______ _

Driver's License# ____________ _ State of Driver's License ____ _

Have you ever been convicted of a criminal *offense or have any pending criminal* charges against you?

*This refers only to felonies and misdemeanors; you do not need to include non-criminal traffic violations or municipal ordinance violations.

Yes D (provide detail on bottom of page) No D To the best ofmy knowledge, the information provided in this Notice and Authorization and any attachments thereto is true and complete. I understand that any falsification or omission of information may disqualify me for entrance and/or may serve as grounds for denial of entry to Picatinny Arsenal. By signing below I hereby provide my authorization to Picatinny Arsenal to conduct a criminal background check. In addition, I understand that I have a right to appeal an adverse decision made by Picatinny Arsenal based on my background check information.

Signature Date

Individual is cleared for entry to Picatinny Arsenal

Yes: L_ I No: [ II

Army Corps of Engineers – Picatinny Residency Visitor Notification/Registration Form

Visitor’s Name(s):

Visitor’s Employer:

Employer’s Address:

Employer’s Telephone #:

Purpose of Visit:

Location of Work / Visit:

U.S. Citizen? Yes: No:

Enclosure Access Needed?

Yes: No:

Duration of Visit:

(Arrival date to end date) Will visitor have a vehicle?

(If yes, fill-in vehicle info below)

Yes: No:

Vehicle Year & Make:

Vehicle Model:

License Plate No:

Prime Contractor POC:

Name of Government POC Office of Government POC Phone # of Government

POC

Location of Government

POC

Please note that all visitor requests must be submitted at least 48 hours prior to the scheduled visit to Picatinny Arsenal. Failure to adhere to all requirements shall be cause for the Security Division to deny entrance the base.

Note: Visitors and/or vehicles will not be permitted access to Picatinny Arsenal without prior registration and the following: Employment Eligibility Form, INS Form I-9 (if not a US citizen), Driver’s license or other type of approved photo identification. Vehicle operators must possess current vehicle registration, insurance, DMV inspection sticker, and driver’s license.

Cameras of any type are prohibited within Picatinny Arsenal without prior authorization via email (4 days in advance). (Info required: Name of person operating camera, location and purpose of photos, camera make, model #, and serial #).

Request for a Visitor Camera Pass

1. Name, address, and phone number of the Government Representative who is sponsoring the

Visitor.

Name: Robert Moran Email: robert.t.moran@usace.army.mil Phone: (917)790-6260 Department: CENAN-CO-NP

2. Name of the person who will be issued the Visitor Camera Pass.

3. Name & address of the Company the Visitor represents.

4. Name of the Area(s) at Picatinny in which the Visitor will be taking photos.

5. Dates for which the Visitor Camera Pass will be issued.

6. Purpose of photos:

7. Camera Information:

a. Manufacturer.

b. Model Number.

c. Serial Number of the Camera.

Submit the above information as soon as you are aware that a visitor would like to obtain a Visitor Camera Pass, AT LEAST 4 DAYS IN ADVANCE OF ANTICIPATED NEED. To follow up on the status of the Visitor Camera Pass, Police Chief and Deputy Cheif may be reached at

(973) 724-6666. Once the Visitor’s Camera Pass is processed, it may be picked up at the Police Headquarters located in the basement of Building 173.

Picatinny: Driving Directions Pagel of3

Newark International Airport (EWR)

,. From the airport, bear feft at main exit to I-78 westbound {follow sigm

78 westbound) .

., Exit I-78 westbound to Route 24 westbounrl.

• Exit Route 24 westbound to I-287 northbound.

" Exit I-287 northbound to 1·80 westbound.

• Exit I-80 westbound at Exit 34 to Route 15 northbound (Sparta & Pleat Arsenal).

" Go through traffic light, bear right to Plcatlnny Entrance (up small hill) underpass.

• Stop at the Visitor Control Building on your left before the gu11rd shack

JFK International Airport (JFK)

• From the airport, exit to Nassau Expressway westbound.

m Exit Nassau Expressway westbound to Shore Parkway (Belt System) westbound.

" Exit Shore Parkway westbound to I-2.78 westbound to Verrazano Narrc

Bridge.

<> Exit I-278 westbound to I-95 northbound.

" Exit 1-95 northbound to I-78 westbound.

" Exit I-78 westbound to Route 24 westbound.

" Exit Rowte 24 westbound to I-2.87 northbound.

" Exit I ·2.87 northbound to I ·SO westbound.

" Exit I-80 westbound at Exit 34 to Route 15 northbound (Sparta & Pica!

Arsenal) .

., Go through traffic light, bear right to Picatinny Entrance (up small hill) underpass.

• Stop at the Visitor Control Building on your left before the guard shack http://w4.picaarmy miVPicatinnyPublic/about/visitors_guide/directions.asp 4/3/2008

Picatinny: Driving Directions Page2 of3

Allentown-Bethlehem-Easton Airport (ABE)

" From the airport, exit to Route 22 eastbound.

" Exit Route 22 eastbound to Route 33 northbound.

