W912BU22B0018 Amendment 3.pdf
PDF 398 KB Posted
- Attached to
- New Crane Barge Federal contract opportunity
- Solicitation number
- W912BU22B0018
About this file
This document contains an amendment to an invitation for bid for the procurement of a new crane barge. The amendment provides answers to questions received from potential offerors. It clarifies requirements for the crane barge such as the need for two diesel air compressors, specifications for barge winches and vent pipe sizes. It also revises language around the spud handling system and spud winch performance requirements. The amendment is intended to provide additional information to assist offerors in preparing bids, which are due by email to the specified contracting officer by August 29th, 2022 at 10:00am EDT.
View the file
Other files for this federal contract opportunity
Show all 50
New Crane Barge has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912BU22B0018
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to publish answ ers to questions received to date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU22B0018
X 9B. DATED (SEE ITEM 11)
29-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2022
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 1 QUESTIONS
Solicitation #W912BU-22-B-0018 for Amendment #1 Questions and answers:
Question #1 For CLIN 0001AE and CLIN 0001AF – Clause C550 Spuds – the clause details out options for one set of spuds (two spuds are a set). Does the contractor assume that the associated equipment with the items that operate the spuds should also be included in the option pricing? This equipment would include the spud well, the spud winches, sheaves, winch VFD, and foundations.
Answer to #1:
Clause C550 in the solicitation defines the work required to fabricate and install two, separate, sets of spuds for the barge. Should the Government choose to exercise one or both options (CLIN 0001AE and/or CLIN 0001AF), then the contractor shall provide the spuds in accordance with the requirements of Clause C550.
Clause C552 Spudwell Installations and Clause C554 Spud Handling System define the work to be performed as part of the base contract, and these items are not options. The spudwells (four) and the spud handling equipment (four) are required by the Government regardless of whether option CLIN 0001AE and/or option CLIN 0001AF are exercised by the Government.
Question #2 Contract drawing 866-B637-01 does not clearly define a pump or pump(s) for the waste oil system. Please define if a pump or pump(s) are required as part of the waste oil system?
Answer to #2:
Clause C637 requires the contractor to prepare a system drawing during the Engineering Phase of the contract that reflects the equipment selected by the contractor for installation on the barge. Drawing #866-B637-01 defines that individual pumps are required with each generator set. The contractor may supply pumps with each generator as shown on the contract drawing or supply a pump or pumps for the complete system based on his system drawing developed during the Engineering
AMENDMENT 2 QUESTIONS
Solicitation #W912BU-22-B-0018 for Amendment #2 Questions and answers Question #3 – On drawing #866-B410-02, Towknees, Rub Rails, & Fenders listed in Clause C410 Hull Outfit, the drawing shows the four corners of the barge being outfitted with 1 inch by 12 inch hardwood rubbing strips. When these strips are scaled from the drawing, they are shown to be 6 inch by 12 inch. Please confirm the size of these wood strips.
Answer to #3:
The four corners of the barge shall be outfitted with 6 inch by 12 inch hardwood rubbing strips.
Question #4 – Would the Corps consider a bolting detail for the hull side shell fenders similar to that shown for the bow/stern fenders?
Answer – The Government will accept using a horizontally mounted fender detail depicted in Detail 2-12A on drawing #866-B410-02, sheet #2, in lieu of Detail 2-11A on the same drawings and sheet. If utilizing Detail 2-12A in lieu of Detail 2-11A, the fender type (10 inch by 10 inch rubber with UHMWPE face) shall be utilized with the bolting detail.
Question #5 – the specifications and drawings are not clear on whether the fairleads should be balanced head fairleads or roller fairleads as listed in contract Clause C420.
Answer – The fairleads for the barge shall be in accordance with contract drawing #866-B420- 01, revision 2 for maximum wire size of ¾ inch.
Question #6 – For the spud handling system, the sheaves are specified as bronze bored, equipped with roller bearings. There appears to be two different sheave designs. Please clarify.
Answer – There are two different sheave designs. The deck sheaves shall be 30 inch, and the spud sheaves shall be 36 inches.
Question #7 – Spud winch performance (from Clause C554, paragraph C) – in the near freefall mode, the winch shall be designed to automatically arrest the rotation of the drum in less than 1/4 rotation of the drum once the spud hits the bottom. Thereby preventing unspooling of the wire.
To meet this requirement, would the Government accept slack rope detection using hydraulic thrusting actuators? This would reduce the chance of bird nesting, but not necessarily meet the requirement of the ¼ rotation. Please advise if this is acceptable.
Answer – The Government requires that there shall be no unspooling of the wire from the spud winch drums once the spuds hit bottom. Based on the contractor’s final selection of the spud winches, either method of automatically arresting the rotation of the drum in less than ¼ rotation or the use of hydraulic thrusting actuators is acceptable to prevent bird nesting of the wire.
Question #8 – Spud winch requirements – based on feedback from winch suppliers, the requirements appear to have mixed performance and horsepower from two different winch types. There are also questions on the rated line pull and speeds.
Answer – The Government has reviewed the spud winch requirements based on all of the questions received. Drawing #866-B522-02 has been marked up to clarify the winch requirements. Contract Clause C554 – Spud Handling System has been revised as well to clarify the requirements. The revised drawing and specifications shall be used for bidding proposes.
