W16ROE91824887
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to:
1. Revised and reissue draw ings 2FA101, 2FP001, 2FP101, 2FP501, CU101, CU111 and CU112
2. Revise and reissue specification Section 21 13 13.00 10 and Section 21 13 26.01 64
3. Extend Proposal due to 05-Sep-2019 at 04:00 PM EST Time 4.Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.
NOTE: Off eror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURETO ACKNOWLEDGE AMENDMENTS BY THE DATEAND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THESUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19R0021
X 9B. DATED (SEE ITEM 11)
26-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 05-Sep-2019 02:00 PM to 05-Sep-2019 04:00 PM.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
AMENDMENT 0005
Explosive Ordnance Disposal Technology Facility, Picatinny Arsenal, NJ
W912DS-19-R-0021
Amendment 0005
To Offerors The purpose of this amendment is to make the following changes to the solicitation.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
2FA101
2FP001
2FP101
2FP501
CU101
CU111
CU112
2. The following DRAWINGS have been ADDED:
None.
3. The following DRAWINGS have been DELETED:
4. The following DRAWINGS have been REVISED but NOT REISSUED:
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
None.
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
None.
3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED:
Section 21 13 13.00 10 Section 21 13 26.01 64 Specifications Table of Contents
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
OFFERORS’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors for information only and do not revise the solicitation, plans, or specifications.)
Question 1:
Please provide the small business contracting goals, if any.
Government Response 1:
We do not have small business subcontracting goals on this project. However, a large business prime contractor will be required to submit a subcontracting plan IAW FAR 52.219-8 and FAR 52.219-9. Subcontracting plan goals should be realistic and fair based on the type of work to be performed.
Question 2:
Please allow Offerors to submit CCASS/CPAR evaluations and existing PPQs. Some of our clients refuse to fill out PPQs if they have already provided previous evaluations.
Government Response 2:
Regarding EVALUATION FACTOR 2 - CONTRACTOR PAST PERFORMANCE:
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or "neutral") past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered "acceptable."
However, the Government may review any known source of information for evaluating past performance.
Question 3:
1. There are a few meters in this project, particularly in the Robotics job, that reference communicating with the existing BAS System. Cannot find specifics on existing metering. Is there more information on this?
2. Please confirm all underground conduit and conduit duct bank can be schedule 40 PVC
3. Please confirm electrical contractor(EC) is only to F/I conduit stub-up and conduit raceway (where required) for tele/communications and security. All cabling, devices and equipment is by others.
4. Is the EC responsible for SREC charges/cost to perform their work on this project?
5. Firing Tunnel in the Robotics building, can the conduit raceway for power and lighting be
EMT?
Government Response 3:
1. All power electric meters are to be interfaced/communicate to the new BAS DDC Panel(s) to report demand usage. Please reference Sht. 1EP-601, Notes 4&5. Also, reference Spec Section 26 27 13.10 30. Specific requirements are to be coordinated with the specific new BAS DDC controls system utilized on this project as indicated on Sheet 2M-702.
2. Underground conduit and conduit duct bank conduit can be schedule 40 PVC. See specifications 33 70 02. 00 1 - Paragraph 2.6.
3. For security, access control, and intrusion detection systems, the Contractor shall provide only conduit infrastructure. The Contractor shall provide inside plant telecommunications which includes all cabling, devices and equipment. Outside plant telecommunications cabling will be provided by the Owner. Bid as shown on the drawings and specifications.
4. The Government pays a fee directly to SREC for the permanent electrical utility installation/construction. The Contractor pays the service application fees as noted in SECTION 01 50 00 - 3.6.2 TEMPORARY AND PERMANENT POWER. The Contractor would need to pay SREC to install/build any temporary electrical utility per SECTION 01 50 00 - 3.6.1
TEMPORARY UTILITIES.
5. All exposed conduit in the Firing Tunnel shall be rigid galvanized steel. Reference is made to Spec Section 26 20 00, pars. 3.1.5.1(g) and NFPA 70, which does not permit EMT where subject to physical damage.
Question 4:
There are no height dimensions given for the Storm Infiltration Tanks. We have scaled the each of the 4 units and were able to derive heights based upon the given volumes for each. The problem is Tanks 2 and 3 will end up sticking out of the ground by our calculations. Is there an available dimensions, scale-able drawings or a minimal cover requirement for these tanks?
Government Response 4:
The Contractor shall provide underground infiltration tanks in accordance with chapter 9.5 of the New Jersey Stormwater Best Management Practices Manual as noted on sheet CG112. The detail represents a generic infiltration tank, the overall dimensions and installation procedures will be dependent on the manufacturer selected.
Question 5:
Spec Section: 00 45 00 The response to ProjNet Bidder Inquiry 8136651 provides the minority goals and not the small business goals as the question asked. Please provide the small business contracting goals, if any.
Government Response 5: Small business Subcontracting goals will addressed upon review of Subcontracting Plan by the government.
(End of Summary of Changes)