• Exit Route 33 northbound to I-80 eastbound.

• Exit I-80 eastbound at Exit 34 (to Wharton & Picatinny Arsenal) in Nev>

Jersey.

• Bear light at exit, go underneath I-80 overpass.

" Go straight at traffic light, bear right at fork (small shopping center on

" Go underneath overpass, through traffic light, bear right to Picatinny

Entrance (up small hill).

" Stop at the Visitor Control Building on your left before the guard shack

South JERSEY (SOUTH) o Take the New Jersey Garden State Parkway- NORTH .

., Exit I-280 westbound to 1-60 westbound.

" Exit 1-80 westbound at Exit 34 to Route 15 northbound (Sparta &. Plea!

Arsenal).

" Go through traffic light, bear right to Picatinny Entrance (up small hill) underpass.

• Stop at the Visitor Control Bulldlng on your left before the guard shack

NorthJERSEY(NORTH)

• Take the New Jersey Garden State Parkway SOUTH.

" Exit I-280 westbound to I-SO westbound.

" Exit I-80 westbound at Exit 34 to Route 15 northbound (Sparta & Pical

Arsenal).

• Go through traffic light, bear right to Picatim1y Entrance (up small hill) underpass.

" Stop at the Vlsitor Control Building on your left before the guard shack http://w4.pica.army.mil!PicatinnyPublic/about/visitors~de/directions.asp 4/3/2008

(End of Summary of Changes)

Picatinny: Driving Directions Page 3 of3

Aberdeen, Maryland

• Take I-95 North to 1-295 towards NJ Turnpike.

• Take NJ Turnpike North to Exit 10 for 1-287 North.

" Take I-287 North to I-80 West. Follow directions for i-80 West.

" Exit I-80 westbound at Exit 34 to Route 15 northbound (Sparta & Pica!

Arsenal).

e Go through traffic light, bear right to Picatinny Entrance {up small hill) underpass.

" Stop at the Visitor Control Building on your left before the guard shack

Watervliet, New York

" Take I-87 (NY Thruway) South.

" Take Exit 15 for I-287. Continue for approximately 15-miles for Exit to

287 South.

• Take I-287 South to I-80 West. Follow directions for 1·80 West.

• Exit I-80 westbound at Exit 34 to Route 15 northbound {Sparta & Pica!

Arsenal).

• Go through traffic light, bear right to Picatinny Entrance {up small hill) underpass.

• Stop at the Visitor Control Building on your left before the guard shack http://w4.pica.army.mil/PicatinnyPublic/about/visitors _guide/ directions.asp 4/3/2008

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor shall be required to (i) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than 730 calendar days after the date the Contractor receives the notice to proceed. In addition, the Contractor is required to have Room 106 in Building 1311 and Room 111 in Building 1312 to be complete with all finishes and environmental controls in place not later than 670 days after the date the Contractor receives Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

b. All work shall be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.

c. Contract requirements may be specified, in part or in whole, within the Solicitation package, referenced Codes and other publications. Restating of a requirement (in part or whole) does not relieve the Contractor of full compliance with all parts of the Solicitation package, referenced Codes and other publications, as well as, all parts of requirements, below. The contractor shall comply with the mandatory and advisory criteria of all contract-referenced Codes and publications except, when inter-related and/or conflicted requirements are encountered, the more stringent contract requirements shall govern. All contract requirements shall be implemented, and adhered to, by the Contractor and at the Contractor's expense. Unless specifically stated otherwise, all items and work required to complete the contract shall be provided and performed by the contractor.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes construciton of Explosive Ordnance Disposal Technology Facility to include the following and incidental related work.

1. Munitions Disassemly Facility

2. Robotics Exp/Field Office

3. Long Term Storage Magazine

4. Supporting facilities and incidental related work.

1.2.2 Location

The work is located at the 1300 Area and 1500 Area of Picatinny Arsenal, New Jersey, approximately as indicated. The site of the work is on a

SECTION 01 11 00 Page 1 military reservation and all rules and regulations issued by the Commanding Officer covering general safety, security, and sanitary requirements, etc., shall be observed by the Contractor. The exact location is indicated within the project construction drawings.

1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS

This project is estimated between $10 Million to $50 Million.

1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING

Do not inflict damage upon land and properties outside the authorized construction area by unwarranted entry upon, passage through, damage to, or disposal of, material on such land or property. The Contractor may make a separate agreement with any other party, regarding the use of, or right to, land or facilities outside the contract area. If such an agreement is made, it must be in writing and a copy shall be provided to the Contracting Officer. The Contractor must hold and save the Government, its officers, and agents free from liability arising from trespassing or damage occasioned by his operations.

1.5 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

c. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to the existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone).

d. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

1.6 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

No excavation whether minor or major including trenching, sidewalk replacement, etc. will be permitted without an approved digging permit.

Contractor shall apply for renewal of work permits as required if the work continues beyond the original permit expiration date. Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a

SECTION 01 11 00 Page 2

Monday or after a Holiday.