C554 SPUD HANDLING SYSTEM REVISED AS PART OF AMENDMENT #2
A. CONTRACT DRAWINGS
866-B215-01 GENERAL ARRANGEMENT
866-B330-02 MACHINERY & WINCH FOUNDATIONS
866-B522-02 SPUD HANDLING SYSTEM ARRANGEMENT
866-B550-03 SPUD WINCH SIZING CALCULATIONS
B. GENERAL REQUIREMENTS
The contractor shall provide and install four (4) electric spud winches in the locations shown on the contract drawings. The contract shall update the drawings during the Engineering Phase. The updated drawings (#866-C522-02 and #866-C550-03) shall reflect the equipment selected by the contractor. The drawings shall be submitted to the COR for review.
The winches shall be electrically powered through Variable Frequency Drives (VFD’s). See contract Clause C750, MOTORS & CONTROLLERS for system requirements.
All sheaves in the spud handling system shall be bore sheave type with SAE 660 bronze bushings for the spud sheaves and roller bearings for the deck sheaves. Sheaves shall be as shown on the contract drawing and as determined by the contractor during the Engineering Phase.
The winches shall be provided with wire rope installed for spud operations. The winch wire shall be 6 strand x 19 wire (6x19) Independent Wire Rope Core (IWRC), Extra Improved Plow Steel (EIPS). The contractor shall provide the COR with a “Certificate of Examination and Test of Wire Rope Before Being Taken Into Use” (U.S. Department of Labor – Occupational Safety and Health Administration Form No. 5) for each continuous run of rope installed on the winches. The certification shall be performed to the requirements of 29 CFR, part 1919 and be in accordance with the requirements of 29 CFR 1918.
Suitable guards shall be provided around exposed wire rope for personnel safety, and painted yellow. Keepers shall be provided to prevent the wire rope from jumping off the sheaves due to slackness of the wire.
Each spud winch shall be mounted to a heavy steel foundation to be designed by the contractor as per contract clause C330.
C. SPUD WINCH PERFORMANCE
Each spud winch system shall be capable of developing a full drum single line pull of 17,500 lbs.at a minimum line speed of 45 ft./min. The line pull shall increase to 46,000 lbs. at or near zero line speed, to assist in removing the spuds buried in the bottom soil. Each winch shall have a minimum drum capacity for 200 feet of wire rope, based on using 1-1/4 inch wire rope. The ratio of barrel drum diameter to wire rope diameter shall not be less than fourteen. The design shall ensure easy spud line replacement.
The spud winches shall have infinitely variable speed power up and power down, and a near free fall lowering capability. The winches shall be equipped with brakes rated at twice the spud dry weight of holding force. The brakes shall automatically set when:
there is any failure in the electric system powering the winch and the control lever is in the center position. Unless moved by the operator, the winch control handle shall always be in the center position.
In the near freefall mode, the winch shall be designed to automatically arrest the rotation of the drum in less than ¼ rotation of the drum once the spud hits the bottom, thereby preventing un-spooling of the wire.
The spud winches shall also be provided with a weekend/unattended mode, consisting of a manually-operated jaw clutch capable of completely disconnecting the drum from the drive train, to permit wire to payout as river level rises. The system shall be kept under tension in order to prevent excessive slack wire should the river level fall.
AMENDMENT 3 QUESTIONS
Solicitation #W912BU-22-B-0018 for Amendment #3 Questions and answers Question #9 – Compressed Air System – clause C690 Compressed Air System states that one electric air compressor and one diesel driven air compressor will be required under the contract. However the contract drawings issued with the solicitation identify two diesel driven air compressors are required. The contract drawings in question include drawings #866-B330-02, #866-B630-01, #866-B640-01, #866-B650-01 and #866-B690-01. Please define the requirements for the air compressors for the compressed air system.
Answer to #9: The air compressors shall be supplied in accordance with clause C690- paragrtaph B. The ship service system compressor shall provide a minimum of 18.8 CFM at 100 psig, and this compressor shall be electric driven. The main deck system shall be diesel driven with the compressor capable of providing 210 CFM at 100 psig.
Question #10 – Barge Winches – In clause C456 of the solicitation, the specifications require four 7.5 HP, electric powered, standard deck winches. A review of four manufacturers of standard deck winches shows that none of the standard winches available meet with the requirements outlined in the solicitation. Please clarify the barge winch requirements.
Answer – The requirements for the barge winches shall be as follows:
Each barge winch shall be 7.5 HP, electric powered, standard deck winches set up for 480 volt AC, 3-phase, 60 Hz service. Each winch shall have a line pull 1st wrap of 12,800 lbs., line speed 1st wrap of 16 fpm, stall pull 1st wrap of 52,000 lbs., dog holding capacity of 130,000 lbs. and brake holding capacity of 82,000 lbs. The balance of the requirements in clause C456, paragraph B remain unchanged and remain applicable for this solicitation.
Question #11 – On drawing #866-B670-01- Vents, Sounds, Overflows & Fills, in the Pipe Material Schedule, should the 2 inch vent pipes be schedule 160?
Answer – The 2 inch vent pipes shall be schedule 80, seamless carbon steel, ANSI B36.10.
Question #12 – On drawing #866-B670-01- Vents, Sounds, Overflows & Fills, in Detail 20-A (zone 17-D), is it the Government’s intent to locate the Lube Oil\Waste Oil Filling\Discharge Connections 192 inches above the main deck?
Answer – The Lube Oil\Waste Oil Filling\Discharge Connections should be located 24 inches above the main deck.
(End of Summary of Changes)